CN205711714U - Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge supporting construction - Google Patents

Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge supporting construction Download PDF

Info

Publication number
CN205711714U
CN205711714U CN201620519326.XU CN201620519326U CN205711714U CN 205711714 U CN205711714 U CN 205711714U CN 201620519326 U CN201620519326 U CN 201620519326U CN 205711714 U CN205711714 U CN 205711714U
Authority
CN
China
Prior art keywords
plate
bridge
vibration absorption
isolation support
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620519326.XU
Other languages
Chinese (zh)
Inventor
张常勇
王志英
王宏博
王洺鑫
董晓
马雪媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Provincial Communications Planning and Design Institute Group Co Ltd
Original Assignee
Shandong Provincial Communications Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Communications Planning and Design Institute Co Ltd filed Critical Shandong Provincial Communications Planning and Design Institute Co Ltd
Priority to CN201620519326.XU priority Critical patent/CN205711714U/en
Application granted granted Critical
Publication of CN205711714U publication Critical patent/CN205711714U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge supporting construction.Wherein bridge pad, including left and right two parts, left part is divided into the disk spring assembly of horizontally set, right part is divided into the one-way movable support of horizontally set, connect between left and right two parts and use connector to link into an integrated entity structure, it is also possible between the first plate and the second plate, being circumferentially evenly arranged with some c-type mild steel dampers.And disclose the application in cable-stayed bridge and suspension bridge.After using the vibration absorption and isolation support that this utility model provides, effectively extending structure oscillation crosswise cycle, disk spring deformation also can consume part seismic energy, therefore, bridge tower transverse seismic response can be significantly reduced, amplitude reaches 20% 30%, and design difficulty and construction cost have all obtained effective reduction.

Description

Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge supporting construction
Technical field
This utility model relates to a kind of bridge pad, particularly relate to a kind of bridge vibration absorption and isolation support and the cable-stayed bridge of application, Suspension bridge.
Background technology
At present for cable-stayed bridge, Suspension bridge structure, owing to girder is laterally restrained condition at bridge tower, and in geological process The lateral seismic force of lower girder can be passed directly on bridge tower by crossbeam, so the direction across bridge Aseismic Design of bridge tower is generally only capable of adopting Carry out by traditional Seismic Design Method, in order to enable bridge tower to keep elastic stage in geological process, only by strengthening Sectional dimension and quantity of reinforcement realize.
Traditional Seismic Design Method needs to rely on the intensity of structure self, ductility and energy dissipation capacity to make to resist earthquake With.And for cable-stayed bridge, Suspension bridge structure, if relying on bridge tower generation ductile fracture to consume energy in geological process resist earthquake work With the most infeasible, bridge tower needs to keep elastic stage.And direction across bridge does not has other dissipative members, therefore bridge tower can only be relied on The intensity of self resists geological process, simultaneously results in basis scale and significantly increases, and design, difficulty of construction strengthen, material Waste and the increase of construction cost.
Utility model content
In order to solve the deficiencies in the prior art, this utility model provides a kind of bridge pad, is used for solving existing bearing The problem of poor seismic behavior in the horizontal.
This utility model solves the technical scheme that its technical problem used:
Bridge pad, including left and right two parts, it is characterised in that left part is divided into the disk spring assembly of horizontally set, right Part is the one-way movable support of horizontally set, connects and use connector to link into an integrated entity structure between left and right two parts.
Further, described disk spring assembly includes the first plate, the second plate, spring leaf and lead, wherein, the first plate It is the steel plate being oppositely arranged with the second plate, the first sleeve that oriented second plate extends is set on the first panel, on the second plate The second sleeve that oriented first plate extends is set, and overlaps each other between the first sleeve and the second sleeve and use shear pin to carry out Connect, stack multi-disc spring leaf between the first plate and the second plate and in the space that surrounds of the first sleeve and the second sleeve, lead It is structure as a whole or Split type structure to post and the second plate, reserves activity space between lead and the first plate, and rubber is set Pad.
Some c-type mild steel dampers circumferentially it are evenly arranged with between the first plate and the second plate.
Further, the outside at the first plate arranges locking member.
Further, described one-way movable support includes the 3rd plate, the 4th plate and movable balls plate, wherein the 3rd plate and the 4th Plate is oppositely arranged and arranges on the 3rd plate the oriented 4th the 3rd sleeve extended, and installs between the 4th plate and the 3rd sleeve One ring-type seal washer, places a movable balls plate, wherein in the space between the 3rd plate, the 4th plate, the 3rd sleeve One surface of movable balls plate coordinates between the 3rd plate, and cooperation face is plane, and arranges rubber blanket at cooperation, described Another surface of movable balls plate coordinates between the 4th plate, and cooperation face is arcwall face, and arranges rubber blanket at cooperation.
Further, the outside at the 4th plate arranges locking member.
Further, mounting bridge beam support between beam body side and pinner side at bridge tower.
The beneficial effects of the utility model are:
Existing cable-stayed bridge, Suspension bridge structure Horizontal Seismic design usually Traditional method of seismic design, is only capable of relying on bridge tower self Intensity opposing geological process, and bigger sectional dimension also can strengthen structure lateral stiffness, increases the input of seismic energy, increases Design difficulty and construction cost.After using the vibration absorption and isolation support that this utility model provides, can effective extending structure transverse-vibration Dynamic cycle, disk spring deformation also can consume part seismic energy, and therefore, bridge tower transverse seismic response can be significantly reduced, Amplitude reaches 20% 30%, and design difficulty and construction cost have all obtained effective reduction.
Accompanying drawing explanation
Fig. 1 is the full sectional view of this bearing.
Fig. 2 is this bearing application schematic diagram in bridge.
Fig. 3 is another design drawing of this bearing.
Fig. 4 is another design drawing of this bearing.
Fig. 5 is the sectional view of embodiment two.
In figure: 1 bearing, 11 disk spring assemblies, 111 first plates, 112 second plates, 113 spring leafs, 114 leads, 115 First sleeve, 116 second sleeves, 117 shear pins, 118,118 ' locking members, 12 one-way movable ball shaped steel bearing assemblies, 121 Three plates, 122 the 4th plates, 123 movable balls plates, 124 the 3rd sleeves, 125 seal washers, 126 planes, 127 arcwall faces, 13 steel rivetings Nail, 2 beam body, 3 pinners, 4 c-type mild steel dampers, 41 is hinged, 5 one-way movable basin type rubbers, 6 disc type rubber supports.
Detailed description of the invention
As shown in Figure 1 to Figure 2,
For existing defect, this utility model is a kind of bridge vibration absorption and isolation support, is mainly used in cable-stayed bridge, suspension bridge knot Structure, this bearing 1 is installed at bridge tower between beam body 2 side and pinner 3 side, it is therefore an objective to realize structure laterally subtracts shock insulation (water Square to).In Traditional method of seismic design, beam body laterally consolidates with bridge tower at bridge tower, and structure is shorter for horizontal natural vibration period;And use After bearing of the present utility model, in seismic process, between the first sleeve and the second sleeve, shear pin is cut off, the dish of bearing front end Shape spring or/and c-type mild steel damper plays a role, on the one hand can effective extending structure horizontal natural vibration period, avoid earthquake Predominant period, reducing the input of seismic energy, on the other hand disk spring is or/and c-type mild steel damper deforms can have Effect consumes part seismic energy, thus is substantially reduced the transverse seismic response of bridge tower.It is computed, under non-near-field earthquake, with Traditional method of seismic design is compared, and after using bearing of the present utility model, bridge tower transverse seismic response about can reduce 20% 30%, pylon foundation scale and construction cost also can significantly reduce accordingly.When normally using, cut between the first sleeve and the second sleeve Power pin remains stationary as, it is ensured that the direction across bridge constraint of beam body and suitable bridge are to the static design requirement slided.Therefore use this practicality new After the bearing of type, not only it is significantly reduced seismic structural response, fully meets the requirement that structure normally uses simultaneously.
Based on the description above, bearing 1 of the present utility model includes left and right two large divisions, and wherein left part is divided into a dishful of shape Spring assembly 11, right part is divided into an one-way movable ball shaped steel bearing assembly 12, in series between left and right two parts, and uses Steel pin, steel rivet 13 are fixed, and during use, bearing is for being transversely mounted.
Embodiment one, concrete structure is as follows: disk spring assembly 11 includes first plate the 111, second plate 112, spring leaf 113 and lead 114, wherein, the first plate 111 and the second plate are the steel plate being oppositely arranged, and arrange oriented on the first plate 111 The first sleeve 115 that second plate extends, arranges the second sleeve 116 that oriented first plate extends, and first set on the second plate 112 Overlap each other and use shear pin 117 to be attached between cylinder and the second sleeve, between the first plate and the second plate and first Stack multi-disc spring leaf 113 in the space that sleeve and the second sleeve surround, wherein place one in the center of spring leaf and lead Xiang Zhu, for slowing down impact, is the first plate and the second plate surface configuration groove and rubber blanket that lead 114 end coordinates.
Locking member 118 is set in the outside of the first plate 111, connects for fixing with beam body.
One-way movable ball shaped steel bearing assembly 12 includes the 3rd plate the 121, the 4th plate 122 and movable balls plate 123, wherein the 3rd Plate 121 and the 4th plate are oppositely arranged and arrange on the 3rd plate the oriented 4th the 3rd sleeve 124 extended, and at the 4th plate and the One ring-type seal washer 125 is installed between three sleeves.Place in space between the 3rd plate, the 4th plate, the 3rd sleeve One movable balls plate 123, wherein a surface of movable balls plate coordinates between the 3rd plate, and cooperation face is plane 126, and Arranging rubber blanket at cooperation, another surface of movable balls plate coordinates between the 4th plate, and cooperation face is arcwall face 127, and rubber blanket is set at cooperation.
Use steel pin, steel rivet 13 to be fixed between above-mentioned the 3rd plate and the second plate, be connected, and set between two parties Put.
Locking member 118 ' is set in the outside of the 4th plate 122, connects for fixing with beam body.
Bearing of the present utility model is that disk spring is in series with one-way movable ball shaped steel bearing, disk spring and other Type one-way movable support series connection (such as one-way movable basin type rubber 5, Fig. 3, disc type rubber support 6, Fig. 4) is this reality Use novel same principle, should be protected.
Embodiment two, with reference to Fig. 5,
Arranging c-type mild steel damper 4 between the first plate and the second plate, wherein, c-type mild steel damper is arranged in uniformly Region between first plate and the second plate.As a kind of optimal form, above-mentioned c-type mild steel damper 4 is a c-type mild steel steel Plate, two ends are provided with hinged end, carry out hinged with the first above-mentioned plate and the second plate, and arrange pretension by the way of hinged 41 Power, forms resilient support.Further, above-mentioned c-type mild steel steel plate can be formed with multi-disc superposition, has bigger support force Degree.
In the present embodiment, with embodiment one second at difference be, lead 114 end and the second plate are carried out forever The fixing connection of property, such as, be welded to connect for a long time, forms integrative-structure, can be along with the second plate linkage.Lead is avoided to be in floating Dynamic state.
Embodiment described above is only to be described preferred implementation of the present utility model, not to this practicality Novel scope is defined, and on the premise of without departing from this utility model design spirit, relevant technical staff in the field is to this The various deformation of utility model and improvement, all should expand in protection domain as determined by this utility model claims.

Claims (8)

1. bridge vibration absorption and isolation support, including left and right two parts, it is characterised in that left part is divided into the disk spring group of horizontally set Part (11), right part is divided into the one-way movable support of horizontally set, connects and use connector to connect into one between left and right two parts Body structure.
Bridge vibration absorption and isolation support the most according to claim 1, it is characterised in that described disk spring assembly (11) includes One plate (111), the second plate (112), spring leaf (113) and lead (114), wherein, the first plate (111) is relative with the second plate The steel plate arranged, arranges the first sleeve (115) that oriented second plate extends, on the first plate (111) on the second plate (112) The second sleeve (116) that oriented first plate extends is set, and overlaps each other between the first sleeve and the second sleeve and use shearing Pin (117) is attached, between the first plate and the second plate and stack many in the space that surrounds of the first sleeve and the second sleeve Flat spring sheet (113), is wherein lead in the center of spring leaf.
Bridge vibration absorption and isolation support the most according to claim 1, it is characterised in that between the first plate (111) and the second plate Circumferentially it is evenly arranged with some c-type mild steel dampers.
Bridge vibration absorption and isolation support the most according to claim 1, it is characterised in that described one-way movable support includes the 3rd plate (121), the 4th plate (122) and movable balls plate (123), wherein the 3rd plate (121) and the 4th plate are oppositely arranged and on the 3rd plate Oriented 4th the 3rd sleeve (124) extended is set, and a ring-type sealing gasket is installed between the 4th plate and the 3rd sleeve Circle (125), places a movable balls plate (123), wherein movable balls in the space between the 3rd plate, the 4th plate, the 3rd sleeve One surface of plate coordinates between the 3rd plate, and cooperation face is plane (126), and arranges rubber blanket at cooperation, described Another surface of movable balls plate coordinates between the 4th plate, and cooperation face is arcwall face (127), and arranges rubber at cooperation Rubber cushion.
Bridge vibration absorption and isolation support the most according to claim 2, it is characterised in that described lead two ends and the first plate and the Two plates are oppositely arranged, and do not contact, be the first plate that lead (114) end coordinates and the second plate surface configuration groove and Rubber blanket.
Bridge vibration absorption and isolation support the most according to claim 2, it is characterised in that described lead 114 one end and the second plate Carry out permanent fixing connection, the other end and the first plate noncontact to connect.
7. a cable-stayed bridge supporting construction, it is characterised in that install between beam body (2) side and pinner (3) side at bridge tower Laterally vibration absorption and isolation support, described horizontal shock-absorbing bearing is the bridge vibration absorption and isolation support in claim 1 to 6 described in any one.
8. a suspension bridge supporting construction, it is characterised in that install between beam body (2) side and pinner (3) side at bridge tower Laterally vibration absorption and isolation support, described horizontal shock-absorbing bearing is the bridge vibration absorption and isolation support in claim 1 to 6 described in any one.
CN201620519326.XU 2016-05-31 2016-05-31 Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge supporting construction Expired - Fee Related CN205711714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620519326.XU CN205711714U (en) 2016-05-31 2016-05-31 Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620519326.XU CN205711714U (en) 2016-05-31 2016-05-31 Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge supporting construction

Publications (1)

Publication Number Publication Date
CN205711714U true CN205711714U (en) 2016-11-23

Family

ID=57300553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620519326.XU Expired - Fee Related CN205711714U (en) 2016-05-31 2016-05-31 Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge supporting construction

Country Status (1)

Country Link
CN (1) CN205711714U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887668A (en) * 2016-05-31 2016-08-24 山东省交通规划设计院 Bridge shock reduction and isolation supporting base and cable-stayed bridge and suspension bridge supporting structure
CN107675614A (en) * 2017-11-16 2018-02-09 北京工业大学 Lantern bone formula ball shaped steel bearing

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887668A (en) * 2016-05-31 2016-08-24 山东省交通规划设计院 Bridge shock reduction and isolation supporting base and cable-stayed bridge and suspension bridge supporting structure
CN105887668B (en) * 2016-05-31 2018-08-17 山东省交通规划设计院 Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge support construction
CN107675614A (en) * 2017-11-16 2018-02-09 北京工业大学 Lantern bone formula ball shaped steel bearing
CN107675614B (en) * 2017-11-16 2023-06-20 北京工业大学 Lantern bone type spherical steel support

Similar Documents

Publication Publication Date Title
CN105887668B (en) Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge support construction
CN208168023U (en) The replaceable combination energy consumption tension and compression type mild steel damper of one kind and steel plate shear force wall
CN101748686B (en) Non-linear damping radiation vibration absorption and isolation support
CN201610521U (en) Large-displacement bridge-type steel expansion device
CN208685432U (en) Energy-consumption shock-absorption device
CN103966943B (en) Control the structural system of cable-stayed bridge main-beam, auxiliary pier and transition pier transverse response
CN205711714U (en) Bridge vibration absorption and isolation support and cable-stayed bridge, suspension bridge supporting construction
CN110777970A (en) Friction energy consumption protection device for wall corner of swinging wall and swinging wall
CN205804156U (en) A kind of two-way vibration absorption and isolation support being applicable to cable-stayed bridge, suspension bridge
CN110847406B (en) Removable ripple viscous spring combination mild steel attenuator
CN106192733A (en) A kind of be applicable to cable-stayed bridge, the three-dimensional of suspension bridge subtracts shock insulation supporting system
CN106939702B (en) A kind of changeable type reinforcement means of girder structure
CN106320570B (en) A kind of compound shear wall with easy replacement vibration damper steel plate damper
CN105113655B (en) Prestressing force viscoelasticity damps wall
CN207211420U (en) A kind of steel reinforced concrete shear walls with replaceable cross mild steel damper
CN207620154U (en) A kind of replaceable folded plate mild steel damper and shear wall structure
CN202830902U (en) Ocean platform damping system
CN106049262A (en) Two-way vibration absorption and isolation support suitable for cable-stayed bridge and suspension bridge
CN102268878A (en) Shearing energy consumption and shock absorption control method for underground structure
CN208950089U (en) A kind of mild steel damper
CN201593162U (en) Nonlinear damping spoke shock absorption and isolation support
CN206928454U (en) A kind of Multi-function earthquake-resistant building structure
CN207727795U (en) A kind of highly energy-consuming Combined-type shock-absorption device
CN203307722U (en) Anti-drawing curve surface rotating support
CN203499054U (en) Energy dissipation and seismic mitigation shear wall with wood supports

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 250031 Shandong Province Flyover District of Ji'nan city Shanxi Road No. 576.

Patentee after: Shandong transportation planning and Design Institute Co.,Ltd.

Address before: 250031 Shandong Province Flyover District of Ji'nan city Shanxi Road No. 576.

Patentee before: SHANDONG PROVINCIAL COMMUNICATIONS PLANNING AND DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province

Patentee after: Shandong transportation planning and Design Institute Group Co.,Ltd.

Address before: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province

Patentee before: Shandong transportation planning and Design Institute Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20210531

CF01 Termination of patent right due to non-payment of annual fee