CN205749581U - Formula connecting plug changed by earth-continuity tester - Google Patents

Formula connecting plug changed by earth-continuity tester Download PDF

Info

Publication number
CN205749581U
CN205749581U CN201620465737.5U CN201620465737U CN205749581U CN 205749581 U CN205749581 U CN 205749581U CN 201620465737 U CN201620465737 U CN 201620465737U CN 205749581 U CN205749581 U CN 205749581U
Authority
CN
China
Prior art keywords
earth
wire holder
insulation wire
clamping bar
continuity tester
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620465737.5U
Other languages
Chinese (zh)
Inventor
张翔
常宇星
杨晟
贾婷
骆嘉敏
李丽丽
刘瑞
薛继斌
刘星
骆瑞
刘向阳
孙宝瑾
任健铭
闫志乾
刘永笑
金阳
孙瑾
杨晓玉
郭利华
祁菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Taiyuan Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Taiyuan Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Taiyuan Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620465737.5U priority Critical patent/CN205749581U/en
Application granted granted Critical
Publication of CN205749581U publication Critical patent/CN205749581U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

This utility model relates to power department detection instrument, it is specially a kind of earth-continuity tester and changes formula connecting plug, including insulation wire holder (1), two wiring holes (2) are offered in described insulation wire holder (1) front, arranging copper thread bush (3) in described wiring hole (2), described copper thread bush (3) is connected with the test lead (4) penetrated by insulation wire holder (1) back side in wiring hole (2);Installation irony clamping bar (5) is screwed in described copper thread bush (3);Two irony clamping bars (5) are used for being plugged in band iron (6) edge.This utility model is reasonable in design, plug uses replacing formula, irony clamping bar is threaded onto in insulation wire holder by helicitic texture, after clamping bar is used for multiple times damage, making new clamping bar, insulation wire holder can reuse, simple and easy to use, and attractive in appearance, there is good practicality and market using value.

Description

Formula connecting plug changed by earth-continuity tester
Technical field
This utility model relates to power department detection instrument, is specially a kind of earth-continuity tester and changes formula connecting plug.
Background technology
In power department transformer station, power equipment needs to be connected ground connection with the earth mat being embedded in underground, as shown in Figure 2 by band iron and wire.At present, operation maintenance personnel uses earth-continuity tester to detect whether charging equipment is reliably connected with earth mat by band iron, it is ensured that charging equipment is in good ground state all the time.One group of I on earth-continuity tester+Binding post and V+Binding post connects wire respectively, and wire is wound on bobbin, and two wires are connected with simple homemade locking-type plug again, and plug is exactly briefly that wire termination fixes two taper irons by being wound around insulating tape and ambroin connection.In like manner, the group of another on earth-continuity tester I-Binding post and V-Binding post also connects another plug.Wherein, one plug inserts at the connection band iron of power equipment, the next junction point that the grounded screen that is connected to another plug elevates above the soil, detected the resistance of this band iron by earth-continuity tester, if in qualified scope, then show that this equipment and grounded screen are in the state of being reliably connected, if test resistance is beyond acceptability limit, the most likely show that this equipment is unreliable with the connection of earth mat, then need operation maintenance personnel to carry out detailed inspection, get rid of hidden danger.
In above-mentioned testing tool, owing to self-control plug is the simplest and the crudest, being wound around simply by insulating tape and be connected with test lead, plug cannot be changed, if plug damages, is again wound around self-control plug with insulating tape, causes test job inconvenience after the most only cutting off wire.
Summary of the invention
The purpose of this utility model is that plug is simple and crude, impracticable, plug damages the most easily changeable problem for utilizing earth-continuity tester to connect when carrying out Earthing Reliability test, it is provided that a kind of novel changeable type connecting plug, improves work efficiency.
This utility model adopts the following technical scheme that realization:
Formula connecting plug changed by a kind of earth-continuity tester, including insulation wire holder, two wiring holes are offered in described insulation wire holder front, arrange copper thread bush in described wiring hole, and described copper thread bush is connected with the test lead penetrated in wiring hole by the insulation wire holder back side;Installation irony clamping bar is screwed in described copper thread bush;Two irony clamping bars are used for being plugged in band iron edge.
During use, two irony clamping bars are screwed in by its tailing screw flight in the copper thread bush of insulation wire holder.One group of I of earth-continuity tester+Binding post and V+Binding post connects a plug, excess wire is then wound on bobbin to save space, utilize on the gap portion insertion equipment of two clamping bars on plug for the edge of ground connection band iron, or, the tapering portions of two clamping bars is contacted by hand-held plug with ground connection band iron;Another group I of earth-continuity tester-Binding post and V-Binding post connects the metal holder of tape insulation shell by test lead, is stepped up the metal part (or having identified at the ground connection band iron of the good charging equipment of ground connection) of grounded screen by clip, it is achieved conducting.During use, plug inserts in by the connection band iron of side power equipment, the resistance of this band iron is detected by earth-continuity tester, if in qualified scope, then show that this equipment and grounded screen are in the state of being reliably connected, if test resistance is beyond acceptability limit, it is likely that show that this equipment is unreliable with the connection of earth mat, then need operation maintenance personnel to carry out detailed inspection, get rid of hidden danger.
This utility model is reasonable in design, plug uses replacing formula, irony clamping bar is threaded onto in insulation wire holder by helicitic texture, after clamping bar is used for multiple times damage, making new clamping bar, insulation wire holder can reuse, simple and easy to use, and attractive in appearance, there is good practicality and market using value.
Accompanying drawing explanation
Fig. 1 represents the connection diagram of connecting plug and earth-continuity tester.
Fig. 2 represents the ground connection schematic diagram of substation equipment.
In figure, 1-junction block, 2-wiring hole, the copper thread bush of 3-, 4-test lead, 5-irony clamping bar, 6-band iron, 7-earth-continuity tester, 8-bobbin, 9-equipment, 10-pedestal, 11-earth mat, 12-bolt, 13-lever.
Detailed description of the invention
Below in conjunction with the accompanying drawings specific embodiment of the utility model is described in detail.
Formula connecting plug changed by a kind of earth-continuity tester, as shown in Figure 1, including insulation wire holder 1, two wiring holes 2 are offered in described insulation wire holder 1 front, arranging copper thread bush 3 in described wiring hole 2, described copper thread bush 3 is connected with the test lead 4 penetrated in wiring hole 2 by insulation wire holder 1 back side;Described insulation wire holder 1 back side is provided with lever 13, facilitates hand-held plug.Installation irony clamping bar 5 is screwed in described copper thread bush 3;Two irony clamping bars 5 are used for being plugged in band iron 6 edge.Two test leads 4 being passed through wiring hole are connected with the current wiring terminal on earth-continuity tester 7 and voltage wiring terminal respectively by after bobbin 8.And, it is generally the case that it is more than the irony clamping bar diameter with voltage wiring terminal UNICOM with the irony clamping bar diameter of current wiring terminal UNICOM.The diameter of irony clamping bar is tapered into its end by its root.
As in figure 2 it is shown, charging equipment 9 is reliably connected with earth mat 11 located underground by band iron 6 in transformer station.Wherein, band iron 6 is fixed on pedestal 10 by bolt 12, has certain gap between the pedestal 10 of band iron 6 and concrete.
Time specifically used, as it is shown in figure 1, the I of earth-continuity tester+Binding post and V+Binding post connects a plug, excess wire is then wound on bobbin to save space, utilize on the gap portion insertion equipment of two clamping bars on plug for the edge of ground connection band iron, or, the tapering portions of two clamping bars is contacted by hand-held plug with ground connection band iron;The I of earth-continuity tester-Binding post and V-Binding post connects the metal holder of tape insulation shell by test lead, is stepped up the metal part (or having identified at the ground connection band iron of the good charging equipment of ground connection) of grounded screen by clip, it is achieved conducting;Then test resistance.During test, it is generally required to two people cooperate to carry out, a people is reliably connected place's operation equipment in metal holder and grounded screen, and another people then holds bobbin and plug at the band iron of Devices to test, utilizes plug connection band iron and earth-continuity tester UNICOM.
Finally it should be noted that; above example is only in order to illustrate the technical solution of the utility model and unrestricted; although being described in detail with reference to this utility model embodiment; it will be understood by those within the art that; the technical solution of the utility model is modified or equivalent; without departure from the spirit and scope of the technical solution of the utility model, it all should be contained in claims of the present utility model.

Claims (5)

1. formula connecting plug changed by an earth-continuity tester, it is characterized in that: include insulation wire holder (1), two wiring holes (2) are offered in described insulation wire holder (1) front, arranging copper thread bush (3) in described wiring hole (2), described copper thread bush (3) is connected with the test lead (4) penetrated by insulation wire holder (1) back side in wiring hole (2);Installation irony clamping bar (5) is screwed in described copper thread bush (3);Two irony clamping bars (5) are used for being plugged in band iron (6) edge.
Formula connecting plug changed by earth-continuity tester the most according to claim 1, it is characterised in that: two test leads (4) being passed through wiring hole are connected with the current wiring terminal on earth-continuity tester (7) and voltage wiring terminal respectively by after bobbin (8).
Formula connecting plug changed by earth-continuity tester the most according to claim 2, it is characterised in that: it is more than the irony clamping bar diameter with voltage wiring terminal UNICOM with the irony clamping bar diameter of current wiring terminal UNICOM.
Formula connecting plug changed by earth-continuity tester the most according to claim 3, it is characterised in that: the diameter of described irony clamping bar (5) is tapered into its end by its root.
Formula connecting plug changed by earth-continuity tester the most according to claim 4, it is characterised in that: described insulation wire holder (1) back side is provided with lever (13).
CN201620465737.5U 2016-05-20 2016-05-20 Formula connecting plug changed by earth-continuity tester Active CN205749581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620465737.5U CN205749581U (en) 2016-05-20 2016-05-20 Formula connecting plug changed by earth-continuity tester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620465737.5U CN205749581U (en) 2016-05-20 2016-05-20 Formula connecting plug changed by earth-continuity tester

Publications (1)

Publication Number Publication Date
CN205749581U true CN205749581U (en) 2016-11-30

Family

ID=57361477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620465737.5U Active CN205749581U (en) 2016-05-20 2016-05-20 Formula connecting plug changed by earth-continuity tester

Country Status (1)

Country Link
CN (1) CN205749581U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107607841A (en) * 2017-09-12 2018-01-19 国家电网公司 High voltage electrical test guard system
CN109061370A (en) * 2018-09-10 2018-12-21 国网山东省电力公司潍坊供电公司 A kind of substation grounding continuity test two pointer type touch operation bar
CN109142956A (en) * 2018-09-10 2019-01-04 国网山东省电力公司潍坊供电公司 The portable crosspointer touch operation device of substation grounding continuity test
CN113406536A (en) * 2021-06-21 2021-09-17 江苏润泰电力设备有限公司 Grounding detection device for power station installation and debugging

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107607841A (en) * 2017-09-12 2018-01-19 国家电网公司 High voltage electrical test guard system
CN107607841B (en) * 2017-09-12 2020-09-18 国家电网公司 High-voltage electrical test protection system
CN109061370A (en) * 2018-09-10 2018-12-21 国网山东省电力公司潍坊供电公司 A kind of substation grounding continuity test two pointer type touch operation bar
CN109142956A (en) * 2018-09-10 2019-01-04 国网山东省电力公司潍坊供电公司 The portable crosspointer touch operation device of substation grounding continuity test
CN113406536A (en) * 2021-06-21 2021-09-17 江苏润泰电力设备有限公司 Grounding detection device for power station installation and debugging

Similar Documents

Publication Publication Date Title
CN205749581U (en) Formula connecting plug changed by earth-continuity tester
CN203491485U (en) Secondary circuit wiring terminal strip short-circuiting plug for power plant or transformer station
CN201788200U (en) Special test clamp for direct-current resistance test
CN204142947U (en) Secondary terminals shorting stub is used in mutual inductor test
CN202977026U (en) Insulation wire clamp
CN206331066U (en) A kind of overhead transmission line electric leakage addressing instrument
CN205665268U (en) Ground connection conduction testing appearance file formula wiring plug
CN206209041U (en) A kind of secondary cable alignment device
CN203981710U (en) A kind of Assisted Combinatorial device that is applicable to megger method test power distribution network stake resistance
CN204103198U (en) Locomotive air conditioning device test short connector
CN203054008U (en) Special-purpose voltage transformer test wiring device
CN203572846U (en) Detection line for connection of 2M coaxial signal cable
CN203365556U (en) Temporary earthing device for public change earth resistance measurement
CN205910290U (en) Earth fault positioning device
CN207542415U (en) A kind of omnipotent ground connection crossover sub
CN205880107U (en) Reserve core of cable extends and connects
CN204228805U (en) 10kV closes the portable live testing device of high-voltage board
CN205080185U (en) Prevent electricity intelligence ground borer
CN205920184U (en) Detection circuit
CN206208928U (en) Intelligent substation phase tests Special test line
CN203551668U (en) An auxiliary ground resistance measuring apparatus
CN203787931U (en) 35kV-type cable connector
CN204789854U (en) Digital cable is to core appearance
CN203056528U (en) Anti-short-circuit and anti-false-wiring insulated conductor bushing
CN207800949U (en) A kind of earthing wire clip

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant