CN205777332U - A kind of vertical drain outlet system of construction of super highrise building - Google Patents

A kind of vertical drain outlet system of construction of super highrise building Download PDF

Info

Publication number
CN205777332U
CN205777332U CN201620711487.9U CN201620711487U CN205777332U CN 205777332 U CN205777332 U CN 205777332U CN 201620711487 U CN201620711487 U CN 201620711487U CN 205777332 U CN205777332 U CN 205777332U
Authority
CN
China
Prior art keywords
pipe
construction
drain outlet
highrise building
vertical drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620711487.9U
Other languages
Chinese (zh)
Inventor
杨显利
迟振涛
杨凤利
朱旭城
胡林东
郑成名
吴昆�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Billion Group Ltd By Share Ltd
QINGDAO CONSTRUCTION ENGINEERING GROUP Co Ltd
China Construction Third Engineering Bureau Co Ltd
Original Assignee
Qingdao Billion Group Ltd By Share Ltd
QINGDAO CONSTRUCTION ENGINEERING GROUP Co Ltd
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Billion Group Ltd By Share Ltd, QINGDAO CONSTRUCTION ENGINEERING GROUP Co Ltd, China Construction Third Engineering Bureau Co Ltd filed Critical Qingdao Billion Group Ltd By Share Ltd
Priority to CN201620711487.9U priority Critical patent/CN205777332U/en
Application granted granted Critical
Publication of CN205777332U publication Critical patent/CN205777332U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the vertical drain outlet system of a kind of construction of super highrise building, including PE pipe, cylindrical bolt buckle, support, defecator, adjustable buffering road, intelligent regulating valve, it is characterized in that: the PE pipe of described native system is fixed on body of wall by support, PE manages every meter and arranges adjustable buffering road and intelligent regulating valve together, and one defecator is set at PE pipe backform, PE pipe is provided with cylindrical bolt buckle.This utility model solves the difficult problem that in construction of super highrise building, backform waste material vertically transports, and decreases tower crane utilization rate in terms of waste material transportation, it is ensured that what the work efficiency of tower crane and backform were constructed is normally carried out;Ensure that the construction environment that backform cleans stably is carried out with the orderly of on-the-spot civilized construction;By to use of the present utility model, save expense labour cost, fee of material etc. produced by waste transportation, also play energy-conservation effect.

Description

A kind of vertical drain outlet system of construction of super highrise building
Technical field
This utility model relates to the vertical drain outlet system of a kind of construction of super highrise building.
Background technology
Along with socioeconomic development and science and technology progress, high-rise building have become as urban development build in not Evitable construction style.But there is also during construction of super highrise building and much need to continue perfect link, such as core The construction of heart cylinder concrete ultra-high pumping produces the vertical transport of waste material becomes the big key factor that on-the-spot impact is constructed, tradition Processing method is to use tower crane waste material allocation and transportation to be processed to ground, not only occupies substantial amounts of tower crane and hangs and time affect scene and execute Work progress, also directly influencing on-the-spot civilized construction, also considerably increasing the unsafe factor of site operation, so vertically arranging The utility model of dirty channel system is arisen at the historic moment.
Utility model content
Technical problem to be solved in the utility model is to provide the vertical drain outlet system of a kind of construction of super highrise building System, it is ensured that the timely conveying of waste material at backform, serves saving engineering cost and the effect of safety construction.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of vertical drain outlet system of construction of super highrise building, including PE pipe 1, cylindrical bolt buckle 2, support 3, Defecator 4, adjustable buffering road 5, intelligent regulating valve 6, it is characterised in that: the PE pipe 1 of described native system is fixed on by support 3 On body of wall, every 10 meters of PE pipe 1 arranges setting filtration together at one adjustable buffering road 5 and intelligent regulating valve 6, and PE pipe 1 backform Device 4, PE pipe 1 is provided with cylindrical bolt buckle 2.
As further program of the utility model: described PE pipe 1 cutting end just, neatly, clean.
As this utility model further scheme: PE pipe 1 is fixed on body of wall by described support 3 by bolt.
As this utility model further scheme: be provided with guiding steel plate in described adjustable buffering road 5, guide steel plate Surface is provided with the rubber that wear-resisting buffer is good, rubber thickness 5mm.
As this utility model further scheme: described intelligent regulating valve 6 two ends band electromagnetic steel plate is attracting, intelligence Above regulation valve 6,1m is provided with induction apparatus.
As this utility model further scheme: described defecator 4 and PE pipe 1 for removably connecting, backform Place's PE pipe 1 wall arranges one cross sections.
As this utility model further scheme: the specification of described PE pipe 1 is that 10mm is thick, a diameter of 250mm。
Compared with prior art, the beneficial effects of the utility model are: this utility model (1) solves high-rise building and executes The difficult problem that in work, backform waste material vertically transports, decreases tower crane utilization rate in terms of waste material transportation, it is ensured that the work of tower crane What efficiency and backform were constructed is normally carried out;(2) by the timely transport for backform refuse and rubbish, it is ensured that backform cleaning Construction environment and the orderly of on-the-spot civilized construction are stably carried out;(3) by Intelligent adjustment waste material transportation, ensure that waste material is transported safely Transport to construction bottom, and can effectively reduce the pipeline maintenance matters that rubbish plugging is caused;(4) by making of the present utility model With, save expense produced by waste transportation (labour cost, fee of material etc.), also play energy-conservation effect.
Accompanying drawing explanation
Fig. 1 is this utility model integral passage system schematic
Fig. 2 and Fig. 3 is cylindrical bolt fastener schematic diagram
Fig. 4 is support schematic diagram
Fig. 5 is defecator figure
Fig. 6 is adjustable separator tube schematic diagram
Fig. 7 is intelligent regulating valve schematic diagram
In figure: 1 includes PE pipe, 2 cylindrical bolt buckles, 3 supports, 4 defecators, 5 adjustable loops, 6-intelligent regulating valve.
Detailed description of the invention
Below in conjunction with Figure of description, the utility model is described in further detail.
As shown in figs. 1-7, the vertical drain outlet system of a kind of construction of super highrise building, including PE pipe, cylindrical bolt Buckle, support, defecator and loop.It is characterized in that: the PE pipe of described native system is fixed on body of wall by support, often 10 meters arrange adjustable separator tube together, and arrange one defecator at backform, arrange one with cylindrical bolt buckle simultaneously Road connects temporarily, before each jacking, is first dismantled by cylindrical bolt buckle, and blow-off line forms open circuit, backform top at backform After Shenging, use hot-melt technology by PE pipe extend, after snap connection with cylindrical bolt, formed path.
Vertical drain outlet system executed by described high-rise building, it is characterised in that: described hot-melt technology requires hot melt Equipment reaches to set operating temperature and can operate, the cutting of PE pipe end to rectify, neatly, clean, socket joint to reach to indicate the degree of depth, sternly Prohibiting and rotate, heat-melting butt-joint requires that hot-melt welding machine temperature controls to want accurately, weld heating time, temperature, pressure and pressurize, cooling Time regulation to be met, insulation, cooling period must not apply external force on connector.
Vertical drain outlet system executed by described high-rise building, it is characterised in that: described hot-melt technology requires hot melt Equipment reaches to set operating temperature and can operate, the cutting of PE pipe end to rectify, neatly, clean, socket joint to reach to indicate the degree of depth, sternly Prohibiting and rotate, heat-melting butt-joint requires that hot-melt welding machine temperature controls to want accurately, weld heating time, temperature, pressure and pressurize, cooling Time regulation to be met, insulation, cooling period must not apply external force on connector.
Vertical drain outlet system executed by described high-rise building, it is characterised in that: PE pipe is fixed by support by bolt On body of wall, play the effect fixing to PE pipe.
Vertical drain outlet system executed by described high-rise building, and the angle that loop initiates is 45 °, afterwards with straight PE pipe even Connecing, direction is vertical, and the angle that loop terminates, also for-45 °, connects with vertical PE pipe.
Vertical drain outlet system executed by described high-rise building, and defecator is detachable, capable of washing, at backform PE tube wall arranges one cross sections, can be inserted into and extract out circular filter mesh sheet, prevents the generation of plugging phenomenon.
The vertical drain outlet system of described construction of super highrise building, the specification of PE pipe is that 10mm is thick, a diameter of 250mm, this material has higher shock resistance and chemical-resistance.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment party Formula, in the ken that one skilled in the relevant art is possessed, it is also possible on the premise of without departing from this patent objective Make a variety of changes.

Claims (7)

1. a vertical drain outlet system for construction of super highrise building, manages (1), cylindrical bolt buckle (2), support including PE (3), defecator (4), adjustable buffering road (5), intelligent regulating valve (6), it is characterised in that: PE pipe (1) of described native system leads to Crossing support (3) to be fixed on body of wall, every 10 meters of PE pipe (1) arranges adjustable buffering road (5) and intelligent regulating valve (6) together, and PE Arranging one defecator (4) at pipe (1) backform, PE pipe (1) is provided with cylindrical bolt buckle (2).
The vertical drain outlet system of a kind of construction of super highrise building the most according to claim 1, it is characterised in that described PE pipe (1) cutting end just, neatly, clean.
The vertical drain outlet system of a kind of construction of super highrise building the most according to claim 1, it is characterised in that described Support (3) by bolt by PE pipe (1) be fixed on body of wall.
The vertical drain outlet system of a kind of construction of super highrise building the most according to claim 1, it is characterised in that described Adjustable buffering road (5) in be provided with guiding steel plate, guide surface of steel plate and be provided with the rubber that wear-resisting buffer is good, rubber thickness 5mm。
The vertical drain outlet system of a kind of construction of super highrise building the most according to claim 1, it is characterised in that described Intelligent regulating valve (6) two ends band electromagnetic steel plate attracting, intelligent regulating valve (6) top 1m be provided with induction apparatus.
The vertical drain outlet system of a kind of construction of super highrise building the most according to claim 1, it is characterised in that described Defecator (4) and PE pipe (1) for removably connecting, at backform, PE manages (1) wall and arranges one cross sections.
The vertical drain outlet system of a kind of construction of super highrise building the most according to claim 1, it is characterised in that described PE pipe (1) specification be 10mm 250mm thick, a diameter of.
CN201620711487.9U 2016-07-07 2016-07-07 A kind of vertical drain outlet system of construction of super highrise building Expired - Fee Related CN205777332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620711487.9U CN205777332U (en) 2016-07-07 2016-07-07 A kind of vertical drain outlet system of construction of super highrise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620711487.9U CN205777332U (en) 2016-07-07 2016-07-07 A kind of vertical drain outlet system of construction of super highrise building

Publications (1)

Publication Number Publication Date
CN205777332U true CN205777332U (en) 2016-12-07

Family

ID=58123978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620711487.9U Expired - Fee Related CN205777332U (en) 2016-07-07 2016-07-07 A kind of vertical drain outlet system of construction of super highrise building

Country Status (1)

Country Link
CN (1) CN205777332U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661335A (en) * 2017-03-29 2018-10-16 五冶集团上海有限公司 A kind of collection device for clearing up high floor concrete placings pump line remaining slurry

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661335A (en) * 2017-03-29 2018-10-16 五冶集团上海有限公司 A kind of collection device for clearing up high floor concrete placings pump line remaining slurry

Similar Documents

Publication Publication Date Title
CN103959974B (en) A kind of pressure reduction of control automatically fertilization system
CN206625428U (en) Floor closed system is poured after a kind of pipe well
CN205777332U (en) A kind of vertical drain outlet system of construction of super highrise building
CN204844444U (en) Concrete tower crane high altitude sprays maintenance system
CN207484425U (en) A kind of waterfall landscape dam
CN207332233U (en) A kind of building tile immersion device
CN203803195U (en) Vertical filter convenient to assemble and disassemble
CN102287003A (en) Dam concrete cabin surface water accumulation hidden pipe discharge method
CN206228997U (en) Concrete structure cutting wastewater recycling device
CN105421782B (en) A kind of concrete current divider
CN206154492U (en) Bury shower nozzle intelligence maintenance system
CN204034406U (en) A kind of piping filter
CN205472982U (en) Waste water aerated conduit fixed knot constructs
CN201095598Y (en) On-line cleaning device for feed pipe of roasting furnace for preparing cobaltosic oxide powder
CN208182826U (en) A kind of dedicated mud and water separating equipment of rubbish
CN207088150U (en) One kind being capable of the water-saving steam-cured pond of concrete tubular pile
CN206208055U (en) A kind of high-temperature water lowered temperature reclamation device
CN205839990U (en) Staircase built-in fitting
CN205024634U (en) Civil construction dust fall spraying system
CN206681382U (en) A kind of vertical pipeline device collected concrete pump pipe profit pipe mortar and be accustomed to waste water
CN204601897U (en) A kind of iron oxide red exhaust treatment system
CN218493150U (en) A concrete maintenance system for construction of thermal power plant capital construction
CN204475880U (en) A kind of concrete curing watering device
CN204328234U (en) A kind of sewer assembly
CN207568217U (en) Full-automatic atomizing concrete curing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20210707

CF01 Termination of patent right due to non-payment of annual fee