CN205735950U - A kind of plastic pipe pipeline production line - Google Patents
A kind of plastic pipe pipeline production line Download PDFInfo
- Publication number
- CN205735950U CN205735950U CN201620669702.3U CN201620669702U CN205735950U CN 205735950 U CN205735950 U CN 205735950U CN 201620669702 U CN201620669702 U CN 201620669702U CN 205735950 U CN205735950 U CN 205735950U
- Authority
- CN
- China
- Prior art keywords
- plastic cement
- pipeline
- cement pipeline
- pipe
- station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004033 plastic Substances 0.000 title claims abstract description 208
- 229920003023 plastic Polymers 0.000 title claims abstract description 208
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 22
- 239000004568 cement Substances 0.000 claims abstract description 144
- 230000005540 biological transmission Effects 0.000 claims abstract description 49
- 238000000071 blow moulding Methods 0.000 claims abstract description 43
- 238000003860 storage Methods 0.000 claims abstract description 30
- 238000005520 cutting process Methods 0.000 claims abstract description 27
- 238000003756 stirring Methods 0.000 claims abstract description 25
- 238000002156 mixing Methods 0.000 claims abstract description 22
- 238000001816 cooling Methods 0.000 claims abstract description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 33
- 238000007599 discharging Methods 0.000 claims description 30
- 239000000463 material Substances 0.000 claims description 21
- 238000009434 installation Methods 0.000 claims description 15
- 230000000694 effects Effects 0.000 abstract description 11
- 230000005484 gravity Effects 0.000 abstract description 6
- 238000000465 moulding Methods 0.000 description 5
- 238000001125 extrusion Methods 0.000 description 4
- 239000002994 raw material Substances 0.000 description 4
- 238000007493 shaping process Methods 0.000 description 4
- 239000000654 additive Substances 0.000 description 3
- 230000000996 additive effect Effects 0.000 description 3
- 239000000975 dye Substances 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 238000003892 spreading Methods 0.000 description 3
- 238000007664 blowing Methods 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 239000012535 impurity Substances 0.000 description 2
- 241000628997 Flos Species 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Landscapes
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
Abstract
The utility model discloses a kind of plastic pipe pipeline production line, including batch mixing station, feeding station, blow molding station, cooling positional stations, traction station, cutting work station and discharge station.This utility model has the following advantages and effect: this programme utilizes new frame for movement, and when plastics carry out feeding, the screw mixer on storage bin hopper can start secondary stirring and conveniently plastics is transferred to conveying worm;Between blow moulding machine and cooler, positioner can prevent plastic cement pipeline from offseting because of gravity when transmission, plays the effect of localized delivery and guiding, and sponge and cylinder in the setting of the cooler other end match, it is possible to removed by the moisture on plastic cement pipeline;Flow in storage tank on registration roller thus remain in the plastic cement pipeline moisture to loss, it is possible to the moisture drawn on plastic cement pipeline by sponge is supplemented, and forms a circulation.
Description
Technical field
This utility model relates to the production field of plastic cement pipeline, particularly to a kind of plastic pipe pipeline production line.
Background technology
Plastic cement pipeline is widely used in the every field of daily life, and plastic cement pipeline blows generally by blow moulding machine
Molded, its production line is combined by a series of equipment, it is possible to needed for raw material machine-shaping step by step
Plastic cement pipeline.
At present, on market, publication No. is CN102310536A, and date of publication is that the Chinese patent on January 11st, 2012 discloses
A kind of plastic section strip processing system, this system is by extrusion molding apparatus, cooling and shaping device, traction apparatus and section cutting apparatus group
Becoming, this extrusion molding apparatus, cooling and shaping device, traction apparatus and section cutting apparatus are sequentially connected with, thus carry out plastic section strip
Processing.Compared with prior art, the present invention makes plastic section strip utilize chiller, traction apparatus, section cutting apparatus and extrusion molding
Device coordinates, and instead of traditional-handwork and completes the subsequent operation of extrusion molding plastic section strip, substantially increases production efficiency, and carry
High product quality.
This plastic section strip processing system aborning, the device the most not positioned because of plastic section strip, easily make
Become plastic cement type bar to offset downward because of the effect of gravity in the transmission, cause the excessive conflict in the lower end of plastic cement pipeline to make
Become the abrasion of plastic cement pipe surface.
Utility model content
The purpose of this utility model is to provide a kind of plastic pipe living according to principles for self-cultivation that can position plastic cement pipeline when transmission
Produce line.
Above-mentioned technical purpose of the present utility model has the technical scheme that a kind of plastic pipe road produces
Line, including batch mixing station, including blender, the storage bin hopper that is positioned at blender side;Feeding station, including being connected to described storing
Conveying worm on bucket;Blow molding station, including the feed hopper being connected with described conveying worm, blow moulding machine;Cooling
Positional stations, including cooler, the positioner that is arranged between described cooler and described blow moulding machine;Traction station, including
Traction machine, described traction machine includes and multiple are rotationally connected and conflict at the traction crawler belt of plastic cement pipeline week side, for driving
State traction crawler belt to extend close to or away from the actuator of plastic cement pipeline side shifting;Cutting work station, including cutting machine;Blankers
Position, including discharging frame, is arranged on described discharging frame side and the multiple guide rods extended towards bottom surface.
By using such scheme, in batch mixing station, raw materials for plastics production and various dyestuff, additive etc. pass through blender
It is stirred mixing, is transferred in storage bin hopper be collected at the raw materials for plastics production through batch mixing after stirring through blender;
After batch mixing station, the plastics through batch mixing are transferred to the feed hopper of blow molding station by the conveying worm of feeding station
Upper: after plastics enter from feed hopper, by blow moulding machine blow molding, to become plastic cement pipeline;At plastic cement pipeline from blow moulding machine
Entering into cooling positional stations after spreading out of, plastic cement pipeline is through high temperature blow molding, and its outer surface has certain stablizing, and needs
Carry out cooling and shaping by cooler, offset because of the effect of gravity, in blowing because plastic cement pipeline can exist when transmission
Positioner between machine and cooler enables to plastic cement pipeline and is transferred to smoothly cool down in cooler;Plastic cement pipeline
After cooler is gone out, enter into traction station, at the traction machine drawn on station by multiple conflicts in plastic cement pipeline week side
Traction crawler belt draw, traction machine is additionally provided with regulation traction crawler belt and is directed away from or near plastic cement pipeline sidesway
Dynamic actuator so that the plastic cement pipeline of different tube diameters can be drawn by multiple traction crawler belts;At plastic cement pipeline from traction
Machine enters into the most afterwards and cuts on the cutting machine of cutting work station;After plastic cement pipeline is cut by cutting machine, plastic cement
Pipeline is transferred in discharge station, then rolls down to be collected on ground by extending guide rod on the discharging frame in discharge station.
By whole production line, it is possible to produce required plastic cement pipeline from raw materials for plastics production.
Of the present utility model it is further arranged to: the lower horizontal of described storage bin hopper is provided with cross section in the font of falling Ω
Installing pipe, be horizontally disposed with the twisted stir paddle matched with described installation pipe in described installation pipe, described twisted stir paddle includes
Have shaft, described shaft through install pipe away from described conveying worm end face and with the first motor linkage, described
Install pipe upper relative to the described shaft of confession through other end be communicated in described conveying worm.
By using such scheme, the cross section of the setting below the storage bin hopper installation pipe in the font of falling Ω,
Plastic cement after batch mixing enters into after being collected on storage bin hopper, and plastics can enter in the installation pipe of storage bin hopper bottom,
Have a twisted stir paddle matched with installation pipe installing in pipe by the first motor linkage, the shaft of twisted stir paddle and
Motor linkage so that screw thread stirring slurry can rotate, because the blade of twisted stir paddle is spiral in installing pipe, it is possible to
Plastics are pushed towards helical feed pusher side so that plastics can enter in conveying worm easily, thus passes through spiral
Conveyer machine is transferred on feed hopper.Simultaneously because installation pipe is in the font of falling Ω, its upper end is formed with one and enters for plastics
Through hole, it is possible to facilitate plastics to be transferred at screw mixer by twisted stir paddle in entering into installation pipe.Plastics are logical simultaneously
The when of crossing twisted stir paddle promotion, the plastics of a part can be gone out from the top installing pipe, plays the effect of batch mixing, and plastics are former
Material passes through blender one-level batch mixing, then by the two grades of batch mixings of twisted stir paddle in storage bin hopper so that mixing effect during batch mixing
Fruit is more preferably.
Of the present utility model it is further arranged to: on described blow moulding machine, be provided with the transfer tube for exporting plastic cement pipeline
Road, described cooler is located close on the end face of described blow moulding machine be provided with a posting, and described positioner includes the company of rotation
Be connected on below described transmission pipeline for position on the downside of plastic cement pipeline location wheel, sliding be arranged on determining of described posting two ends
Position frame, being rotatably connected on described locating rack for positioning the registration roller of plastic cement pipeline both sides, all sides of described registration roller are arranged
Have and plastic cement pipe side wall co-operating annular locating slot.
By using such scheme, plastic cement pipeline is after by blow moulding machine blow molding, conflicts in the lower end of plastic cement pipeline
On the location wheel arranged in transmission pipeline, location wheel is rotatably connected in transmission pipeline, supports at location wheel and transmission pipeline
When touching, location wheel can rotate, thus reduces the frictional force between location wheel and transmission pipeline, and location wheel is can be to moulding
While plastic pipe location, it is possible to play the effect supporting plastic cement pipeline.Positioner turns in not being only included in blow moulding machine pipeline
The location wheel being dynamically connected, also includes the locating rack that sliding is arranged on the posting of cooler, is rotationally connected on locating rack
Registration roller, registration roller week side annular positioning groove and all sides of plastic cement pipeline match so that registration roller can be to plastic cement pipeline
All sides position.Being conflicted in the lower end of plastic cement pipeline by location wheel, two registration rollers are conflicted in all sides of plastic cement pipeline,
Plastic cement pipeline can be positioned when transmission so that plastic cement pipeline will not be because of gravity during entering into cooler
Act on and offset.
Of the present utility model it is further arranged to: the two ends of described registration roller are provided with and are rotatably connected on described locating rack
Rotating shaft, described registration roller be internally provided with helical pipe, described helical pipe is provided with and axially extends to registration roller table
The apopore in face, is positioned in the described rotating shaft below described registration roller and is provided with the inlet opening communicated with described helical pipe, institute
State to connect on inlet opening and have a water supply hose.
By using such scheme, the two ends of registration roller are connected on locating rack by axis of rotation, in registration roller lower end
Rotating shaft on be provided with an inlet opening, at the helical pipe that is internally provided with of registration roller, and at helical pipe towards registration roller
All sides be provided with apopore, in the rotating shaft of registration roller lower end arrange water supply hose water can be passed in registration roller
Portion, and the apopore outflow from registration roller, while plastic cement is positioned by the registration roller of posting both sides, because of plastic pipe
Road is to conflict on registration roller, and the water flowed out in the apopore on registration roller flows on plastic cement pipeline such that it is able to from blowing
The plastic cement pipeline with heat spread out of on molding machine carries out one-level cooling.
Of the present utility model it is further arranged to: be positioned on the described cooler end face away from described blow moulding machine and be provided with one
Framework, institute's framework is provided with draw-in groove on the end face of described cooler, is connected with end face and contacts at institute in described draw-in groove
Stating the sponge on the end face of cooler, the other end of described framework is provided with the first cylinder, the first piston of described first cylinder
Bar is arranged towards the axis direction of plastic cement pipeline, and described first piston bar connects to be had one for extruding the pressure ring of described sponge,
The internal diameter of described pressure ring is more than the caliber of plastic cement pipeline.
By using such scheme, plastic cement pipeline is cooled down by cooler by water, at plastic cement pipeline from cooling
Output uploaded by machine, can depend on the globule on the surface of plastic cement pipeline, by arranging in one end of cooler transmission plastic cement pipeline
Sponge, sponge has individual hole so that plastic cement pipeline is when being fed through sponge so that sponge can be conflicted in the week of plastic cement pipeline
Side, thus the moisture on plastic cement pipeline is drawn onto in sponge, in sponge gradually absorbs water, the moisture in sponge can be gradually
Change is many, by the work of the first cylinder so that the pressure ring on first piston bar extrudes towards sponge side, can be by sea by extruding
Water extruding in silk floss is walked, so that sponge can continue to absorb moisture.The plastic cement pipeline surface when spreading out of is dry
Dry, in traction station, by increasing capacitance it is possible to increase the frictional force between plastic cement pipeline and traction crawler belt, there is the function preventing skidding;
In cutting work station, remove the moisture of plastic cement pipeline, it is possible to prevent the blade of cutting machine from skidding when cutting, it is also possible to avoid cutter
Sheet is permanently connected to moisture and causes corrosion;In discharge station, remove the moisture on plastic cement pipeline, it is possible to place plastic cement pipeline
When placing on the ground, it is to avoid the moisture on plastic cement pipeline contacts with ground impurity and causes the surface of plastic cement pipeline not do
Only.
Of the present utility model it is further arranged to: the lower end being positioned at described posting on described cooler is provided with the first collection
Pond, the lower end that described cooler is positioned at described framework is provided with the second collecting-tank, described cooler is positioned at described first
The lower end of collecting-tank is additionally provided with a tank, described first collecting-tank and described first collecting-tank all by pouring pipe and described
Tank is connected, and described tank connects has a suction pump, described water supply hose to be connected with described suction pump.
By using such scheme, arranging the second collecting-tank below framework can enter extruding moisture on sponge
Row is collected, and the moisture flowed out on registration roller can be collected by the first collecting-tank arranged below posting.Simultaneously
One collecting-tank and the second collecting-tank are all communicated in tank, and the water in water supply hose is to be extracted out from tank by suction pump
's.At work, on the helical pipe of the inside that water supply hose delivers water into registration roller by suction pump, moisture is again from location
After apopore on roller is gone out, plastic cement pipeline is carried out one-level cooling, when moisture carries out one-level cooling to plastic cement pipeline, one
Point water remain on plastic cement pipeline after enter in cooler and cool down, most water flows to again below registration roller the
Entering in one collecting-tank in tank, plastic cement pipeline spreads out of from cooler when, sponge can be by plastic cement pipeline
On moisture draw after, then drive pressure ring after the moisture extruding in sponge, will to enter into the and collecting-tank by cylinder, moisture exists
Enter in the second collecting-tank in aqua storage tank, by suction pump, water is being transferred in water supply hose, constitute a circulation.
Of the present utility model it is further arranged to: described traction crawler belt is rotatably connected on an installing rack, described actuator
For being fixed on the second cylinder on the described traction machine of described installing rack both sides, the second piston rod of described second cylinder is connected to
The two ends of described installing rack, described second piston rod is arranged at the axle center of plastic cement pipeline.
By using such scheme, traction crawler belt is fixed on installing rack and rotates, and conflicts at plastic cement at traction crawler belt
During all sides of flexible pipe, it is possible to plastic hose is carried out traction transmission, is respectively connected with the second cylinder, the second gas at the two ends of installing rack
Second piston rod of cylinder is arranged towards at the axle center of plastic cement pipeline so that the second cylinder installing rack can be driven to be directed away from or
Move at plastic cement pipeline axle center, so that the internal diameter formed between multiple traction crawler belt changes, it is possible to be applicable to
The transmission of the plastic cement pipeline of different tube diameters.
Of the present utility model it is further arranged to: one end of described installing rack is rotatably connected to one and nibbles with described traction crawler belt
The travelling gear closed, described installing rack is additionally provided with the Universal transmission rod linked with described travelling gear, described Universal drive
Bar is relative to engaging the other end of described travelling gear and the second motor linkage, and described universal drive shaft includes and described driving cog
First power transmission shaft of wheel linkage and the second driving shaft of described second motor linkage, described second driving shaft is close to described the
One end of one power transmission shaft is provided with the sleeve pipe that sliding is connected on described first power transmission shaft, and described first power transmission shaft is near described set
All sides of one end of pipe are provided with slide block, are provided with the chute matched with described slide block in described sleeve pipe.
By using such scheme, one end of universal drive shaft is fixed on traction machine and and motor linkage, Universal drive
The other end and the travelling gear being meshed with traction crawler belt of axle link so that universal drive shaft can rotate by band east traction crawler belt
Rear drive plastic cement pipeline moves.Simultaneously when the position of installing rack is adjusted by the second cylinder, because universal drive shaft joins
Distance between nutating gear and linkage motor can change, thus arranged by universal drive shaft and be meshed with travelling gear
The first power transmission shaft and the second driving shaft of motor linkage, the first power transmission shaft and second driving shaft by slide block and the phase of chute
Join so that between the first power transmission shaft and second driving shaft can sliding mutually so that change installing rack at the second cylinder
Position, the entire length of Universal transmission rod can change along with the position of installing rack.
Of the present utility model it is further arranged to: be provided with side on described discharging frame and be rotationally connected with on described discharging frame
Material platform, described discharging frame is additionally provided with the 3rd cylinder for driving described material platform to rotate, described 3rd cylinder
Threaded on 3rd piston rod have a shift fork, and described shift fork is hinged on the lower end of described material platform, and described guide rod is connected to institute
State material platform to rotate on the described discharging frame of side.
By use such scheme, plastic cement pipeline by cutting after, in overall transfer to material platform after, by the second gas
Under the regulation of cylinder, material platform can rotate, so that the plastic cement pipeline of whole tumbles along guide rod on material platform
On the ground.
Of the present utility model it is further arranged to: described guide rod is expansion link, and hinge is passed through in one end of described guide rod
On described discharging frame.
By using such scheme, when being deposited on ground by plastic cement pipeline by guide rod, plastic cement pipeline can be in bottom surface
On form a line, by the angle of rotating guide-bar so that guide rod can be placed at above ground floor plastic cement pipeline, and follow-up moulds
Plastic pipe can be placed at when transmission and forms second layer plastic cement pipeline on ground floor plastic cement pipeline, it is possible to saves and places plastic cement
The floor space of pipeline.
In sum, this utility model has the advantages that when plastics carry out feeding, the spiral on storage bin hopper
Blender can start secondary stirring and conveniently plastics is transferred to conveying worm;Position between blow moulding machine and cooler
Device can prevent plastic cement pipeline from offseting because of gravity when transmission, plays the effect of localized delivery and guiding, at cooler
Sponge and cylinder that the other end is arranged match, it is possible to removed by the moisture on plastic cement pipeline;Flow on registration roller in storage tank
Thus remaining in the plastic cement pipeline moisture to loss, it is possible to the moisture drawn on plastic cement pipeline by sponge is supplemented, and is formed
One circulation.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of batch mixing station;
Fig. 3 is the structural representation of feeding station;
Fig. 4 is the structural representation at blow molding station;
Fig. 5 is the cooling positional stations structural representation near blow moulding machine one end;
Fig. 6 is the partial enlarged drawing in Fig. 5 at A;
Fig. 7 is the cooling positional stations structural representation away from blow moulding machine one end;
Fig. 8 is the partial enlarged drawing in Fig. 7 at B;
Fig. 9 is the structural representation of cooling positional stations;
Figure 10 is the structure sectional view of registration roller, rotating shaft;
Figure 11 is the structural representation of traction station;
Figure 12 is the partial enlarged drawing at the C in Figure 11;
Figure 13 is the structural representation of discharge station.
In figure: 1, batch mixing station;11, blender;111, discharging opening;12 storage bin hoppers;121, pipe is installed;122, auger
Slurry;1221, shaft;123, the first motor;2, feeding station;21, conveying worm;3, blow molding station;31, charging
Bucket;32, blow moulding machine;321 transmission pipelines;322, location wheel;4, cooling positional stations;41, cooler;411, transmission pipeline;42、
Posting;421, locating rack;422, registration roller;4221, annular positioning groove;4222, helical pipe;4223, apopore;423, turn
Axle;4231, inlet opening;424, water supply hose;425, screw rod;43, framework;431, draw-in groove;432, sponge;433, the first cylinder;
4331, first piston bar;434, pressure ring;441, the first collecting-tank;442, the second collecting-tank;443, tank;444, suction pump;
5, traction station;51, traction machine;511, traction crawler belt;512, installing rack;513, the second cylinder;5131;Second piston rod;
514, universal drive shaft;5141, the first power transmission shaft;5142, second driving shaft;5143, slide block;5144, chute;515, the second electricity
Machine;516, travelling gear;6, cutting work station;61, cutting machine;7, discharge station;71, discharging frame;711, material platform;712,
Three cylinders;713, the 3rd piston rod;714, shift fork;715, bearing pin;72, guide rod.
Detailed description of the invention
This utility model is described in further detail to accompanying drawing 13 below in conjunction with accompanying drawing 1.
This specific embodiment is only that it is not to restriction of the present utility model, ability to explanation of the present utility model
The present embodiment can be made after reading this specification by field technique personnel as required does not has the amendment of creative contribution, but
As long as all being protected by Patent Law in right of the present utility model.
As it is shown in figure 1, a kind of plastic pipe pipeline production line, include batch mixing station 1, feeding station 2, blow molding station successively
3, cooling positional stations 4, traction station 5, cutting work station 6 and the station that gets off.Batch mixing station 1, including blender 11, is positioned at and stirs
Mix the storage bin hopper 12 of machine 11 side;Feeding station 2, including the conveying worm 21 being connected on storage bin hopper 12;Blow molding work
Position 3, including the feed hopper 31 being connected with conveying worm 21, blow moulding machine 32;Cooling positional stations 4, including cooler 41, sets
Put the positioner between cooler 41 and blow moulding machine 32;Traction station 5, including traction machine 51, traction machine 51 includes many
The individual traction crawler belt 511 in plastic cement pipeline week side that is rotationally connected and conflicts, for driving described traction crawler belt 511 to extend close to or
Person is away from the actuator of plastic cement pipeline side shifting;Cutting work station 6, including cutting machine 61;Discharge station 7, including discharging frame 71, sets
Put discharging frame 71 side and towards bottom surface extend multiple guide rods 72.
As illustrated in figs. 1 and 2, batch mixing station 1, including blender 11, the storage bin hopper 12 that is positioned at blender 11 side.Stirring
Machine 11 in entirety cylindrically, is provided with a discharging opening 111, is provided with in the lower section of blender 11 in the lower end of blender 11
One storage bin hopper 12, on blender 11, volume discharging opening 111 extends in the inside of storage bin hopper 12, when plastics and dyestuff, additive etc.
After being mixed by blender 11, the plastics after stirring are that the discharging opening 111 of blender 11 enters in storage bin hopper 12.
The lower section of storage bin hopper 12 is that reducing is arranged, and the cross section that the bottom at storage bin hopper 12 is wholely set is in falling
The installation pipe 121 of Ω font, after the plastic cement after batch mixing enters in storage bin hopper 12, because storage bin hopper 12 is arranged in reducing,
Plastics can be slipped in the installation pipe 121 of storage bin hopper 12 bottom, has one to match with installation pipe 121 installing in pipe 121
Twisted stir paddle 122, the shaft 1221 on twisted stir paddle 122 is linked by belt pulley and the first motor 123, and shaft
1221 are rotatably connected on the sidewall installing pipe 121 by bearing, and screw thread stirring slurry is in the first motor 123 and the drive of belt pulley
Under, it is possible to rotate in pipe 121 is installed, because the blade of twisted stir paddle 122 is spiral, it is possible to by plastics towards spiral
Conveyer 21 side pushes so that plastics can enter in conveying worm 21 easily, thus by conveying worm 21 machine
It is transferred on feed hopper 31.Simultaneously because installation pipe 121 is in the font of falling Ω, its upper end is to be formed with one for leading to that plastics enter
Hole, it is possible to facilitate plastics to be transferred at screw mixer 11 by twisted stir paddle 122 in entering into installation pipe 121.Mould simultaneously
Material is promoting by twisted stir paddle 122 when, and the plastics of a part can be gone out from the top installing pipe 121, plays batch mixing
Effect, plastics carry out one-level batch mixing by blender 11, then carry out two grades by the twisted stir paddle 122 in storage bin hopper 12 and mix
Material so that the mixed effect of plastics, additive, dyestuff etc. is more preferable.
As shown in Figure 1, Figure 2 and Figure 3, feeding station 2, including the conveying worm 21 being connected on described storage bin hopper 12,
Plastics enter into the inside of conveying worm 21 after the transmission by twisted stir paddle 122, then are incited somebody to action by conveying worm 21
Plastics are transferred to other place and go.
Shown in as shown in Figure 1, Figure 3 and Figure 4, blow molding station 3, including the feed hopper being connected with described conveying worm 21
31, blow moulding machine 32.The plastics that conveying worm 21 transmits enter in feed hopper 31, and plastics enter into from feed hopper 31 and blow
In molding machine 32, it is being blow molded into plastic cement pipeline by blow moulding machine 32.
As shown in Figure 1, Figure 4 and Figure 5, cool down positional stations 4, including cooler 41, be arranged on described cooler 41 and institute
State the positioner between blow moulding machine 32.
As shown in Fig. 1, Fig. 4, Fig. 5 and Fig. 6, between blow moulding machine 32 and cooler 41, it is provided with a positioner,
Be provided with on blow moulding machine 32 one for the transmission pipeline 411321 exporting plastic cement pipeline, at cooler 41 near blow moulding machine 32
End face sets and has been bolted a posting 42.Positioner includes being rotatably connected on below transmission pipeline 411321
Location wheel 322, the two ends of location wheel 322 are rotatably connected on the lower section of transmission pipeline 411321 by bearing, in location wheel 322
After blow moulding machine 32 blow molding towards inner recess, plastic cement pipeline, conflict and pass at the middle part of location wheel 322 in portion
Defeated so that can conflict and be transmitted at the middle part of location wheel 322 in plastic cement pipeline lower end when transmission, location wheel 322 and plastic cement
All sides of pipeline match so that location wheel 322 is prevented from the transmission path of plastic cement pipeline and deviation occurs when rotating, and exists simultaneously
During the transmission of plastic cement pipeline, additionally it is possible to play the effect of support, prevent plastic cement pipeline from offseting downward under gravity.Location dress
Put and also include the locating rack 421 that sliding is arranged on posting 42 two ends, the registration roller 422 being rotationally connected on locating rack 421,
All sides of registration roller 422 are provided with the annular positioning groove 4221 matched with plastic cement pipe side wall, when plastic cement pipeline is transmitted,
By all sides of plastic cement pipeline being positioned at the registration roller 422 of plastic cement pipeline both sides so that plastic cement pipeline can be straight
It is transmitted.
The two ends up and down of posting 42 are provided with slide block 5143, and the two ends sliding of locating rack 421 is arranged on slide block 5143
In, on the sidewall that locating rack 421 is relatively distant from plastic cement pipeline spiral connect have a screw rod 425, screw rod 425 circumferentially rotate and
Circumferentially fixed on the sidewall of locating rack 421, screw rod 425 is fixed with the annular conflicted respectively on posting 42 1 sidewall
Locating piece, when rotating screw rod 425, it is possible to changes distance threaded between screw rod 425 and locating rack 421, so that
Locating rack 421 can pass through the screw rod 425 enterprising line slip of slide block 5143 at posting 42.The two ends of registration roller 422 are fixed with
Rotating shaft 423, rotating shaft 423 is to be plugged on the groove of locating rack 421 to be rotationally connected, and is being entered plastic cement pipeline by registration roller 422
During row location, because registration roller 422 can be along with plastic pipe be to moving together such that it is able to reduce the friction between plastic cement pipeline
Power.
As shown in Fig. 1, Fig. 6 and Fig. 7, the other end being relatively distant from blow moulding machine 32 of cooler 41 is provided with framework
43, on the end face of cooler 41, it is provided with a draw-in groove 431 at framework 43, in draw-in groove 431, is connected with one piece of sponge
432, it is provided with the internal diameter through hole less than plastic cement pipeline at the middle part of sponge 432, is relatively distant from the another of cooler 41 at framework 43
Being fixed with the first cylinder 433 on end face, the first piston bar 4331 of the first cylinder 433 is put down with the axis of described plastic cement pipeline
OK, first piston bar 4331 is arranged towards near one end of cooler 41, and threaded on first piston bar 4331 have one
Pressure ring 434, the internal diameter of pressure ring 434 is the internal diameter being greater than plastic pipe road, when first piston is stretched on the first cylinder 433
During contracting, pressure ring 434 can be to extruding towards sponge 432 lateral movement and to sponge 432.At plastic cement pipeline from cooler 41
Transmitting out, can depend on the globule on the surface of plastic cement pipeline, the moisture on plastic cement pipeline can be drawn by sponge 432,
During sponge 432 gradually absorbs water, the moisture in sponge 432 can gradually become many, by the work of the first cylinder 433 so that the
Pressure ring 434 on one piston rod 4331 extrudes towards sponge 432 side, it is possible to remove the moisture in sponge 432, so that sponge
432 can continue to carry out plastic cement pipeline being dried except water.Plastic cement pipeline when sponge 432 absorbs moisture, the surface when spreading out of
It is dry, in traction station 5, by increasing capacitance it is possible to increase the frictional force between plastic cement pipeline and traction crawler belt 511, has and prevent from skidding
Function;In cutting work station 6, remove the moisture of plastic cement pipeline, it is possible to prevent the blade of cutting machine 61 from skidding, also when cutting
It can be avoided that blade is permanently connected to moisture and causes corrosion;In discharge station 7, remove the moisture on plastic cement pipeline, it is possible to
When placement plastic cement pipeline is placed on ground, it is to avoid the moisture on plastic cement pipeline contacts with ground impurity and causes plastic pipe
The surface in road is the cleanest.
As shown in Figure 10, it is internally provided with helical pipe 4222 at registration roller 422, helical pipe 4222 is communicated with
Extend to the apopore 4223 on registration roller 422 sidewall, the rotating shaft 423 of registration roller 422 lower end is provided with an inlet opening
4231, inlet opening 4231 is to be connected with the helical pipe 4222 within registration roller 422, connects in the lower end of inlet opening 4231
There is a water supply hose 424 so that water can sequentially pass through water supply hose 424, inlet opening 4231, helical pipe 4222, water outlet
Hole 4223, eventually flows into the surface of plastic cement pipeline, while plastic cement pipeline is positioned by registration roller 422, additionally it is possible to moulding
Plastic pipe cools down.
As shown in Fig. 6, Fig. 8, Fig. 9 and Figure 10, the cooler 41 of the lower section of posting 42 is welded with the first collecting-tank
441, the cooler 41 below framework 43 is provided with the second collecting-tank 442, is additionally provided with in the lower section of the first collecting-tank 441
One tank 443, the first collecting-tank 441 and the second collecting-tank 442 are all to be communicated in tank 443, set in framework 43
The moisture on sponge 432 put, under the extruding by the pressure ring 434 on the first cylinder 433, flows to the interior of the second collecting-tank 442
Flowing in tank 443 behind portion, on registration roller 422, the middle moisture flowed out is going out the part remained on plastic cement pipeline
Outward, most moisture is fallen on the first collecting-tank 441, in being flowed into tank 443.Connect in tank 443 and have one
Individual suction pump 444, suction pump 444 is connected with water supply hose 424, and the water in tank 443 is entered into by suction pump 444
Enter in flexible pipe, by the inlet opening 4231 in rotating shaft 423, the helical pipe 4222 in registration roller 422 and apopore
On 4223 surfaces flowing to plastic cement pipeline, thus plastic cement pipeline is cooled down, but water is when cooling, understands the water of some
Remain on plastic cement pipeline, cause the moisture being back in tank 443 from the first collecting-tank 441 to reduce, but by the
Sponge 432 is extruded by the pressure ring 434 on one cylinder 433, and the moisture after plastic cement pipeline is cooled down by cooler 41 can enter
Enter to the second collecting-tank 442, in entering into tank 443, thus the moisture in tank 443 is supplemented, form one
The system of individual circulation.
As shown in Figure 1, Figure 11 and Figure 12, drawing station 5, including traction machine 51, described traction machine 51 includes multiple turns
Be dynamically connected and conflict the traction crawler belt 511 in plastic cement pipeline week side, for driving described traction crawler belt 511 to extend close to or far
Actuator from plastic cement pipeline side shifting.
Traction crawler belt 511 is to be rotatably connected on installing rack 512, and actuator is the traction being fixed on installing rack 512 both sides
The second cylinder on machine 51, the second piston rod 5131 of the second cylinder 513 is directed towards setting at the axle center of plastic cement pipeline, second
The piston rod of cylinder 513 is fixed on installing rack 512, and when the second cylinder 513 is operated, the piston rod on cylinder can edge
And stretch at plastic cement pipeline axis centre, the piston rod of the second cylinder 513 stretches when, the position of installing rack 512
Change from the drive at two second cylinders 513 at installing rack 512 two ends, so that between multiple installing rack 512
The caliber formed changes, thus the traction crawler belt 511 on installing rack 512 can be used in drawing moulding of different tube diameters size
Plastic pipe.
One end of universal drive shaft 514 is fixed on traction machine 51 and and motor linkage, the other end of universal drive shaft 514
And link with the traction travelling gear 516 that is meshed of crawler belt 511 so that universal drive shaft 514 can 511 turns of crawler belt of band east traction
Dynamic, thus drive plastic cement pipeline to move.Simultaneously when the position of installing rack 512 is adjusted by the second cylinder 513, because of ten thousand
The distance linked between travelling gear 516 and linkage motor to power transmission shaft 514 can change, thus by universal drive shaft 514
Including the first power transmission shaft 5141 being meshed with travelling gear 516 and the second driving shaft 5142 of motor linkage, the first power transmission shaft
5141 and second driving shaft 5142 matching by slide block 5143 and chute 5144 so that the first power transmission shaft 5141 and the second transmission
Between axle 5142 can sliding mutually so that change the position of installing rack 512 at the second cylinder 513, Universal transmission rod
Entire length can change along with the position of installing rack 512.
As it is shown in figure 1, cutting work station 6, including cutting machine 61.Cutting machine 61 uses as shown in Fig. 1 and Figure 13, discharge station
7, including discharging frame 71, it is arranged on described discharging frame 71 side and the multiple guide rods 72 extended towards bottom surface.
Being rotatably connected to material platform 711 on discharging frame 71, plastic cement pipeline, just after cutting machine 61 cuts, passes
It is passed on the material platform 711 on discharging frame 71, is inner concavity in the upper surface of material platform 711, in the lower section of material platform 711
Discharging frame 71 on be provided with the 3rd cylinder 712, on the 3rd piston rod 713 on the 3rd cylinder 712 threaded have one dial
Fork 714, shift fork 714 is hinged on the lower section of discharging frame 71, is placed in completely on material platform 711 at plastic cement pipeline, by the 3rd gas
Stretching of 3rd piston rod 713 of cylinder 712 so that material platform 711 can rotate, so that plastic cement pipeline tumbles
On the guide rod 72 of discharging frame 71.
Guide rod 72 is expansion link, and one end of guide rod 72 is arranged and is hinged on discharging frame 71 by bearing pin 715, by guide rod 72
When being deposited on ground by plastic cement pipeline, plastic cement pipeline can form a line on bottom surface, by the angle of rotating guide-bar 72, makes
Obtaining guide rod 72 and can be placed at above ground floor plastic cement pipeline, follow-up plastic cement pipeline can be placed at ground floor when transmission
Second layer plastic cement pipeline is formed, it is possible to save the floor space placing plastic cement pipeline on plastic cement pipeline.
Claims (10)
1. a plastic pipe pipeline production line, it is characterised in that: include
Batch mixing station (1), including blender (11), the storage bin hopper (12) that is positioned at blender (11) side;
Feeding station (2), including the conveying worm (21) being connected on described storage bin hopper (12);
Blow molding station (3), including the feed hopper (31) being connected with described conveying worm (21), blow moulding machine (32);
Cooling positional stations (4), including cooler (41), is arranged between described cooler (41) and described blow moulding machine (32)
Positioner;
Traction station (5), including traction machine (51), described traction machine (51) includes and multiple are rotationally connected and conflict at plastic pipe
Road week side traction crawler belt (511), be used for driving described traction crawler belt (511) to extend close to or away from plastic cement pipeline side shifting
Actuator;
Cutting work station (6), including cutting machine (61);
Discharge station (7), including discharging frame (71), is arranged on described discharging frame (71) side and multiple the leading towards bottom surface extension
Bar (72).
A kind of plastic pipe pipeline production line the most according to claim 1, it is characterised in that: the lower section water of described storage bin hopper (12)
The flat cross section installation pipe (121) in the font of falling Ω that is provided with, has been horizontally disposed with in described installation pipe (121) and described installation is managed
(121) twisted stir paddle (122) matched, described twisted stir paddle (122) includes shaft (1221), described shaft
(1221) through install pipe (121) away from described conveying worm (21) end face and with the first motor (123) link, described
Install pipe (121) upper relative to the described shaft of confession (1221) through other end be communicated in described conveying worm
(21).
A kind of plastic pipe pipeline production line the most according to claim 1, it is characterised in that: described blow moulding machine is provided with on (32)
For exporting the transmission pipeline (411,321) of plastic cement pipeline, described cooler (41) is located close to the end of described blow moulding machine (32)
Being provided with a posting (42) on face, described positioner includes that being rotatably connected on described transmission pipeline (411,321) lower section uses
Location wheel (322) on the downside of the plastic cement pipeline of location, sliding are arranged on the locating rack (421) at described posting (42) two ends, turn
It is automatically connected in the upper registration roller (422) for positioning plastic cement pipeline both sides of described locating rack (421), described registration roller (422)
All sides are provided with and plastic cement pipe side wall co-operating annular locating slot (4221).
A kind of plastic pipe pipeline production line the most according to claim 3, it is characterised in that: the two ends of described registration roller (422)
Be provided with the rotating shaft (423) being rotatably connected on described locating rack (421), described registration roller (422) be internally provided with spiral
Pipeline (4222), described helical pipe (4222) is provided with the apopore (4223) axially extending to registration roller (422) surface,
It is positioned in the described rotating shaft (423) of described registration roller (422) lower section and is provided with the water inlet communicated with described helical pipe (4222)
Hole (4231), described inlet opening (4231) upper connection has a water supply hose (424).
A kind of plastic pipe pipeline production line the most according to claim 4, it is characterised in that: be positioned at described cooler (41) away from
Being provided with a framework (43) on the end face of described blow moulding machine (32), institute's framework (43) is upper on the end face of described cooler (41)
It is provided with draw-in groove (431), is connected with end face in described draw-in groove (431) and contacts at the sponge on the end face of described cooler (41)
(432), the other end of described framework (43) is provided with the first cylinder (433), the first piston bar of described first cylinder (433)
(4331) axis direction towards plastic cement pipeline is arranged, and the upper connection of described first piston bar (4331) has one for extruding described sea
The pressure ring (434) of continuous (432), the internal diameter of described pressure ring (434) is more than the caliber of plastic cement pipeline.
A kind of plastic pipe pipeline production line the most according to claim 5, it is characterised in that: described cooler is positioned at institute on (41)
The lower end stating posting (42) is provided with the first collecting-tank (441), described cooler (41) is positioned under described framework (43)
End is provided with the second collecting-tank (442), and the lower end that described cooler (41) is positioned at described first collecting-tank (441) is additionally provided with
One tank (443), described first collecting-tank (441) and described first collecting-tank (441) are all by pouring pipe and described water storage
Pond (443) is connected, and the upper connection of described tank (443) has a suction pump (444), described water supply hose (424) to take out with described
Water pump (444) is connected.
A kind of plastic pipe pipeline production line the most according to claim 1, it is characterised in that: described traction crawler belt (511) rotates
Being connected on an installing rack (512), described actuator is to be fixed on the described traction machine (51) of described installing rack (512) both sides
The second cylinder (513), second piston rod (5131) of described second cylinder (513) is connected to the two of described installing rack (512)
End, described second piston rod (5131) is arranged at the axle center of plastic cement pipeline.
A kind of plastic pipe pipeline production line the most according to claim 7, it is characterised in that: one end of described installing rack (512)
Being rotatably connected to a travelling gear (516) engaged with described traction crawler belt (511), described installing rack is additionally provided with on (512)
The Universal transmission rod linked with described travelling gear (516), described Universal transmission rod is relative to engaging described travelling gear (516)
The other end and the second motor (515) linkage, described universal drive shaft (514) includes linking with described travelling gear (516)
The second driving shaft (5142) that first power transmission shaft (5141) and described second motor (515) link, described second driving shaft
(5142) one end close to described first power transmission shaft (5141) is provided with sliding and is connected on described first power transmission shaft (5141)
Sleeve pipe, described first power transmission shaft (5141) is provided with slide block (5143), described sleeve pipe near all sides of one end of described sleeve pipe
Inside it is provided with the chute (5144) matched with described slide block (5143).
A kind of plastic pipe pipeline production line the most according to claim 1, it is characterised in that: described discharging frame is provided with on (71)
Side is rotationally connected with the material platform (711) on described discharging frame (71), and described discharging frame is additionally provided with for driving on (71)
The 3rd cylinder (712) that described material platform (711) rotates, the upper screw thread of the 3rd piston rod (713) of described 3rd cylinder (712)
Connecting and have a shift fork (714), described shift fork (714) to be hinged on the lower end of described material platform (711), described guide rod (72) connects
On the described discharging frame (71) that described material platform (711) rotates side.
A kind of plastic pipe pipeline production line the most according to claim 9, it is characterised in that: described guide rod (72) is expansion link,
One end of described guide rod (72) is hinged on described discharging frame (71) by bearing pin (715).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620669702.3U CN205735950U (en) | 2016-06-25 | 2016-06-25 | A kind of plastic pipe pipeline production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620669702.3U CN205735950U (en) | 2016-06-25 | 2016-06-25 | A kind of plastic pipe pipeline production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205735950U true CN205735950U (en) | 2016-11-30 |
Family
ID=57382780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620669702.3U Expired - Fee Related CN205735950U (en) | 2016-06-25 | 2016-06-25 | A kind of plastic pipe pipeline production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205735950U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107379464A (en) * | 2017-09-07 | 2017-11-24 | 南京浩宇塑业有限公司 | For producing the mobile production line of no-dig technique flexible duct |
CN107538718A (en) * | 2016-06-25 | 2018-01-05 | 绍兴仁通塑胶有限公司 | A kind of plastic pipe pipeline production line |
CN107599337A (en) * | 2017-09-07 | 2018-01-19 | 南京浩宇塑业有限公司 | The mobile production line of no-dig technique flexible duct |
CN108556032A (en) * | 2018-01-20 | 2018-09-21 | 荆门怡盛源环保科技有限公司 | A kind of water purifier hose cutter device |
CN109366923A (en) * | 2018-12-05 | 2019-02-22 | 陈爱莲 | A kind of new type plastic pipeline extrusion forming device |
CN110091494A (en) * | 2019-04-23 | 2019-08-06 | 合肥鑫氟材料科技有限公司 | A kind of pipe fitting hot blow modeling production platform |
CN113733519A (en) * | 2020-05-29 | 2021-12-03 | 昆山天跃翔塑胶制品有限公司 | Automobile pipeline process |
-
2016
- 2016-06-25 CN CN201620669702.3U patent/CN205735950U/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107538718A (en) * | 2016-06-25 | 2018-01-05 | 绍兴仁通塑胶有限公司 | A kind of plastic pipe pipeline production line |
CN107538718B (en) * | 2016-06-25 | 2024-01-02 | 绍兴仁通塑胶有限公司 | Plastic pipeline production line |
CN107379464A (en) * | 2017-09-07 | 2017-11-24 | 南京浩宇塑业有限公司 | For producing the mobile production line of no-dig technique flexible duct |
CN107599337A (en) * | 2017-09-07 | 2018-01-19 | 南京浩宇塑业有限公司 | The mobile production line of no-dig technique flexible duct |
CN107599337B (en) * | 2017-09-07 | 2019-08-30 | 南京浩宇塑业有限公司 | The mobile production line of no-dig technique flexible duct |
CN108556032A (en) * | 2018-01-20 | 2018-09-21 | 荆门怡盛源环保科技有限公司 | A kind of water purifier hose cutter device |
CN109366923A (en) * | 2018-12-05 | 2019-02-22 | 陈爱莲 | A kind of new type plastic pipeline extrusion forming device |
CN110091494A (en) * | 2019-04-23 | 2019-08-06 | 合肥鑫氟材料科技有限公司 | A kind of pipe fitting hot blow modeling production platform |
CN110091494B (en) * | 2019-04-23 | 2021-02-02 | 合肥鑫氟材料科技有限公司 | Hot blow molding production platform for pipe fittings |
CN113733519A (en) * | 2020-05-29 | 2021-12-03 | 昆山天跃翔塑胶制品有限公司 | Automobile pipeline process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205735950U (en) | A kind of plastic pipe pipeline production line | |
CN204622368U (en) | A kind of extruder pre-mixing apparatus | |
CN212087951U (en) | Rice flour extrusion molding machine | |
CN102615736B (en) | High fill material extruding pelletization unit | |
CN215312178U (en) | Granulating device for controlled-release sulfur-based compound fertilizer granulating tower | |
CN110871512A (en) | Polystyrene foam plastic recovery remolding granulation process | |
CN110154352A (en) | A kind of PVC pipe production technology | |
CN208812325U (en) | Plastic granulator | |
CN107538718A (en) | A kind of plastic pipe pipeline production line | |
CN206699370U (en) | A kind of grain-feed forming machine | |
CN116118144A (en) | Double-screw plastic extruder | |
CN207707284U (en) | A kind of Feed Manufacturing processing automatic granulating device | |
CN206967915U (en) | Twin-screw extrusion pusher side feeding mechanism | |
CN214448350U (en) | PVC tubular product extrusion molding equipment of adjustable diameter | |
CN207088434U (en) | A kind of extruding machine plastic part guide retracting device | |
CN221584445U (en) | Hot melt adhesive production line | |
CN213890918U (en) | Plastic product production equipment | |
CN213797965U (en) | PVC pipe production facility that sizing cover cooling was stereotyped | |
CN117429032B (en) | Composite material forming equipment | |
CN205735909U (en) | A kind of macromolecule chemical industry extruder | |
CN212219092U (en) | Uniform material mixing and feeding mechanism for injection molding | |
CN215283275U (en) | Extruding machine is used in production of heat-resisting PVC banding strip | |
CN221112787U (en) | Environment-friendly PE real wall pipe apparatus for producing | |
CN221187468U (en) | Extrusion equipment of high molecular weight PE pipe | |
CN220904042U (en) | High-quality plastic extruding machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |