CN205712180U - Tunnel buried pumping equipment insulation inspection shaft structure with storeroom - Google Patents

Tunnel buried pumping equipment insulation inspection shaft structure with storeroom Download PDF

Info

Publication number
CN205712180U
CN205712180U CN201620149944.XU CN201620149944U CN205712180U CN 205712180 U CN205712180 U CN 205712180U CN 201620149944 U CN201620149944 U CN 201620149944U CN 205712180 U CN205712180 U CN 205712180U
Authority
CN
China
Prior art keywords
cover plate
inspection shaft
tunnel
insulation
lower floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620149944.XU
Other languages
Chinese (zh)
Inventor
马志富
杨昌贤
徐大臻
张凤武
杨宝旭
卢学明
夏勇
曲耀慧
冯山群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN-MUDANJIANG RAILWAY PASSENGER DEDICATED LINE Co.,Ltd.
China Railway Design Corp
China Railway 19th Bureau Group Co Ltd
Original Assignee
Kazakhstan Male Passenger Railway LLC
Third Railway Survey and Design Institute Group Corp
China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kazakhstan Male Passenger Railway LLC, Third Railway Survey and Design Institute Group Corp, China Railway 19th Bureau Group Co Ltd filed Critical Kazakhstan Male Passenger Railway LLC
Priority to CN201620149944.XU priority Critical patent/CN205712180U/en
Application granted granted Critical
Publication of CN205712180U publication Critical patent/CN205712180U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses the tunnel buried pumping equipment insulation inspection shaft structure of a kind of band storeroom, between heat-insulation layer, middle level cover plate and lower floor's cover plate, two storerooms are set in sidewall and the inspection shaft borehole wall arranges steel cat ladder and foot nest including arranging on three layers of cover plate of tunnel insulation inspection shaft and lower floor's cover plate.By arranging the air layer formed between three layers of cover plate, heat-insulation layer and middle level cover plate and heat-insulation layer, improve the heat-insulating property of severe cold area buried pumping equipment inspection shaft, and facilitate the inspection shaft inspection and maintenance to tunnel drainage system;By arranging two storerooms and steel cat ladder and foot nest in inspection shaft, inspection, maintenance activity difficulty can be reduced, in two storerooms lower floor's cover plate and heat-insulation layer can being placed in inspection shaft in the course of the work.This utility model is applicable to tunnel in cold regions and arranges buried pumping equipment location, improves the cold-proof heat insulation performance of drainage system, reduces tunnel drainage system inspection, the task difficulty of maintenance during operation, it is ensured that tunnel operation security.

Description

Tunnel buried pumping equipment insulation inspection shaft structure with storeroom
Technical field
This utility model relates to a kind of tunnel inspection shaft, is specifically related to a kind of tunnel buried pumping equipment insulation inspection shaft structure arranging band storeroom.
Background technology
In severe cold area, causing the extension bad disease such as ice, pucking for percolating water in preventing tunnel, tunnel drainage facility generally includes Deeply buried ditch, buried heat preservation ditch, cold-proof drain cavern etc..And it is the unobstructed of drainage system during guarantee is positioned at the operation of tunnel, this area, need tunnel drainage system carries out the inspection of necessity, maintenance during runing, generally inspection shaft is set at a certain distance on longitudinal along tunnel drainage facility.
Fig. 1 is the longitudinal section of existing buried pumping equipment insulation inspection shaft structure.As it is shown in figure 1, in the prior art, insulation inspection shaft typically uses the form of filled heat insulating material in the middle of double-layer cover plate (including cover plate of upper layer 101 and lower floor's cover plate 102).Cover plate of upper layer 101 typically uses reinforced concrete cover plate, lower floor's cover plate 102 to use two blocks of immersion oil wooden cover plates;Insulation material 103 typically uses polyurethane foamed material, and thickness is between 0.35m~0.50m;And be respectively symmetrically on described inspection shaft sidewall and arrange support member 104, and the top of support member 104 should abut with the bottom of lower floor cover plate 102.And when utilizing existing insulation inspection shaft pumping equipment buried to tunnel 106 to carry out inspection and maintenance, firstly the need of opening cover plate of upper layer 101, then along well, steel cat ladder and foot nest 105 are placed on railway roadbed after heat-insulation layer 103 and lower floor's cover plate 102 being opened downwards and taking out in inspection shaft, thus the buried pumping equipment 106 being pointed to bottom carries out inspection and maintenance.
Owing to tunnel is a kind of long and narrow structures, during operation, in tunnel, often wind speed is relatively big, and the heat-insulation layer material used is general relatively light, if being directly placed on road bed board when checking, keep in repair, is easily taken away by the wind in hole;Additionally, due to insulation material is fragile material, inspection, maintenance process is not protected by easy fracture and crushes, affect heat insulation effect.
Utility model content
The defect existed for above-mentioned prior art, this utility model provides the tunnel buried pumping equipment insulation inspection shaft structure of a kind of band storeroom, can facilitate the use of buried pumping equipment, check and keep in repair, the most not reduce the heat insulation effect of inspection shaft.
This utility model is adopted the technical scheme that by this problem of solution:
The tunnel buried pumping equipment insulation inspection shaft structure of band storeroom of the present utility model, including tunnel insulation inspection shaft, and the cover plate of upper layer being arranged on described inspection shaft and lower floor's cover plate of being arranged in described inspection shaft, it is arranged on the steel cat ladder on described inspection shaft medial wall and foot nest, buried pumping equipment and structural concrete;Middle level cover plate it is provided with in tunnel insulation inspection shaft, middle level cover plate is arranged between cover plate of upper layer and lower floor's cover plate, lower floor's cover plate is provided above heat-insulation layer, air layer insulation it is formed with between middle level cover plate and heat-insulation layer, two storerooms it are provided with, in two storerooms check, lower floor's cover plate and heat-insulation layer being placed in inspection shaft when keeping in repair in inspection shaft sidewall between middle level cover plate and lower floor's cover plate.
Described tunnel insulation inspection shaft is reinforced concrete structure, and in inspection shaft, headroom sectional dimension is 1.0m × 1.0m, and borehole wall thickness is 0.25m.
In described inspection shaft, two storerooms are arranged in inspection shaft shaft wall structure concrete.And it is positioned at above pumping equipment, between middle level cover plate and lower floor's cover plate;Two storeroom inside bottom surface all keep concordant with lower floor cover plate heat-insulation layer end face;During construction, two storerooms apply together with insulation inspection shaft and structural concrete.
Described cover plate of upper layer is reinforced concrete structure, and described middle level cover plate and lower floor's cover plate are respectively adopted two blocks of immersion oil wooden cover plates and make.
Spacing between described cover plate of upper layer bottom surface and middle level cover plate end face is 0.25m;Spacing between cover plate bottom surface, middle level and lower floor's cover plate end face is 0.80m;Insulation layer thickness on lower floor's cover plate is 0.35m, and heat-insulation layer uses the polyurethane foamed material of outsourcing geotextiles, is filled in inspection shaft.
Supported by cover plate support below described middle level cover plate and lower floor's cover plate.
The lateral symmetry setting on insulation inspection shaft inwall of described cover plate support;Cover plate support uses equal leg angle to be anchored on the borehole wall by crab-bolt, and the every 0.25m of crab-bolt is arranged together;The bottom of middle level cover plate and lower floor's cover plate abuts with the top of cover plate support respectively.
Described tunnel insulation inspection shaft inner sidewall upper portion arranges steel cat ladder, and steel cat ladder uses screw-thread steel processing, arranges together along the every 0.40m of course of the hole;After steel cat ladder is attached to the upper edge of buried pumping equipment, bottom arranges foot nest, and every 0.35m is arranged together, until bottom inspection shaft.
This utility model has the advantage that with good effect:
The tunnel buried pumping equipment insulation inspection shaft structure of band storeroom of the present utility model, by arranging three layers of cover plate, the air layer formed between heat-insulation layer and middle level cover plate and the heat-insulation layer of setting on lower floor's cover plate, improve the heat-insulating property ensureing severe cold area buried pumping equipment inspection shaft, and facilitate the inspection shaft inspection and maintenance to tunnel drainage system;By arranging two storerooms and steel cat ladder and foot nest in inspection shaft, inspection, maintenance activity difficulty can be reduced, lower floor's cover plate and heat-insulation layer can be placed in the course of the work in well in two storerooms.This utility model is applicable to tunnel in cold regions and arranges buried pumping equipment location, improve the tunnel drainage system cold-proof heat insulation ability in this area, the task difficulty that during reducing operation, this area's tunnel drainage system checks, keeps in repair, thus ensure tunnel operation security.
Accompanying drawing explanation
Fig. 1 is the longitudinal section of existing buried pumping equipment insulation inspection shaft structure;
Fig. 2 is the top view of buried pumping equipment of the present utility model insulation inspection shaft structure;
Fig. 3 is the sectional view of I I line along Fig. 2;
Fig. 4 is the sectional view of II II line along Fig. 2;
Fig. 5 is storage lower floor's cover plate and the schematic cross section of heat-insulation layer in two storerooms of the present utility model;
Fig. 6 is storage lower floor's cover plate and the vertical section schematic diagram of heat-insulation layer in two storerooms of the present utility model.
Critical piece symbol description in figure:
101: cover plate of upper layer 102: lower floor's cover plate
103: insulation material 104: support member
105: foot nest 106: buried pumping equipment
201: tunnel insulation inspection shaft 202: cover plate of upper layer
203: middle level cover plate 204: lower floor's cover plate
205: heat-insulation layer 206: cover plate support
207: storeroom 208: foot nest
209: buried pumping equipment 210: structural concrete.
Detailed description of the invention
Below in conjunction with drawings and the specific embodiments, the tunnel buried pumping equipment insulation inspection shaft structure of band storeroom of the present utility model is described further.Following each embodiment is merely to illustrate this utility model and is not limitation of the utility model.
The tunnel buried pumping equipment insulation inspection shaft structure of band storeroom of the present utility model, it is adaptable to tunnel in cold regions arranges buried pumping equipment location.This inspection shaft structure is by arranging three layers of cover plate, the air layer formed between heat-insulation layer and middle level cover plate and the heat-insulation layer of setting on lower floor's cover plate, improve the heat-insulating property of severe cold area buried pumping equipment inspection shaft, and facilitate the inspection shaft inspection and maintenance to tunnel drainage system;By arranging two storerooms and steel cat ladder and foot nest in inspection shaft, inspection, maintenance activity difficulty can be reduced, in two storerooms lower floor's cover plate and heat-insulation layer can being placed in inspection shaft in the course of the work.
Fig. 2 is the top view of buried pumping equipment of the present utility model insulation inspection shaft structure.As in figure 2 it is shown, the tunnel buried pumping equipment insulation inspection shaft structure of band storeroom of the present utility model, including 201, two storerooms 207 of tunnel insulation inspection shaft and steel cat ladder and foot nest 208.Insulation inspection shaft 201 is reinforced concrete structure, and in it, headroom sectional dimension is 1.0m × 1.0m, and borehole wall thickness is 0.25m;Two storerooms 207 are positioned on the borehole wall of inspection shaft both sides, xoncrete structure 210 circuit longitudinal gradient direction;When steel cat ladder and foot nest 208 are for inspection shaft inspection and maintenance, wherein inspection shaft top arranges steel cat ladder, uses the processing of φ 18 screw-thread steel, embeds borehole wall 0.15m, expose 0.15m, arranges together along the every 0.40m of course of the hole.In figure " → " represent drainage direction.
Fig. 3, Fig. 4 are I I line, the sectional view of II II line along Fig. 2 respectively.As shown in Figure 3, Figure 4, the tunnel buried pumping equipment insulation inspection shaft structure of band storeroom of the present utility model, also include the cover plate of upper layer 202 being arranged on described inspection shaft, the middle level cover plate 203 being arranged in described inspection shaft and lower floor's cover plate 204, buried pumping equipment 209 and structural concrete 210.Middle level cover plate 203 is arranged between cover plate of upper layer 202 and lower floor's cover plate 204, lower floor's cover plate 204 is provided above heat-insulation layer 205, air layer insulation it is formed with between middle level cover plate 203 and heat-insulation layer 205, improve the insulating power of tunnel in cold regions buried pumping equipment inspection shaft, and facilitate the inspection shaft inspection and maintenance to tunnel drainage system.Two storerooms 207 it are provided with, in two storerooms 207 check, lower floor's cover plate and heat-insulation layer being placed in inspection shaft when keeping in repair in inspection shaft sidewall between middle level cover plate 203 and lower floor's cover plate 204.
Inspection shaft cover plate of upper layer 202 is reinforced concrete structure, and overall dimensions length × width x thickness is 1.18m × 1.18m × 0.10m;Inspection shaft middle level cover plate 203 and lower floor's cover plate 204 are respectively adopted two blocks of immersion oil wooden cover plates, and thickness is 0.05 m, length × a width of 0.98m × 0.49m.
Spacing between cover plate of upper layer 202 bottom surface and middle level cover plate 203 end face is 0.25m;Spacing between middle level cover plate 203 bottom surface and lower floor's cover plate 204 end face is 0.80m;Heat-insulation layer 205 thickness on lower floor's cover plate 204 is 0.35m, and heat-insulation layer 205 uses the polyurethane foamed material that two block lengths × width x thickness is 1.0m × 0.30m × 0.35m and two block lengths × width x thickness is 1.0m × 0.20m × 0.35m, all outsourcing geotextiles, should be at described inspection shaft chock off during construction.
Two storerooms 207 are positioned at inspection both sides, the structural concrete 210 circuit longitudinal gradient direction borehole wall, between middle level cover plate 203 and lower floor's cover plate 204;Two storeroom 207 inside bottom surface all keep concordant with heat-insulation layer 205 end face on lower floor cover plate;Headroom size width × height in two storerooms 207 × be deeply 0.55m × 0.45m × 1.20m, applies during construction together with described inspection shaft 201 and structural concrete 210.
In described, lower floor's cover plate support 206 lateral symmetry setting on described inspection shaft inwall, support member 206 uses the equal leg angle of the 50mm × 50mm × 6mm of a length of 1.0m to be anchored on the borehole wall (embedded length is 0.20m) by the M20 crab-bolt of a length of 0.25m, and the every 0.25m of crab-bolt is arranged together;The bottom of described middle level cover plate 203 and lower floor's cover plate 204 should top with described support member 206 abut respectively.
When steel cat ladder on described inspection shaft medial wall and foot nest 208 are for inspection shaft inspection and maintenance, wherein inspection shaft top arranges steel cat ladder, uses the processing of φ 18 screw-thread steel, embeds borehole wall 0.15m, expose 0.15m, and the every 0.40m of course of the hole is arranged together;After steel cat ladder is attached to the upper edge of buried pumping equipment 209, bottom arranges foot nest, and every 0.35m is arranged together to bottom inspection shaft.
Described buried pumping equipment 209 need to meet tunnel internal drainage traffic requirement.
Fig. 5 and Fig. 6 is storage lower floor cover plate 204 and the schematic diagram of heat-insulation layer 205 in two storerooms 207.When inspection, maintenance, first opening cover plate of upper layer 202 and middle level cover plate 203, in then heat-insulation layer 205 and lower floor's cover plate 204 being both placed in two storerooms 207 along steel cat ladder, pumping equipment 209 buried to tunnel checks, keeps in repair.
The tunnel buried pumping equipment insulation inspection shaft structure of band storeroom of the present utility model is by arranging three layers of cover plate, the air layer formed between heat-insulation layer and middle level cover plate and the heat-insulation layer of setting on lower floor's cover plate, improve the heat-insulating property of severe cold area buried pumping equipment inspection shaft, and facilitate the inspection shaft inspection and maintenance to tunnel drainage system;By arranging two storerooms and steel cat ladder and foot nest in inspection shaft, inspection, maintenance activity difficulty can be reduced, lower floor's cover plate and heat-insulation layer can be placed in the course of the work in well in two storerooms.Improve the tunnel drainage system cold-proof heat insulation performance in this area, the task difficulty that during reducing operation, this area's tunnel drainage system checks, keeps in repair, thus ensure tunnel operation security.
The foregoing is only preferred implementation of the present utility model, not in order to limit this utility model, all on basis of the present utility model, any amendment of being made, improvement etc., should be included within the scope of this utility model comprises.

Claims (8)

1. the buried pumping equipment in the tunnel of band storeroom insulation inspection shaft structure, including tunnel insulation inspection shaft (201), and the cover plate of upper layer (202) that is arranged on described inspection shaft and the lower floor's cover plate (204) being arranged in described inspection shaft, it is arranged on the steel cat ladder on described inspection shaft medial wall and foot nest (208), buried pumping equipment (209) and structural concrete (210);It is characterized in that: in tunnel insulation inspection shaft (201), be provided with middle level cover plate (203), middle level cover plate (203) is arranged between cover plate of upper layer (202) and lower floor's cover plate (204), lower floor's cover plate (204) is provided above heat-insulation layer (205), air layer insulation it is formed with between middle level cover plate (203) and heat-insulation layer (205), two storerooms (207) it are provided with in inspection shaft sidewall between middle level cover plate (203) and lower floor's cover plate (204), check, in two storerooms (207) during maintenance, lower floor's cover plate (204) and heat-insulation layer (205) being placed in inspection shaft.
The tunnel buried pumping equipment insulation inspection shaft structure of band storeroom the most according to claim 1, it is characterized in that: described tunnel insulation inspection shaft (201) is reinforced concrete structure, in inspection shaft, headroom sectional dimension is 1.0m × 1.0m, and borehole wall thickness is 0.25m.
3. according to the tunnel buried pumping equipment insulation inspection shaft structure of the band storeroom described in claim 1 or claim 2, it is characterized in that: in described inspection shaft, two storerooms (207) are arranged on inspection shaft shaft wall structure concrete (210), and it is positioned at the top of buried pumping equipment, between middle level cover plate (203) and lower floor's cover plate (204);Two storeroom (207) inside bottom surface all keep concordant with lower floor cover plate heat-insulation layer (205) end face.
4. according to the tunnel buried pumping equipment insulation inspection shaft structure of the band storeroom described in claim 1 or claim 2, it is characterized in that: described cover plate of upper layer (202) is reinforced concrete structure, described middle level cover plate (203) and lower floor's cover plate (204) are respectively adopted two blocks of immersion oil wooden cover plates and make.
5. according to the tunnel buried pumping equipment insulation inspection shaft structure of the band storeroom described in claim 1 or claim 2, it is characterised in that: the spacing between described cover plate of upper layer (202) bottom surface and middle level cover plate (203) end face is 0.25m;Spacing between middle level cover plate (203) bottom surface and lower floor's cover plate (204) end face is 0.80m;Heat-insulation layer (205) thickness on lower floor's cover plate (204) is 0.35m, and heat-insulation layer (205) is the polyurethane foamed material using outsourcing geotextiles, is filled in inspection shaft.
6. according to the tunnel buried pumping equipment insulation inspection shaft structure of the band storeroom described in claim 1 or claim 2, it is characterised in that: described middle level cover plate (203) and lower floor's cover plate (204) lower section are supported by cover plate support (206).
The tunnel buried pumping equipment insulation inspection shaft structure of band storeroom the most according to claim 6, it is characterised in that: cover plate support (206) lateral symmetry setting on insulation inspection shaft inwall;Cover plate support (206) uses equal leg angle to be anchored on the borehole wall by crab-bolt, and the every 0.25m of crab-bolt is arranged together;Top with cover plate support (206) respectively, the bottom of middle level cover plate (203) and lower floor's cover plate (204) abuts.
8. according to the tunnel buried pumping equipment insulation inspection shaft structure of the band storeroom described in claim 1 or claim 2, it is characterized in that: tunnel insulation inspection shaft inner sidewall upper portion arranges steel cat ladder, steel cat ladder uses screw-thread steel processing, arranges together along the every 0.40m of course of the hole;After steel cat ladder is attached to the upper edge of buried pumping equipment (209), bottom arranges foot nest (208), and every 0.35m is arranged together, until bottom inspection shaft.
CN201620149944.XU 2016-02-29 2016-02-29 Tunnel buried pumping equipment insulation inspection shaft structure with storeroom Active CN205712180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620149944.XU CN205712180U (en) 2016-02-29 2016-02-29 Tunnel buried pumping equipment insulation inspection shaft structure with storeroom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620149944.XU CN205712180U (en) 2016-02-29 2016-02-29 Tunnel buried pumping equipment insulation inspection shaft structure with storeroom

Publications (1)

Publication Number Publication Date
CN205712180U true CN205712180U (en) 2016-11-23

Family

ID=57334318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620149944.XU Active CN205712180U (en) 2016-02-29 2016-02-29 Tunnel buried pumping equipment insulation inspection shaft structure with storeroom

Country Status (1)

Country Link
CN (1) CN205712180U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105937246A (en) * 2016-02-29 2016-09-14 铁道第三勘察设计院集团有限公司 Structure of thermal insulating inspection well with storage chambers for deep-buried drainage facility of tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105937246A (en) * 2016-02-29 2016-09-14 铁道第三勘察设计院集团有限公司 Structure of thermal insulating inspection well with storage chambers for deep-buried drainage facility of tunnel

Similar Documents

Publication Publication Date Title
CN204357485U (en) The drainage system of anti-tunnel double-lining behind ponding crossfire
CN107178393A (en) A kind of Tunnel Second Lining water pressure control structure
CN203230453U (en) Cooling device for casting large volume hollow concrete tunnel lining structure
CN202108542U (en) Heat preservation ditch structure of railway tunnel
CN203475465U (en) Sinking type tower crane foundation
CN205712180U (en) Tunnel buried pumping equipment insulation inspection shaft structure with storeroom
CN105937246A (en) Structure of thermal insulating inspection well with storage chambers for deep-buried drainage facility of tunnel
CN206110182U (en) Three large -scale arcading city utility tunnel
CN103114752B (en) Fiber reinforce plastic (FRP) spherical tank - transposition support combination column system and construction method thereof
CN206834684U (en) A kind of high ferro roadbed cable tank systems
CN206090617U (en) Novel assembled piping lane
CN207093138U (en) A kind of Tunnel Second Lining water pressure control structure
CN203978442U (en) A kind of public iron is built submerged tunnel jointly
CN206396794U (en) A kind of assembled piping lane
CN204960973U (en) High -efficient heat preservation inspection shaft
CN202849877U (en) Split type roadbed structure
CN202560234U (en) Astylar long-span underground space structure
CN206581301U (en) The immersed tube tunnel bottom plate and discharge structure of a kind of ribbing beam
CN203834501U (en) Cross-channel air storage tank base
CN204919568U (en) Compound supporting construction of shallow foundation ditch
CN211972919U (en) Based on tunnel portal half cutting section bed mud pumping renovation system that turns over
CN210117646U (en) Frame bridge for high-fill existing railway line
CN204662506U (en) A kind of cable communication well
CN208073507U (en) A kind of dumbbell shape tunnel bottom liner structure with bilateral collection gallery
CN202220345U (en) Drain pipe system below community driveway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300142 Hebei District, Zhongshan Road, No. 10,

Co-patentee after: HARBIN-MUDANJIANG RAILWAY PASSENGER DEDICATED LINE Co.,Ltd.

Patentee after: CHINA RAILWAY DESIGN Corp.

Co-patentee after: CHINA RAILWAY 19TH BUREAU GROUP Co.,Ltd.

Address before: 300142 Hebei District, Zhongshan Road, No. 10,

Co-patentee before: HARBIN-MUDANJIANG RAILWAY PASSENGER DEDICATED LINE Co.,Ltd.

Patentee before: THE THIRD RAILWAY SURVEY AND DESIGN INSTITUTE Group Corp.

Co-patentee before: CHINA RAILWAY 19TH BUREAU GROUP Co.,Ltd.