A kind of top High Position Drilling power drill support Download PDFInfo
- Publication number
- CN205702565U CN205702565U CN201620329834.1U CN201620329834U CN205702565U CN 205702565 U CN205702565 U CN 205702565U CN 201620329834 U CN201620329834 U CN 201620329834U CN 205702565 U CN205702565 U CN 205702565U
- Authority
- CN
- China
- Prior art keywords
- expansion link
- power drill
- switch
- leading screw
- high position
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
nullThe utility model discloses a kind of top High Position Drilling power drill support,Including base and expansion link,The bottom of described base intracavity is provided with motor,The output shaft of described motor is provided with leading screw by fixation kit,The upper surface of described base is provided with fixed cover,The outside of described fixed cover is provided with switch,The bottom of described expansion link is installed with fixed block,Described fixed block is installed on leading screw by screw,The driven by motor screw turns of base intracavity,Leading screw drives expansion link to move up and down by switch,Expansion link top is provided with the fixed mount for fixing power drill,When needs drilling construction,Have only to be positioned over the rack body installing power drill below region hole to be drilled and can start working by Push switch,Expansion link can be adjusted according to overhead height to be onstructed,Motility is higher,It is high that this utility model has work efficiency,Working stability,The advantages such as construction safety,It is suitable for wideling popularize.
Description
Technical field
This utility model relates to machinery technical field of hardware, is specially a kind of top High Position Drilling power drill
Support.
Background technology
Engineering construction is typically necessary and applies to power drill, and power drill is a kind of boring instrument as its name suggests,
Traditional using method generally relies on pure hand-held, seldom has the special stand matched, when needs exist
Typically take to build on ground scaffold during high-order top drilling construction, or utilize double ladder to help construction,
Working together extremely inconvenient, work efficiency is the lowest, and it is the most physical to expend workmen, uneasy
Entirely, to this, we release a kind of top High Position Drilling power drill support.
Utility model content
The purpose of this utility model is to provide a kind of top High Position Drilling power drill support, on solving
State the problem proposed in background technology.
For achieving the above object, this utility model provides following technical scheme: a kind of top High Position Drilling is used
Power drill support, including base and expansion link, the bottom of described base intracavity is provided with motor, described electricity
The output shaft of machine is provided with leading screw by fixation kit, and the upper surface of described base is provided with fixed cover, institute
The outside stating fixed cover is provided with switch, and described switch is connected and installed with current converter, described switch electricity
Property is connected to motor, and the both sides of described fixed cover inner chamber are provided with chute, and the lower end of described expansion link is hollow
Structure, the top of described expansion link is provided with fixed mount, and described fixed mount is provided with power drill body, institute
The both sides stating expansion link lower end are provided with the slide block matched with chute, the bottom fixed installation of described expansion link
Having fixed block, the middle part of described fixed block to be provided with screw, described fixed block is installed on leading screw by screw.
Preferably, the top of described leading screw is provided with locking cap.
Preferably, the both sides of described base are provided with handle.
Preferably, described switch is connected and installed with speed regulator.
Compared with prior art, the beneficial effects of the utility model are: this top High Position Drilling power drill
Support, by the driven by motor screw turns of base intracavity, leading screw is driven by switch and moves down on expansion link
Dynamic, expansion link top is provided with the fixed mount for fixing power drill, when needs drilling construction, only needs
The rack body installing power drill is positioned over below region hole to be drilled and can start work by Push switch
Making, expansion link can be adjusted according to overhead height to be onstructed, and motility is higher, and this utility model has
There are the advantages such as work efficiency height, working stability, construction safety, are suitable for wideling popularize.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is this utility model expansion link and screw structure schematic diagram;
Fig. 3 is this utility model expansion link and fixed cover structural representation.
In figure: 1 base, 2 motors, 3 leading screws, 4 fixed covers, 5 expansion links, 6 switches, 7 fixed mounts,
8 fixed blocks, 9 locking caps, 10 chutes, 11 slide blocks, 12 handles.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, to the technology in this utility model embodiment
Scheme is clearly and completely described, it is clear that described embodiment is only this utility model one
Divide embodiment rather than whole embodiments.Based on the embodiment in this utility model, this area is common
The every other embodiment that technical staff is obtained under not making creative work premise, broadly falls into this
The scope of utility model protection.
Fig. 1-3, a kind of technical scheme of this utility model offer: a kind of top High Position Drilling pistol are provided
Boring support, including base 1 and expansion link 5, the both sides of described base 1 are provided with handle 12, the described end
The bottom of seat 1 inner chamber is provided with motor 2, and the output shaft of described motor 2 is provided with leading screw by fixation kit
3, the top of described leading screw 3 is provided with locking cap 9, and the upper surface of described base 1 is provided with fixed cover 4,
The outside of described fixed cover 4 is provided with switch 6, and described switch 6 is connected and installed with current converter, described
Switch 6 is connected and installed with speed regulator, and described switch 6 is electrically connected at motor 2, described fixed cover 4 inner chamber
Both sides be provided with chute 10, the lower end of described expansion link 5 is hollow-core construction, the top of described expansion link 5
Being provided with fixed mount 7, described fixed mount 7 is provided with power drill body, the both sides of described expansion link 5 lower end
Being provided with the slide block 11 matched with chute 10, the bottom of described expansion link 5 is installed with fixed block 8,
The middle part of described fixed block 8 is provided with screw, and described fixed block 8 is installed on leading screw 3 by screw.
Operation principle: the motor 2 of base 1 intracavity bottom drives leading screw 3 to rotate, leading screw 3 drives flexible
Bar 5 moves up and down, and expansion link 5 top is provided with the fixed mount 7 for fixing power drill body, works as needs
During drilling construction, it is only necessary to the rack body installing power drill is positioned over below region hole to be drilled i.e.
Can start working by Push switch 6, expansion link 5 can be adjusted according to overhead height to be onstructed.
Embodiment the most of the present utility model, for the ordinary skill people of this area
For Yuan, it is possible to understand that can be real to these in the case of without departing from principle of the present utility model and spirit
Executing example to carry out multiple change, revise, replace and modification, scope of the present utility model is by claims
And equivalent limits.
Claims (4)
1. a top High Position Drilling power drill support, including base (1) and expansion link (5), its
It is characterised by: the bottom of described base (1) inner chamber is provided with motor (2), described motor (2) defeated
Shaft is provided with leading screw (3) by fixation kit, and the upper surface of described base (1) is provided with fixed cover (4),
The outside of described fixed cover (4) is provided with switch (6), and described switch (6) is connected and installed with electric current and turns
Parallel operation, described switch (6) is electrically connected at motor (2), and the both sides of described fixed cover (4) inner chamber set
Having chute (10), the lower end of described expansion link (5) is hollow-core construction, the top of described expansion link (5)
Being provided with fixed mount (7), described fixed mount (7) is provided with power drill body, described expansion link (5)
The both sides of lower end are provided with the slide block (11) matched with chute (10), the bottom of described expansion link (5)
Being installed with fixed block (8), the middle part of described fixed block (8) is provided with screw, described fixed block (8)
It is installed on leading screw (3) by screw.
A kind of top the most according to claim 1 High Position Drilling power drill support, it is characterised in that:
The top of described leading screw (3) is provided with locking cap (9).
A kind of top the most according to claim 1 High Position Drilling power drill support, it is characterised in that:
The both sides of described base (1) are provided with handle (12).
A kind of top the most according to claim 1 High Position Drilling power drill support, it is characterised in that:
Described switch (6) is connected and installed with speed regulator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620329834.1U CN205702565U (en) | 2016-04-18 | 2016-04-18 | A kind of top High Position Drilling power drill support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620329834.1U CN205702565U (en) | 2016-04-18 | 2016-04-18 | A kind of top High Position Drilling power drill support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205702565U true CN205702565U (en) | 2016-11-23 |
Family
ID=57298425
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620329834.1U Expired - Fee Related CN205702565U (en) | 2016-04-18 | 2016-04-18 | A kind of top High Position Drilling power drill support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205702565U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107972523A (en) * | 2017-12-28 | 2018-05-01 | 东莞市趣电智能科技有限公司 | A kind of lever charging pile |
-
2016
- 2016-04-18 CN CN201620329834.1U patent/CN205702565U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107972523A (en) * | 2017-12-28 | 2018-05-01 | 东莞市趣电智能科技有限公司 | A kind of lever charging pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107453275A (en) | One kind is used for power equipment maintenance rush repair equipment | |
CN205702565U (en) | A kind of top High Position Drilling power drill support | |
CN207874104U (en) | A kind of wind pipe of central air-conditioning mounting device | |
CN207944881U (en) | A kind of architectural engineering drilling equipment | |
CN112814404A (en) | Coincide assembled underground pipe gallery wallboard positioner | |
CN207499795U (en) | A kind of portable climbing ladder of power construction | |
CN205259392U (en) | Damping device of building equipment | |
CN203197848U (en) | Installation tool | |
CN107806276A (en) | Anchor is changed in a kind of bracing wire | |
CN212176672U (en) | Building site is with knocking wall device | |
CN218952980U (en) | Warning fence for managing hydraulic engineering embankment | |
CN207548781U (en) | A kind of industrial robot tool quickly-replacing device | |
CN210608292U (en) | Special cable erecting device for electromechanical installation | |
CN105552784B (en) | A kind of device suitable for installing bird-scaring unit on the transmission line cross-arm of low latitude | |
CN215186339U (en) | Connecting mechanism convenient to disassemble and assemble and used for fixed motor | |
CN213703143U (en) | Turning device is used in processing of aerogenerator rotor | |
CN204867531U (en) | Folding flexible drilling equipment of assembled | |
CN212360051U (en) | Be used for wind-powered electricity generation acceleration rate case aerial working spare part to change auxiliary device | |
CN207691556U (en) | A kind of adjustable position motor without dismounting | |
CN211817805U (en) | Assembled scaffold for housing construction engineering | |
CN218954389U (en) | Microseismic sensor fixing device for monitoring mine geological disasters | |
CN215065350U (en) | Geological drilling sampling device | |
CN214134101U (en) | High-altitude labor-saving efficient drilling mechanical device | |
CN212485850U (en) | Outdoor electric power cabinet convenient to disassemble and assemble | |
CN220117700U (en) | Building construction builds current frame of jumping fast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180831 Address after: 113000 14 Shen Dong Road, Fushun Economic Development Zone, Fushun, Liaoning, 14 Patentee after: LIAONING JUNFENG MACHINERY MANUFACTURING CO., LTD. Address before: 311800 Shaoxing, Zhuji, Zhejiang Jiyang street, Jinfeng District 18 building 604 rooms Patentee before: He Fengying |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20210418 |