CN205712173U - Melt pit side bar - Google Patents
Melt pit side bar Download PDFInfo
- Publication number
- CN205712173U CN205712173U CN201620382563.6U CN201620382563U CN205712173U CN 205712173 U CN205712173 U CN 205712173U CN 201620382563 U CN201620382563 U CN 201620382563U CN 205712173 U CN205712173 U CN 205712173U
- Authority
- CN
- China
- Prior art keywords
- side bar
- melt pit
- guide rail
- pit side
- steel column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
This utility model is melt pit side bar, and its structure includes that side bar (1), side bar (1) are arranged on before and after's guide rail (2) lower section, steel column (3) before and after the connection of side bar (1) end.Advantage of the present utility model: optimize structure, this melt pit side bar is arranged on below before and after's guide rail, strains at before and after's steel column, substitutes the steel corbel required for guide rail before and after former installation, and can realize the function of melt pit side bar original tension integrated steel-structure, saves material.
Description
Technical field
The utility model relates to melt pit side bar.
Background technology
Existing melt pit side bar is arranged on the outside of steel column, and this structure increases installing space.
Actual installation often occurs installation of steel columns complete after because of civil engineering error melt pit side bar install
Situation about not going up, has a strong impact on construction.
Summary of the invention
The utility model proposes melt pit side bar, it is upper that its purpose is intended to overcome prior art to exist
State deficiency, by existing structure is redesigned, it is achieved that melt pit side bar is installed less than steel column,
Solve the problem strengthening installing space.
Technical solution of the present utility model: melt pit side bar, its structure includes side bar, and side bar is pacified
It is contained in below before and after's guide rail, steel column before and after the connection of side bar end.
Preferably, described side bar is bolted before and after's guide rail.
Preferably, described side bar is bolted before and after's steel column.
Advantage of the present utility model: optimize structure, this melt pit side bar is arranged on below before and after's guide rail,
Strain at before and after's steel column, substitute the steel corbel required for guide rail before and after former installation, and melt pit can be realized
The function of side bar original tension integrated steel-structure, saves material.
Accompanying drawing explanation
Fig. 1 is the structural representation of melt pit side bar.
Fig. 2 is the side view of Fig. 1.
In figure 1 is side bar, 2 is before and after's guide rail, 3 is before and after's steel column, 4 is bolt.
Detailed description of the invention
Below in conjunction with embodiment and detailed description of the invention, this utility model made further details of theory
Bright.
As shown in Figure 1, 2, melt pit side bar, its structure includes side bar 1, before and after side bar 1 is arranged on
Below guide rail 2, steel column 3 before and after the connection of side bar 1 end.
Described side bar 1 is by guide rail 2 before and after bolt 4 connection.
Described side bar 1 is by steel column 3 before and after bolt 4 connection.
Above-described is only preferred implementation of the present utility model, it is noted that for ability
For the those of ordinary skill in territory, on the premise of creating design without departing from this utility model, also may be used
To make some deformation and improvement, these broadly fall into protection domain of the present utility model.
Claims (3)
1. melt pit side bar, its feature includes that side bar (1), side bar (1) are arranged on before and after's guide rail (2)
Lower section, steel column (3) before and after the connection of side bar (1) end.
2. melt pit side bar as claimed in claim 1, is characterized in that described side bar (1) passes through
Guide rail (2) before and after bolt (4) connection.
3. melt pit side bar as claimed in claim 1, is characterized in that described side bar (1) passes through
Steel column (3) before and after bolt (4) connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620382563.6U CN205712173U (en) | 2016-04-29 | 2016-04-29 | Melt pit side bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620382563.6U CN205712173U (en) | 2016-04-29 | 2016-04-29 | Melt pit side bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205712173U true CN205712173U (en) | 2016-11-23 |
Family
ID=57331762
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620382563.6U Expired - Fee Related CN205712173U (en) | 2016-04-29 | 2016-04-29 | Melt pit side bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205712173U (en) |
-
2016
- 2016-04-29 CN CN201620382563.6U patent/CN205712173U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104153289B (en) | Replaceable modulus bridge expansion device and install and examine and replace method | |
CN102031749B (en) | Grid structure for controlling girder induced vibration of split steel box girder bridge | |
CN203977286U (en) | Replaceable modulus bridge expansion device | |
CN204531473U (en) | A kind of building structure discharge mechanism | |
CN103669882B (en) | Utilize wire rope to do in industrial premises method that track carries out Components installation | |
CN104746895A (en) | Building structure single-pipe supporting device | |
CN205712173U (en) | Melt pit side bar | |
CN201309797Y (en) | Reinforced structure of steel crane girder | |
CN204571353U (en) | A kind of building structure single tube bracing or strutting arrangement | |
CN203403355U (en) | Tension-bearing pot type rubber support | |
CN103807274B (en) | A kind of anti-theft bolt | |
CN103821162A (en) | Novel socle structure of steel column | |
CN204326498U (en) | Screw outrigger oblique pull wire rope fixing device | |
CN203701878U (en) | Split-type bearing connection mechanism for vertical columns of platform screen door | |
CN205709518U (en) | Melt pit prostatitis middle standing pillar | |
CN203531357U (en) | Wind load resistance device of attached-type lifting scaffold | |
CN202000266U (en) | Supporting structure of bridge coping template | |
CN207109555U (en) | Shearing force tenon | |
CN205739905U (en) | A kind of guide rail bracket of elevator | |
CN204591316U (en) | A kind of i iron crossbeam is reinforced, erecting by overhang | |
CN205802791U (en) | Driving buffer protection device | |
CN203904828U (en) | Rubber bearing | |
CN205387667U (en) | Double slit formula bridge rubber expansion joint device | |
CN205709517U (en) | Suspension centre tie-beam in the middle of before melt pit | |
CN205591545U (en) | Instrument is consolidated to log template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20170429 |