CN205693277U - Vertical shaft crane span structure - Google Patents
Vertical shaft crane span structure Download PDFInfo
- Publication number
- CN205693277U CN205693277U CN201620566086.9U CN201620566086U CN205693277U CN 205693277 U CN205693277 U CN 205693277U CN 201620566086 U CN201620566086 U CN 201620566086U CN 205693277 U CN205693277 U CN 205693277U
- Authority
- CN
- China
- Prior art keywords
- trailing arm
- vertical shaft
- crane span
- span structure
- cover plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jib Cranes (AREA)
Abstract
This utility model relates to a kind of vertical shaft crane span structure for cabling, belongs to electrical equipment.Described vertical shaft crane span structure includes that the well body surrounded by cover plate that at least two is connected by connecting portion, cover plate and connecting portion connect by being located at the protruding draw-in groove cooperated of junction;Described connecting portion also includes the Axial Mounting Part for securing cover plate.By protruding draw-in groove, only need to simply assemble, vertical shaft crane span structure can be made to have the repeat unit structure being made up of well body and connecting portion, when local goes wrong, only the well body of corresponding unit or connecting portion need to be repaired or replaced, time saving and energy saving and cost-effective.By Axial Mounting Part, can securing cover plate further, the contact making adjacent cover plate is the tightst.
Description
Technical field
This utility model relates to a kind of vertical shaft crane span structure for cabling, belongs to electrical equipment.
Background technology
In electrical installation project work progress, for preferably fixing and protection cable, crane span structure is to install cable to be musted
Indispensable carrier.Cable shaft crane span structure is the cable passage of the widely used a kind of vertical direction of power industry.At present, becoming
In the construction of power station, workmen is usually channel direction at cable shaft the most in advance and installs a rectangular steelframe structure, then will
Cable passes in the channel direction of vertical shaft, is finally fixed in the peripheral direction of vertical shaft with steel plate etc., and in vertical shaft junction
Carry out the measures such as fireproof blocking.This installation method, although technique is simple, but, cable shaft safeguarded in the later stage and
During replacing, easily cause cable shaft to be difficult to remove because of problems such as processing technique, affect maintenance and the use of vertical shaft, be somebody's turn to do meanwhile
It is the longest that kind of vertical shaft also exists processing, install inconvenient, the shortcomings such as tolerance rate is low are installed.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of simple in construction, construction and easy to maintenance dismantled and assembled
The vertical shaft crane span structure of formula.
The technical scheme that the above-mentioned technical problem of this utility model solution is used is, vertical shaft crane span structure leads to including at least two
Crossing the well body surrounded by cover plate that connecting portion is connected, cover plate and connecting portion are by being located at the projection-card cooperated of junction
Groove connects;Described connecting portion also includes the Axial Mounting Part for securing cover plate.By projection-draw-in groove, only need to simply assemble,
Vertical shaft crane span structure can be made to have the repeat unit structure being made up of well body and connecting portion, when local goes wrong, only need right
Well body or the connecting portion of answering unit repair or replace, time saving and energy saving and cost-effective.By Axial Mounting Part, one can be entered
Step securing cover plate, the contact making adjacent cover plate is the tightst.
Further, the length of the length < well body of described fixture.Described fixture is positioned at the top and bottom of connecting portion,
If the connecting portion connecting multiple well body is structure as a whole (i.e. the length of the length of fixture=well body), not only transports and make
Cost is high, and once connecting portion goes wrong, and needs integral replacing.If the connecting portion of well body top and the bottom is separate (the most fixing
The length of the length < well body of part), not only do not interfere with the effect of securing cover plate, and saved to a great extent making,
Transport and maintenance cost.Further, it is fastenedly connected between described fixture and cover plate.
Further, described cover plate is provided with reinforcement structure and/or passage.Described reinforcement structure can be reinforcement or prop up
Support etc..The vertical shaft crane span structure being provided with reinforcement structure has higher intensity, can place more cable.Upper containing passage
It is stamped and helps heat radiation.
Further, it is provided with cable bundle in described well body.Cable bundle can make cable obtain ordered arrangement and effectively fix.
Further, described cable bundle includes connecting hinge, is individually fixed in the movable leaf both sides of described connection hinge
Fix trailing arm, the movable trailing arm being connected with described fixing trailing arm by securing member and be arranged at the fixing of the movable trailing arm other end
Steel plate;Described cable bundle is connected with well body by fixation steel plate.The inner space of vertical shaft crane span structure is divided into three by this cable bundle
Individual part, and by hinge, the size of each several part can be regulated.
Further, described fixing trailing arm and movable trailing arm be respectively equipped with the regulating tank spacing to movable trailing arm, described tightly
Firmware, through fixing trailing arm regulating tank and corresponding movable trailing arm regulating tank, makes fixing trailing arm be connected with movable trailing arm.By adjusting
Joint groove can regulate the relative position of fixing trailing arm and movable trailing arm, the placement location of cable bundle of being more convenient for.
Further, it is provided with and can move along regulating tank between the movable trailing arm of described movable leaf both sides and/or between fixing trailing arm
Dynamic cable tie seat.Further, described cable tie seat is provided with colligation hole.The purpose so arranged is to make cable obtain more
Orderly arrangement is with the most fixing.
Further, in described well body, portion is provided with fire-fighting spray device, and outside is provided with fire fighting alarm device, such as alarm etc.,
Connected by existing usual manner, vertical shaft crane span structure so can be made to realize automatic fire prevention and early warning.
Vertical shaft portal structure of the present utility model is simple, has and repeats dismountable structure, it is simple to the installation of crane span structure with
And maintenance in the future.The internal cable bundle arranged of crane span structure is compared with traditional dividing plate, it is possible to for greater flexibility inside distribution crane span structure
Space, wiring when being more conducive to cable laying.
Below in conjunction with detailed description of the invention, above-mentioned utility model content of the present utility model is made the most specifically
Bright.But this should not being interpreted as, the scope of the above-mentioned theme of this utility model is only limitted to Examples below.New without departing from this practicality
In the case of the above-mentioned technological thought of type, the various replacements made according to ordinary skill knowledge and customary means and change
More, all should be included in protection domain of the present utility model.
Accompanying drawing explanation
Fig. 1 is the structural representation (not shown cable bundle) of this utility model vertical shaft crane span structure.
Fig. 2 is the partial enlarged drawing of A in Fig. 1.
Fig. 3 is the structural representation of connecting portion in Fig. 1.
Fig. 4 is the partial enlarged drawing of B in Fig. 3.
Fig. 5 is the structural representation of the cable bundle within Fig. 1.
Fig. 6 is the structural representation of cable bundle in Fig. 5.
Detailed description of the invention
As it is shown in figure 1, vertical shaft crane span structure of the present utility model includes two by being surrounded by cover plate 1 of being connected of connecting portion 2
Well body, cover plate 1 is provided with bar shaped air-vent 13, bar shaped reinforcement 12 and handle 14.As shown in Figure 2, the upper and lower of cover plate 1
It is equipped with protruding 11.From the figure 3, it may be seen that connecting portion 2 also includes the Axial Mounting Part 22 for securing cover plate 1, the length of fixture 22
The length of degree < well body, is fastenedly connected between fixture 22 and cover plate 1.As shown in Figure 4, the upper and lower of connecting portion is equipped with
With above-mentioned protruding 11 draw-in grooves 21 mated, cover plate 1 and connecting portion 2 by being located at the protruding 11-draw-in groove cooperated of junction
21 connect.In well body, portion is provided with fire-fighting spray device, and outside is provided with fire protection warning device.
From Fig. 5 and Fig. 6, in well body, it is provided with cable bundle 3.This cable bundle 3 includes connecting hinge 31, fixing respectively
Fixing trailing arm 32 in movable leaf 311 both sides of described connection hinge 31, the work being connected with fixing trailing arm 32 by securing member 33
Move trailing arm 34 and be arranged at the fixation steel plate 35 of movable trailing arm 34 other end;Cable bundle 3 is by fixation steel plate 35 with well body even
Connect.Being respectively equipped with the regulating tank spacing to movable trailing arm 34 on fixing trailing arm 32 and movable trailing arm 34, described securing member 33 passes
Fixing trailing arm regulating tank 36 and corresponding movable trailing arm regulating tank 37, make fixing trailing arm 32 be connected with movable trailing arm 34.Movable leaf
The cable tie seat 38 that can move it is provided with along regulating tank between the movable trailing arm 34 of 311 both sides and/or between fixing trailing arm 32, its
It is provided with colligation hole 381.
Vertical shaft portal structure of the present utility model is simple, has the structure of repeatable reassembling type, it is simple to installs and ties up in the future
Protect.The cable bundle inside set can be according to well body size and number of cables, and the space in portion in distribution well body, contributes to cable neatly
When laying connect up.
Claims (10)
1. vertical shaft crane span structure, passes through, including at least two, the well body surrounded by cover plate (1) that connecting portion (2) is connected, it is characterised in that:
Cover plate (1) and connecting portion (2) connect by being located at the projection (11) cooperated-draw-in groove (21) of junction;Described connecting portion
(2) Axial Mounting Part (22) for securing cover plate (1) is also included.
2. vertical shaft crane span structure as claimed in claim 1, it is characterised in that: the length of the length < well body of described fixture (22).
3. vertical shaft crane span structure as claimed in claim 1, it is characterised in that: between described fixture (22) and cover plate (1), fastening is even
Connect.
4. vertical shaft crane span structure as claimed in claim 1, it is characterised in that: described cover plate (1) be provided with reinforcement structure (12) and/or
Passage (13).
5. vertical shaft crane span structure as claimed in claim 1, it is characterised in that: it is provided with cable bundle (3) in described well body.
6. vertical shaft crane span structure as claimed in claim 5, it is characterised in that: described cable bundle (3) includes connecting hinge (31), dividing
Be not fixed on the fixing trailing arm (32) of movable leaf (311) both sides of described connection hinge (31), by securing member (33) with described
Fix the movable trailing arm (34) that trailing arm (32) connects and the fixation steel plate (35) being arranged at movable trailing arm (34) other end;Described
Cable bundle (3) is connected with well body by fixation steel plate (35).
7. vertical shaft crane span structure as claimed in claim 6, it is characterised in that: described fixing trailing arm (32) and upper point of movable trailing arm (34)
Not being provided with the regulating tank spacing to movable trailing arm (34), described securing member (33) is through fixing trailing arm regulating tank (36) and correspondence
Movable trailing arm regulating tank (37), makes fixing trailing arm (32) be connected with movable trailing arm (34).
8. vertical shaft crane span structure as claimed in claim 6, it is characterised in that: the movable trailing arm (34) of described movable leaf (311) both sides
Between and/or fixing trailing arm (32) between be provided with the cable tie seat (38) that can move along regulating tank.
Vertical shaft crane span structure the most according to claim 8, it is characterised in that: described cable tie seat (38) is provided with colligation hole
(381)。
10. the vertical shaft crane span structure as described in one of claim 1 to 9, it is characterised in that: in described well body, portion is provided with fire-fighting spraying dress
Putting, outside is provided with fire protection warning device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620566086.9U CN205693277U (en) | 2016-06-13 | 2016-06-13 | Vertical shaft crane span structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620566086.9U CN205693277U (en) | 2016-06-13 | 2016-06-13 | Vertical shaft crane span structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205693277U true CN205693277U (en) | 2016-11-16 |
Family
ID=57427223
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620566086.9U Active CN205693277U (en) | 2016-06-13 | 2016-06-13 | Vertical shaft crane span structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205693277U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107579495A (en) * | 2017-11-13 | 2018-01-12 | 许昌恒科实业发展有限公司 | A kind of vertical shaft crane span structure |
CN109149470A (en) * | 2018-10-17 | 2019-01-04 | 贵州建工集团第四建筑工程有限责任公司 | A kind of steel construction sidewall support of adjustable support height |
-
2016
- 2016-06-13 CN CN201620566086.9U patent/CN205693277U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107579495A (en) * | 2017-11-13 | 2018-01-12 | 许昌恒科实业发展有限公司 | A kind of vertical shaft crane span structure |
CN109149470A (en) * | 2018-10-17 | 2019-01-04 | 贵州建工集团第四建筑工程有限责任公司 | A kind of steel construction sidewall support of adjustable support height |
CN109149470B (en) * | 2018-10-17 | 2024-03-08 | 贵州建工集团第四建筑工程有限责任公司 | Steel structure side wall bracket with adjustable supporting height |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205693277U (en) | Vertical shaft crane span structure | |
KR20130026849A (en) | Cable support apparatus and method for separating power cable using the same | |
CN106954362A (en) | A kind of rack cable management device | |
CN202876157U (en) | Auxiliary device for hook mounting band | |
CN106300164A (en) | Wire harness wire fixing clamp | |
CN208158042U (en) | A kind of layer-by-layer isolated insulation compound cable support of drawer type | |
CN211151081U (en) | Electrical cabinet convenient for wiring | |
CN103532030B (en) | Distribution box with movable slide rail type installing plate | |
CN104678521A (en) | Floor type optical cable distributing box | |
CN208814440U (en) | Elevator weight sensor guard assembly | |
CN202917819U (en) | Distribution box guide rail | |
CN208750333U (en) | A kind of communication apparatus mounting rack | |
CN208797510U (en) | A kind of combination gantry | |
CN206312834U (en) | Coil rack | |
CN205296883U (en) | Opening cover plate assembly used for covering openings | |
CN201392761Y (en) | Load switch protective masking cover on rod | |
CN207705606U (en) | Switchgear | |
CN104806045B (en) | Integrated base station | |
CN205429552U (en) | High -voltage switch cabinet structure | |
CN204349283U (en) | The power distribution cabinet that a kind of space availability ratio is high | |
CN101527219B (en) | Protective shield of pole load switch | |
CN203589498U (en) | Cabinet body structure of outdoor integrated power distribution cabinet | |
CN104078875A (en) | Bus duct installing method | |
CN205787288U (en) | Novel portable optical branching device | |
CN209244180U (en) | A kind of office office building light current well installation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: No.2, section 3, middle Renmin Road, Chengdu, Sichuan 610000 Patentee after: Sichuan Industrial Equipment Installation Group Co.,Ltd. Address before: No.2, section 3, middle Renmin Road, Chengdu, Sichuan 610031 Patentee before: SICHUAN PROVINCIAL INDUSTRIAL EQUIPMENT INSTALLATION Co. |
|
CP03 | Change of name, title or address |