CN205706334U - A kind of dumper is walked on stage - Google Patents

A kind of dumper is walked on stage Download PDF

Info

Publication number
CN205706334U
CN205706334U CN201620090717.4U CN201620090717U CN205706334U CN 205706334 U CN205706334 U CN 205706334U CN 201620090717 U CN201620090717 U CN 201620090717U CN 205706334 U CN205706334 U CN 205706334U
Authority
CN
China
Prior art keywords
crossbeam
longeron
longerons
stage
walked
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620090717.4U
Other languages
Chinese (zh)
Inventor
王丽滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Electrical Locomotive Co Ltd
Original Assignee
Guangzhou Electrical Locomotive Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Electrical Locomotive Co Ltd filed Critical Guangzhou Electrical Locomotive Co Ltd
Priority to CN201620090717.4U priority Critical patent/CN205706334U/en
Application granted granted Critical
Publication of CN205706334U publication Critical patent/CN205706334U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

A kind of dumper is walked on stage, and including square metal framework, described metal framework is surrounded by front beam, back end beam, left side beam and right side beam;First crossbeam it is sequentially provided with from back to front in described metal framework, second cross beam and the 3rd crossbeam, two the first longerons being parallel to each other it are provided with between first crossbeam and back end beam, it is provided with the 4th crossbeam between two first longerons, the second longeron it is provided with between first crossbeam and second cross beam, it is provided with the 5th crossbeam between the second longeron and the left side beam of left side beam, it is provided with the 6th crossbeam and the 7th crossbeam between the second longeron and the right side beam of right side beam, two arranged in parallel and the 3rd longerons of leap the 3rd crossbeam it are provided with between second cross beam and front beam, it is provided with the 4th longeron between second cross beam and the 3rd crossbeam, it is provided with the 5th longeron between 3rd crossbeam and front beam.The crisscross girder construction of this utility model is rationally distributed, and between crossbeam and longeron, junction uses and is welded to connect formation overall structure, and structural strength is higher.

Description

A kind of dumper is walked on stage
Technical field
This utility model relates to dumper, and especially a kind of dumper is walked on stage.
Background technology
After dumper is walked on stage except equipment such as equipment requiring installation driver's cabins, also require that personnel can stand row on walking on stage Walk and equipment is safeguarded, so existing dumper is walked on stage the biggest, and formed by bar splicing, in order to have foot Enough support forces so that overall weight of walking on stage is heavier.In order to solve transport and the assembly problem walked on stage, existing dumper is walked on stage Generally splicing structure, walk on stage on each electrical equipment form single subassembly, dumper is installed when walking on stage, then by these On individually subassembly is arranged on and walks on stage, these subassemblies are carried out the layout of circuit and pipeline the most again.Walking of this structure Platform parts are relatively many and disperse, and install, transport and the most relatively bother, and owing to having walked on stage, multiple subassembly is constituted, each Installation accuracy between subassembly requires higher, brings many troubles therefore to the installation walked on stage, and is exactly also that subassembly is installed After completing, circuit and pipeline are owing to being restricted by space, and belong to field operation, and the difficulty that operates is bigger;Multiple Walking on stage of parts composition needs first to dismount when transport, then needs to carry out each subassembly respectively handling, time-consuming takes Power.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of dumper and walks on stage, and topology layout is reasonable, has foot Enough strength support walk on stage on equipment, and overall weight of walking on stage is lighter.
For solving above-mentioned technical problem, the technical solution of the utility model is: a kind of dumper is walked on stage, including square gold Belonging to framework, described metal framework is surrounded by front beam, back end beam, left side beam and right side beam;In described metal framework from back to front It is sequentially provided with first crossbeam, second cross beam and the 3rd crossbeam, and the two ends distribution weldering of first crossbeam, second cross beam and the 3rd crossbeam It is connected on metal framework;Two the first longerons being parallel to each other it are provided with between described first crossbeam and back end beam, the first longeron Two ends are respectively welded on first crossbeam and back end beam;The 4th crossbeam, the two ends of the 4th crossbeam it are provided with between two first longerons It is welded on two first longerons;Being provided with two the second longerons be arrangeding in parallel between first crossbeam and second cross beam, second indulges The two ends of beam are respectively welded on first crossbeam and second cross beam;The it is provided with between the second longeron and the left side beam of left side beam Five crossbeams, the two ends of the 5th crossbeam are respectively welded on left side beam and the second longeron;The second longeron and right side near right side beam Being provided with the 6th crossbeam and the 7th crossbeam between beam, the 6th crossbeam and the 7th crossbeam are parallel to each other and its two ends are respectively welded at second On longeron and right side beam;Be provided with between second cross beam and front beam two arranged in parallel and cross over the 3rd crossbeam the 3rd indulge Beam, the two ends of the 3rd longeron are respectively welded on second cross beam and front beam;It is provided with the 4th between second cross beam and the 3rd crossbeam Longeron, the 4th longeron is positioned at the centre of two the 3rd longerons and its two ends are respectively welded on second cross beam and the 3rd crossbeam;The Being provided with the 5th longeron between three crossbeams and front beam, the 5th longeron is positioned at the centre of two the 3rd longerons and its two ends are respectively welded On the 3rd crossbeam and front beam.The crisscross girder construction of this utility model is rationally distributed, and connects between crossbeam and longeron The place's of connecing employing is welded to connect formation overall structure, structural strength is higher, the quantity reducing buttress brace that can be suitable, alleviates and walks on stage Overall weight;It addition, be provided with crossbeam as reinforcement structure in the position of equipment requiring installation, it is ensured that walk on stage and there is enough propping up Support force.
As improvement, first crossbeam, second cross beam and two second longerons surround the first equipment installation region.
As improvement, back end beam, first crossbeam and two first longerons surround the second equipment installation region.
As improvement, first crossbeam, second cross beam, left side beam and the second longeron surround the 3rd equipment installation region.
As improvement, first crossbeam, second cross beam, right side beam and the second longeron surround the 4th equipment installation region.
This utility model is compared with prior art had the benefit that
The crisscross girder construction of this utility model is rationally distributed, and between crossbeam with longeron, junction uses the company of welding Connecing formation overall structure, structural strength is higher, the quantity of minimizing buttress brace that can be suitable, alleviates the overall weight walked on stage;It addition, It is provided with crossbeam as reinforcement structure, it is ensured that walk on stage and there is enough support forces in the position of equipment requiring installation.
Accompanying drawing explanation
Fig. 1 is this utility model top view.
Detailed description of the invention
Below in conjunction with Figure of description, the utility model is described in further detail.
As it is shown in figure 1, a kind of dumper is walked on stage, including square metal framework, described metal framework by front beam 1, after End carriage 2, left side beam 3 and right side beam 4 surround;First crossbeam 5, second cross beam 6 it is sequentially provided with from back to front in described metal framework With the 3rd crossbeam 7, and first crossbeam 5, second cross beam 6 and the 3rd crossbeam 7 two ends distribution be welded on metal framework;Described Being provided with two the first longerons 8 being parallel to each other between one crossbeam 5 and back end beam 2, the two ends of the first longeron 8 are respectively welded at first On crossbeam 5 and back end beam 2;Being provided with the 4th crossbeam 9 between two first longerons 8, the two ends of the 4th crossbeam 9 are welded on two first On longeron 8;Two the second longerons 10 be arrangeding in parallel, the two ends of the second longeron 10 it are provided with between first crossbeam 5 and second cross beam 6 It is respectively welded on first crossbeam 5 and second cross beam 6;It is provided with the 5th between the second longeron 10 and the left side beam 3 of left side beam 3 Crossbeam 11, the two ends of the 5th crossbeam 11 are respectively welded on left side beam 3 and the second longeron 10;The second longeron near right side beam 4 Being provided with the 6th crossbeam 12 and the 7th crossbeam 13 between 10 and right side beam 4, the 6th crossbeam 12 and the 7th crossbeam 13 are parallel to each other and it Two ends are respectively welded on the second longeron 10 and right side beam 4;It is provided with two between second cross beam 6 and front beam 1 to be parallel to each other and set Putting and cross over the 3rd longeron 14 of the 3rd crossbeam 7, the two ends of the 3rd longeron 14 are respectively welded on second cross beam 6 and front beam 1; Be provided with the 4th longeron 15 between second cross beam 6 and the 3rd crossbeam 7, the 4th longeron 15 be positioned at the centre of two the 3rd longerons 14 and its Two ends are respectively welded on second cross beam 6 and the 3rd crossbeam 7;It is provided with the 5th longeron 16 between 3rd crossbeam 7 and front beam 1, the Five longerons 16 are positioned at the centre of two the 3rd longerons 14 and its two ends are respectively welded on the 3rd crossbeam 7 and front beam 1.First is horizontal Beam 5, second cross beam 6 and two second longerons 10 surround the first equipment installation region;Back end beam 2, first crossbeam 5 and two first Longeron 8 surrounds the second equipment installation region;First crossbeam 5, second cross beam 6, left side beam 3 and the second longeron 10 surround the 3rd equipment Installation region;First crossbeam 5, second cross beam 6, right side beam 4 and the second longeron 10 surround the 4th equipment installation region.In order to make to set Standby installation is more convenient, can arrange mounting seat and screw on crossbeam and longeron.Spreading on surface of walking on stage that steel plate can be formed can The platform of walking, stands for operator and walks.
The crisscross girder construction of this utility model is rationally distributed, and between crossbeam with longeron, junction uses the company of welding Connecing formation overall structure, structural strength is higher, the quantity of minimizing buttress brace that can be suitable, alleviates the overall weight walked on stage;It addition, It is provided with crossbeam as reinforcement structure, it is ensured that walk on stage and there is enough support forces in the position of equipment requiring installation.

Claims (5)

1. a dumper is walked on stage, it is characterised in that: including square metal framework, described metal framework is by front beam, rear end Beam, left side beam and right side beam surround;First crossbeam, second cross beam and the 3rd it is sequentially provided with from back to front horizontal in described metal framework Beam, and first crossbeam, second cross beam and the 3rd crossbeam two ends distribution be welded on metal framework;Described first crossbeam and rear end Being provided with two the first longerons being parallel to each other between beam, the two ends of the first longeron are respectively welded on first crossbeam and back end beam; Being provided with the 4th crossbeam between two first longerons, the two ends of the 4th crossbeam are welded on two first longerons;First crossbeam and Being provided with two the second longerons be arrangeding in parallel between two crossbeams, the two ends of the second longeron are respectively welded at first crossbeam and the second horizontal stroke Liang Shang;Being provided with the 5th crossbeam between the second longeron and the left side beam of left side beam, the two ends of the 5th crossbeam are respectively welded at a left side On curb girder and the second longeron;It is provided with the 6th crossbeam and the 7th crossbeam between the second longeron and the right side beam of right side beam, the 6th Crossbeam and the 7th crossbeam are parallel to each other and its two ends are respectively welded on the second longeron and right side beam;Second cross beam and front beam it Between be provided with two arranged in parallel and cross over the 3rd longerons of the 3rd crossbeam, it is horizontal that the two ends of the 3rd longeron are respectively welded at second On beam and front beam;Being provided with the 4th longeron between second cross beam and the 3rd crossbeam, the 4th longeron is positioned in two the 3rd longerons Between and its two ends be respectively welded on second cross beam and the 3rd crossbeam;It is provided with the 5th longeron between 3rd crossbeam and front beam, the Five longerons are positioned at the centre of two the 3rd longerons and its two ends are respectively welded on the 3rd crossbeam and front beam.
A kind of dumper the most according to claim 1 is walked on stage, it is characterised in that: first crossbeam, second cross beam and two pieces the Two longerons surround the first equipment installation region.
A kind of dumper the most according to claim 1 is walked on stage, it is characterised in that: back end beam, first crossbeam and two first Longeron surrounds the second equipment installation region.
A kind of dumper the most according to claim 1 is walked on stage, it is characterised in that: first crossbeam, second cross beam, left side beam and Second longeron surrounds the 3rd equipment installation region.
A kind of dumper the most according to claim 1 is walked on stage, it is characterised in that: first crossbeam, second cross beam, right side beam and Second longeron surrounds the 4th equipment installation region.
CN201620090717.4U 2016-01-29 2016-01-29 A kind of dumper is walked on stage Active CN205706334U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620090717.4U CN205706334U (en) 2016-01-29 2016-01-29 A kind of dumper is walked on stage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620090717.4U CN205706334U (en) 2016-01-29 2016-01-29 A kind of dumper is walked on stage

Publications (1)

Publication Number Publication Date
CN205706334U true CN205706334U (en) 2016-11-23

Family

ID=57333617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620090717.4U Active CN205706334U (en) 2016-01-29 2016-01-29 A kind of dumper is walked on stage

Country Status (1)

Country Link
CN (1) CN205706334U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107416028A (en) * 2017-05-11 2017-12-01 徐州徐工矿山机械有限公司 A kind of platform skeleton structure of quarry tipper

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107416028A (en) * 2017-05-11 2017-12-01 徐州徐工矿山机械有限公司 A kind of platform skeleton structure of quarry tipper

Similar Documents

Publication Publication Date Title
CN201071251Y (en) Assembled adjustable gantry
CN104191127B (en) Car roof skeleton assembly or fitting table
US9487255B2 (en) Overhead conveying device having column gantries
CN204623570U (en) A kind of without subframe riveted type mine car vehicle frame
CN205706334U (en) A kind of dumper is walked on stage
CN102951523A (en) Car frame for economical passenger elevator
CN202879449U (en) Supporting leg installation base for semi-trailer
CN203304429U (en) Die change device, die placement device and die change system
CN107979012A (en) Modularization prefabricated cabin nacelle, modularization prefabricated cabin and substation
CN207749839U (en) A kind of detachable five feet support jig
CN204161467U (en) A kind of subframe and engineering truck
CN103216092B (en) Construction material handling method and equipment thereof
CN203006197U (en) Full-frame tank container
CN102976240B (en) A kind of manned lift platform truck
CN211280931U (en) Assembled semitrailer rear protective net structure
CN204876630U (en) Interim supporting platform of super high -rise building equipment
CN207660277U (en) A kind of self-propelled Overall Steel Formwork trolley for wall construction
CN208715732U (en) Heavy dies laying rack
CN202913447U (en) Internally installed anti-rolling loading machine cab framework
CN102351096A (en) Double-trolley loading device in suspended conveyor
CN202523724U (en) Solar photovoltaic assembly fixing support
CN202335650U (en) Assembled goods shelf
CN206891466U (en) A kind of multifunctional combination experimental rig installation frame
CN204917599U (en) Staircase transportation support frame
CN203834660U (en) Supporting structure for portal frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant