CN205712761U - A kind of grout sleeve and prefabricated component - Google Patents

A kind of grout sleeve and prefabricated component Download PDF

Info

Publication number
CN205712761U
CN205712761U CN201620361652.2U CN201620361652U CN205712761U CN 205712761 U CN205712761 U CN 205712761U CN 201620361652 U CN201620361652 U CN 201620361652U CN 205712761 U CN205712761 U CN 205712761U
Authority
CN
China
Prior art keywords
sleeve
sleeve body
grout
steel lobe
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620361652.2U
Other languages
Chinese (zh)
Inventor
俞大有
陈定球
刘斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mingsheng Drawin Technology Investment Co Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201620361652.2U priority Critical patent/CN205712761U/en
Application granted granted Critical
Publication of CN205712761U publication Critical patent/CN205712761U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

This utility model belongs to building engineering field, specifically discloses a kind of grout sleeve and prefabricated component, and described grout sleeve includes that sleeve body, described sleeve body are provided with grouting mouth and air vent, the one end open of described sleeve body, and the other end is for connecting end;The inwall of described sleeve body is provided with steel lobe, and the thickness of described steel lobe is become larger to connecting end by opening, and described steel lobe is provided with groove or projection.This utility model can realize reinforcing bar and the most axially controls and radially position, it is ensured that the positioning precision between reinforcing bar and grout sleeve.The setting of steel lobe, can reduce wall thickness in the case of sleeve body external diameter is identical, add grouting material so that be in the milk more closely knit, and reinforcing bar is higher with the adhesive property of sleeve body entirety;Steel lobe is provided with groove or protruding cocoa increases the contact area between steel lobe and grouting material, to increase the gmatjpdumamics between itself and grouting material so that between reinforcing bar and sleeve body, power transmission is more uniform.

Description

A kind of grout sleeve and prefabricated component
Technical field
This utility model belongs to building engineering field, particularly relates to a kind of grout sleeve and prefabricated component.
Background technology
In traditional cast-in-place concrete structure, the connection of reinforcing bar, using overlap joint to connect, be welded to connect or squeeze more The mechanical joining methods such as gland cylinder, the construction of bar connecting is complex and it is necessary to before cast concrete Complete the connection of reinforcing bar, it is impossible to realize the connection of reinforcing bar between prefabricated component, thus cannot be carried out prefabricated construction.
In prior art, the bar connecting between assembly concrete architectural prefab needs to use sleeve grouting Connect, in two connected reinforcing bars are inserted metal sleeve and in the space between sleeve and reinforcing bar, irrigate height Performance cement mortar, cement mortar hardening after, mutual build-in between three thus realize the connection of reinforcing bar.As Patent CN 105133795 A discloses a kind of reducing type half grout sleeve, use seamless steel pipe as main body tube, Main body tube inwall is male and fomale(M&F), and main body tube upper end connects with the larger diameter end of conical tube, the minor diameter of conical tube End connects with cylindrical tube one end.Above-mentioned sleeve adds a conical pipe and plays the effect of reducing so that should Grout sleeve is easily attached reinforcing bar, and makes it deform so that it is be in close contact with being connected reinforcing bar through extruding.But In above-mentioned grout sleeve, the setting of conical pipe makes the internal diameter of this part diminish suddenly, owing to reinforcing bar has necessarily Rigidity, be difficult to so that reinforcing bar to be connected on the same line, even reinforcing bar to be extend into sleeve The inside, existing defects in stress.
In sum, a kind of axially control being capable of reinforcing bar of exploitation and radial direction location are needed badly, it is ensured that reinforcing bar And the positioning precision between grout sleeve, reasonable stress, cost savings, can be effectively improved grouting closely knit simultaneously The grout sleeve of degree.
Utility model content
The purpose of this utility model is to provide a kind of axially control being capable of reinforcing bar and radially positions, it is ensured that Positioning precision between reinforcing bar and grout sleeve, reasonable stress, cost savings, grouting can be effectively improved simultaneously The grout sleeve of degree of compaction, and apply the prefabricated component having this grout sleeve.
Above-mentioned purpose is to be achieved through the following technical solutions: a kind of grout sleeve, including sleeve body, described Sleeve body is provided with grouting mouth and air vent, the one end open of described sleeve body, and the other end is for connecting end; The inwall of described sleeve body is provided with steel lobe, and the thickness of described steel lobe is become larger to connecting end by opening, Described steel lobe is provided with groove or projection.During grout sleeve application, in the manufacturing process of prefabricated component, will grouting Sleeve is embedded in prefabricated component in advance, and the connection end of sleeve body is connected with embedded bar, the opening of sleeve body Connecting outside prefabricated component, when carrying out steel reinforcement abutting joints, reinforcing bar stretches to sleeve originally from the opening of sleeve body Intracoelomic cavity, owing to steel lobe is the most thickening to connecting end by opening, the inside in sleeve body divides and gradually becomes Little, after reinforcing bar enters inner chamber, steel bar end moves to connection end under the constraint of steel lobe inwall, until reinforcing bar End be connected end be connected, so, in the docking operation of reinforcing bar, reinforcing bar can be realized by sleeve body Accurate axially control, it is achieved radially location, it is ensured that the positioning precision between reinforcing bar and grout sleeve, preferably In the case of, i.e. it is provided with multiple steel lobe, the size of steel lobe and consistency of thickness, and when being symmetrical arranged, it is right to make Connect reinforcing bar on the same line, reasonable mechanical;Reinforcing bar can be made simultaneously to be positioned at the central part of inner chamber, so filling After slurry, the thickness of the grouting material of reinforcing bar surrounding keeps consistent, improves Grouted density, increases grouting material to reinforcing bar Bond stress.It is pointed out that the thickness of described steel lobe is in aerofluxus in order to reach above-mentioned technique effect Mouthful section can not be too big, reinforcing bar be ensure that can connect end through air vent Duan Houyu and be connected.This Skilled person should be appreciated that air vent section described herein refers to air vent in sleeve body lumen shaft The length of interval upwards taken.
The setting of steel lobe increases sleeve body integral rigidity, on the premise of meeting rigidity, can suitably subtract Few sleeve body wall thickness, saves material.In the case of external diameter is identical, reduces wall thickness simultaneously, adds grouting Material so that be in the milk more closely knit, reinforcing bar is higher with the adhesive property of sleeve body entirety.Additionally, pour into Slurry forms the lock solid structure matched with sky in sleeve and steel lobe in sleeve body, and steel is greatly improved The anchorage reliability of muscle.Should be appreciated that described steel lobe can be and sleeve body one-piece casting molding, it is possible to It is cutting processing molding, it is also possible to be that work progress is arranged on intracavity in sleeve body, lives with sleeve body It is dynamically connected.Certainly, steel lobe arrange position with grouting mouth and steam vent set by position not overlapping.
Groove or the projection of certain depth are set on steel lobe, the contact surface between steel lobe and grouting material can be increased Long-pending, to increase the gmatjpdumamics between itself and grouting material so that between reinforcing bar and sleeve body, power transmission is more uniform. Should be appreciated that described groove or projection can be arranged on sidewall and/or the inwall of steel lobe, described groove or convex It can be horizontal, vertical for rising or annular is arranged.Preferably it is opened in sidewall, does not so interfere with the docking of reinforcing bar. If offering groove, the middle part of steel lobe sidewall or sidewall can be provided near one end of sleeve body wall, Especially groove is opened in steel lobe sidewall near one end of sleeve body wall, it is possible to increase the grouting of grouting material is empty Between, and increase the contact area of steel lobe, sleeve lining and grouting material simultaneously.For reaching preferably technique effect, Axially arranged along sleeve body inner chamber of described groove or projection.
Further, the bottom of described sleeve body opening inner chamber is provided with annular protrusion.During grouting, In order to avoid grouting material is first to open outer end overflow, convex annular is set in the bottom of sleeve body opening inner chamber Rise, so grouting material is played certain barrier effect so that grouting material can be the most smoothly to sleeve body Internal flow, can improve Grouted density.
Further, the inwall of described sleeve body is provided with the steel lobe of more than two lobes.Steel lobe lobe number master is set Depending on will be according to the size of sleeve, steel lobe can use the lobe number such as two lobes, three lobes so that the regulation of sleeve body Space is bigger.
Further, it is less than the straight of reinforcing bar to be connected along the distance that the inner chamber of sleeve body is circumferential between described steel lobe Footpath.It is arranged such, it is to avoid during construction reinforced bar docking, reinforcing bar inserts in the seam between steel lobe, it is achieved not right Connect, strengthen difficulty of construction.
Further, described steel lobe was offered slurry hole or led stock tank.Cross slurry hole or lead arranging on the one hand of stock tank Ensure that grouting material has enough flowing spaces in time connecting end flowing, enrich whole grout sleeve, simultaneously can be by The grouting material in gap between steel lobe connects into entirety, increases the adhesion between sleeve body and grouting material, The globality of grouting material is higher, and then is effectively increased the grouting material bond stress to reinforcing bar.
Further, described cross slurry hole or lead circumferentially disposed along sleeve of stock tank.So, by crossing slurry hole or leading Gap between steel lobe is connected by stock tank.
Further, the opening of described sleeve body is provided with closing device, and described closing device is provided with jack hole. Be arranged such, it is to avoid grouting material before condensing hardening from sleeve body opening spilling.During use, first will Reinforcing bar, through the jack hole on closing device, seals after completing the docking of reinforcing bar, then carries out grouting behaviour Make.
Further, described closing device uses screw thread or shackle member to be connected with sleeve body.So, sealing dress Put to be formed with sleeve body and be reliably connected, can avoid in filling process, due to the impulsive force of grouting material and its Gravity itself and back down the phenomenon of closing device and occur.
Further, the two side of described closing device is provided with anchoring projection.Being arranged such, closing device can Form certain anchor force with the grouting material of its both sides and in-situ layer, indirectly strengthen the sleeve body company with the two Connect.
Further, described closing device is lock sleeve, and described lock sleeve is interior with described sleeve body opening Chamber interference fit, described lock sleeve is mild steel or prepared by spring steel.It is arranged such, after completing the docking of reinforcing bar, During sealing, lock sleeve is pushed away inward, gradually become to connecting end by opening owing to the inside of sleeve body divides Little, cause lock sleeve generation elastic deformation, and then reinforcing bar is pinned tightly, reinforcing bar can be made at filling process In do not swinging.During it should be noted that lock sleeve uses loop configuration, the inner chamber of sleeve body is opened Mouth end is not provided with steel lobe, and certainly, when the lumen openings end of sleeve body arranges steel lobe, lock sleeve outer wall is provided with The projection of the matched in clearance between multiple and steel lobe.
Further, the end of described lock sleeve offers otch.It is arranged such, beneficially lock sleeve generation shape Become.Should be appreciated that described otch can be arranged on any one or both ends of lock sleeve.
Further, described connection end is provided with threaded mouth or fixing bolt.So, it is ensured that sleeve two The connection of side reinforcing bar and fixing.
Further, described sleeve body outer surface is matsurface.When grout sleeve is as built-in fitting, sleeve Body outer surface uses rough surface, adds the anchor force between grout sleeve and concrete.
Further, described steel lobe is extended internally by opening, and described sleeve body is near connecting formation ring at end Shape inner chamber.It is meant that steel lobe is extended internally by opening expressed by should be appreciated that herein, but does not extend To connecting end, therefore sleeve body is near connecting formation annular cavity at end.It is arranged such, it is ensured that grouting material In time connecting endwall flow, there are enough flowing spaces, it is ensured that grouting material fills whole inner chamber, improve grouting close Solidity, simultaneously the increasing of this part grouting material, increase the grouting material bond stress to reinforcing bar, form one section of reinforcement District.
Further, described steel lobe is extended inwardly to described air vent front end by opening.It is arranged such, sleeve Body is not provided with steel lobe in air vent section, and the intracavity space of air vent section significantly increases, and contributes to sleeve body The discharge of gas in inner chamber, to ensure that grouting material has enough flowing spaces in time connecting endwall flow, improves Grouted density.Should be appreciated that described air vent front end refers to sleeve body the most close by opening Exhaust ports.
Further, described steel lobe is provided with flex point, and the thickness of described steel lobe is become larger to flex point by opening, Tapered into connecting end by flex point.Being arranged such, beneficially guiding grouting material is to connecting endwall flow, Ensure enough flowing spaces simultaneously, improve Grouted density, simultaneously the increasing of this part grouting material, increase The grouting material bond stress to reinforcing bar, forms one section and strengthens district.
Further, described flex point is arranged on described air vent front end.It is arranged such, sleeve body can be made to exist The intracavity space of air vent section significantly increases, and contributes to the discharge of gas in sleeve body inner chamber, to ensure to fill Slurry has enough flowing spaces in time connecting endwall flow, it is ensured that grouting material fills whole inner chamber, improves and fills Slurry degree of compaction.
Further, described steel lobe is in the shape of a spiral.It is arranged such, it is possible to increase being engaged between steel lobe and grouting material Power, guides grouting material to flow in sleeve body the most to a certain extent, is effectively improved Grouted density.
Further, described steel lobe inwall is by the inside corrugated extension of opening.Steel lobe uses undulatory interior Wall, on the one hand, taper into connection end owing to the inside of sleeve body divides, is unfavorable for that grouting material is to even Connect end flowing, and steel lobe is arranged to undulatory inwall and can ensure that grouting material has enough flowing spaces and leads The effect of purling slurry, can be effectively improved Grouted density, on the other hand, can be effectively increased steel lobe inwall Concavity and convexity, and then increase the gmatjpdumamics between grouting material and steel lobe, improve the anchoring strength of reinforcing bar.Need Bright, under the conditions of this, steel lobe is gradually become to connecting the most thickening the referring to of end by opening on overall trend Thickness, and it is not properly suited for the thickness change of steel lobe local, reflection is steel lobe overall variation trend.
Further, the sleeve body inwall between described steel lobe is provided with groove.It is arranged such, increases grouting sky Increase the gmatjpdumamics between sleeve body inwall and grouting material while between, increase sleeve body binding site Overall tension or the ability of anti-shearing force.Described groove is preferably arranged to annular, i.e. along sleeve body inner chamber Circumferentially disposed.
Further, described sleeve body outer surface is provided with annular cutting.It is arranged such, adds sleeve body With the contact area of concrete, increase the anchor force between grout sleeve and concrete.
Further, the opening of described sleeve body is arranged to angle.It is arranged such, increases opening inner chamber Diameter, angle can also play the insertion of guide effect, beneficially reinforcing bar and achieves a butt joint simultaneously.
For reaching above-mentioned purpose, this utility model also provides for a kind of prefabricated component, and described prefabricated component is embedded with pre-buried Grout sleeve described in reinforcing bar and above-mentioned any one, described embedded bar is connected with the connection end of grout sleeve. Being arranged such, prefabricated component is embedded with grout sleeve, stretches out reinforcing bar by grout sleeve and prefabricated component to be assembled Being connected, then grouting is fixing, it is achieved the abutting joint of prefabricated component.
Accompanying drawing explanation
The accompanying drawing constituting a part of the present utility model is further appreciated by of the present utility model for providing, this The schematic description and description of utility model is used for explaining this utility model, is not intended that this practicality new The improper restriction of type.
Fig. 1 and Fig. 2 is respectively the front section view of the grout sleeve involved by a kind of embodiment of this utility model;
Fig. 3 and 4 is respectively the opening profile of the grout sleeve involved by this utility model another embodiment;
Fig. 5~8 is respectively the section on the right side of the connection end of the grout sleeve involved by a kind of embodiment of this utility model Figure;
Fig. 9 is the front section view of the grout sleeve involved by this utility model another embodiment;
Figure 10 is the profile on the right side of the connection end of the grout sleeve involved by this utility model another embodiment;
Figure 11 and Figure 12 is respectively the front cross-sectional of the grout sleeve involved by this utility model another embodiment Figure;
Figure 13 is the profile on the right side of the connection end of the grout sleeve involved by this utility model another embodiment;
Figure 14 and Figure 15 is respectively the front cross-sectional of the grout sleeve involved by this utility model another embodiment Figure;
Figure 16 is the structural representation of the lock sleeve involved by a kind of embodiment of this utility model;
Figure 17 is the preform structure schematic diagram involved by a kind of embodiment of this utility model;
Figure 18 is the prefabricated component mated condition schematic diagram involved by a kind of embodiment of this utility model.
In figure:
1 sleeve body 2 is in the milk mouth 3 air vent 4 opening
5 connect end 6 annular protrusion 7 annular cavity 8 steel lobe
9 cross slurry hole 10 inner chamber 11 steel lobe inwall 12 flex point
13 protruding 16 grooves of reinforcing bar 14 grouting material 15
17 closing device 18 lock sleeve 19 jack hole 20 otch
21 prefabricated component 22 embedded bars
Detailed description of the invention
Being described in detail this utility model below in conjunction with the accompanying drawings, the description of this part is only exemplary reconciliation The property released, should not have any restriction effect to protection domain of the present utility model.Additionally, people in the art Feature in embodiment in presents and in different embodiment, according to the description of presents, can be carried out by member Respective combination.
This utility model embodiment is as follows, and with reference to Fig. 1~4, a kind of grout sleeve, including sleeve body 1, institute State sleeve body 1 and be provided with grouting mouth 2 and air vent 3, the one end open of described sleeve body 1, another End is for connecting end 5, and the inwall of described sleeve body 1 is provided with steel lobe 8, and the thickness of described steel lobe 8 is by opening 4 inwardly become larger, and described steel lobe 8 is provided with groove 16 or protruding 15.During grout sleeve application, in advance In the manufacturing process of product 21, grout sleeve is embedded in advance in prefabricated component 21, the connection end of sleeve body 1 5 are connected with embedded bar 22, and the opening 4 of sleeve body 1, towards the outer connection of prefabricated component 21, is carrying out steel When muscle 13 docks, reinforcing bar 13 stretches to sleeve body 1 inner chamber 10 from the opening 4 of sleeve body 1, by The most thickening to connecting end 5 by opening 4 in steel lobe 8, the inside in sleeve body 1 divides and tapers into, After reinforcing bar 13 enters inner chamber 10, reinforcing bar 13 termination is moved to connection end 5 under the constraint of steel lobe inwall 11, Until the end of reinforcing bar 13 is connected with being connected end 5, so, in the docking operation of reinforcing bar 13, sleeve is originally Body 1 can realize accurate axially control to reinforcing bar 13, it is achieved radially location, it is ensured that reinforcing bar 13 and grouting Positioning precision between sleeve, under preferable case, is i.e. provided with multiple steel lobe 8, the size of steel lobe 8 and thickness Unanimously, and when being symmetrical arranged, can make to dock reinforcing bar 13 on the same line, reasonable mechanical;Can make simultaneously Reinforcing bar 13 is positioned at the central part of inner chamber 10, the so thickness of the grouting material 14 of reinforcing bar 13 surrounding after grouting Keep consistent, improve Grouted density, increase the grouting material 14 bond stress to reinforcing bar 13.It may be noted that Be, in order to reach above-mentioned technique effect, the thickness of described steel lobe 8 air vent 3 sections can not be too big, Reinforcing bar 13 be ensure that can through after air vent 3 sections with to be connected end 5 connected.People in the art It is axial at sleeve body 1 inner chamber 10 that member should be appreciated that air vent described herein 3 sections refers to air vent 3 On the length of interval that takies.
The setting of this utility model steel lobe 8 increases sleeve body 1 integral rigidity, on the premise of meeting rigidity, Can suitably reduce sleeve body 1 wall thickness, save material.In the case of external diameter is identical, reduce wall thickness simultaneously, Add grouting material 14 so that be in the milk more closely knit, reinforcing bar 13 and the adhesive property of sleeve body 1 entirety Higher.Additionally, the slurry poured into forms the lock matched with sky in sleeve and steel lobe 8 in sleeve body 1 Fixing structure, is greatly improved the anchorage reliability of reinforcing bar 13.Preferably steel lobe 8 setting direction and inner chamber 10 Axial direction is consistent.Should be appreciated that such as Fig. 5~8, described steel lobe 8 can be to water with sleeve body 1 entirety Build up type, it is possible to be cutting processing molding, it is also possible to be that work progress is arranged on sleeve body 1 inner chamber 10 In, it is flexibly connected with sleeve body 1.Certainly, steel lobe 8 arrange position not with grouting mouth 2 and steam vent institute If position is overlapping.
The groove 16 or protruding 15 of certain depth is set on steel lobe 8, steel lobe 8 and grouting material 14 can be increased Between contact area, to increase the gmatjpdumamics between itself and grouting material 14 so that reinforcing bar 13 and sleeve this Between body 1, power transmission is more uniform.Described groove 16 or protruding 15 can be arranged on steel lobe 8 sidewall and/ Or on inwall, described groove 16 or protruding 15 can be horizontal, vertical or annular is arranged.Preferably it is opened in Sidewall, does not so interfere with the docking of reinforcing bar 13.Should be appreciated that described groove 16 or protruding 15 can set Putting on the sidewall and/or inwall of steel lobe 8, described groove 16 or protruding 15 can be horizontal, vertical or ring Shape is arranged.If offering groove 16, can be provided in the middle part of steel lobe 8 sidewall or sidewall near sleeve this One end of body 1 wall, is especially opened in steel lobe 8 sidewall near one end of sleeve body 1 wall by groove, can Increase the grouting space of grouting material 14, and increase steel lobe 8, sleeve lining contact with grouting material 14 simultaneously Area.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 5~8, described sleeve body 1 Inwall be provided with the steel lobe 8 of more than two lobes.Steel lobe 8 lobe number arrange main according to the size of sleeve depending on, Steel lobe 8 can use the lobe number such as two lobes, three lobes so that the regulation space of sleeve body 1 is bigger.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 3, between described steel lobe 8 Distance along inner chamber 10 circumference of sleeve body 1 is less than the diameter of reinforcing bar 13 to be connected.It is arranged such, keeps away Exempt from reinforcing bar 13 when construction reinforced bar 13 docks and insert in the seam between steel lobe 8, it is achieved not docking, strengthen Difficulty of construction.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 9, described sleeve body 1 The bottom of opening 4 inner chamber 10 is provided with annular protrusion 6.During grouting, in order to avoid grouting material 14 First to open outer end overflow, annular protrusion 6 is set in the bottom of sleeve body 1 opening 4 inner chamber 10, this Grouting material 14 is played certain barrier effect by sample so that grouting material 14 can be the most smoothly to sleeve body 1 internal flow, can improve Grouted density.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1, described connection end 5 sets There are threaded mouth or fixing bolt.So, it is ensured that the connection of sleeve both sides reinforcing bar 13 and fixing.
On the basis of above-described embodiment, in another embodiment of the present invention, described sleeve body 1 outer surface is Matsurface.When grout sleeve is as built-in fitting, sleeve body 1 outer surface uses rough surface, adds Anchor force between grout sleeve and concrete.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 15, described sleeve body 1 Opening 4 be provided with closing device 17, described closing device 17 is provided with jack hole 19.It is arranged such, keeps away Exempt from grouting material 14 to overflow from sleeve body 1 opening 4 before condensing hardening.During use, first by reinforcing bar 13, through the jack hole 19 on closing device 17, seal after completing the docking of reinforcing bar 13, then carry out Grouting operation.
On the basis of above-described embodiment, in another embodiment of the present invention, described closing device 17 is with sleeve originally Body 1 uses screw thread or shackle member to connect.So, closing device 17 is formed with sleeve body 1 and is reliably connected, Can avoid in filling process, back down closing device due to impulsive force and the gravity of itself of grouting material 14 The phenomenon of 17 occurs.
On the basis of above-described embodiment, in another embodiment of the present invention, the two side of described closing device 17 It is provided with anchoring projection.Being arranged such, closing device 17 can be with the grouting material 14 of its both sides and in-situ layer shape Become certain anchor force, indirectly strengthen the sleeve body 1 connection with the two.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 15 and 16, described sealing Device 17 is lock sleeve 18, described lock sleeve 18 and inner chamber 10 mistake of described sleeve body 1 opening 4 Being full of cooperation, described lock sleeve 18 is prepared for mild steel or spring steel.It is arranged such, completes the docking of reinforcing bar 13 After, during sealing, lock sleeve 18 is pushed away inward, owing to the inside of sleeve body 1 divides by opening 4 to even Connect end 5 to taper into, cause lock sleeve 18 that elastic deformation occurs, and then reinforcing bar 13 is pinned tightly, Reinforcing bar 13 can be made not swing in filling process.It should be noted that lock sleeve 18 uses annular During structure, inner chamber 10 opening 4 of sleeve body 1 is not provided with steel lobe 8, certainly, and sleeve body 1 interior When chamber 10 opening 4 arranges steel lobe 8, the gap that lock sleeve 18 outer wall is provided with between multiple and steel lobe 8 is joined The projection closed.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 16, described lock sleeve 18 End offer otch 20.Being arranged such, beneficially lock sleeve 18 deforms upon.Should be appreciated that institute State otch 20 and can be arranged on any one or both ends of lock sleeve 18.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 9 and Figure 10, described steel lobe Offered slurry hole 9 on 8 or led stock tank.Cross slurry hole 9 or lead stock tank arrange on the one hand ensure grouting material 14 to Connect when end 5 flows and have enough flowing spaces, enrich whole grout sleeve, simultaneously can be by between steel lobe 8 Gap in grouting material 14 connect into entirety, increase the adhesion between sleeve body 1 and grouting material 14, The globality of grouting material 14 is higher, and then is effectively increased the grouting material 14 bond stress to reinforcing bar 13.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 10, described cross slurry hole 9 or Lead circumferentially disposed along sleeve of stock tank.So, by crossing slurry hole 9 or leading stock tank by the gap between steel lobe 8 Connection.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 11, described steel lobe 8 is by opening Mouth end 4 extends internally, and described sleeve body 1 is near connecting formation annular cavity 7 at end 5.Should be appreciated that It is meant that steel lobe 8 is extended internally by opening 4 expressed by herein, but is not extended to connect end 5, therefore Sleeve body 1 is near connecting formation annular cavity 7 at end 5.It is arranged such, it is ensured that grouting material 14 is to even There are enough flowing spaces when connecing the flowing of 5, end, it is ensured that grouting material 14 fills whole inner chamber 10, improve and fill Slurry degree of compaction, the increasing of this part grouting material 14 simultaneously, increase the grouting material 14 bond stress to reinforcing bar 13, Form one section and strengthen district.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 11, described steel lobe 8 is by opening Mouth end 4 extends inwardly to described air vent 3 front end.Being arranged such, sleeve body 1 is air vent 3 sections not Arranging steel lobe 8, inner chamber 10 space that air vent is 3 sections significantly increases, and contributes to sleeve body 1 inner chamber 10 The discharge of middle gas, to ensure that grouting material 14 has enough flowing spaces in time connecting the flowing of 5, end, improves Grouted density.Should be appreciated that described air vent 3 front end refer to sleeve body 1 by opening 4 to Interior at air vent 3.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 12, described steel lobe 8 is provided with Flex point 12, the thickness of described steel lobe 8 is become larger to flex point 12 by opening 4, by flex point 12 to Connect end 5 to taper into.It is arranged such, is conducive to guiding grouting material 14 to connecting the flowing of 5, end, simultaneously Ensure enough flowing spaces, improve Grouted density, simultaneously the increasing of this part grouting material 14, increase and fill The slurry 14 bond stress to reinforcing bar 13, forms one section and strengthens district.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 12, described flex point 12 sets Put in described air vent 3 front end.It is arranged such, sleeve body 1 can be made at the inner chamber 10 of air vent 3 sections Space significantly increases, and contributes to the discharge of gas in sleeve body 1 inner chamber 10, with ensure grouting material 14 to There are enough flowing spaces when connecting the flowing of 5, end, it is ensured that grouting material 14 fills whole inner chamber 10, improve Grouted density.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 13, described steel lobe 8 is in spiral shell Rotation shape.It is arranged such, it is possible to increase the gmatjpdumamics between steel lobe 8 and grouting material 14, draws to a certain extent simultaneously Lead grouting material 14 to flow in sleeve body 1, be effectively improved Grouted density.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 14, described steel lobe inwall 11 By the inside corrugated extension of opening 4.Steel lobe 8 uses undulatory inwall, on the one hand, due to sleeve The inside of body 1 divide to connect end 5 taper into, be unfavorable for grouting material 14 to connect end 5 flow, and Undulatory inwall can ensure that grouting material 14 has enough flowing spaces and the effect of water conservancy diversion grouting material 14, Grouted density can be effectively improved, on the other hand, the concavity and convexity of steel lobe inwall 11, Jin Erzeng can be effectively increased Add the gmatjpdumamics between grouting material 14 and steel lobe 8, improve the anchoring strength of reinforcing bar 13.
On the basis of above-described embodiment, in another embodiment of the present invention, the sleeve between described steel lobe 8 is originally Body 1 inwall is provided with groove.It is arranged such, while increasing grouting space, increases sleeve body 1 inwall and filling Gmatjpdumamics between slurry 14, increases overall tension or the ability of anti-shearing force of sleeve body 1 binding site. Described groove is preferably arranged to annular, i.e. along inner chamber 10 circumferentially disposed of sleeve body 1.
It should be noted that Fig. 9, in the embodiment of Figure 11, Figure 12, Figure 14 and Figure 15, use relatively Good embodiment, groove 16 or protruding 15 is respectively provided with the sidewall of steel lobe 8, and not shown in figure.
On the basis of above-described embodiment, in another embodiment of the present invention, described sleeve body 1 outer surface sets There is annular cutting.It is arranged such, adds the contact area of sleeve body 1 and prefabricated component 21 concrete, increase Add the anchor force between grout sleeve and concrete.
On the basis of above-described embodiment, in another embodiment of the present invention, the opening of described sleeve body 1 4 are arranged to angle.Being arranged such, increase the diameter of inner chamber 10 at opening 4, angle can also play simultaneously Guide effect, the beneficially insertion of reinforcing bar 13 achieve a butt joint.
This utility model also provides for a kind of prefabricated component 21, and embodiment is as follows, with reference to Figure 17 and 18, described pre- Product 21 is embedded with the grout sleeve described in embedded bar 22 and above-mentioned any one, described embedded bar 22 It is connected with the connection end 5 of grout sleeve.Being arranged such, prefabricated component 21 is embedded with grout sleeve, by grouting Sleeve is connected with the reinforcing bar that stretches out of prefabricated component 21 to be assembled, and then grouting is fixing, it is achieved prefabricated component 21 right Connect installation.
The above is only preferred implementation of the present utility model, it is noted that for the art For those of ordinary skill, on the premise of without departing from this utility model principle, it is also possible to make some improvement And retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (15)

1. a grout sleeve, including sleeve body, described sleeve body is provided with grouting mouth and air vent, it is characterised in that the one end open of described sleeve body, and the other end is for connecting end;The inwall of described sleeve body is provided with steel lobe, and the thickness of described steel lobe is become larger to connecting end by opening, and described steel lobe is provided with groove or projection.
Grout sleeve the most according to claim 1, it is characterised in that the bottom of described sleeve body opening inner chamber is provided with annular protrusion.
Grout sleeve the most according to claim 1, it is characterised in that the inwall of described sleeve body is provided with the steel lobe of more than two lobes.
Grout sleeve the most according to claim 3, it is characterised in that be less than the diameter of reinforcing bar to be connected between described steel lobe along the distance that the inner chamber of sleeve body is circumferential.
Grout sleeve the most according to claim 4, it is characterised in that offered slurry hole on described steel lobe or led stock tank.
Grout sleeve the most according to claim 5, it is characterised in that described cross slurry hole or lead circumferentially disposed along sleeve of stock tank.
7. according to the grout sleeve described in claim 1~6 any one, it is characterised in that the opening of described sleeve body is provided with closing device, and described closing device is provided with jack hole.
Grout sleeve the most according to claim 7, it is characterised in that described closing device uses screw thread or shackle member to be connected with sleeve body.
Grout sleeve the most according to claim 8, it is characterised in that the two side of described closing device is provided with anchoring projection.
Grout sleeve the most according to claim 7, it is characterised in that described closing device is lock sleeve, the inner chamber interference fit of described lock sleeve and described sleeve body opening, described lock sleeve is mild steel or prepared by spring steel.
11. grout sleeves according to claim 10, it is characterised in that the end of described lock sleeve offers otch.
12. grout sleeves according to claim 11, it is characterised in that described connection end is provided with threaded mouth or fixing bolt.
13. grout sleeves according to claim 11, it is characterised in that described sleeve body outer surface is matsurface.
14. grout sleeves according to claim 7, it is characterised in that or the sleeve body inwall between described steel lobe is provided with groove.
15. 1 kinds of prefabricated components, it is characterised in that described prefabricated component is embedded with the grout sleeve described in embedded bar and claim 1~14 any one, and described embedded bar is connected with the connection end of grout sleeve.
CN201620361652.2U 2016-04-26 2016-04-26 A kind of grout sleeve and prefabricated component Active CN205712761U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620361652.2U CN205712761U (en) 2016-04-26 2016-04-26 A kind of grout sleeve and prefabricated component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620361652.2U CN205712761U (en) 2016-04-26 2016-04-26 A kind of grout sleeve and prefabricated component

Publications (1)

Publication Number Publication Date
CN205712761U true CN205712761U (en) 2016-11-23

Family

ID=57293658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620361652.2U Active CN205712761U (en) 2016-04-26 2016-04-26 A kind of grout sleeve and prefabricated component

Country Status (1)

Country Link
CN (1) CN205712761U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643459A (en) * 2018-06-07 2018-10-12 德睿盛兴(大连)装配式建筑科技有限公司 A kind of grout sleeve
CN116201294A (en) * 2023-04-26 2023-06-02 中铁城建集团第一工程有限公司 Combined steel bar grouting sleeve structure and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643459A (en) * 2018-06-07 2018-10-12 德睿盛兴(大连)装配式建筑科技有限公司 A kind of grout sleeve
CN116201294A (en) * 2023-04-26 2023-06-02 中铁城建集团第一工程有限公司 Combined steel bar grouting sleeve structure and installation method

Similar Documents

Publication Publication Date Title
CN206529969U (en) A kind of full grout sleeve
CN105781020A (en) Grouting sleeve and prefabricated member
CN205712757U (en) A kind of grout sleeve and prefabricated component
CN205712761U (en) A kind of grout sleeve and prefabricated component
CN205712760U (en) A kind of grout sleeve and prefabricated component
CN205712772U (en) A kind of grout sleeve and prefabricated component
CN205712752U (en) A kind of grout sleeve and prefabricated component
CN205712767U (en) A kind of grout sleeve and prefabricated component
CN205712763U (en) A kind of grout sleeve and prefabricated component
CN105781027A (en) Grouting sleeve and prefabricated member
CN205712765U (en) A kind of grout sleeve and prefabricated component
CN205712770U (en) A kind of grout sleeve and prefabricated component
CN205712774U (en) A kind of grout sleeve and prefabricated component
CN205976235U (en) Grout sleeve and prefab
CN205712775U (en) A kind of grout sleeve and prefabricated component
CN205917993U (en) Grout sleeve and prefab
CN205712762U (en) A kind of grout sleeve and prefabricated component
CN205712776U (en) A kind of grout sleeve and prefabricated component
CN205712768U (en) A kind of grout sleeve and prefabricated component
CN105735568A (en) Grouting sleeve and prefabricated member
CN105781021A (en) Grouting sleeve and prefabricated piece
CN205712758U (en) A kind of grout sleeve and prefabricated component
CN205712764U (en) A kind of grout sleeve and prefabricated component
CN105756290A (en) Grouting sleeve and pre-fabricated part
CN205712759U (en) A kind of grout sleeve and prefabricated component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Grouting sleeve and prefabricated member

Granted publication date: 20161123

License type: Common License

Record date: 20190102