CN205777103U CN201620418789.7U CN201620418789U CN205777103U CN 205777103 U CN205777103 U CN 205777103U CN 201620418789 U CN201620418789 U CN 201620418789U CN 205777103 U CN205777103 U CN 205777103U
Authority
CN
China
Prior art keywords
loam wall
shear connector
prefabricated shear
prefabricated
rammed earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620418789.7U
Other languages
Chinese (zh)
Inventor
杨新磊
郭强亮
张建国
李东兰
王海良
任权昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Chengjian University
Original Assignee
Tianjin Chengjian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Chengjian University filed Critical Tianjin Chengjian University
Priority to CN201620418789.7U priority Critical patent/CN205777103U/en
Application granted granted Critical
Publication of CN205777103U publication Critical patent/CN205777103U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

It is applicable to prefabricated shear connector and the loam wall of loam wall, prefabricated shear connector is made up of built-in framework of steel reinforcement and external wrapping concrete two parts, built-in framework of steel reinforcement is welded by vertical skeleton part and multilamellar horizontal skeleton part and constitutes, the horizontal skeleton of multilamellar is from top to bottom arranged by spacing, and vertical skeleton is arranged on the center of the horizontal skeleton of multilamellar;Position between the horizontal skeleton of two-layer corresponding to arbitrary neighborhood of the outside of external wrapping concrete is equipped with annular recess, and annular recess forms the occlusal crib being connected with rammed earth;Loam wall is made up of multilamellar rammed earth setting up and down, is equipped with multiple prefabricated shear connector at each layering position, in the top half embedment upper strata rammed earth of prefabricated shear connector, in the latter half embedment lower floor rammed earth of prefabricated connector.This prefabricated shear connector enhances the shearing strength between loam wall layering, improves the globality of body of wall, decreases wall crazing;Loam wall has higher shear behavior and has preferable globality.

Description

It is applicable to prefabricated shear connector and the loam wall of loam wall
Technical field
This utility model belongs to construction wall construction applications, is applicable to the prefabricated of rammed earth chamber particularly to a kind of Shear connector and use the loam wall structure of this prefabricated shear connector.
Background technology
Rammed earth construction builds one of green building type as energy-saving and environmental protection, is extensively built in China wide The areas such as big Fujian, northwest, Xinjiang, due to China as natural disaster than one of more serious country, The rammed earth body of wall shear-carrying capacity that loam wall system causes due to the reason such as geological process, Lack of support is not The phenomenon ftractureed enough is serious, and the shear-carrying capacity how improving loam wall structure becomes rammed earth construction improvement One important directions of performance.
Generally for the shear behavior of raising loam wall interlayer, loam wall structure is in the work progress of rammed earth Can some prismatic cylindrical horizontal shear connectors be set at horizontal gap, but these are prismatic Adhesion between horizontal shear connector and levels rammed earth is less, and effect is the most notable.Meanwhile, traditional Building method shearing strength is low, anchorage zone scope is little and the around defect such as rammed earth material gmatjpdumamics difference.
Summary of the invention
This utility model provides one to be applicable to loam wall for solving technical problem present in known technology Prefabricated shear connector and loam wall.This prefabricated shear connector can strengthen resisting between loam wall layering Cut intensity, improve wall integrity, minimizing wall crazing;Loam wall has higher shear behavior and tool There is preferable globality.
This utility model is adopted the technical scheme that by solving technical problem present in known technology:
A kind of prefabricated shear connector being applicable to loam wall, it is characterised in that: prefabricated shear connector is Precast concrete, it is made up of built-in framework of steel reinforcement and external wrapping concrete two parts, described built-in steel Muscles and bones frame is welded by vertical skeleton part and multilamellar horizontal skeleton part and constitutes, and the horizontal skeleton of multilamellar is by up to Arranging by spacing down, vertical skeleton is arranged on the center of the horizontal skeleton of multilamellar;At external wrapping concrete Position between the outside horizontal skeleton of two-layer corresponding to arbitrary neighborhood is equipped with annular recess, annular recess Form the occlusal crib being connected with rammed earth.
Preferred: every layer of horizontal skeleton is by the many reinforcing bars radially arranged centered by vertical skeleton Constitute.
Preferred: every layer of horizontal skeleton is all for the bar-mat reinforcement structure being made up of crisscross reinforcing bar.
Preferred: vertical skeleton uses spiral.
Preferred: it is round pie or side's pie that external wrapping concrete corresponds partly to the position of every layer of horizontal skeleton.
A kind of loam wall, loam wall is made up of multilamellar rammed earth setting up and down, it is characterised in that: at rammed earth Each layering position of wall is equipped with multiple above-mentioned prefabricated shear connector arranged by spacing, prefabricated shearing resistance In the top half embedment upper strata rammed earth of connector, in the latter half embedment lower floor rammed earth of prefabricated connector, Annular recess on prefabricated shearing-resistant member is connected with the rammed earth formation of corresponding position.
Preferred: in every layer of rammed earth of loam wall, position near middle part is laid with many along the vertical direction Individual prefabricated shear connector.
This utility model has the advantage that with good effect:
This prefabricated shear connector, centre arranges built-in framework of steel reinforcement, it is possible to be effectively improved bearing capacity, with Time, built-in framework of steel reinforcement is played a protective role by the external wrapping concrete outside built-in framework of steel reinforcement, built-in steel Muscles and bones frame and external wrapping concrete act on jointly, it is ensured that prefabricated shear connector has higher intensity and ductility, The annular recess on prefabricated shear connector surface adds the gmatjpdumamics between itself and rammed earth material, by prefabricated Shear connector is arranged in the layered position of loam wall, it is possible to increase substantially loam wall structure globality, Shear-carrying capacity, prevent the aspect performances such as delamination.When there being bigger vertical uniform load q, prefabricated anti- Cut connector and can connect each layer rammed earth layer, improve the shear-carrying capacity of whole body of wall simultaneously, reach to prevent The purpose of loam wall structural deterioration.Use the loam wall of this prefabricated shear connector, due at layered position There is the effect of prefabricated shear connector, therefore there is higher shear behavior and reached preferable globality.
Accompanying drawing explanation
Fig. 1 is the structural representation of the prefabricated shear connector of this utility model;
Fig. 2 is the A-A profile of Fig. 1;
Fig. 3 is the B-B profile of Fig. 1;
Fig. 4 is the structural representation of this utility model loam wall.
In figure: 1, built-in framework of steel reinforcement;1-1, vertical skeleton part;1-2, horizontal skeleton part;2、 External wrapping concrete;3, annular recess;1 ', loam wall;1-1 ', layering position.
Detailed description of the invention
For summary of the invention of the present utility model, feature and effect can be further appreciated that, hereby enumerate following enforcement Example, and it is as follows to coordinate accompanying drawing to describe in detail:
A kind of prefabricated shear connector being applicable to loam wall, refers to Fig. 1-4, and prefabricated shear connector is Precast concrete, it is made up of built-in framework of steel reinforcement 1 and external wrapping concrete 2 two parts.In described Putting framework of steel reinforcement to be made up of vertical skeleton part 1-1 and the welding of multilamellar horizontal skeleton part 1-2, multilamellar is horizontal Skeleton is from top to bottom arranged by spacing, and vertical skeleton is arranged on the center of the horizontal skeleton of multilamellar, the most often The centre of layer laterally skeleton is all formed with vertical skeleton and is connected.Correspond in the outside of external wrapping concrete Position between the horizontal skeleton of two-layer of arbitrary neighborhood is equipped with annular recess 3, and annular recess is formed and rams The occlusal crib that soil is connected, the shape of above-mentioned annular recess is unrestricted, closes as long as formed along one week The groove closed, annular recess can use common circular ring or side's circulus etc..
In said structure, the preferable the following two kinds of version of every layer of horizontal skeleton:
The first structure: every layer of horizontal skeleton is by many radially arranged centered by vertical skeleton Reinforcing bar is constituted, the horizontal framing structure being made up of four reinforcing bars in such as accompanying drawing 2.
The second structure: every layer of horizontal skeleton is all for the bar-mat reinforcement structure being made up of crisscross reinforcing bar. This horizontal framing structure is the most not shown.
In said structure, described vertical skeleton preferably employs spiral.
In said structure, as long as the position that external wrapping concrete corresponds partly to every layer of horizontal skeleton is horizontal by correspondence All wrapping to skeleton, its concrete shape is unrestricted, in this utility model, and outsourcing coagulation Soil corresponds partly to the position of every layer of horizontal skeleton and preferably employs round pie or side's pie.
The forming method of this prefabricated shear connector, including following forming step:
S1 welds prefabricated built-in framework of steel reinforcement;
Prefabricated built-in framework of steel reinforcement is put in template by S2, and template uses steel form, and template is by a left side Right two points of template alignment are constituted, and are formed and after pouring shear connector molding after two points of template alignment The die cavity that shape is consistent, built-in framework of steel reinforcement is placed in the centre of die cavity, under built-in framework of steel reinforcement Side arranges bottom spacer, and arranges one layer or the multilamellar arranged up and down at the periphery of built-in framework of steel reinforcement Sidepiece spacer, is formed fixing to built-in framework of steel reinforcement, so, can avoid in follow-up concreting During, built-in framework of steel reinforcement moves and off-center position in the horizontal direction, wherein bottom spacer The consistency of thickness of thickness and the bottom external wrapping concrete after pouring shear connector molding;
Template is fixed by the bolt that S3 uses punching block supporting, concrete, fixes by two points of templates of bolt Link together, and check that whether the sidepiece spacer being arranged in punching block is by firm for built-in framework of steel reinforcement Fix;
S4 above-mentioned steps completes casting concrete in the die cavity of backward punching block, fully to vibrate in casting process, Avoid leakage shaking phenomenon;
After S5 pours, every day sprinkles water maintenance, and maintenance reaches form removal after 28 days, prefabricated shear connector Molding.
A kind of loam wall, refers to Fig. 4, and loam wall 1 ' is made up of multilamellar rammed earth setting up and down, is ramming Each layering portion 1-1 ' of cob wall is equipped with multiple above-mentioned prefabricated shear connector arranged by spacing, prefabricated In the top half embedment upper strata rammed earth of shear connector, the latter half embedment lower floor of prefabricated connector rams In soil, the annular recess on prefabricated shearing-resistant member is connected with the rammed earth formation of corresponding position.
In above-mentioned loam wall structure, along the vertical direction near the position at middle part in every layer of rammed earth of loam wall Put and be laid with multiple prefabricated shear connector further.
Above-mentioned prefabricated shear connector apply to loam wall structure use following construction process:
1. building ground floor soil layer, when needing, places prefabricated shear connector in centre position;
2. the prefabricated shear connector between ground floor and second layer rammed earth is placed, it is ensured that prefabricated shear connections It is identical that part is embedded to length between two-layer;
3. building second layer soil layer, when needing also exist for, places prefabricated shear connector in centre position;
4. above second step and the 3rd step are repeated, until it reaches loam wall design height.
This utility model efficiently solves the problem that at loam wall layering, shear resistance is not enough, construction technology Simply, the feature such as cheap, practical, this prefabricated shear connector can be widely applied for various In rammed earth construction.

Claims (7)

1. the prefabricated shear connector being applicable to loam wall, it is characterised in that: prefabricated shear connections Part is precast concrete, and it is made up of built-in framework of steel reinforcement and external wrapping concrete two parts, described interior Put framework of steel reinforcement to be welded by vertical skeleton part and multilamellar horizontal skeleton part and constitute, the horizontal skeleton of multilamellar by Up to lower by spacing setting, vertical skeleton is arranged on the center of the horizontal skeleton of multilamellar;At outsourcing coagulation The outside of soil is equipped with annular recess corresponding to the position between the horizontal skeleton of two-layer of arbitrary neighborhood, ring-type Groove forms the occlusal crib being connected with rammed earth.
The prefabricated shear connector being applicable to loam wall the most according to claim 1, its feature exists In: every layer of horizontal skeleton is constituted by the many reinforcing bars radially arranged centered by vertical skeleton.
The prefabricated shear connector being applicable to loam wall the most according to claim 1, its feature exists In: every layer of horizontal skeleton is all for the bar-mat reinforcement structure being made up of crisscross reinforcing bar.
The prefabricated shear connector being applicable to loam wall the most according to claim 1, its feature exists In: vertical skeleton uses spiral.
The prefabricated shear connector being applicable to loam wall the most according to claim 1, its feature exists In: it is round pie or side's pie that external wrapping concrete corresponds partly to the position of every layer of horizontal skeleton.
6. a loam wall, loam wall is made up of multilamellar rammed earth setting up and down, it is characterised in that: It is arbitrary described pre-that each layering position of loam wall is equipped with multiple claim 1-5 arranged by spacing Shear connector processed, in the top half embedment upper strata rammed earth of prefabricated shear connector, prefabricated connector In the latter half embedment lower floor rammed earth, the annular recess on prefabricated shearing-resistant member is formed with the rammed earth of corresponding position It is connected.
Loam wall the most according to claim 6, it is characterised in that: at every layer of rammed earth of loam wall Uniform near the position at middle part the most along the vertical direction bury multiple prefabricated shear connector underground.
CN201620418789.7U 2016-05-09 2016-05-09 It is applicable to prefabricated shear connector and the loam wall of loam wall Withdrawn - After Issue CN205777103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620418789.7U CN205777103U (en) 2016-05-09 2016-05-09 It is applicable to prefabricated shear connector and the loam wall of loam wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620418789.7U CN205777103U (en) 2016-05-09 2016-05-09 It is applicable to prefabricated shear connector and the loam wall of loam wall

Publications (1)

Publication Number Publication Date
CN205777103U true CN205777103U (en) 2016-12-07

Family

ID=57412680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620418789.7U Withdrawn - After Issue CN205777103U (en) 2016-05-09 2016-05-09 It is applicable to prefabricated shear connector and the loam wall of loam wall

Country Status (1)

Country Link
CN (1) CN205777103U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822023A (en) * 2016-05-09 2016-08-03 天津城建大学 Prefabricated shear-resistant connecting part for rammed-earth wall, molding method of prefabricated shear-resistant connecting part and rammed-earth wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822023A (en) * 2016-05-09 2016-08-03 天津城建大学 Prefabricated shear-resistant connecting part for rammed-earth wall, molding method of prefabricated shear-resistant connecting part and rammed-earth wall

Similar Documents

Publication Publication Date Title
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN105926802B (en) A kind of reinforcement structure of 3D printing reinforced masonry shear wall structure
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN104727440B (en) Industrialized production efficiently-assembled type building frame column beam and manufacturing method
CN210598410U (en) Recycled concrete assembled enclosure wall
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN106760228A (en) The method of precast shear wall wall Vertical bar connection
CN205777103U (en) It is applicable to prefabricated shear connector and the loam wall of loam wall
CN105822023B (en) Suitable for the prefabricated shear connector, its forming method and loam wall of loam wall
CN206328863U (en) Prefabricated assembled frame beam column structure
CN203795601U (en) Horizontal connection node for precast concrete members
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN202401667U (en) Prefabricated column with reserved embedded column porous channel and embedded column type full-assembly anti-seismic building
CN108343234B (en) Modification module capable of being used as cast-in-situ ring beam template of hollow block masonry and application thereof
CN206346341U (en) Suitable for the prefabricated shear connector of cross and loam wall of loam wall
CN208023735U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam T shape connecting nodes
CN206873734U (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN205502058U (en) Pin -connected panel tower crane foundation
CN211143496U (en) Column PC component
CN204626696U (en) Prefabricated assembled sandwich composite shear wall
CN204343444U (en) Factorial praluction new and effective assembled architecture frame column beam
CN108412036A (en) Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node
CN108625491A (en) Assembled H profile steel column-isolated footing-concrete collar tie beam L-shaped connecting node
CN203795600U (en) Embedded column type prefabricated reinforced concrete member joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161207

Effective date of abandoning: 20180417

AV01 Patent right actively abandoned