CN205777102U - Building beam column gusset integration binding structure - Google Patents

Building beam column gusset integration binding structure Download PDF

Info

Publication number
CN205777102U
CN205777102U CN201620566463.9U CN201620566463U CN205777102U CN 205777102 U CN205777102 U CN 205777102U CN 201620566463 U CN201620566463 U CN 201620566463U CN 205777102 U CN205777102 U CN 205777102U
Authority
CN
China
Prior art keywords
reinforcing bar
post reinforcing
reinforced steel
steel bar
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620566463.9U
Other languages
Chinese (zh)
Inventor
王根柱
郭占杰
李少军
郭立刚
张超
袁普
高攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIJIAZHUANG CONSTRUCTION GROUP Co Ltd
Original Assignee
SHIJIAZHUANG CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIJIAZHUANG CONSTRUCTION GROUP Co Ltd filed Critical SHIJIAZHUANG CONSTRUCTION GROUP Co Ltd
Priority to CN201620566463.9U priority Critical patent/CN205777102U/en
Application granted granted Critical
Publication of CN205777102U publication Critical patent/CN205777102U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of building beam column gusset integration binding structure, it includes interlocking the beam reinforced steel bar laid along the horizontal plane and being arranged on this position, beam reinforced steel bar upper strata the post reinforcing bar vertically laid, and described beam reinforced steel bar, post reinforcing bar are integrated by the discrete colligation of binding device of many groups;Being socketed with on described beam reinforced steel bar and post reinforcing bar and organize stirrup more, and the position arranging stirrup on described post reinforcing bar arranges positioner, this positioner is made up of through fixing colligation on described post reinforcing bar thin wire.This utility model constructs frame structure post and beam reinforced steel bar engineering staggered floor integral structure, and through applying in cast-in-situ steel reinforced concrete frame structure engineering, construction quality has obtained effective guarantee, and economic benefit promotes notable.

Description

Building beam column gusset integration binding structure
Technical field
This utility model relates to cast-in-situ steel reinforced concrete frame structure layer field of engineering technology.
Background technology
It is suitable that the cast-in-situ steel reinforced concrete frame structure layer commonly used first level of construction vertically builds post construction after building beam slab Sequence is constructed, and its construction technology is the most ripe.In engineering practice unbalanced, long in time limit due to frame post displacement, construction organization labour, special Be not post reinforcing bar on floor in stacking process to young concrete floor disturbance, cause floor construction crack the most universal.
Utility model content
The technical problems to be solved in the utility model is all deficiencies overcoming prior art, it is provided that a kind of building beam column Gusset integration binding structure.
For solving above-mentioned technical problem, technical solution adopted in the utility model is as follows.
Building beam column gusset integration binding structure, it beam reinforced steel bar laid and being arranged on of including interlocking along the horizontal plane This position, beam reinforced steel bar upper strata the post reinforcing bar vertically laid, binding device is discrete ties up by many groups for described beam reinforced steel bar, post reinforcing bar Bundle is integrated;Described beam reinforced steel bar and post reinforcing bar are socketed with and organize stirrup more, and hoop is set on described post reinforcing bar The position of muscle arranges positioner, and this positioner is made up of through fixing colligation on described post reinforcing bar thin wire.
As a kind of optimal technical scheme of the present utility model, the periphery at described post reinforcing bar arranges post reinforcing bar operation horizontal Platform, this post reinforcing bar job platform includes a spike and is arranged on the object disposing platform above a spike, its spike and described beam slab Reinforcing bar does not contacts, and is directly seated on the building supporting layer below described beam reinforced steel bar.
As a kind of optimal technical scheme of the present utility model, many group water power heating coil lines are set below described beam reinforced steel bar.
As a kind of optimal technical scheme of the present utility model, it is equipped with according to described beam reinforced steel bar and organizes beam-slab template more.
As a kind of optimal technical scheme of the present utility model, according to described post steel-bar arrangement column template.
As a kind of optimal technical scheme of the present utility model, pour inside described beam-slab template and column template and be provided with Structural concrete.
Use and have the beneficial effects that produced by technique scheme: this utility model easily occurs in prior art Quality problems and defect, the frame structure post summed up by engineering practice and the beam reinforced steel bar integrated structure of engineering staggered floor Making, through applying in cast-in-situ steel reinforced concrete frame structure engineering, construction quality has obtained effective guarantee, and economic benefit promotes Significantly.In technology of the present utility model, structure sheaf post is integrated with beam reinforced steel bar binding structure to be completed, and structure sheaf reinforcing bar binding closes Two is one, and structure organization is more scientific and reasonable, reduces each work post work holdup to greatest extent, and the construction period shortens 1~2 day/layer.With This simultaneously, this utility model is also effectively reduced construction loads factor to building the disturbance of structure, and floor construction crack is big Width reduces.
Accompanying drawing explanation
Fig. 1 is the structural representation of one detailed description of the invention of this utility model, does not illustrates horizontal hoop in figure Display.
In figure: beam reinforced steel bar (1), post reinforcing bar (2), stirrup (3), binding device (4), positioner (5), water power heating coil line (6), post reinforcing bar job platform (7).
Detailed description of the invention
Referring to accompanying drawing, the structure of one specific embodiment of this utility model includes the beam slab steel laid that interlocks along the horizontal plane Muscle 1, it is arranged on many groups water power heating coil line 6 below beam reinforced steel bar 1 and is arranged on this position, beam reinforced steel bar 1 upper strata and vertically lays Post reinforcing bar 2, beam reinforced steel bar 1, post reinforcing bar 2 are integrated by the discrete colligation of binding device 4 of many groups;Week at post reinforcing bar 2 While arrange post reinforcing bar job platform 7, this post reinforcing bar job platform 7 includes a spike and the glove being arranged on above a spike is put down Platform, its spike does not contacts with beam reinforced steel bar 1, is directly seated on the building supporting layer below beam reinforced steel bar 1, effectively keeps away Exempt from superstructure to the disturbance of understructure and the disturbance to beam steel of the post reinforcing bar;Beam reinforced steel bar 1 and post reinforcing bar 2 are socketed Having many group stirrups 3, and the position arranging stirrup 3 on post reinforcing bar 2 arranges positioner 5, this positioner 5 is existed by thin wire Constitute through fixing colligation on post reinforcing bar 2;It is equipped with according to beam reinforced steel bar 1 and organizes beam-slab template more, post mould is set according to post reinforcing bar 2 simultaneously Plate.
Referring to accompanying drawing, operation principle of the present utility model is: in technology of the present utility model, structure sheaf post and beam slab steel Muscle binding structure integration completes, and structure sheaf reinforcing bar binding unites two into one, and structure organization is more scientific and reasonable, subtracts to greatest extent Few each work post work holdup, construction period shortening 1~2 day/layer;This utility model utilizes post reinforcing bar job platform to be effectively reduced and executes Work load factor is to building the disturbance of structure, and cracks on floor slab is greatly decreased;This utility model pin construct frame structure post with Beam reinforced steel bar engineering staggered floor integrated structure, through applying in cast-in-situ steel reinforced concrete frame structure engineering, construction quality obtains Effective guarantee, and economic benefit promotes notable.
Foregoing description is only used as the enforceable technical scheme of this utility model and proposes, not as to its technical scheme itself Single restrictive condition.

Claims (6)

1. building beam column gusset integration binding structure, it is characterised in that: it includes the beam slab steel laid that interlocks along the horizontal plane Muscle (1) and be arranged on this beam reinforced steel bar (1) position, upper strata the post reinforcing bar (2) vertically laid, described beam reinforced steel bar (1), post reinforcing bar (2) pass through to organize binding device (4) discrete colligation to be integrated more;In the upper socket of described beam reinforced steel bar (1) and post reinforcing bar (2) Organizing stirrup (3) more, and the position arranging stirrup (3) on described post reinforcing bar (2) arranges positioner (5), this positions dress Put (5) to be made up of in the fixing colligation of upper warp of described post reinforcing bar (2) thin wire.
Building beam column gusset integration binding structure the most according to claim 1, it is characterised in that: at described post reinforcing bar (2) periphery arranges post reinforcing bar job platform (7), and this post reinforcing bar job platform (7) includes a spike and is arranged on a spike The object disposing platform of side, its spike does not contacts with described beam reinforced steel bar (1), is directly seated in described beam reinforced steel bar (1) lower section On building supporting layer.
Building beam column gusset integration binding structure the most according to claim 2, it is characterised in that: described beam reinforced steel bar (1) lower section arranges many groups water power heating coil line (6).
Building beam column gusset integration binding structure the most according to claim 3, it is characterised in that: according to described beam slab steel Muscle (1) is equipped with organizes beam-slab template more.
Building beam column gusset integration binding structure the most according to claim 4, it is characterised in that: according to described post reinforcing bar (2) column template is set.
Building beam column gusset integration binding structure the most according to claim 5, it is characterised in that: at described beam slab mould Pour inside plate and column template and be provided with structural concrete.
CN201620566463.9U 2016-06-13 2016-06-13 Building beam column gusset integration binding structure Expired - Fee Related CN205777102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620566463.9U CN205777102U (en) 2016-06-13 2016-06-13 Building beam column gusset integration binding structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620566463.9U CN205777102U (en) 2016-06-13 2016-06-13 Building beam column gusset integration binding structure

Publications (1)

Publication Number Publication Date
CN205777102U true CN205777102U (en) 2016-12-07

Family

ID=58134484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620566463.9U Expired - Fee Related CN205777102U (en) 2016-06-13 2016-06-13 Building beam column gusset integration binding structure

Country Status (1)

Country Link
CN (1) CN205777102U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108812A (en) * 2021-12-09 2022-03-01 中国化学工程第九建设有限公司 Construction method of main body frame of concrete engineering frame structure building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108812A (en) * 2021-12-09 2022-03-01 中国化学工程第九建设有限公司 Construction method of main body frame of concrete engineering frame structure building

Similar Documents

Publication Publication Date Title
CN108580758B (en) Double-deck reinforcing bar net piece processingequipment
CN104175398B (en) Make the mold and method of prefabricated case beam framework of steel reinforcement
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN104314095B (en) A kind of shaped steel buttress for the construction of super thick raft plate and valve plate and construction method
CN108381746A (en) The construction method of sliding caisson platform precasting box beam
CN105908902A (en) Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN107584650A (en) Using the bridge prefabrication devices and methods therefor of self-propelled continuous productive process
CN105256948A (en) Construction method and molding bed of square reinforced concrete pier
CN106638947A (en) Prefabricated frame structure and cascaded prefabrication construction method thereof
CN204920239U (en) A child die carrier for making square framework of steel reinforcement
CN103410269A (en) Unbonded prestress cast-in-place reinforced concrete hollow slab construction structure and method
CN105201204A (en) Method and structure for preventing root rotting in pouring process of column legs of reinforced concrete columns
CN201738597U (en) Sectional steel and steel pipe combined type support system of beam with high and large cross section
CN105484165B (en) Integrated prestress tensioning frame structure and manufacturing and using methods thereof
CN205777102U (en) Building beam column gusset integration binding structure
CN102936958B (en) Construction method for positioning upper reinforcements of concrete floor slab by using tool type supports
CN202090578U (en) Shaped elevator shaft construction operating platform device
CN109138280A (en) A kind of concrete pad and its application in control bar spacing, slab thickness
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN206690311U (en) Mold for tie with reinforcing bar
CN102383376B (en) Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member
CN207073117U (en) Factory's formula large-sized aqueduct construction system
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN105817883B (en) Hydraulic press frame group is carried out to method using mold
CN204691032U (en) A kind of integral precast groined type building cover structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20210613