CN205760407U - A kind of ultra-clean dust arrester - Google Patents

A kind of ultra-clean dust arrester Download PDF

Info

Publication number
CN205760407U
CN205760407U CN201620553237.7U CN201620553237U CN205760407U CN 205760407 U CN205760407 U CN 205760407U CN 201620553237 U CN201620553237 U CN 201620553237U CN 205760407 U CN205760407 U CN 205760407U
Authority
CN
China
Prior art keywords
water inlet
pipe
gas wash
tower
tower body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620553237.7U
Other languages
Chinese (zh)
Inventor
李连清
刘颍
李瑞龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG LIAOCHENG SANYANG ENVIRONMENTAL PROTECTION INDUSTRY Co.,Ltd.
Original Assignee
李连清
刘颍
李瑞龙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李连清, 刘颍, 李瑞龙 filed Critical 李连清
Priority to CN201620553237.7U priority Critical patent/CN205760407U/en
Application granted granted Critical
Publication of CN205760407U publication Critical patent/CN205760407U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of ultra-clean dust arrester, it is to utilize water that flue gas is cleaned multiple times, the clearance efficient energy-saving water-saving dust arrester up to 99.99%, structure is: is provided with in gas wash tower tower body (2) and organizes gas barrier (23,25,27) and water-accepting board (26,24) more, it is provided with on dividing plate and leads smoke pipe (18) and cyclone (29), lead smoke pipe (18) top to be connected with antidrip cap (19), cyclone (29) top is fixedly connected with water inlet pipe (3,5,6) and shower nozzle (30), and bottom is fixedly connected with spiral board (28);Water inlet pipe (3,5,6) is connected with the outlet of force (forcing) pump (8,10,11), and the other end is through with shower nozzle (30) fixing to be connected.In the side of gas wash tower tower body (2), it is installed with three sedimentation tanks, in each sedimentation tank (12,14,16), is installed with force (forcing) pump (8,10,11).

Description

A kind of ultra-clean dust arrester
Technical field:
This utility model relates to the device of a kind of middle dust that removes smoke specially.
Background technology:
At present, China's haze is serious, and its main cause carrys out discharge (the mainly steel of the industrial waste gas such as spontaneous combustion coal, fuel oil Ferrum, cement, thermoelectricity) and motor vehicles, peasant's burning straw and building airborne dust etc..The method of dedusting is nothing more than filtering, centrifugal, quiet The modes such as electricity, spray, filtrating type dedusting has another name called bag-type dusting, not only needs often to clear up, and invalid to PM2.5 micronic dust;From Core type dedusting noise is big, is also to remove oarse-grained dust, although electrostatic dedusting effect is preferable, but it is more to consume energy, if Standby complicated, relatively costly, fault rate is the highest;Fountain dust removing effects still can, but waste certain water resource.
Summary of the invention:
This utility model discloses a kind of ultra-clean dust arrester, it is therefore an objective to: on the premise of water saving, economize on electricity, create one effect The most good ultra-clean dust arrester.
Technical scheme is: in the large cylindrical container that a fiberglass is made, and is provided with 2~6 groups of spray equipments, organizes number The most, dust removing effects is the best, but cost is the highest, can select as the case may be;Often group spray equipment can make dust removal efficiency improve 0.5~1 order of magnitude, the structure of spray equipment is: often group is divided into by the fiberglass dividing plate of upper and lower two-layer horizontal direction up and down Two cavitys, upper side partition is gas barrier, and lower side partition is water-accepting board, and each fiberglass dividing plate uniformly has 7~100 The circular hole of (determining quantity according to the exhaust gas volumn processed) equal diameter, each circular hole of water-accepting board is fixedly connected with glass steel Become columnar leads smoke pipe and antidrip cap that fiberglass is made, and the profile of antidrip cap is the hollow cone bodily form of bamboo hat shape;Every Being fixedly connected with the cyclone that plastics are made in the perforate of gas plate, cyclone is a cylindrical section shape extra heavy pipe, and top is fixedly connected with Water inlet pipe and shower nozzle;Installing a shower nozzle in each cyclone, cyclone bottom is fixedly connected with one group of spiral board, spiral board Also be the swash plate being made of plastics, the air inlet turbofan of profile such as medium-long range passenger plane electromotor (turbofan type), its outside with The inwall of cyclone is fixing to be connected, and internal fixing with one section of plastic pipe closed is connected.It is not perfectly level that water-accepting board is installed , but towards the direction inclination 5 ° of soil pipe and recovery tube, in order to sewage flows out smoothly.Gas outlet is by falling that fiberglass is made Funnel-form, is fixedly connected on gas wash tower tower body top, the tubulose that smoke inlet is also made up of fiberglass, is fixedly connected on gas wash tower Tower body lower side, does not install and leads smoke pipe and antidrip cap for bottom one group.The funnel-form that gas outlet is made up of fiberglass, Gu Surely it is connected to gas wash tower tower body top, the tubulose that smoke inlet is also made up of fiberglass, is fixedly connected on gas wash tower tower body bottom Side;Being the tower base plate made of fiberglass bottom gas wash tower tower body, tower base plate is fixed on the tower seat that concrete is made, and tower seat is Construct cone table top on the ground, in the side of gas wash tower tower body, also construct the stepped base fixed on the ground, Stepped base is the three rank platforms that the height of concrete casting is different, is installed with three sedimentation tanks above: the highest Primary sedimentation basin, second highest secondary sedimentation tank and minimum three sedimentation tanks, primary sedimentation basin, secondary sedimentation tank and three times are heavy Shallow lake Chi Doushi is by fiberglass or adds waterproof brick concrete and makes, and is installed with force (forcing) pump, sidewall in each sedimentation tank Top fixes through connection once overflow pipe, secondary overflow pipe respectively.The lower end of one, two, three recovery tube is fixedly connected on The bottom of sedimentation tank.The through fixing connection of outlet of water inlet pipe and a force (forcing) pump, a water inlet pipe upper end enters removes After chimney tower body, enter through with shower nozzle after each cyclone fixing be connected, the upper end peace of a recovery tube by multistage bifurcated Being contained on the sidewall of gas wash tower tower body, lower end is inserted in primary sedimentation basin;Secondary water inlet pipe passes through with the outlet of secondary pressing pump Logical fixing connection, after the other end enters gas wash tower tower body, passes through with shower nozzle after entering each cyclone of second-order by multistage bifurcated Logical fixing connection, the upper end of secondary returning closed tube is arranged on the sidewall of gas wash tower tower body, and lower end is inserted in secondary sedimentation tank, three times The through fixing connection of outlet of water inlet pipe and three force (forcing) pumps, after the other end enters gas wash tower tower body, is entered by multistage bifurcated Through with shower nozzle after entering each cyclone on the 3rd rank fixing being connected, the upper end of three recovery tubes is arranged on the side of gas wash tower tower body Bottom wall, the lower end of three recovery tubes is inserted in three sedimentation tanks, the water often organizing dust arrester so can be made not mix, improve Efficiency of dust collection, each moisturizing, only supplement just in primary sedimentation basin, many water spills over secondary and three precipitations by overflow pipe In pond.
What this utility model was claimed is mainly technically characterized ny: gas wash tower tower body is hollow cylinder, and leading smoke pipe is one Cylindrical section shape extra heavy pipe, leads smoke pipe and is fixedly connected on below in the perforate of water-accepting board, and top is fixing with antidrip cap to be connected, on gas barrier Being fixedly connected with cyclone, cyclone top is fixedly connected with water inlet pipe, secondary water inlet pipe, three water inlet pipes and shower nozzle, Bottom is fixedly connected with spiral board, and gas outlet is fixedly connected on gas wash tower tower body top, and smoke inlet is fixedly connected on gas wash tower tower Body bottom.
What this utility model was claimed secondary technology is characterized in that the outlet of a water inlet pipe and a force (forcing) pump is through Fixing connection, after one time water inlet pipe upper end enters gas wash tower tower body, passes through with shower nozzle after entering each cyclone by multistage bifurcated Logical fixing connection, the upper end of a recovery tube is arranged on the sidewall of gas wash tower tower body, and lower end is inserted in primary sedimentation basin;Secondary Water inlet pipe is through with the outlet of secondary pressing pump fixing to be connected, and after the other end enters gas wash tower tower body, is entered by multistage bifurcated Through with shower nozzle after entering each cyclone of second-order fixing being connected, the upper end of secondary returning closed tube is arranged on the sidewall of gas wash tower tower body On, lower end is inserted in secondary sedimentation tank, the through fixing connection of outlet of three water inlet pipes and three force (forcing) pumps, and the other end enters After gas wash tower tower body, through with shower nozzle entered each cyclone on the 3rd rank by multistage bifurcated after fixing it is connected, reclaims for three times The upper end of pipe is arranged on the sidewall bottom of gas wash tower tower body, and the lower end of three recovery tubes is inserted in three sedimentation tanks.
The beneficial effects of the utility model are:
The highest dirt clearance the most of the present utility model is up to 99.99%, and clean effect is good, can remove little to 2 μm Micronic dust, has the highest efficiency of dust collection, has relatively particularly with dust granules tiny in flue gas, aerosol, metallic particles etc. Strong removal ability.
2. economize on electricity, water saving, power consumption is the electricity consumption of three water pumps, ratio electrostatic energy-conservation 90%, than centrifugal and filtration Formula energy-conservation 50%, ratio general fountain water saving 70%, and water can recycle after processing using filter pressing level.
Accompanying drawing illustrates:
The most in conjunction with the accompanying drawings:
Fig. 1 is overall longitudinal section of the present utility model.
Fig. 2 is the partial sectional view of this utility model cyclone overall picture.
Fig. 3 is the partial sectional view leading smoke pipe overall picture of the present utility model.
In figure: 1. gas outlet, 2. gas wash tower tower body, a 3. water inlet pipe, 4. secondary returning closed tube, 5. two water inlet pipes, 6. Three water inlet pipes, 7. a recovery tube, 8. three force (forcing) pumps, 9. an overflow pipe, 10. secondary pressing pump, 11. once pressurize Pump, 12. primary sedimentation basins, 13. stepped bases, 14. secondary sedimentation tanks, 15. 2 overflow pipes, 16. 3 sedimentation tanks, 17. Three recovery tubes, 18. lead smoke pipe, 19. antidrip caps, 20. tower seats, 21. tower base plates, 22. smoke inlets, 23. gas barriers, 24. water receivings Plate, 25. gas barriers, 26. water-accepting boards, 27. gas barriers, 28. spiral boards, 29. cyclones, 30. shower nozzles, 31. ring flanges, 32. Bar.
Detailed description of the invention
This utility model includes gas outlet 1, gas wash tower tower body 2, a water inlet pipe 3, secondary returning closed tube 4, secondary water inlet pipe 5, three water inlet pipes 6, a recovery tube 7, three force (forcing) pumps 8, an overflow pipe 9, secondary pressing pump 10, a force (forcing) pump 11, Primary sedimentation basin 12, stepped base 13, secondary sedimentation tank 14, secondary overflow pipe 15, three sedimentation tanks 16, three recovery tubes 17, lead smoke pipe 18, antidrip cap 19, tower seat 20, tower base plate 21, smoke inlet 22, gas barrier 23,25,27, water-accepting board 24,26, eddy flow Plate 28, cyclone 29, shower nozzle 30, ring flange 31, pole 32.
The hollow cylinder that gas wash tower tower body 2 is made up of fiberglass;Water inlet pipe 3, secondary returning closed tube 4, secondary enters Water pipe 5, three water inlet pipes 6, a recovery tube 7, an overflow pipe 9, secondary overflow pipe 15, three recovery tubes 17 be all common from Come water pipe (galvanizing welded tube), a force (forcing) pump 11, secondary pressing pump 10, and three force (forcing) pumps 8 and use pressure common immersible pump, Commercially available finished product is all belonged to charging pump and tubing.Leading smoke pipe 18 and antidrip cap 19 is also made up of fiberglass, leading smoke pipe 18 is one section Cylindrical shape extra heavy pipe, center non-structure, it is fixedly connected on below in the perforate of water-accepting board 24,26, pole 32 is passed through with antidrip in top Cap 19 is fixing to be connected, and pole 32 is made up of steel rod, and outside is enclosed with fiberglass and protects, antidrip cap 19 be fiberglass make as The hollow cone of bamboo hat shape.Outside water-accepting board 24,26 and gas barrier 23,25,27 and tower base plate 21 are all made up of fiberglass The circular slab that footpath is identical with gas wash tower tower body 2 internal diameter, has above and leads smoke pipe 18 and cyclone 29 quantity is identical, size is corresponding Uniform manhole, gas barrier 23,25,27 is fixedly connected with cyclone 29, cyclone 29 be by PP (polypropylene) make The cylindrical section shape extra heavy pipe become, top is fixedly connected with water inlet pipe 3,5, three water inlet pipes 6 of secondary water inlet pipe respectively and sprays 30 (installing shower nozzles 30 in each cyclone 29), are fixedly connected with spiral board 28 in bottom, spiral board 28 is also by PP The swash plate that (polypropylene) is made, outside is fixing with the inwall of cyclone 29 to be connected, the internal one section of envelope made with PP (polypropylene) Pipe (one section of plastic tube weldering lastblock plectane so that it is stuffiness) the fixing connection closed, cyclone 29 is outside by ring flange 31, It is fixedly connected in the perforate of gas barrier 23,25,27.Water-accepting board 24,26 and tower base plate 21 are not horizontally mounted, and are towards one Secondary recovery tube 7, the direction of 4, three recovery tubes 17 of secondary returning closed tube tilt 5 °, in order to sewage flows out smoothly.Gas outlet 1 is by glass Funnel-form that what glass steel was made fall, is fixedly connected on gas wash tower tower body 2 top, the tubulose that smoke inlet 22 is also made up of fiberglass, It is fixedly connected on gas wash tower tower body 2 lower side;It is the tower base plate 21 made of fiberglass bottom gas wash tower tower body 2, tower base plate 21 Being fixed on the tower seat 20 that concrete is made, tower seat 20 is to construct bevel head (5 °) cone table top on the ground, in dedusting The side of tower tower body 2, also constructs the stepped base 13 fixed on the ground, and stepped base 13 is that concrete casting forms The different three rank platforms of height, be installed with three sedimentation tanks above: the highest primary sedimentation basin 12, second highest secondary sinks Pond, shallow lake 14 and minimum three sedimentation tanks 16, primary sedimentation basin 12, secondary sedimentation tank 14 and three sedimentation tanks 16 are all by glass Steel or add waterproof brick concrete and make, is installed with force (forcing) pump 8,10,11, sidewall in each sedimentation tank 12,14,16 Top fixes through connection once overflow pipe 9, secondary overflow pipe 15 respectively.The lower end of one, two, three recovery tube 7,4,17 is solid Surely the bottom in sedimentation tank 12,14,16 it is connected to.
Water inlet pipe 3 is through with the outlet of a force (forcing) pump 11 fixing to be connected, and the other end enters gas wash tower tower body 2 After, entering through with shower nozzle 30 after each cyclone 29 fixing be connected by multistage bifurcated, the upper end of a recovery tube 7 is arranged on On the sidewall of gas wash tower tower body 2, lower end is inserted in primary sedimentation basin 12;Secondary water inlet pipe 5 and the outlet of secondary pressing pump 10 Through fixing connection, the other end enters after gas wash tower tower body 2, by multistage bifurcated enter after each cyclone of second-order 29 with spray 30 through fixing connections, the upper end of secondary returning closed tube 4 is arranged on the sidewall of gas wash tower tower body 2, and secondary precipitation is inserted in lower end In pond 14, three water inlet pipes 3 are through with the outlet of three force (forcing) pumps 8 fixing to be connected, after the other end enters gas wash tower tower body 2, Through with shower nozzle 30 entered each cyclone 29 on the 3rd rank by multistage bifurcated after fixing it is connected, the upper end of three recovery tubes 17 Being arranged on the sidewall bottom of gas wash tower tower body 2, the lower end of three recovery tubes 17 is inserted in three sedimentation tanks 16.
During use, as long as smoke inlet 22 is communicated with the flue of boiler, gas outlet 1 is communicated with air by chimney, once All fill it up with clear water in sedimentation tank 12,14, three sedimentation tanks 16 of secondary sedimentation tank, connect force (forcing) pump 11, secondary pressing pump 10, The power supply of three force (forcing) pumps 8, device just can work, water purification just from shower nozzle 30 with vaporific ejection, flue gas from bottom to top by Gradual change is cleaned, and water purification is the most dirty, and often through one-level, dust quantity can reduce by 0. five to an order of magnitude, this Embodiment is three grades, clearance 99%, if installing six grades, clearance up to 99.99%, this utility model low cost and efficiently Eliminate the dust in flue gas, contribute to a little the most meagre power for the blue sky and white cloud alleviating haze puzzlement, recovering motherland's the earth Amount.

Claims (2)

1. a ultra-clean dust arrester, including gas outlet (1), gas wash tower tower body (2), a water inlet pipe (3), secondary returning closed tube (4), secondary water inlet pipe (5), three water inlet pipes (6), a recovery tube (7), three force (forcing) pumps (8), an overflow pipe (9), two Secondary force (forcing) pump (10), a force (forcing) pump (11), primary sedimentation basin (12), stepped base (13), secondary sedimentation tank (14), secondary Overflow pipe (15), three sedimentation tanks (16), three recovery tubes (17), lead smoke pipe (18), antidrip cap (19), tower seat (20), at the bottom of tower Plate (21), smoke inlet (22), gas barrier (23,25,27), water-accepting board (24,26), spiral board (28), cyclone (29), shower nozzle (30), ring flange (31), pole (32), it is characterised in that gas wash tower tower body (2) is hollow cylinder, leading smoke pipe (18) is one Cylindrical section shape extra heavy pipe, leads smoke pipe (18) and is fixedly connected on below in the perforate of water-accepting board (24,26), and top is solid with antidrip cap (19) Fixed connection, gas barrier (23,25,27) is fixedly connected with cyclone (29), and cyclone (29) top is fixedly connected with once to enter Water pipe (3) secondary water inlet pipe (5), three water inlet pipes (6) and shower nozzle (30), bottom is fixedly connected with spiral board (28), gas outlet (1) being fixedly connected on gas wash tower tower body (2) top, smoke inlet (22) is fixedly connected on gas wash tower tower body (2) bottom.
The ultra-clean dust arrester of one the most according to claim 1, it is characterised in that water inlet pipe (3) with once pressurize The through fixing connection of outlet of pump (11), after one time water inlet pipe (3) upper end enters gas wash tower tower body (2), by multistage bifurcated Entering that each cyclone (29) is through with shower nozzle (30) afterwards fixing to be connected, the upper end of a recovery tube (7) is arranged on gas wash tower tower On the sidewall of body (2), lower end is inserted in primary sedimentation basin (12);Secondary water inlet pipe (5) and the outlet of secondary pressing pump (10) Through fixing connection, after the other end enters gas wash tower tower body (2), after entering each cyclone of second-order (29) by multistage bifurcated Through with shower nozzle (30) fixing being connected, the upper end of secondary returning closed tube (4) is arranged on the sidewall of gas wash tower tower body (2), and lower end is inserted In entering secondary sedimentation tank (14), three water inlet pipes (3) are through with the outlet of three force (forcing) pumps (8) fixing to be connected, and the other end enters After entering gas wash tower tower body (2), each cyclone (29) being entered the 3rd rank by multistage bifurcated is through with shower nozzle (30) fixing afterwards Connecting, the upper end of three recovery tubes (17) is arranged on the sidewall bottom of gas wash tower tower body (2), the lower end of three recovery tubes (17) Insert in three sedimentation tanks (16).
CN201620553237.7U 2016-06-02 2016-06-02 A kind of ultra-clean dust arrester Active CN205760407U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620553237.7U CN205760407U (en) 2016-06-02 2016-06-02 A kind of ultra-clean dust arrester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620553237.7U CN205760407U (en) 2016-06-02 2016-06-02 A kind of ultra-clean dust arrester

Publications (1)

Publication Number Publication Date
CN205760407U true CN205760407U (en) 2016-12-07

Family

ID=58133760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620553237.7U Active CN205760407U (en) 2016-06-02 2016-06-02 A kind of ultra-clean dust arrester

Country Status (1)

Country Link
CN (1) CN205760407U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108722074A (en) * 2018-06-01 2018-11-02 安徽理工大学 A kind of Novel chimney exhaust gas atomization dust-collecting equipment
CN114269453A (en) * 2019-05-24 2022-04-01 知地恩环保科技有限公司 Wet dust collecting unit and wet dust collecting device using same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108722074A (en) * 2018-06-01 2018-11-02 安徽理工大学 A kind of Novel chimney exhaust gas atomization dust-collecting equipment
CN114269453A (en) * 2019-05-24 2022-04-01 知地恩环保科技有限公司 Wet dust collecting unit and wet dust collecting device using same

Similar Documents

Publication Publication Date Title
CN101601954B (en) Oil smoke purifying device
CN204275742U (en) Cyclone wet-type sack cleaner
CN205760407U (en) A kind of ultra-clean dust arrester
CN105625557B (en) Integrated sewage disposal pumping plant
CN101545628B (en) Dust removing and residual heat recovery device of boiler
CN205392073U (en) Fountain smoke treatment device
CN103949349A (en) Apparatus for cleaning and discharging liquid in purifying case of oil smoke purifier
CN205308039U (en) Wet dust collector
CN102240494B (en) Oily fume purification machine
CN202199207U (en) Environment-friendly industrial sewage treatment equipment
CN104964325A (en) Oil fume extraction purifier
CN205604431U (en) Purifier is collected to rainwater
CN204778939U (en) Oil -water separation apparatus
CN211913155U (en) Novel air purification equipment
CN201175637Y (en) Water curtain spray eliminator
CN201783281U (en) Tertiary dust removal chamber for spray tower
CN201470268U (en) Oil smoke purifier
CN203281176U (en) Dust removing and filtering device for chimney
CN208305361U (en) A kind of marble slab production dust-extraction unit
CN203440116U (en) High-efficiency air flotation device
CN203128516U (en) Combined washing apparatus
CN105056639A (en) Spiral pipe gas-liquid separation method
CN201848125U (en) Automatic sludge-removing circulating sedimentation basin for dedusting equipment
CN201470229U (en) Environment-friendly dust suppression device
CN212283330U (en) Coarse fuel gas purification spray tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220307

Address after: Maguantun village, Liuyuan street, Liaocheng City, Shandong Province

Patentee after: SHANDONG LIAOCHENG SANYANG ENVIRONMENTAL PROTECTION INDUSTRY Co.,Ltd.

Address before: 252000 family hospital of the third squadron of criminal police, Limin East Road, Dongchangfu District, Liaocheng City, Shandong Province

Patentee before: Li Lianqing

Patentee before: Liu Ying

Patentee before: Li Ruilong

TR01 Transfer of patent right