CN205712823U - Prestressing force assembled stair - Google Patents
Prestressing force assembled stair Download PDFInfo
- Publication number
- CN205712823U CN205712823U CN201620543370.4U CN201620543370U CN205712823U CN 205712823 U CN205712823 U CN 205712823U CN 201620543370 U CN201620543370 U CN 201620543370U CN 205712823 U CN205712823 U CN 205712823U
- Authority
- CN
- China
- Prior art keywords
- gangboard
- time
- prestressing force
- marking time
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model discloses a kind of prestressing force assembled stair.Described prestressing force assembled stair include gangboard and the multistage unit of marking time being fixed on gangboard;Every grade of unit of marking time includes mark time panel and the side plate of marking time supporting panel of marking time as tread;Described gangboard is prestressing force gangboard, and gangboard thickness is 80mm 140mm.Stair of the present utility model use prestressing force gangboard, reduce the thickness of prefabricated gangboard component, thus reach the effect of loss of weight.Further, gangboard and mark time the most prefabricated, install, the component lightweight after fractionation, reduce load to greatest extent, it is possible to reach mass production, efficient assembling construction, can gamut promote purpose.
Description
Technical field
This utility model relates to a kind of prestressing force assembled stair, belongs to building industrialization field (building).
Background technology
The form that assembled staircase splits is more and more diversified, and connected mode is different.But the most all exist
Some problems: 1. construction weight is big, project under construction needs tower crane of upgrading, and increases cost;2. a lot of abnormity components, component after splitting
The bad production of factory;3. connect node many, the on-the-spot bad installation of project.Need a kind of high standardization of design, symmetry attractive in appearance, convenient
The stair of construction, assembled stair as splicing furniture.Chinese patent CN200510200224.8 discloses a kind of assembling entirety
Formula stair and preparation method thereof, particularly a kind of assembled integral spiral stairway and preparation method thereof, it is in advance by every grade of step
It is fabricated to box shape structure, and it is whole by the method for bolt or welding, the step of box shape structure to be connected to an assembling
Body formula stair, its integrally assembling staircase can be straight stair or spiral stairway shape.This patent eliminates making conventional concrete
Making template, the wiretie that must carry out during stair, build and dismantle the work such as scaffold, maintenance, therefore substantially reduce
Make the duration, reduce cost of manufacture, have simple in construction, cheap, make that the duration is short, it is extensive easily to realize industrialization
Produce and fabrication and installation all facilitate easy feature.But, this patent is primarily adapted for use in spiral stairway, and assembled, relies on phase
Adjacent two box shape structures are connected with each other and form, and the rear connecting plate of next stage step is connected with the front of upper level step by bolt
Plate is formed by connecting integrally assembling staircase, and the rear connecting plate of its upper level step is connected with the floor of building, this connection
Mode structural stability is the highest, and assembling structure is complicated, and versatility is poor.
Utility model content
This utility model aims to provide a kind of prestressing force assembled stair, and these stair use prestressing force gangboard, reduce prefabricated
The thickness of gangboard component, thus reach the effect of loss of weight.Further, gangboard and the most prefabricated, installation of marking time, the structure after fractionation
Part lightweight, reduces load to greatest extent, it is possible to reach mass production, efficient assembling construction, can gamut promote mesh
's.
To achieve these goals, this utility model be the technical scheme is that
A kind of prestressing force assembled stair, including gangboard and the multistage unit of marking time being fixed on gangboard;It is characterized in that,
Every grade of unit of marking time includes mark time panel and the side plate of marking time supporting panel of marking time as tread;Described gangboard is prestressing force ladder
Plate, gangboard thickness is 80mm-140mm.
Prestressing force gangboard described in the utility model is similar to pre-stress floor, refers in process of production to steel bar stress
Apply tension stress, cracking with the concrete preventing gangboard operationally advancing side, also give full play to tension steel simultaneously
The effect of muscle, saving steel.
Thus, this utility model uses prestressing force gangboard, on the premise of structural strength is equal to, efficiently reduces gangboard
Thickness, convenient lifting.
According to embodiment of the present utility model, it is also possible to make this utility model further to optimize, after being below optimization
The technical scheme formed:
Preferably, marking time in unit for adjacent two, the side plate bottom of marking time of a upper unit of marking time is fixed on the next one and steps on
Marking time on panel of step unit.
So that the installation process of stair is more simple and convenient, and can come into operation, preferably adjacent two after installation at once
Level is marked time in unit, and upper level is marked time, and to have lower limit domatic for the side plate bottom of marking time of unit, and next stage is marked time the marking time of unit
Panel the inner has and domatic with described lower limit coordinates spacing upper limit domatic.Thus, it is provided with spacing due to the bottom of gangboard
Platform, it is only necessary to adjust the right position marked time and can complete the installation of marking time of next stage, and mark time and will not move easily, install
Can use after completing at once.Further, the lower end of described gangboard has and marks time the spacing of unit for positioning subordinate
Platform, and mark time the spacing domatic of side plate of marking time of unit of subordinate be arranged on inside described limiting stand.Can certainly be spacing
Opening translot on platform, the riser part of marking time of unit of then subordinate being marked time realizes spacing in snapping in translot, the most this structure
The most more complex.Thus, during installation, by prefabricated gangboard and mark time and be transported to scene, first lifting stair gangboard
And install fixing, then inject grouting material in the installing hole of marking time of the next stage on gangboard, will mark time and be placed on gangboard,
The latch reinforcing bar marked time is made to insert in the installing hole of gangboard, owing to the bottom of gangboard is provided with confined planes, it is only necessary to adjustment is marked time
Right position can complete the installation of marking time of next stage, and mark time and will not move easily, can use after installation at once.
Installing one-level again to mark time, be provided with bound plane owing to marking time, the upper limit plane of next stage can be marked time as upper level
Confined planes, it is only necessary to the most up place and mark time, the right position marked time of regulation, all peaces marked time can be completed
Dress, and every one-level marks time and all can come into operation immediately after installation.
Preferably, mark time panel and side plate of marking time is yi word pattern structure.
In this utility model, unit of marking time can be fabricated structure, it is also possible to be integral structure.
In order to improve the reliability of unit of marking time, the most conveniently play the termination plug-hole effect of unit of marking time, single mark time
In unit, the panel and mark time and be provided with plate torr between side plate of marking time, this plate torr is fixed on described ladder by connector and/or structure glue
On plate.Thus, whole unit class of marking time is similar to the triangular prism that a side is hollowed out, it is ensured that the while of light-weighted, structural strength
More preferably.
In order to sliding, loosening situation occurs in the panel that prevents from marking time, described in mark time and have locating slot on panel lower surface, institute
The top stating side plate of marking time is positioned at the locating slot of panel of marking time;The lower end of described plate torr is domatic with what gangboard gradient was mated
Structure.
In order to improve the structural reliability of unit of marking time, described in mark time panel and mark time between side plate, mark time panel and plate
Between torr and mark time and be equipped with structure glue and/or cement mortar between side plate and plate torr and sit slurry.
Preferably, described gangboard thickness is 80mm-110mm, most preferably 90mm-100mm.
Preferably, the top of described gangboard is had for being fixedly linked by the cast-in-place half space of connector Yu top
Reserving installation hole, the bottom of gangboard has the reserved installation for being fixedly linked by the cast-in-place half space of connector Yu bottom
Hole.It is highly preferred that connector is joint bar.
It is provided with structure glue and/or cast-in-place concrete between top and the cast-in-place half space on top of described gangboard, described
It is provided with structure glue and/or cast-in-place concrete between bottom and the cast-in-place half space of bottom of gangboard.
Lifting gangboard for convenience, the side of described gangboard is provided with suspension centre.
Compared with prior art, the beneficial effects of the utility model are:
1. use prestressing force gangboard, significantly alleviate gangboard weight, it is possible to decrease hoisting cost, convenient installation;
2. step plate splits into yi word pattern and marks time panel and yi word pattern is marked time side plate, it is simple in batches, standardized production;
3. plate torr uses heavy in section design, as Force transmission parts, is arranged on each both sides marked time, also has termination plug-hole
Effect.
Accompanying drawing explanation
Fig. 1 is the structure principle chart of one embodiment of this utility model;
Fig. 2 is the side view of gangboard described in the utility model;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the connection diagram of gangboard and the cast-in-place half space on top;
Fig. 5 is the connection diagram of gangboard and the cast-in-place half space of bottom;
Fig. 6 is the connection diagram of gangboard and unit of marking time;
Fig. 7 is the structural representation of panel of marking time;
Fig. 8 is the structural representation of side plate of marking time;
Fig. 9 is the structural representation of plate torr.
In the drawings
1-prestressing force gangboard;2-marks time panel;3-marks time side plate;4-plate torr;The cast-in-place half space of 5,6-;7,8-wall
Body;9-reserving installation hole;10-lifting hole(eyelet);11-joint bar;12-concrete;Slurry sat by 13-cement mortar;14-latch.
Detailed description of the invention
Below with reference to accompanying drawing and describe this utility model in detail in conjunction with the embodiments.It should be noted that do not conflicting
In the case of, the embodiment in this utility model and the feature in embodiment can be mutually combined.For sake of convenience, the most such as
Occur " on ", D score, "left", "right" printed words, only represent consistent, not to structure with the direction, upper and lower, left and right of accompanying drawing itself
Play restriction effect.
A kind of prestressing force assembled stair, as it is shown in figure 1, stair are split as one piece of gangboard, several plate torr, several
It is the most prefabricated with panel of marking time to mark time side plate.Half space and ladder beam are cast-in-place.Plate torr, side plate of marking time, panel of marking time are all standards
The component changed can be with mass production.Gangboard top is connected the bearing that fixes, gangboard bottom with the latch that is connected by of landing slab
It is connected as sliding support with the simple stuff up a crack that is connected by of landing slab (the most cast-in-place half space).The connection of plate torr and gangboard is adopted
Slip-load is resisted with connecting mode of inserted pin.Mark time panel, mark time side plate preferably by mortar sit slurry be connected with plate torr.
Time prefabricated, design drawing of stair adjusted according to practical situation, is designed to two pieces of identical landing slabs, gangboard
Taking as beam area of bed is designed to up and down, side plate of marking time, panel of marking time do yi word pattern design, and plate torr is designed to standardized triangle
Shape.Factory produces each component in batches, during the construction of every layer main body, first landing slab and gangboard is transported to scene, lifts, is formed up and down
Construction passage.Agent structure will be unified installation when will bind and is marked time.Installation is marked time first fixed plate torr, then installs the panel and stepping on of marking time
Step side plate.
The content that above-described embodiment illustrates should be understood to that these embodiments are only used for being illustrated more clearly that this utility model,
Rather than limit scope of the present utility model, after having read this utility model, those skilled in the art are new to this practicality
The amendment of the various equivalent form of values of type each falls within the application claims limited range.
Claims (10)
1. prestressing force assembled stair, including gangboard and the multistage unit of marking time being fixed on gangboard;It is characterized in that, often
Level unit of marking time includes that the panel of marking time (2) as tread and support are marked time the side plate of marking time (3) of panel (2);Described gangboard is
Prestressing force gangboard (1), gangboard thickness is 80mm-140mm.
Prestressing force assembled stair the most according to claim 1, it is characterised in that mark time in unit for adjacent two, upper one
Side plate of marking time (3) bottom of individual unit of marking time be fixed on the next one mark time unit panel of marking time (2) on.
Prestressing force assembled stair the most according to claim 1, it is characterised in that in adjacent two-stage stepping unit, upper one
Level is marked time, and to have lower limit domatic for side plate of marking time (3) bottom of unit, and mark time panel of marking time (2) the inner of unit of next stage has
Domatic with described lower limit coordinate spacing upper limit domatic.
Prestressing force assembled stair the most according to claim 3, it is characterised in that the lower end of described gangboard (1) has use
Mark time the limiting stand of unit in positioning subordinate, and mark time the spacing domatic of side plate of marking time of unit of subordinate is arranged on described limit
Inside the platform of position.
5., according to the prestressing force assembled stair one of claim 1-4 Suo Shu, it is characterised in that single mark time in unit, step on
Being provided with plate torr (4) between step panel (2) and side plate of marking time (3), this plate torr (4) is fixed on institute by connector and/or structure glue
State on gangboard.
Prestressing force assembled stair the most according to claim 5, it is characterised in that described in mark time on panel (2) lower surface
Have locating slot, described in the mark time top of side plate (3) be positioned at the locating slot of panel of marking time (2);The lower end of described plate torr (4) is
The slope structure mated with gangboard gradient.
Prestressing force assembled stair the most according to claim 5, it is characterised in that described in mark time panel (2) and side of marking time
It is equipped with structure glue between plate (3), between panel of marking time (2) and plate torr (4) and between side plate of marking time (3) and plate torr (4)
And/or cement mortar seat slurry.
8. according to the prestressing force assembled stair one of claim 1-4 Suo Shu, it is characterised in that described gangboard thickness is
80mm-110mm。
9. according to the prestressing force assembled stair one of claim 1-4 Suo Shu, it is characterised in that the top of described gangboard has
For the reserving installation hole (9) being fixedly linked by the cast-in-place half space (5) of connector Yu top, the bottom of gangboard has use
In the reserving installation hole (9) being fixedly linked by the cast-in-place half space (6) of connector Yu bottom.
Prestressing force assembled stair the most according to claim 9, it is characterised in that the top of described gangboard and top
Being provided with structure glue and/or cast-in-place concrete (12) between cast-in-place half space (5), the bottom of described gangboard is stopped with the cast-in-place of bottom
It is provided with structure glue and/or cast-in-place concrete (12) between breath platform (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620543370.4U CN205712823U (en) | 2016-06-07 | 2016-06-07 | Prestressing force assembled stair |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620543370.4U CN205712823U (en) | 2016-06-07 | 2016-06-07 | Prestressing force assembled stair |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205712823U true CN205712823U (en) | 2016-11-23 |
Family
ID=57302059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620543370.4U Expired - Fee Related CN205712823U (en) | 2016-06-07 | 2016-06-07 | Prestressing force assembled stair |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205712823U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110359649A (en) * | 2018-03-26 | 2019-10-22 | 诸暨市碧涵精工模塑有限公司 | A kind of large span is without support steel structure spiral stairs prestressed construction technology |
CN110685411A (en) * | 2018-09-11 | 2020-01-14 | 中天建设集团有限公司 | Separated stair adopting prefabricated steps and installation method thereof |
CN112482676A (en) * | 2020-11-20 | 2021-03-12 | 广州金辉建设集团有限公司 | Prefabricated staircase and installation process thereof |
CN113882604A (en) * | 2021-10-29 | 2022-01-04 | 浙江亚厦装饰股份有限公司 | Clamped assembly type stair panel installation system and installation method thereof |
-
2016
- 2016-06-07 CN CN201620543370.4U patent/CN205712823U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110359649A (en) * | 2018-03-26 | 2019-10-22 | 诸暨市碧涵精工模塑有限公司 | A kind of large span is without support steel structure spiral stairs prestressed construction technology |
CN110359649B (en) * | 2018-03-26 | 2021-08-06 | 诸暨市碧涵精工模塑有限公司 | Prestress construction process for large-span support-free steel structure spiral stair |
CN110685411A (en) * | 2018-09-11 | 2020-01-14 | 中天建设集团有限公司 | Separated stair adopting prefabricated steps and installation method thereof |
CN112482676A (en) * | 2020-11-20 | 2021-03-12 | 广州金辉建设集团有限公司 | Prefabricated staircase and installation process thereof |
CN113882604A (en) * | 2021-10-29 | 2022-01-04 | 浙江亚厦装饰股份有限公司 | Clamped assembly type stair panel installation system and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205712823U (en) | Prestressing force assembled stair | |
CN205531085U (en) | Combined assembled type stairway | |
CN205399856U (en) | Hollow step combination stair | |
CN205531082U (en) | Assembled combination stair | |
US20190093367A1 (en) | Stair system and manufacturing | |
CN104989098A (en) | Laminated plate support frame | |
CN107587643A (en) | The ceiling structure of quick grafting assembling | |
CN212405792U (en) | Assembled concrete spiral stair | |
CN205875817U (en) | Assembled stage | |
CN204960309U (en) | Fixed adjustable cast -in -place stair template is propped up to establish and is used cushion braced system | |
CN111894216A (en) | Assembled concrete spiral stair and construction method thereof | |
CN214833410U (en) | PC assembled structure beam column node dry-type connection structure | |
CN207499196U (en) | A kind of cladding node of assembled architecture outer wall and precast facade | |
CN205712820U (en) | A kind of board-like combined staircase | |
JP4516585B2 (en) | Internal staircase for building and its construction method | |
CN215977675U (en) | Dry-type connection assembly and connection node of prefabricated part | |
CN201011126Y (en) | Building support | |
CN205444736U (en) | Standardized assembled stair and staircase structure | |
CN105464218B (en) | One kind landing truss bearing pin connecting joint structure | |
CN205653994U (en) | Assembled staircase structure | |
CN205688692U (en) | A kind of gangboard structure and assembled combined staircase | |
JP3669762B2 (en) | Assembly method of assembly stairs | |
CN208981745U (en) | Multifunction scaffold | |
CN215368907U (en) | Novel formwork support device for building construction | |
CN203808364U (en) | Stand column suitable for building indoor device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 |