CN205704460U - A kind of switch enclosure production group mould - Google Patents

A kind of switch enclosure production group mould Download PDF

Info

Publication number
CN205704460U
CN205704460U CN201620333538.9U CN201620333538U CN205704460U CN 205704460 U CN205704460 U CN 205704460U CN 201620333538 U CN201620333538 U CN 201620333538U CN 205704460 U CN205704460 U CN 205704460U
Authority
CN
China
Prior art keywords
punching
burr removal
perforating die
punching press
removal dish
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620333538.9U
Other languages
Chinese (zh)
Inventor
王国宣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG TIANQI ELECTRIC CO Ltd
Original Assignee
ZHEJIANG TIANQI ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG TIANQI ELECTRIC CO Ltd filed Critical ZHEJIANG TIANQI ELECTRIC CO Ltd
Priority to CN201620333538.9U priority Critical patent/CN205704460U/en
Application granted granted Critical
Publication of CN205704460U publication Critical patent/CN205704460U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture Of Switches (AREA)

Abstract

The utility model discloses a kind of switch enclosure production group mould, including punch forming module, injection mould, edger, punching edging mould;Described punching edging mould include body frame, be located on body frame can the upper perforating die of knee-action, lower perforating die, the punching part being located between perforating die and lower perforating die and edging part;Described punching part include being fixed on perforating die lower surface stamping arm, can left and right action and then immigration or leave the punching press matching seat below stamping arm, be opened in can coordinating the punching press chamber that switch enclosure is punched out with this stamping arm and being located at the punching bolster in this punching press matching seat of this punching press matching seat top;Described punching bolster includes that the punching on top coordinates base plate and can carry out the elastic buffering strip stretched when by punching press.This utility model simple in construction, instant after punching can carry out edging process, ensure punching quality bore edges;The two-sided flash removed that goes, burr is removed complete, and punching the smooth of the edge is smooth.

Description

A kind of switch enclosure production group mould
Technical field
This utility model relates to field of machining, especially relates to a kind of switch enclosure production group mould.
Background technology
Switch enclosure sidepiece needs to form through hole by punching and supply button to stretch out, but after punching completes, the edge of through hole there will be burr, uneven, impact use.Switch enclosure after punching would generally be carried out edging by edge polisher by prior art, the burr at through hole edge is removed.But, punching and edging are separated operation by such operation, so needing to use two equipment, the production cost of enterprise is relatively big, and the space hold of equipment is very big, and the equipment that can accommodate in Factory Building is limited, inefficient.
Utility model content
This utility model is in order to overcome the deficiencies in the prior art, it is provided that a kind of can be punched out and edging operation, switch enclosure are unlikely to deform, edging is effective, work efficiency is high, the switch enclosure production group mould of energy efficient simultaneously.
To achieve these goals, this utility model by the following technical solutions: a kind of switch enclosure production group mould, including punch forming module, injection mould, edger, punching edging mould;Described punching edging mould include body frame, be located on body frame can the upper perforating die of knee-action, lower perforating die, the punching part being located between perforating die and lower perforating die and edging part;Described punching part include being fixed on perforating die lower surface stamping arm, can left and right action and then immigration or leave the punching press matching seat below stamping arm, be opened in can coordinating the punching press chamber that switch enclosure is punched out with this stamping arm and being located at the punching bolster in this punching press matching seat of this punching press matching seat top;Described punching bolster includes that the punching on top coordinates base plate and can carry out the elastic buffering strip stretched when by punching press, and this elastic buffering strip bottom is embedded in punching press matching seat, and upper end is fixed on this punching and coordinates base plate lower surface;Offering opening bottom described punching press chamber, described punching cooperation base plate may pass through this opening and inserts punching press intracavity;Described edging part includes being fixed on the first cooperation support of perforating die lower surface, the rotating L-type second being located at lower perforating die coordinates support, the first burr removal dish being rotationally connected with the first cooperation support bottom, for the first actuator driving this first burr removal dish to rotate and be rotationally connected with described L-type second and coordinate the second burr removal dish of frame upper;Being provided with when the first burr removal dish rotates the driven structure that the second burr removal dish can be driven to rotate between described first burr removal dish and the second burr removal dish, this driven structure includes that this spline protuberance that is available for by upwardly extending the spline protuberance formed in the middle part of this second burr removal dish be opened in the middle part of the first burr removal dish inserts and realizes the spline card division that spline connects between the two.
Further, described second coordinates support to include transverse arm and trailing arm, and this trailing arm bottom is connected to lower perforating die, and this transverse arm one end is fixed on trailing arm top, and described second burr removal dish is connected to the other end of this transverse arm.
Further, described transverse arm end upper lateral part is formed with cooperation post, and this cooperation post top is formed with position limiting convex ring;Described second burr is removed tray bottom and is offered mating cavity, offers the limited ring groove coordinated with this position limiting convex ring in this mating cavity.
In sum, this utility model simple in construction, punching and the edging operation in hole is completed by same machine, it is not necessary to simultaneously use two machines, energy efficient;Transmission distance is short between the two, has deducted the artificial release time that product is moved to edge polisher by perforating press, and work efficiency is high;Punching bolster is set, effectively stamping arm is buffered, prevent stamping press from spending big and making switch enclosure deform;Arranging two groups of abrasive discs, the upper and lower surface in hole can carry out edging operation, burrs on edges is removed completely, and burr removal efficiency is high;Second burr removal dish is rotated by the first burr removal dish integral drive, reduces the setting of actuator, energy efficient.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of the second cooperation support.
The structural representation of Fig. 3 punching part.
Detailed description of the invention
In order to make those skilled in the art be better understood from this utility model scheme, below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out clear, complete description.
As Figure 1-3, a kind of switch enclosure production group mould, including punch forming module, injection mould, edger, punching edging mould;Described punching edging mould include body frame, be located on body frame can the upper perforating die 1 of knee-action, lower perforating die 2, the punching part being located between perforating die 1 and lower perforating die 2 and edging part;Described punching part can be punched out operation to switch enclosure, and this edging part can carry out edging operation to the through hole formed after punching press, removes flash removed;This edging part is arranged on rear side of punching part, both of which carries out main driving by the knee-action of upper perforating die, punching complete after switch enclosure be immediately pushed into edging part in carry out edging, save switch enclosure and transfer to the time of another equipment from an equipment, improve work efficiency;It is provided with feeding mechanism on front side of this punching part, this feeding mechanism includes the feeding belt 10 being communicated in lower perforating die sidepiece and the switch enclosure on feeding belt can be pushed into the charging push piece below punching part, this charging push piece is arranged on feeding belt sidepiece, realized the automatic feed of equipment by feeding mechanism, improve work efficiency;Concrete, described punching part includes stamping arm 31, punching press matching seat 32, punching press chamber 33;Described stamping arm 31 is fixedly connected on perforating die 1 lower surface, can upper perforating die drive under knee-action, switch enclosure is punched out;Described punching press matching seat 32 can left and right action, thus can move into below stamping arm 31 when needs punching press, leave below stamping arm 31 after punching press completes, it is simple to switch enclosure enters and moves down operation seat in the plane;Described punching press chamber 33 is opened in this punching press matching seat 32 top, inserts for stamping arm 31 lower end when punching press, thus the switch enclosure being placed on punching press matching seat 32 stretches, and then punching;Owing to needing relative movement frequently between stamping arm 3 and punching press chamber 33, so the most easily wearing and tearing, so we are at the sheathed overcoat in stamping arm 3 bottom 91, inner sleeve 92 is set in punching press chamber 33;Between described overcoat and stamping arm 3 and inner sleeve is with punching press chamber 33 and removably connects, when abrasion occurs between the two, only need to be replaced jacket and inner sleeve, stamping arm 3 and punching press chamber 33 are not susceptible to damage, and service life of equipment is long.
In order to prevent stamping press from spending greatly, switch enclosure is deformed, we are provided with a punching bolster at described punching press matching seat 32, this punching bolster includes that the punching on top coordinates base plate 41 and elastic buffering strip 42, this this elastic buffering strip 42 bottom is embedded in punching press matching seat 32, and upper end is fixed on this punching and coordinates base plate 41 lower surface;Offering opening bottom described punching press chamber 33, described punching cooperation base plate 41 may pass through this opening and inserts in punching press chamber 33;When stamping arm 31 pours punching press chamber 33, punching can coordinate base plate 41 be pressed downward against so that elastic buffering strip 42 stretches, thus elastic buffering strip 42 acts on to 31 1 active forces upwards of stamping arm, and then prevent stamping arm 31 punching press excessive;Elastic buffering strip 42 can also give upper perforating die an overall restoring force upwards simultaneously so that the driving force that the upper shifting of upper perforating die needs reduces, energy efficient.
Concrete, described edging part includes that the first cooperation support 51, L-type second coordinate support the 52, first actuator, first burr removal dish the 53, second burr removal dish 54;Described first coordinates support 51 to be fixedly connected on perforating die 1 lower surface, and this first burr removal dish 53 is rotationally connected with the first cooperation support 51 bottom, and described first actuator is then used for driving this first burr removal dish 53 to rotate;This second burr removal dish 54 is rotationally connected with described L-type second and coordinates support 52 top, concrete, and described transverse arm 521 end upper lateral part is formed with cooperation post 71, and this cooperation post top is formed with position limiting convex ring 72;Offer mating cavity bottom described second burr removal dish 54, in this mating cavity, offer the limited ring groove coordinated with this position limiting convex ring 72.
Described second coordinates support 52 to include transverse arm 521 and trailing arm 522, and this transverse arm 521 one end is fixedly connected on trailing arm 522 top, and described second burr removal dish 54 is connected to the other end of this transverse arm 521;The lower end of described trailing arm 522 can rotate relative to lower perforating die, when needs carry out edging operation to switch enclosure, L-type second coordinates support 52 inwardly to rotate, drive the second burr removal dish 54 to be rotated into the first burr removal dish 53 lower position simultaneously, and then match with the first burr removal dish 53 through hole is carried out edging process, now generally L-type second coordinates and there is slanted angle between support 52 and switch enclosure sidewall line;Preferably, this angle is set to 30 °;After edging completes, L-type second coordinates support 52 to be turned out, so that switch enclosure can discharging easily;Concrete, described lower perforating die is provided with discharging push piece 8 and a discharging opening, this discharging push piece 8 is located at this L-type second and is coordinated on front side of support 52, discharging opening is located at L-type second and is coordinated on rear side of support 52, when L-type second coordinates support 52 after external rotation, this discharging push piece can forward motion and then push in discharging opening by switch enclosure so that discharging realizes automation mechanized operation, improves work efficiency.
In order to save energy consumption, we are provided with a driven structure between described first burr removal dish 53 and the second burr removal dish 54;This driven structure can drive the second burr removal dish 54 to rotate when the first burr removal dish 53 rotates, thus without arranging actuator on the second burr removal dish 54, reduces energy consumption;Concrete, this driven structure includes spline protuberance 61 and spline card division 62, this spline protuberance 61 is formed by upwardly extending in the middle part of this second burr removal dish 54, this spline card division 62 is opened in the middle part of the first burr removal dish 53, during both transmissions, this spline protuberance 61 can snap in spline card division 62, and spline connects between the two so that the first burr removal dish 53 drives the second burr removal dish 54 to rotate;Preferably, described second coordinates support 52 to be provided with the displacement drive part for driving the second burr removal dish 54 upwards action, this displacement drive part can coordinate support 52 to be placed in shifting on this second cooperation support 52 of rear drive below the first burr removal dish 53 second so that spline protuberance 61 inserts in spline card division 62;And then realize the connection between two abrasive discs.
Obviously, described embodiment is only a part of embodiment of the present utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, all should belong to the scope of this utility model protection.

Claims (3)

1. a switch enclosure production group mould, including punch forming module, injection mould, edger, punching edging mould;Described punching edging mould include body frame, be located on body frame can the upper perforating die (1) of knee-action, lower perforating die (2), the punching part being located between perforating die (1) and lower perforating die (2) and edging part;It is characterized in that: described punching part include being fixed on perforating die (1) lower surface stamping arm (31), can left and right action and then immigration or leave the punching press matching seat (32) of stamping arm (31) lower section, be opened in can coordinating the punching press chamber (33) that switch enclosure is punched out with this stamping arm (31) and being located at the punching bolster in this punching press matching seat (32) of this punching press matching seat (32) top;Described punching bolster includes that the punching on top coordinates base plate (41) and can carry out the elastic buffering strip (42) stretched when by punching press, this elastic buffering strip (42) bottom is embedded in punching press matching seat (32), and upper end is fixed on this punching and coordinates base plate (41) lower surface;Opening is offered in described punching press chamber (33) bottom, and described punching cooperation base plate (41) may pass through this opening and inserts in punching press chamber (33);Described edging part includes being fixed on the first cooperation support (51) of perforating die (1) lower surface, the rotating L-type second being located at lower perforating die coordinates support (52), the first burr removal dish (53) being rotationally connected with the first cooperation support (51) bottom, the first actuator being used for driving this first burr removal dish (53) to rotate and be rotationally connected with described L-type second and coordinate second burr removal dish (54) on support (52) top;Be provided with the driven structure that the second burr removal dish (54) can be driven to rotate when the first burr removal dish (53) rotates between described first burr removal dish (53) and the second burr removal dish (54), this driven structure include by this second burr removal dish (54) middle part upwardly extend the spline protuberance (61) formed and be opened in the first burr removal dish (53) middle part be available for the spline card division (62) that this spline protuberance (61) inserts and realizes spline connection between the two.
Switch enclosure production group mould the most according to claim 1, it is characterized in that: described second coordinates support (52) to include transverse arm (521) and trailing arm (522), this trailing arm (522) bottom is connected to lower perforating die (2), this transverse arm (521) one end is fixed on trailing arm (522) top, and described second burr removal dish (54) is connected to the other end of this transverse arm (521).
Switch enclosure production group mould the most according to claim 2, it is characterised in that: described transverse arm (521) end upper lateral part is formed with cooperation post (71), and this cooperation post top is formed with position limiting convex ring (72);Described second burr removal dish (54) bottom offers mating cavity, offers the limited ring groove coordinated with this position limiting convex ring (72) in this mating cavity.
CN201620333538.9U 2016-04-18 2016-04-18 A kind of switch enclosure production group mould Expired - Fee Related CN205704460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620333538.9U CN205704460U (en) 2016-04-18 2016-04-18 A kind of switch enclosure production group mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620333538.9U CN205704460U (en) 2016-04-18 2016-04-18 A kind of switch enclosure production group mould

Publications (1)

Publication Number Publication Date
CN205704460U true CN205704460U (en) 2016-11-23

Family

ID=57298552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620333538.9U Expired - Fee Related CN205704460U (en) 2016-04-18 2016-04-18 A kind of switch enclosure production group mould

Country Status (1)

Country Link
CN (1) CN205704460U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110588282A (en) * 2019-09-12 2019-12-20 杭州众川科技有限公司 Automobile air conditioner assembly and processing equipment thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110588282A (en) * 2019-09-12 2019-12-20 杭州众川科技有限公司 Automobile air conditioner assembly and processing equipment thereof
CN110588282B (en) * 2019-09-12 2021-04-09 杭州众川科技有限公司 Automobile air conditioner assembly and processing equipment thereof

Similar Documents

Publication Publication Date Title
CN202411500U (en) Milling special machine
CN204194586U (en) Negative angle bending die tool
CN206605036U (en) A kind of cutter and servomotor rigid connection formula metal cutting knife rest structure
CN205704456U (en) Switch enclosure side piercing die
CN205704460U (en) A kind of switch enclosure production group mould
CN115091207A (en) Trimming and waste cutting integrated stamping die
CN205702044U (en) Perforating die for switch enclosure
CN102513448B (en) A kind of eyelet punching flanging composite mold
CN205704445U (en) Switch enclosure processing unit (plant)
CN205704457U (en) Energy-saving switch enclosure perforating die
CN208288736U (en) A kind of mechanical press's automatic discharge unit
CN205704440U (en) Energy-saving switch enclosure produces equipment
CN205704459U (en) A kind of switch enclosure punching edging mould
CN205704458U (en) A kind of processing unit (plant) for switch enclosure
CN205704444U (en) Practical switch enclosure produces equipment
CN210188257U (en) Concatenation formula hemisphere head mould
CN209920557U (en) Rotation center mechanism
CN211331018U (en) Be used for product riveted mould
CN202278093U (en) Improved structure for squeeze die of vertical coaming of carrying frame
CN103359332B (en) Full-automatic plastic lifting handle deformation device of carton lifting handle buckling machine
CN203972644U (en) A kind of outer plate mould
CN103350800A (en) Plastic lifting handle eyeleting device of full-automatic carton lifting handle eyeleting machine
CN105364677B (en) A kind of side flash removed mechanism for the automatic flash removed machine in multiplexing station
CN210208382U (en) Stamping device of convenient blanking
CN203358976U (en) Plastic handle deformation device for fully-automatic carton handle drawing-in machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20170418