CN205712067U - A kind of topping machanism of comprehensive high-pressure injection engineering method - Google Patents
A kind of topping machanism of comprehensive high-pressure injection engineering method Download PDFInfo
- Publication number
- CN205712067U CN205712067U CN201620548592.5U CN201620548592U CN205712067U CN 205712067 U CN205712067 U CN 205712067U CN 201620548592 U CN201620548592 U CN 201620548592U CN 205712067 U CN205712067 U CN 205712067U
- Authority
- CN
- China
- Prior art keywords
- drilling rod
- engineering method
- pressure
- discharging mouth
- topping machanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses the topping machanism of a kind of comprehensive high-pressure injection engineering method, aim to provide a kind of can during practice of construction the actual pressure of base area basilar part to control underground waste mud force extracted amount, actual pressure with this adjustably basilar part, avoid foundation pressure to increase, and affect the topping machanism of the comprehensive high-pressure injection engineering method of ejection efficiency.It includes drilling rod, be arranged in drilling rod spoil disposal pipeline, it is arranged on drilling rod lateral surface and the mud discharging mouth that is connected with spoil disposal pipeline and the pressure transducer being arranged on drilling rod, described drilling rod is provided with the spoil disposal valve of the aperture area for controlling mud discharging mouth, described mud discharging mouth and pressure transducer near drilling rod lower end.
Description
Technical field
This utility model relates to comprehensive high-pressure injection engineering method, is specifically related to the cutting of a kind of comprehensive high-pressure injection engineering method
Device.
Background technology
In construction, often foundation soil is processed, especially silt soil, clay, silt and sandy soil etc.
Foundation soil processes.Carry out crushing and stirring to foundation soil by machinery, and crushing and while stirring, spray to foundation soil
Penetrate firming agent, thus improve degree of compaction and the impermeability of foundation soil.This technique is Soil-cement pile work method, is usually used in foundation soil
The water-stop curtain construction of improvement and foundation pit enclosure.
The spoil disposal of the displacement soil of conventional soil cement mixing pile engineering method is based on gas-lift effect, useless mud by drilling rod and undisturbed soil it
Between gap discharge, but, along with the increase of construction depth, gas-lift effect can be more and more weak, it addition, when gap blocks
Waiting, foundation pressure can increase, and the ejection efficiency of high pressure nozzle can decline, and can cause the negative interactions such as land upheaval.
Current comprehensive high-pressure injection engineering method (MJS engineering method) can overcome this problem, and it arranges mud in drilling rod
Extraction tube, under the effect of suck-back water and suck-back air adapter, can force to extract out by the waste mud of underground, thus solve tradition
Deficiency present in the gas lift spoil disposal method of Soil-cement pile work method.Although the drilling rod of current comprehensive high-pressure injection engineering method can be by
The waste mud of underground is forced to extract out, it is to avoid foundation pressure increases, and affects the ejection efficiency of high pressure nozzle, but it cannot base area
The actual pressure of basilar part controls the waste mud of underground forces extracted amount, it is difficult to basilar part over the ground during practice of construction
Actual pressure carries out suitable regulation.
Utility model content
The purpose of this utility model is to overcome gram the deficiencies in the prior art, it is provided that one can be executed actual
During work, the actual pressure of base area basilar part controls the waste mud of underground and forces extracted amount, with this adjustably basilar part
Actual pressure, it is to avoid foundation pressure increases, and affects the topping machanism of the comprehensive high-pressure injection engineering method of ejection efficiency.
The technical solution of the utility model is:
The topping machanism of a kind of comprehensive high-pressure injection engineering method includes drilling rod, be arranged in drilling rod spoil disposal pipeline, setting
The mud discharging mouth being connected on drilling rod lateral surface and with spoil disposal pipeline and the pressure transducer being arranged on drilling rod, on described drilling rod
Being provided with the spoil disposal valve of aperture area for controlling mud discharging mouth, described mud discharging mouth and pressure transducer are near drilling rod lower end.
Ground basilar part monitored in real time by the topping machanism of the comprehensive high-pressure injection engineering method of this programme by pressure transducer
Actual pressure, and the actual pressure data recorded according to pressure transducer adjust the size of spoil disposal valve, control underground
Waste mud forces extracted amount, with the actual pressure of this adjustably basilar part, reduces pressure in ground, is allowed to normal, it is ensured that high pressure spray
Penetrate efficiency.
As preferably, valve plate that spoil disposal valve includes the aperture area for controlling mud discharging mouth and the valve being arranged in drilling rod
Plate drives actuator.
As preferably, the end of valve plate is provided with cylinder, and described cylinder is rotatably provided on valve plate by axostylus axostyle, described axle
Bar and the axis perpendicular of drilling rod.
During underground waste mud is forced to extract out, owing to the end of valve plate is provided with cylinder, underground waste mud is by row
Cylinder can be driven during mud mouth to rotate, and the cylinder rotated can stir the coagula being gathered in mud discharging mouth, is allowed to loose
Open or leave mud discharging mouth, thus effectively reduce the situation that mud discharging mouth is blocked.
As preferably, cylinder surface is provided with some grooves.Owing to cylinder surface is provided with some grooves, this not only contributes to carry
High cylinder stirs dynamics and the efficiency of the coagula being gathered in mud discharging mouth, and is conducive to improving the strength that cylinder rotates, thus
The most effectively reduce the situation that mud discharging mouth is blocked.
As preferably, cylinder is positioned at mud discharging mouth.This programme structure can reduce the impact that drilling rod is worked by cylinder as far as possible.
As preferably, the lateral surface of drilling rod is provided with pressure transducer installing hole, and described pressure transducer is positioned at pressure and passes
In sensor installing hole.
As preferably, mud discharging mouth is rectangular.
As preferably, the axis coaxle of spoil disposal pipeline and drilling rod.
As preferably, pressure transducer is positioned at the lower section of mud discharging mouth.
The beneficial effects of the utility model are: can control by the actual pressure of base area basilar part during practice of construction
The waste mud of underground processed forces extracted amount, with the actual pressure of this adjustably basilar part, it is to avoid foundation pressure increases, and affects spray
Penetrate efficiency.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the present utility model.
In figure: drilling rod 1, spoil disposal pipeline 2, pressure transducer 3, mud discharging mouth 4, cylinder 5, axostylus axostyle 6, groove 7, spoil disposal valve 8,
Valve plate 81.
Detailed description of the invention
With detailed description of the invention, this utility model is described in further detail below in conjunction with the accompanying drawings:
As it is shown in figure 1, the topping machanism of a kind of comprehensive high-pressure injection engineering method includes drilling rod 1, the row being arranged in drilling rod
Mud pipeline 2, it is arranged on drilling rod lateral surface and the mud discharging mouth 4 that is connected with spoil disposal pipeline and the pressure sensing being arranged on drilling rod
Device 3.Drilling rod is vertically arranged.Mud discharging mouth and pressure transducer are near drilling rod lower end.Pressure transducer is positioned at the lower section of mud discharging mouth.Bore
The lateral surface of bar is provided with pressure transducer installing hole.Pressure transducer is positioned at pressure transducer installing hole.Spoil disposal pipeline with
The axis coaxle of drilling rod.
Mud discharging mouth is rectangular.Drilling rod is provided with the spoil disposal valve 8 of the aperture area for controlling mud discharging mouth.Spoil disposal valve bag
The valve plate 81 including the aperture area for controlling mud discharging mouth and the valve plate being arranged in drilling rod drive actuator.Valve plate drives and holds
Row mechanism drives valve plate to lift along drill rod axis.The valve plate of the present embodiment drives actuator to be hoist cylinder or push-rod electric machine.
The end of valve plate is provided with cylinder 5.Cylinder is rotatably provided on valve plate by axostylus axostyle 6.Axostylus axostyle and the axis of drilling rod
Perpendicular.Cylinder surface is provided with some grooves 7.Groove is hemispherical.Cylinder is positioned at mud discharging mouth.
Ground substrate monitored in real time by the topping machanism of the comprehensive high-pressure injection engineering method of the present embodiment by pressure transducer
The actual pressure in portion, and the actual pressure data recorded according to pressure transducer adjust the big of mud discharging mouth by spoil disposal valve
Little, thus the waste mud controlling underground forces extracted amount, with the actual pressure of this adjustably basilar part, reduces pressure in ground, makes
Normal, it is ensured that high-pressure injection efficiency.
Claims (9)
1. a topping machanism for comprehensive high-pressure injection engineering method, is characterized in that, including drilling rod, the discharge pipeline that is arranged in drilling rod
Road, it is arranged on drilling rod lateral surface and the mud discharging mouth that is connected with spoil disposal pipeline and the pressure transducer being arranged on drilling rod, institute
Stating drilling rod and be provided with the spoil disposal valve of the aperture area for controlling mud discharging mouth, described mud discharging mouth and pressure transducer are near drilling rod
Lower end.
The topping machanism of a kind of comprehensive high-pressure injection engineering method the most according to claim 1, is characterized in that, described mud valve
Valve plate that door includes aperture area for controlling mud discharging mouth and the valve plate being arranged in drilling rod drive actuator.
The topping machanism of a kind of comprehensive high-pressure injection engineering method the most according to claim 2, is characterized in that, described valve plate
End is provided with cylinder, and described cylinder is rotatably provided on valve plate by axostylus axostyle, described axostylus axostyle and the axis perpendicular of drilling rod.
The topping machanism of a kind of comprehensive high-pressure injection engineering method the most according to claim 3, is characterized in that, described cylinder table
Face is provided with some grooves.
5., according to the topping machanism of a kind of comprehensive high-pressure injection engineering method of claim 3 or 4 or described, it is characterized in that, described
Cylinder is positioned at mud discharging mouth.
6., according to the topping machanism of a kind of comprehensive high-pressure injection engineering method of claim 1 or 2 or 3 or described, it is characterized in that, institute
The lateral surface stating drilling rod is provided with pressure transducer installing hole, and described pressure transducer is positioned at pressure transducer installing hole.
7., according to the topping machanism of a kind of comprehensive high-pressure injection engineering method of claim 1 or 2 or 3 or described, it is characterized in that, institute
State mud discharging mouth rectangular.
8., according to the topping machanism of a kind of comprehensive high-pressure injection engineering method of claim 1 or 2 or 3 or described, it is characterized in that, institute
State the axis coaxle of spoil disposal pipeline and drilling rod.
9., according to the topping machanism of a kind of comprehensive high-pressure injection engineering method of claim 1 or 2 or 3 or described, it is characterized in that, institute
State pressure transducer and be positioned at the lower section of mud discharging mouth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620548592.5U CN205712067U (en) | 2016-06-07 | 2016-06-07 | A kind of topping machanism of comprehensive high-pressure injection engineering method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620548592.5U CN205712067U (en) | 2016-06-07 | 2016-06-07 | A kind of topping machanism of comprehensive high-pressure injection engineering method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205712067U true CN205712067U (en) | 2016-11-23 |
Family
ID=57301453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620548592.5U Expired - Fee Related CN205712067U (en) | 2016-06-07 | 2016-06-07 | A kind of topping machanism of comprehensive high-pressure injection engineering method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205712067U (en) |
-
2016
- 2016-06-07 CN CN201620548592.5U patent/CN205712067U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2020103672A4 (en) | Construction method of rotary drilling hole-forming and jet mixing cement-soil occlusion curtain piles | |
CN100485134C (en) | Construction technique for holding type PHC tube pile with tip entering into rock by augering technique | |
CN104831708A (en) | Foundation excavation retaining and protecting cast-in-situ bored pile construction method and equipment thereof | |
CN101538857A (en) | Pile extraction construction method | |
CN111594041A (en) | Rapid hole forming construction method for large-diameter deep hole pile foundation under karst geology | |
CN104563099A (en) | Porous pipe method large-diameter high-pressure jet grouting pile construction method | |
CN112195924A (en) | Method for reinforcing foundation pit base of silt silty clay layer | |
CN107338795A (en) | A kind of full-sleeve pulls out post row's formula bored pile construction method | |
CN101985836B (en) | Processing method of pile-wall type deep base pit supporting structure in case of encountering large boulder stone | |
CN107905728B (en) | Rock-fill area drilling construction method | |
JP6110903B2 (en) | Underground pile removal method | |
CN205712067U (en) | A kind of topping machanism of comprehensive high-pressure injection engineering method | |
CN213061989U (en) | High-pressure rotary spraying device | |
CN207727581U (en) | A kind of full-sleeve obstacle cleaning machine | |
CN203741843U (en) | Punching grouting conical head | |
CN206090565U (en) | Concrete pile's construction equipment | |
CN208563316U (en) | A kind of large-section in-situ concrete pile pile-end sediment sediment processing unit | |
CN204225100U (en) | The construction equipment of concrete pile | |
CN108914939A (en) | A kind of major diameter ultra-deep high pressure jet grouting construction method | |
CN114991670A (en) | Pile forming method for large-diameter high-pressure jet grouting pile in complex soil layer | |
CN106930294A (en) | A kind of bedrock fracture artesian area grouting method | |
CN114352189A (en) | Construction method of jet grouting pile | |
CN207633341U (en) | A kind of static pressure pile-sinking machine | |
CN108589715B (en) | Construction method for taking soil, spraying and stirring cement soil pile | |
CN106193038A (en) | The construction equipment of concrete-pile and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20170607 |
|
CF01 | Termination of patent right due to non-payment of annual fee |