CN205716138U CN201620598892.4U CN201620598892U CN205716138U CN 205716138 U CN205716138 U CN 205716138U CN 201620598892 U CN201620598892 U CN 201620598892U CN 205716138 U CN205716138 U CN 205716138U
Authority
CN
China
Prior art keywords
pipeline
pipe
layer
water supply
pipe joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620598892.4U
Other languages
Chinese (zh)
Inventor
刘梦琪
黎再德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Lingshui Environmental Protection Technology Co Ltd
Original Assignee
Shenzhen Lingshui Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Lingshui Environmental Protection Technology Co Ltd filed Critical Shenzhen Lingshui Environmental Protection Technology Co Ltd
Priority to CN201620598892.4U priority Critical patent/CN205716138U/en
Application granted granted Critical
Publication of CN205716138U publication Critical patent/CN205716138U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The utility model discloses a kind of water supply and sewerage pipeline connecting structure, belong to plumbing technical field, comprise the first pipeline, second pipe and pipe joint, the first pipeline is connected by pipe joint with second pipe;First pipeline including at least inner insulating layer and is arranged on the conductive layer outside inner insulating layer with second pipe;Pipe joint comprises insulating barrier, axially disposed at least metal conductive strips in insulating barrier, metal conductive strips is provided with connection end at the two ends of pipe joint, connects end and overlaps the conductive layer of the first pipeline and second pipe, makes the first pipeline and second pipe keep electric connection by metal conductive strips.This utility model achieves the circuit communication of many segment pipes, so that many segment pipes can detect breakage by electric current simultaneously, makes water supply and sewerage pipeline damage testing more convenient.

Description

A kind of water supply and sewerage pipeline connecting structure
Technical field
This utility model relates to plumbing technical field, particularly relates to a kind of water supply and sewerage pipeline connecting structure.
Background technology
Presently used water supply and sewerage pipeline (including industrial and civilian) has steel pipe, galvanized pipe, pure plastic pipe (to include substantially PVC, PP, PPR, PE etc.), cast iron pipe, pipe of cement and multiple tube, rubber-lined pipe and spray pipe etc..And galvanized pipe and pipe of cement are existing The most being impermissible for use, steel pipe is only used in the special occasions such as High Temperature High Pressure substantially because of the reason such as cost and anticorrosion, as The lowest but the same with the pipe of cement percolation ratio high pollution environment of cast iron pipe cost of draining also reduce use, line with rubber and spray pipe because of Technique and cost reason are seldom seen, and connect by feat of natural antiseptic power and modern science and technology and producing Progressing greatly of technique, the stable raising of properties of product and the reduction of cost, plastic pipe particularly steel-plastics composite pipe obtains greatly in recent years The popularization of area, in the substantial amounts of water supply and sewerage pipeline being applied to productive life.
It is known that the plastic cement such as PE, PP, PVC, PPR the most used are antiseptical good materials, same is the most all electric Insulator, although steel-plastics composite pipe has metal reinforcement in the centre of tubing, but most metals reinforcement is with holes or spiral shell Rotation shape and netted, it is ensured that the not all standing to plastic layer, and metal reinforcement predominantly strengthens pipeline rigidity, to conduction Property no requirement (NR).
In order to realize the damage Fast nondestructive evaluation to plastic cement and compound pipeline complex pipeline, early stage breakage early warning particularly can be realized, Preventing plumbing from leaking pollution environment, it is achieved online monitoring in real time and detection, applicant proposes to increase in existing tubing one Layer conducting film so that supplying drainage carries out damage testing and early warning by electric method and algorithm, accomplish to pinpoint the problems in time and Time safeguard.Effectively prevent from oozing, leaking, economize on resources, protect environment, also can prevent secondary disaster.
Secondly, corresponding with the function that existing pipeline is only used as plumbing effect, existing pure plastic pipe or the connection of multiple tube Mode is substantially that glue is bonding and two kinds of methods of electric heating melting. and in both methods of attachment, the purest plastic pipe fitting still adds The pipe fitting of reinforcement all can only realize the effective connection between two tubing, without realizing the demand of electric connection between tubing.
With material behavior and the structure present situation of existing tubing, the real-time damage testing of water supply and sewerage pipeline to be realized is very difficult 's.
Summary of the invention
In view of this, this utility model provides a kind of water supply and sewerage pipeline connecting structure, to solve existing underground water supply and drainage pipe The problem that net cannot realize real-time damage testing.
The technical scheme that the above-mentioned technical problem of this utility model solution is used is as follows:
A kind of water supply and sewerage pipeline connecting structure, comprises the first pipeline, second pipe and pipe joint, described first pipeline with Second pipe is connected by pipe joint;Described first pipeline and is arranged in insulation including at least inner insulating layer with second pipe Conductive layer outside Ceng;Described pipe joint comprises insulating barrier, axially disposed at least metal conductive strips in described insulating barrier, Described metal conductive strips is provided with connection end at the two ends of pipe joint, and described connection end overlaps the conduction of the first pipeline and second pipe Layer, makes the first pipeline and second pipe keep electric connection by metal conductive strips.
Further, the conductive layer connecting end and the first pipeline or second pipe of described metal conductive strips pass through wire or Person's electroconductive elastic sheet overlaps.
Further, described metal conductive strips is provided with 4, is uniformly arranged in the insulating barrier of pipe joint, and exists respectively The two ends of pipe joint arrange connection end, and the conductive layer of described connection end and the first pipeline and second pipe connects.
Further, described pipe joint outer wrapping conductive film layer, described metal conductive strips and conductive film layer electric connection.
Further, described metal conductive strips is one-body molded with pipe joint.
Further, described first pipeline and second pipe arrange insulating outer layer outside conductive layer.
Further, between described first pipeline and the inner insulating layer of second pipe and insulating outer layer, also set up enhancement Layer, Described enhancement Layer is arranged on inner side or the outside of conductive layer.
Further, described conductive layer is conducting metal or conductive film.
Further, described inner insulating layer and insulating barrier be PE, PP, PVC, PPR any one.
The water supply and sewerage pipeline connecting structure that this utility model provides, by the supplying drainage by respectively having separate conductive characteristic Realize electric connection fast and effectively, so that whole water supply and sewerage pipeline becomes the conductor of 360 degree of scope conductions of a whole process, thus In the case of connecting detection device, it is achieved the breakage Anywhere of whole water supply and sewerage pipeline can carry out real-time early warning and detection, Greatly reduce the cost of water supply and sewerage pipeline damage testing, accomplish to pinpoint the problems in time, safeguard in time.Effectively prevent from oozing, leaking, Economize on resources, protect environment, also can prevent secondary disaster.
Accompanying drawing explanation
The water supply and sewerage pipeline that Fig. 1 provides for this utility model connects partial schematic sectional view one;
Fig. 2 is the close-up schematic view of Fig. 1;
The water supply and sewerage pipeline that Fig. 3 provides for this utility model connects partial schematic sectional view two;
Fig. 4 is the close-up schematic view of Fig. 3;
Fig. 5 is that shell fragment connects end structure schematic diagram.
10 First pipeline 20 Second pipe
30 Pipe joint 11 Inner insulating layer
12 Conductive layer 21 Inner insulating layer
22 Conductive layer 31 Metal conductive strips
32 Connect end 1 Wire
2 Connector
Detailed description of the invention
In order to make technical problem to be solved in the utility model, technical scheme and beneficial effect clearer, clear, with Under in conjunction with the accompanying drawings and embodiments, this utility model is further elaborated.Should be appreciated that concrete reality described herein Execute example only in order to explain this utility model, be not used to limit this utility model.
Embodiment one
This utility model first embodiment provides a kind of water supply and sewerage pipeline connecting structure, as depicted in figs. 1 and 2, comprises the One pipeline 10, second pipe 20 and pipe joint 30, socket pipe joint 30 outside the first pipeline 10 and second pipe 20, then manage Joint 30 is bonding with one end glue of one end of the first pipeline 10 and second pipe 20 or hot-melt adhesive paste, so that the first pipeline 10 couple together with second pipe 20;As it is shown in figure 1, the first pipeline 10 comprises inner insulating layer 11 and is arranged at outside inner insulating layer 11 Conductive layer 12, second pipe 20 comprises inner insulating layer 21 and is arranged on the conductive layer 22 outside inner insulating layer 21;Pipe joint 30 comprise insulating barrier.Conductive layer in described first pipeline or second pipe is conducting metal or conductive film, described insulation Internal layer and insulating barrier be PE, PP, PVC, PPR any one.Axially disposed at least gold in the insulating barrier of described pipe joint Belong to bus 31, the metal conductive strips of 2,4,6 etc. quantity can be arranged as required to, when arranging many metal conductive strips Time, in the range of each bus is evenly distributed on the tube wall of pipe joint.Metal conductive strips is one-body molded with described pipe joint insulating barrier In described insulating barrier, or length more than insulating barrier isometric with insulating barrier or less than the length of insulating barrier.Described metallic conduction Bar is provided with connection end 32 at the two ends of pipe joint, in the present embodiment, as in figure 2 it is shown, described insulating barrier arranges groove in end, Make described connection end 32 be exposed to the end of pipe joint, be conveniently connected with the conductive layer of the first pipeline or second pipe.Such as Fig. 1 Shown in, the end 32 that connects of the metal conductive strips of pipe joint 30 is overlapped with the conductive layer of corresponding pipeline by wire 1, makes the first pipeline 10 keep electric connection with the conductive layer of second pipe 20 by metal conductive strips.
In order to make pipe joint part can realize the detection of full tube wall, described pipe joint 30 outer wrapping conductive film layer is (in figure not Illustrate), and make metal conductive strips and conductive film layer electric connection, now, metal conductive strips can not be through tube joint total length, this The full tube wall of sample pipe joint can pass through current detection signal, when generator tube joint breakage, in that context it may be convenient to breakage detected Place.When pipeline or pipe joint rupture, the conducting liquid such as the water in pipeline and the conductive layers make contact in pipeline, cause inspection Survey device to test to the signal of telecommunication change, the judgement of pipeline breaking can be made.
This programme goes for more pipeline configuration, such as, at the first pipeline with second pipe at conductive layer peripheral hardware Put insulating outer layer, form the water supply and sewerage pipeline of three-decker.Or between inner insulating layer and insulating outer layer, also set up enhancement Layer, Described enhancement Layer is arranged on inner side or the outside of conductive layer, and described enhancement Layer is grid or mesh or screw-like.
The water supply and sewerage pipeline connecting structure of implementation above, by arranging metal conductive strips on pipe joint, then metal is led The conductive layer of two pipelines that pipe joint is connected by electricity bar couples together, so that two pipelines connected by pipe joint can be same Time receive the detection electric current of damage detection device, thus simplify the damage testing program of whole water supply and sewerage pipeline, significantly drop The low cost of water supply and sewerage pipeline damage testing, accomplishes to pinpoint the problems in time, safeguard in time.Effectively prevent from oozing, leaking, save money Source, protection environment, also can prevent secondary disaster.
Embodiment two
This utility model the second embodiment provides a kind of water supply and sewerage pipeline connecting structure, as shown in Figure 3 and Figure 4, comprises the One pipeline 10, second pipe 20 and pipe joint 30, socket pipe joint 30 outside the first pipeline 10 and second pipe 20, then manage Joint 30 is bonding with one end glue of one end of the first pipeline 10 and second pipe 20 or hot-melt adhesive paste, so that the first pipeline 10 couple together with second pipe 20.
It is with embodiment one difference, the non-end that is exposed to of metal conductive strips in described pipe joint 30, but Insulating barrier contacts and is provided with opening in the range of the first pipeline and second pipe, and the end 32 of metal conductive strips is set to zigzag And it is concordant with described opening or slightly protrude from described opening.When pipe joint is socketed in the outside of the first pipeline and second pipe Time, the Sawtooth connection end 32 at described metal conductive strips 31 two ends contacts conductive layer 12 He of the first pipeline and second pipe respectively Conductive layer 22, thus the first pipeline is coupled together with second pipe current-carrying part.
As optional another way, the metal conductive strips of described opening part can be hidden in described opening, then Arranging connection assist 2 as described in Figure 5 in opening, described connection assist can be spring or shell fragment, described spring Or shell fragment one end abuts the metal conductive strips in pipe joint and connects end, and the other end abuts the conduction of the first pipeline or second pipe Layer.
The conductive layer connecting end and the first pipeline or second pipe of described metal conductive strips is by wire or conduction bullet Oblique cut grafting.
The water supply and sewerage pipeline connecting structure of implementation above, by arranging metal conductive strips on pipe joint, then metal is led The conductive layer of two pipelines that pipe joint is connected by electricity bar by connection assist couples together, so that connected by pipe joint Two pipelines can be simultaneously received the detection electric current of damage detection device, thus simplifies the damaged inspection of whole water supply and sewerage pipeline Ranging sequence, greatly reduces the cost of water supply and sewerage pipeline damage testing, accomplishes to pinpoint the problems in time, safeguard in time.Effectively prevent Ooze, leak, economize on resources, protect environment, also can prevent secondary disaster.
Illustrate preferred embodiment of the present utility model above by reference to accompanying drawing, not thereby limit to right of the present utility model Scope.Those skilled in the art are without departing from any amendment, the equivalent made in scope and spirit of the present utility model and change Enter, all should be within interest field of the present utility model.

Claims (9)

1. a water supply and sewerage pipeline connecting structure, comprises the first pipeline, second pipe and pipe joint, described first pipeline and Two pipelines are connected by pipe joint;It is characterized in that: described first pipeline and sets including at least inner insulating layer with second pipe Put the conductive layer outside inner insulating layer;Described pipe joint comprises insulating barrier, in described insulating barrier axially disposed at least one Metal conductive strips, described metal conductive strips is provided with connection end at the two ends of pipe joint, and described connection end overlaps the first pipeline and The conductive layer of two pipelines, makes the first pipeline and second pipe keep electric connection by metal conductive strips.
A kind of water supply and sewerage pipeline connecting structure the most according to claim 1, it is characterised in that: the company of described metal conductive strips Connect the end conductive layer with the first pipeline or second pipe by wire or electroconductive elastic sheet overlap joint.
A kind of water supply and sewerage pipeline connecting structure the most according to claim 1, it is characterised in that: described metal conductive strips is arranged Have 4, be uniformly arranged in the insulating barrier of pipe joint, and two ends at pipe joint arrange connection end respectively, described connection end with The conductive layer of the first pipeline and second pipe connects.
4. according to a kind of water supply and sewerage pipeline connecting structure described in claim 1 or 3, it is characterised in that: described pipe joint outsourcing Wrap up in conductive film layer, described metal conductive strips and conductive film layer electric connection.
A kind of water supply and sewerage pipeline connecting structure the most according to claim 1, it is characterised in that: described metal conductive strips and pipe Joint is one-body molded.
A kind of water supply and sewerage pipeline connecting structure the most according to claim 1, it is characterised in that: described first pipeline and second Pipeline arranges insulating outer layer outside conductive layer.
A kind of water supply and sewerage pipeline connecting structure the most according to claim 6, it is characterised in that: described first pipeline and second Also setting up enhancement Layer between inner insulating layer and the insulating outer layer of pipeline, described enhancement Layer is arranged on inner side or the outside of conductive layer.
A kind of water supply and sewerage pipeline connecting structure the most according to claim 1, it is characterised in that: described conductive layer is conductive gold Belong to or conductive film.
A kind of water supply and sewerage pipeline connecting structure the most according to claim 1, it is characterised in that: described inner insulating layer and insulation Layer be PE, PP, PVC, PPR any one.
CN201620598892.4U 2016-06-17 2016-06-17 A kind of water supply and sewerage pipeline connecting structure Withdrawn - After Issue CN205716138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620598892.4U CN205716138U (en) 2016-06-17 2016-06-17 A kind of water supply and sewerage pipeline connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620598892.4U CN205716138U (en) 2016-06-17 2016-06-17 A kind of water supply and sewerage pipeline connecting structure

Publications (1)

Publication Number Publication Date
CN205716138U true CN205716138U (en) 2016-11-23

Family

ID=57306070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620598892.4U Withdrawn - After Issue CN205716138U (en) 2016-06-17 2016-06-17 A kind of water supply and sewerage pipeline connecting structure

Country Status (1)

Country Link
CN (1) CN205716138U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927805A (en) * 2016-06-17 2016-09-07 深圳凌水环保科技股份有限公司 Connecting structure of water supplying and draining pipelines

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927805A (en) * 2016-06-17 2016-09-07 深圳凌水环保科技股份有限公司 Connecting structure of water supplying and draining pipelines
CN105927805B (en) * 2016-06-17 2018-07-24 深圳凌水环保科技股份有限公司 A kind of water supply and sewerage pipeline connecting structure

Similar Documents

Publication Publication Date Title
CN105927805B (en) A kind of water supply and sewerage pipeline connecting structure
US20190368967A1 (en) Pipe assembly
CN106015953B (en) A kind of supplying drainage and its leak detection system and detection method
US2761949A (en) Prefabricated pipe system
CN206756397U (en) Water leakage detection line
CN205716138U (en) A kind of water supply and sewerage pipeline connecting structure
CN205716113U (en) A kind of novel supplying drainage connecting structure
CN105339718B (en) The method of bushing, sealing device, pipe and installing pipe
CN103151755B (en) Improve method and the structure of downhole instrument stube cable reliability
CN111769511B (en) Joint connecting device
KR101562166B1 (en) Waterproof tube for cable connecter
CN205745697U (en) A kind of supplying drainage
CN103278755A (en) Installing method of sensor for detecting XLPE (cross linked polyethylene) power cable partial discharge
CN207468260U (en) A kind of corrosion product capturing device
CN207398723U (en) Three core cable tracting head
CN208433719U (en) A kind of electrical threading connector sleeve
CN206697902U (en) A kind of Full shielding electric cable connector
CN207459615U (en) A kind of leakage spool protective device
KR101861491B1 (en) Method for Checking and Repairing of Underground Low Voltage Joint-box
CN207530123U (en) The corrugated connector of enclosed busbar
CN206194533U (en) Capacitor lead
CN206310244U (en) A kind of supplying drainage and its leak detection system
CN210953754U (en) Modularization cathodic protection testing arrangement
JP3418801B2 (en) Water leak detection type flexible pipe joint
CN217130574U (en) Multilayer composite high-strength PE pipe and connecting structure thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161123

Effective date of abandoning: 20180724