CN205712175U - A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device - Google Patents

A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device Download PDF

Info

Publication number
CN205712175U
CN205712175U CN201620208997.4U CN201620208997U CN205712175U CN 205712175 U CN205712175 U CN 205712175U CN 201620208997 U CN201620208997 U CN 201620208997U CN 205712175 U CN205712175 U CN 205712175U
Authority
CN
China
Prior art keywords
winch
tube coupling
niggerhead
pontoon
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620208997.4U
Other languages
Chinese (zh)
Inventor
邓建新
章勇
邹文清
彭再勇
王秋林
陈旺
刘敏
谢海金
邓世萍
王蕊
龚学栋
张小红
李勇
伍晓峰
章旭
管蕾
安东旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201620208997.4U priority Critical patent/CN205712175U/en
Application granted granted Critical
Publication of CN205712175U publication Critical patent/CN205712175U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device, steel plate, steel wire rope, fixing multiple sheave block, movable multiple sheave block, fixing gin block is separated including winch, niggerhead, steel plate is used to be divided into the left and right sides in the middle part of niggerhead, steel wire rope one end is fixed on niggerhead side, the other end is fixed on niggerhead opposite side through fixed block after fall block, start winch and reclaim remaining steel wire rope, activity multiple sheave block is connected with immersed tube tube coupling, it is again started up winch and tightens up steel wire rope, reach stress.Application this utility model can promote tube coupling sinking speed.

Description

A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device
Technical field
This utility model relates to a kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon, is specifically related to a kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device.
Background technology
Tube coupling Winch Pontoon is the visual plant needed for immersed tunnelling method tunnel tube coupling sinking is installed, and mainly includes hull, downward putting device, electric power system, mooring system etc., and downward putting device therein is the core component of Winch Pontoon, is directly connected to the efficiency that tube coupling sinking is installed.
In prior art, there is slow-footed problem in winch type Winch Pontoon downward putting device in use.
Utility model content
The purpose of this utility model proposes a kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device for prior art deficiency, to accelerate tube coupling sinking installation rate.
The immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device of a kind of improvement described in the utility model includes: winch, niggerhead separate steel plate, steel wire rope, fixing multiple sheave block, movable multiple sheave block, fixing gin block;Steel plate is used to be divided into the left and right sides in the middle part of niggerhead, steel wire rope one end is fixed on niggerhead side, the other end is fixed on niggerhead opposite side through fixed block after fall block, start winch and reclaim remaining steel wire rope, activity multiple sheave block is connected with immersed tube tube coupling, is again started up winch and tightens up steel wire rope, reach stress, winch pulling force is adjusted according to the negative buoyancy force of design during tube coupling sinking, and rope capacity should match with actual tube coupling sinking depth of water demand;Aggregate breaking force, after considering safety coefficient, should mate with winch pulling force;Owing to securing two of steel wire rope on niggerhead, therefore the overall linear velocity of steel wire rope is promoted to 2 times of winch linear velocity, and i.e. movable multiple sheave block and tube coupling sinking speed are all promoted to 2 times of prior art.
Preferably, described winch pulling force 200kN.
Preferably, it is circular that described niggerhead separates steel plate, thickness 20mm, and internal diameter matches with niggerhead external diameter, and external diameter matches with niggerhead two side shield, is positioned in the middle part of niggerhead, is connected with using welding manner between niggerhead.
Preferably, described steel wire rope is φ 26~φ 28 independent wire strand.
Preferably, described rope capacity is 500m.
Preferably, described fixing multiple sheave block, movable multiple sheave block are eight skating cars, and bearing capacity is 2000kN.
Preferably, described fixing gin block bearing capacity is 250kN.
This utility model beneficial effect: compared with prior art, its remarkable advantage is this utility model: tube coupling sinking speed can be promoted 1 times.
Accompanying drawing explanation
Fig. 1 is that immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device arranges schematic diagram;
Fig. 2 is that hanging of prior art refutes downward putting device schematic diagram;
Fig. 3 is that hanging of improvement of the present utility model refutes downward putting device schematic diagram.
Wherein: 1 is winch;2 is steel wire rope;3 is fixing multiple sheave block;4 is movable multiple sheave block;5 refute for hanging;6 is coaster fixing support rack;7 is fixing gin block;8 separate steel plate for niggerhead;9 is immersed tube tube coupling.
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in detail.
Step a) as it is shown on figure 3, separate steel plate (8) and be soldered on winch (1) reel by niggerhead;
Step b) is as it is shown in figure 1, be fixed by welding in hang refute winch (1), coaster fixing support rack (6) on (5);Fixing multiple sheave block (3), fixing gin block (7) are installed to coaster fixing support rack (6);
Step c) is as shown in Figure 3, steel wire rope (2) one end is fixed on winch (1) reel side, after the other end passes fixing multiple sheave block (3) and movable multiple sheave block (4), it is fixed on winch (1) reel opposite side via fixing gin block (7) again, starts winch (1) and reclaim remaining steel wire rope (2);
Step d), as it is shown in figure 1, activity multiple sheave block (4) is fixed to immersed tube tube coupling (9), starts winch (1) and tightens up steel wire rope (2), reach stress.
Although describing example of the present utility model the most with reference to the accompanying drawings, it will be recognized to those skilled in the art that in the case of without departing from this utility model scope and spirit, this utility model can be made various different modifications and variations.It will therefore be appreciated that the above embodiments are not to limit, but the illustration in terms of certain.

Claims (7)

1. an immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device, it is characterised in that: described apparatus structure includes: winch, niggerhead separate steel plate, steel wire rope, fixing multiple sheave block, movable multiple sheave block, fixing gin block;Steel plate is used to be divided into the left and right sides in the middle part of niggerhead, steel wire rope one end is fixed on niggerhead side, and the other end is fixed on niggerhead opposite side through fixed block after fall block, starts winch and reclaims remaining steel wire rope, activity multiple sheave block is connected with immersed tube tube coupling Winch pulling force is adjusted according to the negative buoyancy force of design during tube coupling sinking, and rope capacity matches with actual tube coupling sinking depth of water demand;Aggregate breaking force, after considering safety coefficient, should mate with winch pulling force;Owing to securing two of steel wire rope on niggerhead, therefore the overall linear velocity of steel wire rope is promoted to 2 times of winch linear velocity, and i.e. movable multiple sheave block and tube coupling sinking speed are all promoted to 2 times of prior art.
A kind of immersed tunnelling method tunnel the most according to claim 1 winch type tube coupling Winch Pontoon downward putting device, it is characterised in that: described winch pulling force 200kN.
A kind of immersed tunnelling method tunnel the most according to claim 1 winch type tube coupling Winch Pontoon downward putting device, it is characterized in that: it is circular that described niggerhead separates steel plate, thickness 20mm, internal diameter matches with niggerhead external diameter, external diameter matches with niggerhead two side shield, it is positioned in the middle part of niggerhead, is connected with using welding manner between niggerhead.
A kind of immersed tunnelling method tunnel the most according to claim 1 winch type tube coupling Winch Pontoon downward putting device, it is characterised in that: described steel wire rope is φ 26~φ 28 independent wire strand.
A kind of immersed tunnelling method tunnel the most according to claim 1 winch type tube coupling Winch Pontoon downward putting device, it is characterised in that: described rope capacity is 500m.
A kind of immersed tunnelling method tunnel the most according to claim 1 winch type tube coupling Winch Pontoon downward putting device, it is characterised in that: described fixing multiple sheave block, movable multiple sheave block are eight skating cars, and bearing capacity is 2000kN.
A kind of immersed tunnelling method tunnel the most according to claim 1 winch type tube coupling Winch Pontoon downward putting device, it is characterised in that: described fixing gin block bearing capacity is 250kN.
CN201620208997.4U 2016-03-18 2016-03-18 A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device Withdrawn - After Issue CN205712175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620208997.4U CN205712175U (en) 2016-03-18 2016-03-18 A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620208997.4U CN205712175U (en) 2016-03-18 2016-03-18 A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device

Publications (1)

Publication Number Publication Date
CN205712175U true CN205712175U (en) 2016-11-23

Family

ID=57314646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620208997.4U Withdrawn - After Issue CN205712175U (en) 2016-03-18 2016-03-18 A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device

Country Status (1)

Country Link
CN (1) CN205712175U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649109A (en) * 2016-03-18 2016-06-08 中铁隧道集团二处有限公司 Sunken tube method tunnel winch type tube joint sinking crane barge lowering device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649109A (en) * 2016-03-18 2016-06-08 中铁隧道集团二处有限公司 Sunken tube method tunnel winch type tube joint sinking crane barge lowering device
CN105649109B (en) * 2016-03-18 2017-09-15 中铁隧道集团二处有限公司 A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device

Similar Documents

Publication Publication Date Title
CN202759189U (en) Cable collecting device of medium-sized cable laying ship
CN103274323A (en) Quick replacement method for movable pulley blocks and wire ropes in cranes
CN102588675B (en) Method for protectively recovering flexible tube from deep water
CN205712175U (en) A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device
CN103303741A (en) Multi-unit synchronous tension control system and method for pull steel wire rope cleaning and maintenance line
CN203129178U (en) Ultra-large type immersed tube stranded cable undock system
CN103590539A (en) Finished steel strand bundle
CN105743013B (en) The method of charged for replacement ± 500kV AC line anchor support insulator chains
CN105649109B (en) A kind of immersed tunnelling method tunnel winch type tube coupling Winch Pontoon downward putting device
CN106786157A (en) Transmission line of electricity Great span above the navigation water surface tears aging method open
CN107324231B (en) Endless rope winch wire rope distributing technique
CN202097228U (en) Wire reeling brake structure of wire drawing machine
CN204210697U (en) A kind of anchor line winch structure including gravity anchor support
CN203377535U (en) Self-adaptive type paying-off tackle
CN203589605U (en) Reverse-twisting roller frame for paving submarine cable
CN203722133U (en) Paying-off device for power-distribution overhead lines
CN210435260U (en) Paying-off and cutting-off platform for steel strands
CN107190544A (en) The insertion method of steel wire rope
CN107882567A (en) A kind of method of pit shaft pipeline installation cooling pipeline
CN204237486U (en) A kind of Hauler for ship with anti-inverted structure
CN202563984U (en) Width-adjustable steel belt wrapping stop device
CN209088499U (en) A kind of monoblock type J protection of pipe device
CN203924490U (en) A kind of finished product steel wire bundle
CN203529834U (en) Novel steel wire rope universal guiding device
CN205247987U (en) A wire protector for production pencil

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20161123

Effective date of abandoning: 20170908

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20161123

Effective date of abandoning: 20170915