CN205716101U - A kind of trombone slide engineering method pipeline welding structure - Google Patents
A kind of trombone slide engineering method pipeline welding structure Download PDFInfo
- Publication number
- CN205716101U CN205716101U CN201620625779.0U CN201620625779U CN205716101U CN 205716101 U CN205716101 U CN 205716101U CN 201620625779 U CN201620625779 U CN 201620625779U CN 205716101 U CN205716101 U CN 205716101U
- Authority
- CN
- China
- Prior art keywords
- welding rod
- welding
- outer tube
- pipeline
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The utility model discloses a kind of trombone slide engineering method pipeline welding structure, including the outer tube at pipe joint, the two ends of described outer tube are provided with the welding groove of one or more, and described welding groove is not through on the tube wall of outer tube;In the both sides and welding groove of outer tube, outer tube is together with its interior pipeline welding;On the inwall of outer tube, it is provided with the first welding rod, the second welding rod, the 3rd welding rod and the 4th welding rod in the middle part of described outer tube, pipe joint is positioned between the second welding rod and the 3rd welding rod, first welding rod, the second welding rod, the 3rd welding rod and the 4th welding rod use the mode of hot melt to be sealedly attached between outer tube and pipeline, the utility model simple in construction, the setting of outer sleeve structure, it is ensured that the firmness of two pipeline weldings and tightness when the traction of distance, stretching.
Description
Technical field
The utility model relates to a kind of Welding Structure, specifically a kind of trombone slide engineering method pipeline welding structure.
Background technology
Urban road pipeline construction, owing to transportation condition limits, on-the-spot without putting slope excavation condition, do not put slope tunneling boring and strengthen
The mode of supporting excavation, requires height to supporting, and construction safety ensures relatively low, fakes very high and very big to traffic impact, it is impossible to
Ensure that traffic dispersion requires.Non-digging tube-pulling construction method solves the problems referred to above, special such as Publication No. CN101457853A
Profit document discloses a kind of non-digging tube-pulling construction method, comprises the following steps: (1) preparation: understand stratum and underground feelings
Condition, calculates reaming number of times and returns expansion device specification, the control data of formulation pipeline center line and elevation and satisfactory after correcting;(2) measurement is flat
Face control unwrapping wire simultaneously measures each stake elevation;(3) active well is set and accepts well and dispose rig;(4) liquid is bored in configuration;(5) to brill
Hole;(6) reamer reaming is used, simultaneously clear hole, mud off;(7) pipeline welding;(8) trombone slide is drawn in and pipe etc. simultaneously in the lump
Long steel pipe;(9) grouting and reinforcing;(10) pipe fitting is installed;(11) pressure testing is rinsed.
In pipe in pipe pulling construction, owing to needing the traction of distance, therefore pipeline welding is particularly important, not only needs weldering
Connecing firmly, and being necessary to ensure that the sealing of welding, especially for gas pipeline, water supply pipe etc., welded seal is just
It is particularly important.
Utility model content
The purpose of this utility model is to provide a kind of firm welding, the trombone slide engineering method pipeline welding structure of good airproof performance.
In order to reach above-mentioned technical purpose, the technical solution of the utility model is:
A kind of trombone slide engineering method pipeline welding structure, including the outer tube at pipe joint, the two ends of described outer tube are equal
Being provided with the welding groove of one or more, described welding groove is not through on the tube wall of outer tube;Both sides and weldering at outer tube
In access slot, outer tube is together with its interior pipeline welding;It on the inwall of outer tube, in the middle part of described outer tube, is provided with first
Welding rod, the second welding rod, the 3rd welding rod and the 4th welding rod, pipe joint be positioned at the second welding rod and the 3rd welding rod it
Between, the first welding rod, the second welding rod, the 3rd welding rod and the 4th welding rod use the mode of hot melt to be sealedly attached to outer tube
And between pipeline.
The two ends of outer tube are respectively welded on two segment pipes, again weld between welding groove and pipeline, thus
Realize multi-pass welding seam, it is ensured that pipeline distance traction, stretching when two pipelines between welding fastness, it is to avoid routine can only
Carry out at outer tube two ends welding and easily produce the unsteady problem of welding.
For the firmness that outer tube is overall, the pipe wall position between described welding groove two ends is different.
The first welding rod, the second welding rod, the 3rd welding rod and the 4th welding rod that arrange effectively ensure that welding
Air-tightness, has the positive effect of reality to conduit for gas, running water pipeline etc., it is to avoid conveying material (as running water,
Natural gas) reveal at two pipeline weldings.
Use outer tube welding, it is to avoid directly welding of two pipeline junctions, two pipeline junctions have certain interval, make
Obtain pipeline and there is certain crooking ability.Meanwhile, the first welding rod, the second welding rod, the 3rd welding rod and the 4th welding rod set
Putting at two pipeline junctions, when pipeline bends at outer tube, welding rod can play buffering between pipeline and outer tube
Effect, it is to avoid abrasion and rigid contact, the weld seam of indirect protection rigidity.
In order to between the first welding rod and the second welding rod, and airtight between the 3rd welding rod and the 4th welding rod
Property detect, the tube wall of outer tube is provided with the first detection hole, second detection hole, first detection hole be arranged on first melt
Connecing between bar and the second welding rod, the second detection hole is arranged between the 3rd welding rod and the 4th welding rod.When from the first detection
Hole, the second detection hole be when being passed through gas, check the flow of gas just can between the first welding rod and the second welding rod, and
Air-tightness between 3rd welding rod and the 4th welding rod detects.
The utility model simple in construction, the setting of outer sleeve structure, it is ensured that two pipelines weldering when the traction of distance, stretching
The firmness connecing and tightness.
Brief description
Fig. 1 is Welding Structure schematic diagram of the present utility model.
Fig. 2 is the structural representation of outer tube.
Detailed description of the invention
With detailed description of the invention, the utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, 2, a kind of trombone slide engineering method pipeline welding structure, including outside at the pipe joint of two pipelines 1,2
Sleeve pipe 3, the two ends of described outer tube 3 are provided with the welding groove 9 of one or more, three (sides) as shown in Figure 1, and described
Tube wall 12 position between welding groove 9 two ends is different, the beneficially firmness of outer tube 3 entirety.Described welding groove 9 is at outer tube
On the tube wall of 3 not through, such as used C font, or more shorter than C font, but can not be through, otherwise outer tube 3 is divided into
Two bodys, but also remain the globality of outer tube 3.The two ends of outer tube 3 are respectively welded on two segment pipes 12, are formed
Weld seam 8, in welding groove 9, again welds between outer tube 3 and pipeline 1 (or pipeline 2), thus realizes multi-pass welding seam,
Guarantee pipeline distance traction, stretching when two pipelines 1, the welding fastness between 2, it is to avoid routine can only be outer tube 3 liang
End carries out welding the easily unsteady problem of generation welding.Outer tube 3 is used to weld, it is to avoid two pipe 1,2 junctions, road direct
Welding, two pipeline 1,2 junctions have certain interval so that pipeline has certain crooking ability.
On the inwall of outer tube 3, be provided with in the middle part of described outer tube 3 first welding rod the 4th, the second welding rod the 5th, the 3rd melt
Connecing articles 6 and the 4th welding rod 7, the first welding rod the 4th, the second welding rod the 5th, the 3rd welding rod 6 and the 4th welding rod 7 are PE material,
Pipeline 1,2 joints are positioned between the second welding rod 5 and the 3rd welding rod 6, the 4th, the second welding rod the 5th, the 3rd welding of the first welding rod
Articles 6 and the 4th welding rod 7 use the mode of hot melt to be sealedly attached between outer tube 3 and pipeline 1,2.
The first welding rod the 4th, the second welding rod the 5th, the 3rd welding rod 6 and the 4th welding rod 7 that arrange effectively ensure that weldering
The air-tightness connecing, has the positive effect of reality to conduit for gas, running water pipeline etc., it is to avoid conveying material (as from
Water, natural gas) reveal at two pipeline weldings.
First welding rod the 4th, the second welding rod the 5th, the 3rd welding rod 6 and the 4th welding rod 7 are arranged on two pipelines 1,2 and connect
Place, when pipeline bends at outer tube 3s, welding rod can play the effect of buffering between pipeline 1,2 and outer tube 3, keeps away
Exempt from abrasion and rigid contact, the weld seam of indirect protection rigidity.
In order to between the first welding rod 4 and the second welding rod 5, and between the 3rd welding rod 6 and the 4th welding rod 7
Air-tightness detects, and is provided with the 10th, the second detection hole 11, the first detection hole on the tube wall of outer tube, and the first detection hole 10 sets
Put between the first welding rod 4 and the second welding rod 5, the second detection hole 5 be arranged on the 3rd welding rod 6 and the 4th welding rod 7 it
Between.When being passed through gas from the first detection hole 11, detection hole 10 second, check that the flow of gas just can be to the first welding rod 4 He
Between second welding rod 5, and the air-tightness between the 3rd welding rod 6 and the 4th welding rod 7 detects.
Above-described embodiment limits the utility model, the mode of every employing equivalent or equivalent transformation never in any form
The technical scheme obtaining all falls within protection domain of the present utility model.
Claims (3)
1. a trombone slide engineering method pipeline welding structure, it is characterised in that include the outer tube at pipe joint, described outer tube
Two ends be provided with the welding groove of one or more, described welding groove is not through on the tube wall of outer tube;At outer tube two
In side and welding groove, outer tube is together with its interior pipeline welding;On the inwall of outer tube, set in the middle part of described outer tube
Being equipped with the first welding rod, the second welding rod, the 3rd welding rod and the 4th welding rod, pipe joint is positioned at the second welding rod and the 3rd
Between welding rod, the first welding rod, the second welding rod, the 3rd welding rod and the 4th welding rod use the mode of hot melt to be tightly connected
Between outer tube and pipeline.
2. a kind of trombone slide engineering method pipeline welding structure according to claim 1, it is characterised in that: described welding groove two ends
Between pipe wall position different.
3. a kind of trombone slide engineering method pipeline welding structure according to claim 1 and 2, it is characterised in that: at outer tube
Being provided with the first detection hole, the second detection hole on tube wall, the first detection hole is arranged between the first welding rod and the second welding rod,
Second detection hole is arranged between the 3rd welding rod and the 4th welding rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620625779.0U CN205716101U (en) | 2016-06-23 | 2016-06-23 | A kind of trombone slide engineering method pipeline welding structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620625779.0U CN205716101U (en) | 2016-06-23 | 2016-06-23 | A kind of trombone slide engineering method pipeline welding structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205716101U true CN205716101U (en) | 2016-11-23 |
Family
ID=57315519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620625779.0U Expired - Fee Related CN205716101U (en) | 2016-06-23 | 2016-06-23 | A kind of trombone slide engineering method pipeline welding structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205716101U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105952992A (en) * | 2016-06-23 | 2016-09-21 | 江苏中达建设工程有限公司 | Pipeline welding structure for pull pipe construction method |
-
2016
- 2016-06-23 CN CN201620625779.0U patent/CN205716101U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105952992A (en) * | 2016-06-23 | 2016-09-21 | 江苏中达建设工程有限公司 | Pipeline welding structure for pull pipe construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102565859B (en) | Overburden water flowing fractured zone observation system and detection drilling method thereof | |
CN103075179B (en) | Entitative coal seam gas drainage drilling hole double-pipe drainage method | |
CN104790419B (en) | A kind of dewatering construction method suitable for rich water mobile sand layer tunnel | |
CN102678167A (en) | Hydraulic-fracturing rock cross-cut coal uncovering method for short-distance coal beds | |
CN205716101U (en) | A kind of trombone slide engineering method pipeline welding structure | |
CN105952992A (en) | Pipeline welding structure for pull pipe construction method | |
CN209398967U (en) | A kind of oil extraction pipeline leakproof equipment | |
CN205262629U (en) | A temperature measuring device for measuring freeze inside temperature of soil layer | |
CN215369773U (en) | Freezing pipe orifice sealing device | |
CN203655265U (en) | Gun drilling gas emission initial speed tester for outburst forecast of coal mine | |
CN107642354B (en) | Method for measuring length of drill hole after drill rod exits from drill hole | |
CN205297457U (en) | A hole sealing device for determining gas pressure | |
CN105333989B (en) | For measuring the pressure-inducting device of the differential pressure of liquid medium in pipeline | |
CN106840228A (en) | A kind of hydrological observation device that can pass through frost wall | |
CN207145867U (en) | The commissure external anti-corrosion layer protection structure of long range horizontal directional drilling water supply line | |
TWM486758U (en) | Multiple depth groundwater hydrology parameters and water quality investigation multiple sealing device | |
CN205048062U (en) | Pipeline for natural compensation of steam pipeline | |
CN101957252A (en) | Experiment device for detecting sealing performance of swelling capsule and sealing liquid | |
CN204126625U (en) | A kind of high temperature resistance burnout-proof multichannel continuous-tube | |
CN207298164U (en) | A kind of socket joint type pipeline socket connecting elements | |
CN211232016U (en) | Socket-embedded self-fixing steel-plastic composite full-swinging dragging pipe | |
CN203395438U (en) | Connecting pipe for underground bending pipelines | |
CN202972253U (en) | Reinforced water drainage pipe connector and connection structure thereof | |
CN107905756A (en) | A kind of tunnel boring construction opening arrangement | |
CN203671018U (en) | Right-angle elbow pipe full fixing joint structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20180623 |
|