CN205747131U - Non junction formula hot and cold water installation system - Google Patents

Non junction formula hot and cold water installation system Download PDF

Info

Publication number
CN205747131U
CN205747131U CN201620534370.8U CN201620534370U CN205747131U CN 205747131 U CN205747131 U CN 205747131U CN 201620534370 U CN201620534370 U CN 201620534370U CN 205747131 U CN205747131 U CN 205747131U
Authority
CN
China
Prior art keywords
water
hot
supervisor
cold
cold water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620534370.8U
Other languages
Chinese (zh)
Inventor
潘茂江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINCHANG COUNTY RUAO TOWN NUOYI MECHANICAL FACTORY
Original Assignee
XINCHANG COUNTY RUAO TOWN NUOYI MECHANICAL FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINCHANG COUNTY RUAO TOWN NUOYI MECHANICAL FACTORY filed Critical XINCHANG COUNTY RUAO TOWN NUOYI MECHANICAL FACTORY
Priority to CN201620534370.8U priority Critical patent/CN205747131U/en
Application granted granted Critical
Publication of CN205747131U publication Critical patent/CN205747131U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Multiple-Way Valves (AREA)

Abstract

The utility model discloses a kind of non junction formula hot and cold water installation system, belong to hot water pipe mounting technique field.This utility model includes cold water pipe, hot-water line and the most a set of water knockout drum, water knockout drum PEXC material injection makes molding, water knockout drum includes connecting the hot water of described hot-water line and divides water supervisor and connect the cold water of described cold water pipe and divide water to be responsible for, multiple hot water water segregator valve is offered in the lower end that hot water divides water to be responsible for, hot water water segregator valve is connected in water mixing valve by distributive pipe, cold water water segregator valve is offered in the lower end that cold water divides water to be responsible for, cold water water segregator valve is connected to water mixing valve or outlet valve by distributive pipe, cold water divides water supervisor and hot water to divide water supervisor to connect unified being installed in an installation case by link, box cavity is installed and is provided with thermostat.

Description

Non junction formula hot and cold water installation system
Technical field
This utility model belongs to hot water pipe mounting technique field, non junction under especially antifreeze with one, floor, can sub-control Non junction formula hot and cold water installation system relevant.
Background technology
Along with the lifting of living standard, being commonly installed hot water pipe when sprucing up, people are led to when needing to use hot water Cross hot water pipe mixing regulation to use to suitable temperature.Ppr pipe typically used by the material being currently used for installing hot water pipe, House, to easily bursting by freezing in winter, can be caused infiltration, thus cause economic loss by ppr pipe after leaking.Ppr pipe another lack Falling into is to install trouble, and the general set house of joint quantity being layed in underfloor artificial thermal welding needs about 200, manually Indirectly there are major safety risks in welding open country.
Utility model content
For problem present in above-mentioned background, the purpose of this utility model aims to provide a kind of simple in construction, installation side Just non junction formula hot and cold water installation system.
To this end, this utility model is by the following technical solutions: non junction formula hot and cold water installation system, including cold water pipe and heat Water pipe, is characterized in that, described non junction formula hot and cold water installation system also includes the most a set of water knockout drum, and described water knockout drum leads to Crossing PEXC material injection and make molding, water knockout drum includes that the hot water connecting described hot-water line divides water supervisor and connects described cold water pipe Cold water divide water to be responsible for, multiple hot water water segregator valve is offered in the lower end that hot water divides water to be responsible for, hot water water segregator valve by point Water pipe is connected in water mixing valve, and cold water water segregator valve is offered in the lower end that cold water divides water to be responsible for, and cold water water segregator valve is by dividing Water pipe is connected to water mixing valve or outlet valve, and cold water divides water supervisor and hot water to divide water supervisor to be installed on one by link connection is unified Install in case, box cavity is installed and is provided with thermostat.
As supplementing technique scheme and perfect, this utility model also includes techniques below feature.
The bleeder that the hot water connecting described hot water water segregator valve divides water to be responsible for and the described cold water water segregator valve of connection The cold water bleeder of dividing water to be responsible for be provided with the copper pipe fitting for connecting valve.
Described hot water divide water supervisor and cold water divide water be responsible for quantity everybody one, hot water divide water supervisor with cold water divide water Supervisor's transverse horizontal arrangement, hot water divides water supervisor to be positioned at the top that cold water divides water to be responsible for.
The quantity that described hot water divides water supervisor and cold water to divide water to be responsible for is respectively two, and two hot water divide water to be responsible for or two Cold water divides series connection between water supervisor laterally to lay.
Every hot water divides water supervisor and every cold water to divide between water supervisor fixing by two links connections.
Use this utility model can reach following beneficial effect: this utility model install simple, hot water divide water supervisor and Cold water divides water supervisor to make molding by PEXC material, by arranging thermostat in installing case, thus plays time in the winter time Antifreeze effect, the pipeline under laying floor without any manual joint, pipe fitting can 360 degree of rotations, thus greatly reduce The labor intensity of human weld.This utility model solves the problem that antifreeze leakproof eliminates safe hidden trouble, thus reduces property and damage Lose, reduce neighbourhood's dispute, beneficially social harmony.On the other hand, this utility model energy-conserving and environment-protective, energy-conservation 13% 20%, right Country can reduce haze.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in detail.
Embodiment: as it is shown in figure 1, this utility model includes cold water pipe, hot-water line and a set of water knockout drum, water knockout drum passes through PEXC material injection makes molding, and often set water knockout drum includes that the hot water connecting hot-water line divides water supervisor 1 and connects the cold of cold water pipe Moisture water supervisor 2, hot water divides the lower end of water supervisor 1 to offer multiple hot water water segregator valve 4, and hot water water segregator valve 4 is by dividing Water pipe is connected in water mixing valve, and cold water divides the lower end of water supervisor 2 to offer cold water water segregator valve 5, and cold water water segregator valve 5 passes through Distributive pipe is connected to water mixing valve or outlet valve, and cold water water segregator valve 5 is connected to water mixing valve or outlet valve by distributive pipe, connects The hot water of hot water water segregator valve 4 divides the bleeder of water supervisor 1 and the cold water of connection cold water water segregator valve 5 to divide water supervisor's 2 Bleeder is provided with the copper pipe fitting for connecting valve.Cold water divides water supervisor 2 and hot water to divide water supervisor 1 by two links 3 even Connect unified being installed in an installation case, box cavity is installed and is provided with thermostat 6.Hot water divides water supervisor 1 and cold water to divide water supervisor 2 horizontal To horizontally arranged, hot water divides water supervisor 1 to be positioned at cold water and divides the top of water supervisor 2.Control often as valve with overall plastic water knockout drum Road water pipe, upper row controls hot water, lower row controls cold water.The hot water pipe drinking-water pipe of 70 degree to 110 degree, any two tubes Do not intersect.
Further, cold water water segregator valve 5 is mop sink outlet, toilet seat water outlet by the outlet that pipeline connects Mouth, washing machine outlet etc., the outlet of water mixing valve is vegetable sink outlet, wash basin outlet, shower water mouth etc. Deng.
As another embodiment, the quantity that hot water divides water supervisor 1 and cold water to divide water supervisor 2 can also be respectively two, Two hot water divide water supervisor 1 or two cold water to divide series connection between water supervisor 2 laterally to lay.

Claims (5)

1. non junction formula hot and cold water installation system, including cold water pipe and hot-water line, it is characterised in that: described non junction formula is cold and hot Water installation system also includes the most a set of water knockout drum, and described water knockout drum PEXC material makes molding, often set point water by injection Device includes that the hot water connecting described hot-water line divides the cold water of water supervisor (1) and the described cold water pipe of connection to divide water to be responsible for (2), and hot water divides Multiple hot water water segregator valve (4) is offered in the lower end of water supervisor (1), and hot water water segregator valve (4) is connected to mix by distributive pipe In water valve, cold water divides the lower end of water supervisor (2) to offer cold water water segregator valve (5), and cold water water segregator valve (5) passes through distributive pipe Being connected to water mixing valve or outlet valve, cold water divides water supervisor (2) and hot water to divide water supervisor (1) to connect unified peace by link (3) It is loaded in an installation case, box cavity is installed and is provided with thermostat (6).
Non junction formula hot and cold water installation system the most according to claim 1, it is characterised in that: connect described hot water water knockout drum The hot water of valve (4) divides the bleeder of water supervisor (1) and the cold water of the described cold water water segregator valve (5) of connection to divide water to be responsible for (2) Bleeder be provided with the copper pipe fitting for connecting valve.
Non junction formula hot and cold water installation system the most according to claim 2, it is characterised in that: described hot water divides water to be responsible for (1) and cold water divide water supervisor (2) quantity everybody one, hot water divide water supervisor (1) and cold water divide water supervisor (2) transverse horizontal arrange Row, hot water divides water supervisor (1) to be positioned at cold water and divides the top of water supervisor (2).
Non junction formula hot and cold water installation system the most according to claim 2, it is characterised in that: described hot water divides water to be responsible for (1) and cold water divides the quantity of water supervisor (2) to be respectively two, two hot water divide water supervisor (1) or two cold water divide water supervisor (2) it Between series connection laterally lay.
5. according to the non junction formula hot and cold water installation system described in claim 3 or 4, it is characterised in that: every hot water divides water master Pipe (1) and every cold water divide to be connected by two links (3) between water supervisor (2) to be fixed.
CN201620534370.8U 2016-06-03 2016-06-03 Non junction formula hot and cold water installation system Expired - Fee Related CN205747131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620534370.8U CN205747131U (en) 2016-06-03 2016-06-03 Non junction formula hot and cold water installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620534370.8U CN205747131U (en) 2016-06-03 2016-06-03 Non junction formula hot and cold water installation system

Publications (1)

Publication Number Publication Date
CN205747131U true CN205747131U (en) 2016-11-30

Family

ID=57359840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620534370.8U Expired - Fee Related CN205747131U (en) 2016-06-03 2016-06-03 Non junction formula hot and cold water installation system

Country Status (1)

Country Link
CN (1) CN205747131U (en)

Similar Documents

Publication Publication Date Title
CN206145767U (en) Take underfloor heating system of monitor control device
CN205747131U (en) Non junction formula hot and cold water installation system
CN203637638U (en) Heat preservation tank for field dining car
CN204730260U (en) A kind of band is with the floor heating system of Cheng Buguan
CN206928384U (en) A kind of modified indoor water supply system
CN203550259U (en) Solar water heater auxiliary water tank
CN204645153U (en) Antifreezing water pipe
CN208349393U (en) A kind of mixed-flow electricity geothermal water-heating device
CN202770027U (en) Solar energy water heater water supply and drainage structure
CN206113106U (en) It opens central water supply system of instant heating promptly to need not return water
CN207317292U (en) A kind of electric-heating water energy storage heating and solar energy water energy storage heating complementary system
CN207362941U (en) A kind of integrated sink case
CN205641110U (en) Solar energy reaches system of preventing frostbite with hanging stove in coordination with heat supply water
CN103075761B (en) Temperature-adjusting and water-saving device for hot water system
CN205897332U (en) Controllable formula radiator of single tube series connection
CN203549974U (en) Floor heating manifold
CN204460789U (en) Intelligent temperature-difference backwater energy-saving control system
CN2879050Y (en) Water-saving box for solar water heater
CN210196734U (en) Layered parallel water supply and distribution device
CN204285833U (en) A kind of supplementary energy integrated solar hot water device
CN201401868Y (en) Floor heating water separator
CN201973940U (en) Heat transfer anti-freezing device of water tank
CN202153065U (en) Solar water pipe emptying device
CN202852974U (en) Hot water supply system
CN204678473U (en) A kind of water saving fixtures being applicable to domestic hot-water supply system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20170603

CF01 Termination of patent right due to non-payment of annual fee