CN205714216U - A kind of jib and concrete spraying vehicle - Google Patents
A kind of jib and concrete spraying vehicle Download PDFInfo
- Publication number
- CN205714216U CN205714216U CN201620323176.5U CN201620323176U CN205714216U CN 205714216 U CN205714216 U CN 205714216U CN 201620323176 U CN201620323176 U CN 201620323176U CN 205714216 U CN205714216 U CN 205714216U
- Authority
- CN
- China
- Prior art keywords
- rotary table
- pull bar
- forearm
- hinged
- large arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
This application discloses a kind of jib, including rotary table (1) and large arm (2), one end of described large arm (2) is hinged with described rotary table (1), and described large arm (2) can rotate in perpendicular relative to described rotary table (1), in described large arm (2), the one end away from described rotary table (1) is hinged with forearm (3), described forearm (3) can rotate in perpendicular relative to described large arm (2), it is characterized in that, described rotary table (1) is hinged with pull bar (4), described pull bar (4) is hinged with described forearm (3) away from one end of described rotary table (1), described rotary table (1), described large arm (2), described forearm (3) and described pull bar (4) constitute quadric chain.The jib that the application provides, it is possible to realize forearm Automatic Levelling, Stability Analysis of Structures.
Description
Technical field
The application relates to technical field of engineering machinery, particularly relates to a kind of jib, and the application further relates to one
Plant concrete spraying vehicle.
Background technology
In tunnel construction, after tunnel excavation, discharge in right amount to control surrouding rock stress and deform,
Increase structural safety and convenient construction, apply rigidity after tunnel excavation immediately less and as forever carrying knot
The structure sheaf of a structure part, referred to as preliminary bracing.
In Tunnel Engineering, preliminary bracing typically uses combined bolting and shotcrete.Combined bolting and shotcrete refers to by means of high pressure spray jetting
Cement concrete and the synergy reinforcing rock stratum of the anchor metal squeezed in rock stratum, be divided into temporary supporting to tie
Structure and permanent supporting construction.
Wherein, pressure-injected cement concrete is completed by concrete spraying vehicle.Concrete spraying vehicle is
Complete the operation of jib to swing by staff, commutate, the various actions such as acceleration.Wherein, existing
Having the typically no leveling mechanism of jib of concrete spraying vehicle, concrete spraying vehicle, when wet shot, front and back follows
During ring wet shot, needing several action just can complete, action includes that large arm pitching, telescopic arm stretch or forearm
Pitching, operation complexity.Concrete spraying vehicle later uses hydraulic jack to realize the levelling of forearm, uses
It is levelling that hydraulic jack realizes forearm, and hydraulic system requires height, and cost is high.
Utility model content
For solving above-mentioned technical problem, this utility model provides a kind of jib, it is possible to realize automatic to forearm
Levelling, Stability Analysis of Structures, simple to operate.
The technical scheme that this utility model provides is as follows:
A kind of jib, including rotary table and large arm, one end of described large arm is hinged with described rotary table, and
Described large arm can rotate in perpendicular relative to described rotary table, away from described time in described large arm
One end of turntable is hinged with forearm, and described forearm can rotate in perpendicular relative to described large arm,
It is characterized in that, being hinged with pull bar on described rotary table, described pull bar is away from one end of described rotary table
Hinged with described forearm, described rotary table, described large arm, described forearm and described pull bar constitute four even
Linkage.
Preferably, described pull bar is hinged specifically, in institute away from one end and the described forearm of described rotary table
Stating and be provided with balance base on forearm, described balance base is arranged on the upside of described forearm, described pull bar away from
One end of described rotary table is hinged with described balance base.
Preferably, described pull bar and described balance base are hinged away from one end of described forearm.
Preferably, described rotary table is hinged with pull bar specifically, fixedly mount on described rotary table
Having pull bar mounting seat, described pull bar is hinged with described pull bar mounting seat.
Preferably, described pull bar is hinged away from one end of described rotary table with described pull bar mounting seat.
Preferably, described large arm hollow vertically arrange so that described pull bar, described balance base and
Pull bar mounting seat all can be placed in described large arm.
This utility model also provides for a kind of concrete spraying vehicle, and described concrete spraying vehicle have employed said arm
Frame.
The jib that this utility model provides, is hinged with pull bar on rotary table, and pull bar is away from the one of rotary table
Holding hinged with forearm, rotary table, large arm, forearm and pull bar constitute quadric chain.Rotate in large arm
At the beginning of, forearm is in level, and when large arm carries out pitching, i.e. large arm carries out turning relative to rotary table
Dynamic, hinged with rotary table, forearm respectively due to pull bar, therefore, during large arm rotates, pull bar
Also can rotate identical angle relative to rotary table, collateral security forearm is in level all the time.Again owing to using
Large arm is as the effect of the connecting rod in quadric chain, therefore, and rotary table, large arm, forearm and draw
The stabilized soil pavement tool that bar constitutes quadric chain is good.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present application or technical scheme of the prior art, below will be to reality
Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that below,
Accompanying drawing in description is only some embodiments described in the application, for those of ordinary skill in the art
From the point of view of, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is in structural representation during level for this utility model embodiment offer jib;
Fig. 2 is in structural representation during nutation state for this utility model embodiment offer jib;
Fig. 3 provides jib to be in structural representation when facing upward state for this utility model embodiment;
Fig. 4 provides the quadric chain action principle figure in jib for this utility model embodiment.
Detailed description of the invention
For the technical scheme making those skilled in the art be more fully understood that in the application, below in conjunction with
Accompanying drawing in the embodiment of the present application, clearly and completely retouches the technical scheme in the embodiment of the present application
State, it is clear that described embodiment is only some embodiments of the present application rather than whole enforcement
Example.Based on the embodiment in the application, those of ordinary skill in the art are not before making creative work
Put the every other embodiment obtained, all should belong to the scope of the application protection.
The most as shown in Figure 1 to Figure 3, this utility model embodiment provides a kind of jib, including rotary table 1
With large arm 2, one end of large arm 2 is hinged with rotary table 1 logical, and large arm can be relative to rotary table 1 perpendicular
Straight rotation with in surface, in large arm 2, the one end away from rotary table 1 is hinged with forearm 3, and forearm 3 can be relative
Rotate in perpendicular in large arm 2, wherein, rotary table 1 be hinged with pull bar 4, pull bar 4 away from
One end of rotary table 1 is hinged with forearm 31, and rotary table 1, large arm 2, forearm 3 and pull bar 4 are constituted
Quadric chain.
The most as shown in Figure 4, Fig. 4 is schematic diagram of the present utility model, and Fig. 4 is quadric chain, connecting rod x
Fixing, some a, some b, some c and some d are pin joint.When connecting rod m around pin joint a relative to
When connecting rod x rotates, owing to connecting rod x fixes, therefore, connecting rod n rotates phase around a b relative to connecting rod x
Same angle, in the process, the angle between connecting rod y and level is constant, and the level that only produces is with vertical
Displacement on direction.
The jib that this utility model provides, at the beginning of large arm 2 rotates, forearm 3 is in level, when
When large arm 2 carries out pitching, i.e. large arm 2 rotates relative to rotary table 1, due to pull bar 4 respectively with
Rotary table 1, forearm 3 are hinged, and therefore, during large arm 2 rotates, pull bar 4 also can be relative to returning
Turntable 1 rotates identical angle, and collateral security forearm is in level all the time.Again owing to using large arm 2 conduct
The effect of the connecting rod in quadric chain, therefore, rotary table 1, large arm 2, forearm 3 and pull bar 4
The stabilized soil pavement tool constituting quadric chain is good.
In this utility model embodiment, pull bar 4 is hinged with forearm concrete preferred away from a business of rotary table 1
For, forearm 3 is provided with balance base 5, balance base 5 is arranged on the upside of forearm 3, pull bar 4 away from
One end of rotary table 1 is hinged with balance base 5.
Wherein, pull bar 4 and balance base 5 are hinged away from one end of forearm 3.
In this utility model embodiment, rotary table 1 is hinged with pull bar 4 and is particularly preferred as, in revolution
Being installed with pull bar mounting seat 6 on platform 1, pull bar 4 is hinged with pull bar mounting seat 6.
Wherein, pull bar 4 and pull bar mounting seat 6 are hinged away from one end of rotary table 1.
In this utility model embodiment, large arm 2 hollow vertically is arranged, so that pull bar 4, balance base 5
And pull bar mounting seat 6 all can be placed in large arm 2.
This utility model embodiment also provides for a kind of concrete spraying vehicle, and this concrete spraying vehicle have employed
State jib.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses
This utility model.Multiple amendment to these embodiments will be aobvious for those skilled in the art
And be clear to, generic principles defined herein can be without departing from spirit or scope of the present utility model
In the case of, realize in other embodiments.Therefore, this utility model is not intended to be limited to institute herein
These embodiments shown, and it is to fit to consistent with principles disclosed herein and features of novelty the widest
Scope.
Claims (7)
1. a jib, including rotary table (1) and large arm (2), one end of described large arm (2) is hinged with described rotary table (1), and described large arm (2) can rotate in perpendicular relative to described rotary table (1), in described large arm (2), the one end away from described rotary table (1) is hinged with forearm (3), described forearm (3) can rotate in perpendicular relative to described large arm (2), it is characterized in that, described rotary table (1) is hinged with pull bar (4), described pull bar (4) is hinged with described forearm (3) away from one end of described rotary table (1), described rotary table (1), described large arm (2), described forearm (3) and described pull bar (4) constitute quadric chain.
Jib the most according to claim 1, it is characterized in that, described pull bar (4) is hinged with described forearm (3) specially away from one end of described rotary table (1), described forearm (3) is provided with balance base (5), described balance base (5) is arranged on the upside of described forearm (3), and described pull bar (4) is hinged with described balance base (5) away from one end of described rotary table (1).
Jib the most according to claim 2, it is characterised in that described pull bar (4) and described balance base (5) are hinged away from one end of described forearm (3).
Jib the most according to claim 2, it is characterized in that, described rotary table (1) is hinged with pull bar (4) be specially, being installed with pull bar mounting seat (6) on described rotary table (1), described pull bar (4) is hinged with described pull bar mounting seat (6).
Jib the most according to claim 4, it is characterised in that described pull bar (4) is hinged away from one end of described rotary table (1) with described pull bar mounting seat (6).
Jib the most according to claim 5, it is characterized in that, described large arm (2) hollow vertically is arranged, so that described pull bar (4), described balance base (5) and pull bar mounting seat (6) all can be placed in described large arm (2).
7. a concrete spraying vehicle, it is characterised in that described concrete spraying vehicle have employed the jib as described in claim 1 to 6 any one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620323176.5U CN205714216U (en) | 2016-04-18 | 2016-04-18 | A kind of jib and concrete spraying vehicle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620323176.5U CN205714216U (en) | 2016-04-18 | 2016-04-18 | A kind of jib and concrete spraying vehicle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205714216U true CN205714216U (en) | 2016-11-23 |
Family
ID=57297048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620323176.5U Expired - Fee Related CN205714216U (en) | 2016-04-18 | 2016-04-18 | A kind of jib and concrete spraying vehicle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205714216U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948838A (en) * | 2017-04-07 | 2017-07-14 | 安徽佳乐建设机械有限公司 | A kind of wet shot chassis arm support |
-
2016
- 2016-04-18 CN CN201620323176.5U patent/CN205714216U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948838A (en) * | 2017-04-07 | 2017-07-14 | 安徽佳乐建设机械有限公司 | A kind of wet shot chassis arm support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106401476A (en) | Multifunctional arching drill jambo | |
CN107023309B (en) | Arch frame mounting trolley | |
CN205558927U (en) | Every single move cantilever crane and concrete spraying vehicle | |
CN105240029B (en) | A kind of fold mechanism and concrete spraying vehicle | |
CN207879975U (en) | Shock-absorbing type concrete pump pipe horizontal support device | |
CN205714216U (en) | A kind of jib and concrete spraying vehicle | |
JP6706093B2 (en) | Slope scaffolding assembly method | |
CN207111142U (en) | Temporary supporting device for laneway tunneling | |
CN105697035B (en) | A kind of cantilever crane assembly and concrete spraying vehicle | |
CN203781788U (en) | Aerial work cantilever crane extending device | |
CN205558926U (en) | Cantilever crane assembly and concrete spraying vehicle | |
CN105484767B (en) | A kind of arm support and concrete spraying vehicle | |
CN209686834U (en) | One kind being used for construction overhanging scaffold inner corner trim assembling type frame body device | |
CN208416569U (en) | A kind of workbench manipulator for tunnel support construction equipment | |
CN103276722A (en) | Low-clearance pile frame and application method for same | |
CN207597473U (en) | One kind is with vehicle counterweight self-disassembling device and excavator | |
CN207597406U (en) | For the slope reinforcement system of foundation construction engineering | |
CN211081696U (en) | Anchor rod trolley | |
CN205558925U (en) | Flexible arm swing mechanism and concrete spraying vehicle | |
CN209925776U (en) | Pipeline supporting device for natural gas exploitation | |
CN207892629U (en) | The grid steel frame of steel concrete supporting is used in a kind of constructing tunnel | |
CN207362706U (en) | Load carrying type hanging basket operating platform | |
CN204126224U (en) | The special auxiliary spray equipment of Mortar spraying machine | |
CN205101001U (en) | Every single move arm and concrete spraying vehicle | |
CN107060093A (en) | The support system and assembling method of large-scale oblique braiding gusset plate latticed shell structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20200418 |