CN205776976U - A kind of curtain wall - Google Patents

A kind of curtain wall Download PDF

Info

Publication number
CN205776976U
CN205776976U CN201620755968.XU CN201620755968U CN205776976U CN 205776976 U CN205776976 U CN 205776976U CN 201620755968 U CN201620755968 U CN 201620755968U CN 205776976 U CN205776976 U CN 205776976U
Authority
CN
China
Prior art keywords
curtain wall
lead
drill bushing
erecting
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620755968.XU
Other languages
Chinese (zh)
Inventor
金柏盛
陈建海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yun Xin Decoration Engineering Co., Ltd.
Original Assignee
Wenzhou City United States And Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou City United States And Construction Engineering Co Ltd filed Critical Wenzhou City United States And Construction Engineering Co Ltd
Priority to CN201620755968.XU priority Critical patent/CN205776976U/en
Application granted granted Critical
Publication of CN205776976U publication Critical patent/CN205776976U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a kind of curtain wall, its drip irrigation device is: includes curtain wall erecting and is fixed on the U-shaped corner brace on curtain wall erecting lateral surface, the inside of described curtain wall erecting is provided with along the length direction of curtain wall erecting runs through groove, described run through groove in sliding be provided with lead, described lead is perpendicular to the side of curtain wall erecting and arranges, the drill bushing isometric with lead it is embedded with in described lead, the internal diameter of described drill bushing matches with the external diameter of drill bit, and described lead is provided with and is directed to post and is positioned at the positioning element running through in groove.When mounted, first hole on a side of curtain wall erecting, get out the installing hole for installing U-shaped corner brace, subsequently, it is directed to post and moves to the position coaxial with installing hole, by arranging lead, under the guiding of lead, can ensure that the installing hole got out on two sides of curtain wall erecting is on same axis, it is ensured that the accuracy of later stage curtain wall main beam position when mounted.

Description

A kind of curtain wall
Technical field
This utility model design building technical field, more specifically, it relates to a kind of curtain wall.
Background technology
Existing building external protects curtain wall, and curtain wall cross beam uses overall structure, and integrally-built curtain wall cross beam is not suitable for adopting With first erectting the process method construction filling crossbeam the most afterwards, make troubles to the installation of curtain wall.
Therefore the patent of invention of Publication No. CN101059005A provides a kind of curtain wall, mainly includes curtain wall erecting and curtain Wall main beam, curtain wall erecting is connected corner brace with curtain wall main beam by U-shaped and is fixed together, and on main beam, sliding connects horizontal stroke Corbel plate, curtain wall erecting is provided with the connection sheet for fixed cross beam supporting plate, after installing, installs glass connecting again on sheet Glass.
Carrying out the structure of curtain wall when, it is required in the both sides of a curtain wall erecting curtain wall main beam is installed, in peace During dress, first using electric drill, the drill bit of electric drill is holed on the two sides of curtain wall erecting, then U-shaped is connected corner brace is fixed on base On, due to curtain wall one entirety of the pattern of wants after installing, the position between all parts needs very accurate, but On two sides of curtain wall erecting during boring, it is difficult to ensure that two holes are on same level line, so pacify in the later stage During dress, the curtain wall main beam in curtain wall erecting just cannot be installed accurately and put in place, assemble complete after, the most unsightly, and And reduce the overall construction intensity of curtain wall.
Utility model content
For the deficiencies in the prior art, the purpose of this utility model is to provide one and can ensure that curtain wall erecting when mounted The curtain wall main beam of both sides is in the curtain wall on same level line.
Above-mentioned technical purpose of the present utility model has the technical scheme that a kind of curtain wall, including curtain Wall erecting and be fixed on the U-shaped corner brace on curtain wall erecting lateral surface, the inside of described curtain wall erecting is along the length of curtain wall erecting Direction is provided with runs through groove, described in run through groove in sliding be provided with lead, described lead be perpendicular in curtain wall erecting boring side Face is arranged, and is embedded with the drill bushing isometric with lead in described lead, and the internal diameter of described drill bushing matches with the external diameter of drill bit, Described lead is provided with and is directed to post and is positioned at the positioning element running through in groove.
By using technique scheme, when mounted, first hole on a side of curtain wall erecting, get out for pacifying The installing hole of dress U-shaped corner brace, subsequently, is directed to post and moves to the position coaxial with installing hole, now, the medial surface of axle sleeve and peace The medial surface alignment in dress hole, after lead position determines, positioning element is directed to post and is positioned at running through within curtain wall erecting In groove, now, electric drill drilled through through the installing hole accomplished fluently and drill bushing, on the another one side of curtain wall erecting Get out installing hole again, by arranging lead, under the guiding of lead, it is ensured that bore on two sides of curtain wall erecting The installing hole gone out is on same axis, it is ensured that the accuracy of later stage curtain wall main beam position when mounted, additionally, Owing to an installing hole is that the medial surface from curtain wall erecting outwards gets out, the waste iron filing produced when can as far as possible reduce boring is residual Stay in curtain wall erecting.
Running through described in it is also preferred that the left and be fixed with iron plate on the medial wall of groove, described positioning element includes being embedded at lead Both ends of the surface on Magnet.
By using technique scheme, can produce certain magnetic force between Magnet and iron plate, magnetic force is more than lead Gravity, therefore, magnetic force can be directed to post and adsorb on iron plate, so can realize the location of lead, and structure is very simple, After use is complete, it is also possible to being directed to post and take out in mounting groove, lead can be reused, and reduces and produces into This.
It is also preferred that the left be equipped with the projection that inwall that is some and that run through groove abuts in the both ends of the surface of described lead.
By using technique scheme, in use, directly pass through projection and run through the friction produced between groove sidewall Power, positions lead, and structure is very simple, and location is convenient.
It is also preferred that the left described lead is four, the distance between adjacent lead matches with the installing hole in U-shaped corner brace Closing, connecting between adjacent lead has connecting plate.
By using technique scheme, U-shaped corner brace is typically provided four installing holes, when operation, owing to guiding Distance between post is that the distance between installing hole is to cooperate with, therefore, after determining the position of two leads, i.e. Can complete to remain the location of two leads, improve working (machining) efficiency.
It is also preferred that the left the two ends of described lead stretch out forms the flange of annular.
By using technique scheme, arranging flange, when mounted, Magnet can be installed on flange, thus may be used To improve the volume of the magnet can being arranged on flange, magnetic force can be improved, play more preferable locating effect.
It is also preferred that the left described drill bushing is detachably arranged in lead.
By use technique scheme, when drill bushing after this multiple use, drill bushing can be replaced, so guide Post can be reused, and improves the utilization rate of lead, reduces production cost.
It is also preferred that the left be provided with in described lead with place drill bushing through hole, described drill bushing sliding is arranged in through hole, institute Stating threaded on the outer circumference surface of lead has the screw that can abut with drill bushing.
By using technique scheme, when drill bushing is replaced by needs when, unscrew screw, by screw from drill bushing On disassemble, now drill bushing can be skidded off in through hole, after completing the replacing of drill bushing, tightening screw, by screw with Frictional force between drill bushing, gets final product the fixing of drill bushing.
It is also preferred that the left the outer circumference surface of described drill bushing is provided with the screwed hole with screw fit, the end face of described drill bushing sets Locating piece, the end face of described lead is had to be provided with the locating slot coordinated with locating piece
By using technique scheme, during installation, screw can be threadeded with drill bushing, can improve screw and drill bushing Between bonding strength, it is to avoid drill bushing drops out in lead, additionally, by lead and locating slot, it is possible to achieve drill bushing exists Location in through hole, it is ensured that screw can screw in inside drill bushing, convenient installation.
In sum, this utility model has the advantages that
1, by arranging lead, under the guiding of lead, it is ensured that get out on two sides of curtain wall erecting Installing hole be on same axis, it is ensured that the accuracy of later stage curtain wall main beam position when mounted, additionally, by It is that the medial surface from curtain wall erecting outwards gets out in an installing hole, the waste iron filing residual produced when can as far as possible reduce boring In curtain wall erecting;
2, when drill bushing after this multiple use, drill bushing can be replaced, such lead can be reused, improve The utilization rate of lead, reduces production cost.
Accompanying drawing explanation
Fig. 1 is the assembled view of embodiment one;
Fig. 2 is the drill bushing assembling explosive view of embodiment one;
Fig. 3 is the guide post structure schematic diagram of embodiment two.
In figure: 1, curtain wall erecting;2, corner brace;3, main beam;4, groove is run through;5, lead;51, through hole;511, locating slot; 52, flange;521, Magnet;6, drill bushing;61, locating piece;7, screw;8, connecting plate;9, projection;10, iron plate.
Detailed description of the invention
Below in conjunction with accompanying drawing 1-3, this utility model is described in further detail.
Embodiment one:
A kind of curtain wall, including curtain wall erecting 1, is provided with U-shaped corner brace 2, on the lateral surface of curtain wall erecting 1 in U-shaped corner brace 2 It is provided with four installing holes, when mounted, wears screw 7 in installing hole, curtain wall erecting 1 is drilled with and installing hole pair by electric drill The through hole answered, after screw 7 passes installing hole, threadeds with through hole, it is achieved U-shaped corner brace 2 is consolidated with curtain wall erecting 1 Fixed, two sides of curtain wall erecting 1 are respectively and fixedly provided with U-shaped corner brace 2, after installing corner brace 2, then curtain are installed in corner brace 2 Wall main beam 3.
The inside of curtain wall erecting 1 is provided with along the length direction of curtain wall erecting 1 runs through groove 4, arranges and runs through groove 4, can reduce The weight of curtain wall erecting 1, saves material, can conveniently transport and install, and within running through groove 4, sliding is provided with lead 5, guides The both ends of the surface of post 5 fit with running through groove 4, and lead 5 is perpendicular to the side of curtain wall erecting 1 boring and arranges, i.e. the axle of lead 5 Line be arranged in parallel with the axis of through hole, is axially arranged with through hole 51 along lead 5 in lead 5, and in through hole 51, sliding sets There are the equal diameters of drill bushing 6, the external diameter of drill bushing 6 and through hole 51, the internal diameter of drill bushing 6 and through hole and the equal diameters of drill bit, The outer circumference surface of lead 5 and the outer circumference surface of drill bushing 6 are equipped with screwed hole, the screw 7 on lead 5 and screwed hole Coordinate, it is achieved fixing between drill bushing 6 and lead 5, an end face of drill bushing 6 is outwardly provided with locating piece 61, The end of through hole 51 stretches out and is provided with the locating slot 511 coordinated with locating piece 61, and when mounted during drill bushing 6, locating piece 61 blocks After entering in locating slot 511, guarantee locating piece 61 abuts with locating slot 511, by arranging screw 7 and screw thread Hole, can realize removably connecting of drill bushing 6 and lead 5.
Lead 5 is four, is correspondingly arranged with the through hole on curtain wall erecting 1 side, between lead 5 and lead 5 Connect by connecting plate 8 is fixing.
Being provided with the positioning element of positioning guide column 5 within running through groove 4, in the present embodiment, positioning element includes being arranged on brill Magnet 521 in the both ends of the surface of set 6, Magnet 521 is embedded in the both ends of the surface of drill bushing 6, and the both ends of the surface at lead 5 stretch out Forming flange 52, flange 52 is arranged ringwise, is provided with cannelure on flange 52, and Magnet 521 is embedded in cannelure, is running through Being fixed with iron plate 10 on the medial wall of groove 4, iron plate 10 is coated on the surface running through groove 4, and Magnet 521 can adsorb at iron plate 10 On, certainly, make if curtain wall erecting 1 is the material that Magnet 521 can adsorb, then need not arrange iron plate 10, Magnet 521 Can directly adsorb in and run through in groove 4.
Embodiment two:
Being with the difference of embodiment one, in the present embodiment, positioning element includes being arranged in lead 5 both ends of the surface Projection 9, the hemispherical setting of projection 9, projection 9 abuts with the inwall running through groove 4, and the height of projection 9 is 1-2mm, is in this The projection 9 of height, both will not impact the slip of lead 5, lead 5 can be played positioning action again.
The above is only preferred implementation of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under this utility model thinking belong to protection domain of the present utility model.Should refer to Go out, for those skilled in the art, without departing from the some improvement under this utility model principle premise and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (8)

1. a curtain wall, including curtain wall erecting (1) and the U-shaped corner brace (2) that is fixed on curtain wall erecting (1) lateral surface, described The inside of curtain wall erecting (1) is provided with along the length direction of curtain wall erecting (1) runs through groove (4), it is characterised in that run through groove described in: (4) interior sliding is provided with lead (5), and described lead (5) is perpendicular to the side of the upper boring of curtain wall erecting (1) and arranges, described in lead Being embedded with the drill bushing (6) isometric with lead (5) in post (5), the internal diameter of described drill bushing (6) matches with the external diameter of drill bit, Described lead (5) is provided with and is directed to post (5) and is positioned at the positioning element run through in groove (4).
Curtain wall the most according to claim 1, it is characterised in that run through described in: and be fixed with iron plate on the medial wall of groove (4) (10), described positioning element includes the Magnet (521) being embedded in the both ends of the surface of lead (5).
Curtain wall the most according to claim 1, it is characterised in that: be equipped with in the both ends of the surface of described lead (5) some with Run through the projection (9) that the inwall of groove (4) abuts.
4. according to the curtain wall described in Claims 2 or 3, it is characterised in that: described lead (5) is four, adjacent lead (5) Between distance match with the installing hole in U-shaped corner brace (2), between adjacent lead (5) connect have connecting plate (8).
5. according to the curtain wall described in Claims 2 or 3, it is characterised in that: the two ends of described lead (5) stretch out formation ring The flange (52) of shape.
Curtain wall the most according to claim 1, it is characterised in that: described drill bushing (6) is detachably arranged in lead (5).
Curtain wall the most according to claim 6, it is characterised in that: be provided with in described lead (5) with place drill bushing (6) Through hole (51), described drill bushing (6) sliding is arranged in through hole (51), and threaded on the outer circumference surface of described lead (5) have The screw (7) that can abut with drill bushing (6).
Curtain wall the most according to claim 7, it is characterised in that: the outer circumference surface of described drill bushing (6) is provided with and screw (7) The screwed hole coordinated, the end face of described drill bushing (6) is provided with locating piece (61), and the end face of described lead (5) is provided with fixed The locating slot (511) that position block (61) coordinates.
CN201620755968.XU 2016-07-18 2016-07-18 A kind of curtain wall Expired - Fee Related CN205776976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620755968.XU CN205776976U (en) 2016-07-18 2016-07-18 A kind of curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620755968.XU CN205776976U (en) 2016-07-18 2016-07-18 A kind of curtain wall

Publications (1)

Publication Number Publication Date
CN205776976U true CN205776976U (en) 2016-12-07

Family

ID=58121882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620755968.XU Expired - Fee Related CN205776976U (en) 2016-07-18 2016-07-18 A kind of curtain wall

Country Status (1)

Country Link
CN (1) CN205776976U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110777984A (en) * 2019-10-24 2020-02-11 天一建设发展有限公司 Construction method of building heat-insulation wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110777984A (en) * 2019-10-24 2020-02-11 天一建设发展有限公司 Construction method of building heat-insulation wall

Similar Documents

Publication Publication Date Title
CN205776976U (en) A kind of curtain wall
CN205533996U (en) Shock attenuation formula erection equipment for architectural equipment convenient to remove
CN204657532U (en) A kind of Electric drill support for building
CN105303966A (en) Automatic suspension machine of nameplates
CN207815117U (en) A kind of street lamp pre-fixes device
CN206510600U (en) A kind of endoporus laser marking device for rod collar
CN205259973U (en) Oil drilling equipment , automatic calandria system and running gear
CN206010923U (en) The fixed mechanism of swingle connection
CN203992473U (en) A kind of borehole drill construction
CN203456769U (en) Safety belt hanging device fixed on oil pipeline of main transformer
CN103042251B (en) Electric hand drill vertical perforating auxiliary electrical drilling cramp
CN206112866U (en) Support
CN205704755U (en) A kind of glass drilling machine drilling attachment
CN104377887B (en) A kind of box type electrical machine rotating shaft runs through sealing device with outer shroud
CN206051360U (en) A kind of gin pole supporting construction suitable for adjustable little loop wheel machine
CN205558808U (en) Oil development pilot scale prospecting bit ground device
CN205092014U (en) Mark automatic machine that hangs of tablet
CN204713496U (en) A kind of sucker spacing regulator of paper-plastic packing machine
CN204341823U (en) A kind of transhipment support of automotive parts
CN204691670U (en) The built-in cylinder apparatus of rig
CN204590727U (en) Three-dimensional parking device hypotenuse is taken turns
CN204493368U (en) A kind of axle limit structure and use the long-spiral drilling machine of this axle limit structure
CN204386521U (en) Unload the supporting seat of pipe machine
CN207647478U (en) A kind of oil-well drilling equipment lifting pipe device
CN204012418U (en) A kind of cable testing bridge mounting auxiliary

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180522

Address after: 325000 room 506, Li Fu mansion, Gao Tian Road, Wenzhou, Zhejiang.

Patentee after: Zhejiang Yun Xin Decoration Engineering Co., Ltd.

Address before: 325000 room 402, 29 lane, liming West Road, Lucheng District, Wenzhou, Zhejiang, 402

Patentee before: Wenzhou City, the United States and Construction Engineering Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20190718

CF01 Termination of patent right due to non-payment of annual fee