CN205718073U CN201620347908.4U CN201620347908U CN205718073U CN 205718073 U CN205718073 U CN 205718073U CN 201620347908 U CN201620347908 U CN 201620347908U CN 205718073 U CN205718073 U CN 205718073U
Authority
CN
China
Prior art keywords
well
water
pipe
valve
screen pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620347908.4U
Other languages
Chinese (zh)
Inventor
滕飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DANDONG ANTONG AIR-CONDITIONING REFRIGERATION INSTALLATION MAINTENANCE ENGINEERING Co.,Ltd.
Liaoning Shenhe New Energy Technology Co., Ltd
Original Assignee
Dandong Antong Air-Conditioning Refrigeration Installation And Maintenance Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dandong Antong Air-Conditioning Refrigeration Installation And Maintenance Engineering Co Ltd filed Critical Dandong Antong Air-Conditioning Refrigeration Installation And Maintenance Engineering Co Ltd
Priority to CN201620347908.4U priority Critical patent/CN205718073U/en
Application granted granted Critical
Publication of CN205718073U publication Critical patent/CN205718073U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses the water-collecting return unification well construction that a kind of screen pipe moves down, including an inspection shaft, inspection shaft is arranged on original soil layer;The top of inspection shaft is well lid, and through hole is left in shaft bottom, arranges well casing in described through hole;The outside of well casing is filter material layer;It in water lift pipe inserts well casing and is connected with immersible pump;Water lift pipe is connected with main pipeline by check valve, valve;Return pipe is arranged on the lower end of detection well, and return pipe is connected with main pipeline by valve;Main pipeline is connected with water collector and water knockout drum respectively by valve;The lower end of well casing is screen pipe, and screen pipe is arranged on bottom, and screen pipe top is less than lithosphere top.Owing to screen pipe is arranged on bottom and corresponding with lithosphere, therefore, do not result in subsiding of filter material layer, form cavity;Further, since water is greatly increased compared with prior art via the distance of filter material layer, this improves filter effect.

Description

The water-collecting return unification well construction that a kind of screen pipe moves down
Technical field
The utility model relates to water source heat pump technology field, specifically one collection backwater unification well Structure.
Background technology
Water source heat pump technology is the solar energy and geothermal energy utilizing earth surface shallow-layer water source to absorb And the low temperature Lowlevel thermal energy resource being formed, and use heat pump principle, logical too small amount of high-order electric energy Input, it is achieved a kind of technology that Lowlevel thermal energy shifts to high level heat.And wet well or back water well It is requisite part in water source heat energy technology;Prior art typically use multiple individually Sump and back water well, so unavoidably cause construction and the increase of operating cost;This Outward, existing back water well is not owing to blocking sand structure, and the operating silt of system can deposit and return The filter material layer of well mouth, causes the filter material layer of backwater well head to lose efficacy, further, since do not have sand control Along arranging, the bottom sludge causing inspection shaft is a lot, and workman checks and constructs extremely difficult.
Underground structure is divided into argillic horizon, water-bearing layer and lithosphere, existing collection typically from top to bottom Screen pipe is typically arranged on water-bearing layer by well, and due to the souring of current during operation, mistake The earth of the filter material layer of chimney filter both sides constantly runs off, the huge cavity 21 in causing such as Fig. 4, This cavity silt mixes with filtrate, reduces filter effect, and needs to be continuously replenished filtrate, This adds operating cost undoubtedly and reduces the efficiency of unit.
Content of the invention
For solving above-mentioned technical problem, the purpose of this utility model is to provide one can efficient solution The certainly well construction of drawbacks described above, concrete technical scheme is as follows:
The water-collecting return unification well construction that a kind of screen pipe moves down, including an inspection shaft, inspection shaft It is arranged on original soil layer;The top of inspection shaft is well lid, and through hole is left in shaft bottom, in described through hole Well casing is set;The outside of well casing is filter material layer;It in water lift pipe inserts well casing and is connected with immersible pump; Water lift pipe is connected with main pipeline by check valve, valve;Return pipe is arranged on the lower end of detection well, Return pipe is connected with main pipeline by valve;Main pipeline by valve respectively with water collector and Fen Shui Device connects;The lower end of well casing is screen pipe, and screen pipe is arranged on bottom, and screen pipe top is low In lithosphere top.
Described valve is magnetic valve, and described valve is connected with control system.
The outside of filter material layer arranges sand control edge, and the lower end on sand control edge arranges permeable mouth;Return pipe goes out Mouth becomes 20-60 ° with horizontal line.
Described permeable mouth is 4, is symmetrical arranged.
Screen pipe top is less than 1~2 meter of lithosphere top.
The utility model has the advantages that:
Owing to screen pipe is arranged on bottom and corresponding with lithosphere, therefore, do not result in filter Subsiding of the bed of material, forms cavity;Further, since water is via the distance relatively prior art of filter material layer It is greatly increased, this improves filter effect;
Owing to have employed collection backwater unification well construction, effectively reduce construction cost, and, by It is horizontally disposed with along, water return outlet in blocking sand, it is ensured that well water meets service requirement, it is achieved that catchment Uniting two into one of well and back water well.
Owing to return pipe mouth is horizontally disposed with, backwater can rotate in inspection shaft, and silt is at centrifugal force And under the effect of gravity, pile up to the borehole wall lower end of inspection shaft, and backwater exceedes well head height Part flows into back water well from well head, and is less than well head, is higher than the part on sand control edge through filter material layer Flow into back water well, contain substantial amounts of silt less than the part on sand control edge, be mainly deposited in inspection shaft Borehole wall lower end, the moisture containing slowly flows into back water well from permeable mouth, and silt is then retained in inspection Looking into the borehole wall lower end of well, so, the bottom of inspection shaft does not results in Sediment Siltation.
Brief description
Fig. 1 is the structural representation within inspection shaft;
Fig. 2 is pipe connecting structure schematic diagram;
Fig. 3 is screen pipe position view;
Fig. 4 is the screen pipe position view of prior art.
Detailed description of the invention
Illustrating the utility model below in conjunction with the accompanying drawings, as Figure 1-Figure 4, this practicality is new Type includes an inspection shaft 2, and inspection shaft 2 is arranged on original soil layer 7;The top of inspection shaft 2 is well lid 1, through hole is left in shaft bottom, arranges well casing 8 in described through hole;The outside of well casing 8 is filter material layer 4; It in water lift pipe 14 inserts well casing and is connected with immersible pump;Water lift pipe 14 passes through check valve the 9th, valve 15 are connected with main pipeline 10;Return pipe 6 is arranged on the lower end of detection well, and return pipe 6 passes through valve 9 are connected with main pipeline 10;Main pipeline 10 by valve 9 respectively with water collector 11 and water knockout drum 12 Connect;The lower end of well casing 8 is screen pipe 19, and screen pipe 19 is arranged on bottom 20, screen pipe 19 tops 16 are less than lithosphere top 17.
Described valve 9 is magnetic valve, and described valve is connected with control system.
The outside of filter material layer 4 arranges sand control along 3, and sand control arranges permeable mouth 5 along the lower end of 3;Backwater Pipe outlet 6 becomes 20-60 ° with horizontal line.
Described permeable mouth 5 is 4, is symmetrical arranged.
Screen pipe top 16 is less than 1~2 meter of lithosphere top, this Assurance of Size circulation of water Fine combination with filter effect.
Well water of the present utility model can sufficiently be filtered, thus is effectively guaranteed well water Cleannes.2nd, the setting from well head to shaft bottom of filter material layer, can prevent and solve effectively, Because of first become well when, permeable filtrate filling is not full and that cause well water silt content makes more greatly underground Solution cavity problem occurs.If solution cavity occurs because of above reason underground, when this well is converted to inverted well When, the filtrate at top sediment trapping edge automatically can carry out filling from top to bottom, until filling is full be Only.The filtrate sinking at sediment trapping edge, top can be filled out by manually carrying out benefit.Owing to water is through filter material layer Thickness distance be greatly increased compared with prior art, this improves filter effect.Additionally, this Plant technique also can solve because underground occurs that solution cavity causes filter material layer and subsiding of ground to ask Topic, and increase the amount of recharging of well water.

Claims (5)

1. the water-collecting return unification well construction that a screen pipe moves down, it is characterised in that: include One inspection shaft, inspection shaft is arranged on original soil layer;The top of inspection shaft is well lid, and shaft bottom is left Through hole, arranges well casing in described through hole;The outside of well casing is filter material layer;Water lift pipe inserts well casing In and be connected with immersible pump;Water lift pipe is connected with main pipeline by check valve, valve;Return pipe Being arranged on the lower end of detection well, return pipe is connected with main pipeline by valve;Main pipeline passes through valve Door is connected with water collector and water knockout drum respectively;The lower end of well casing is screen pipe, and screen pipe is arranged on Bottom, screen pipe top is less than lithosphere top.
2. collection backwater unification well construction according to claim 1, it is characterised in that: described Valve is magnetic valve, and described valve is connected with control system.
3. collection backwater unification well construction according to claim 1, it is characterised in that: filtrate The outside of layer arranges sand control edge, and the lower end on sand control edge arranges permeable mouth;Return pipe outlet and level Line becomes 20-60 °.
4. collection backwater unification well construction according to claim 1, it is characterised in that: described Permeable mouth is 4, is symmetrical arranged.
5. collection backwater unification well construction according to claim 1, it is characterised in that: filter Pipe top is less than 1~2 meter of lithosphere top.
CN201620347908.4U 2016-04-25 2016-04-25 The water-collecting return unification well construction that a kind of screen pipe moves down Active CN205718073U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620347908.4U CN205718073U (en) 2016-04-25 2016-04-25 The water-collecting return unification well construction that a kind of screen pipe moves down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620347908.4U CN205718073U (en) 2016-04-25 2016-04-25 The water-collecting return unification well construction that a kind of screen pipe moves down

Publications (1)

Publication Number Publication Date
CN205718073U true CN205718073U (en) 2016-11-23

Family

ID=57296098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620347908.4U Active CN205718073U (en) 2016-04-25 2016-04-25 The water-collecting return unification well construction that a kind of screen pipe moves down

Country Status (1)

Country Link
CN (1) CN205718073U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105716330A (en) * 2016-04-25 2016-06-29 丹东市安通空调制冷安装维修工程有限责任公司 Water collecting and returning integrated well structure with filtering pipe moving downwards

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105716330A (en) * 2016-04-25 2016-06-29 丹东市安通空调制冷安装维修工程有限责任公司 Water collecting and returning integrated well structure with filtering pipe moving downwards
CN105716330B (en) * 2016-04-25 2018-05-15 丹东市安通空调制冷安装维修工程有限责任公司 The water-collecting return unification well construction that a kind of screen pipe moves down

Similar Documents

Publication Publication Date Title
CN201866970U (en) Same-floor geothermal energy cyclic utilization system
CN103104219B (en) Utilize and draw back with layer equivalent original place the method that well group draws underground heat energy
CN103354766B (en) For the groundwater management system of mine
CN208072351U (en) A kind of siphoning installation of discharge slope underground water
CN201011333Y (en) Gravitation energy hydroelectric power generating system in plain area
CN103215937B (en) Multilayer aquifer structure-based rainwater recharging underwater system
CN108266912A (en) A kind of recharge system and recharge method using shallow layer geothermal energy
CN203742591U (en) Device for automatically collecting and cleaning geological logging rock debris
CN105953292A (en) Heating supply system adopting clean energy and construction method thereof
CN205718073U (en) The water-collecting return unification well construction that a kind of screen pipe moves down
CN206220850U (en) A kind of special environment-friendly type sampler drill for preventing mud from spilling of geologic prospect
CN206289586U (en) Hydraulic engineering ecological protection slope
CN105716330B (en) The water-collecting return unification well construction that a kind of screen pipe moves down
CN206131521U (en) Earth source heat pump is with well system of recharging
CN205444216U (en) Depth well foundation pit dewatering system on compound stratum of large -scale foundation ditch
CN110230895A (en) Buried hiding GEOTHERMAL WATER the same well and layer takes out filling heat-source Cycles and utilizes system and working method
CN206816485U (en) A kind of mine water pump automaton based on photovoltaic generation
CN103541405B (en) A kind of Full-automatic comprehensive rainwater utilization combination system
CN205678923U (en) A kind of collection backwater unification well construction
CN205712169U (en) What a kind of water resource heat pump subsoil water went back to tank well room blocks sand along structure
CN205276368U (en) Roof rainwater collection device
CN203546819U (en) Fully-automatic comprehensive rainwater utilization combination system
CN210718172U (en) Partitioned recharge type middle-deep geothermal energy collecting well
CN208349612U (en) A kind of ground source heat blowback tank special water box
CN211143096U (en) Deep foundation pit drainage structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190508

Address after: 118000 Jihe Road 903, Zhenxing District, Dandong City, Liaoning Province

Co-patentee after: DANDONG ANTONG AIR-CONDITIONING REFRIGERATION, INSTALLATION AND MAINTENANCE ENGINEERING CO., LTD.

Patentee after: Dandong Tianhe new energy equipment Co., Ltd.

Address before: 118016 No. 21-8 Wuwei Road, Bajingjie Street, Zhenxing District, Dandong City, Liaoning Province

Patentee before: DANDONG ANTONG AIR-CONDITIONING REFRIGERATION, INSTALLATION AND MAINTENANCE ENGINEERING CO., LTD.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 903 Jiehe Road, Zhenxing District, Dandong City, Liaoning Province

Co-patentee after: DANDONG ANTONG AIR-CONDITIONING REFRIGERATION INSTALLATION MAINTENANCE ENGINEERING Co.,Ltd.

Patentee after: Liaoning Shenhe New Energy Technology Co., Ltd

Address before: 118000 Jihe Road 903, Zhenxing District, Dandong City, Liaoning Province

Co-patentee before: DANDONG ANTONG AIR-CONDITIONING REFRIGERATION INSTALLATION MAINTENANCE ENGINEERING Co.,Ltd.

Patentee before: Dandong Tianhe new energy equipment Co.,Ltd.