CN205689920U - Pe pipeline - Google Patents

Pe pipeline Download PDF

Info

Publication number
CN205689920U
CN205689920U CN201620459164.5U CN201620459164U CN205689920U CN 205689920 U CN205689920 U CN 205689920U CN 201620459164 U CN201620459164 U CN 201620459164U CN 205689920 U CN205689920 U CN 205689920U
Authority
CN
China
Prior art keywords
tracing line
pipeline
line connector
copper
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620459164.5U
Other languages
Chinese (zh)
Inventor
陈天麟
楼红尧
施燕琴
景雪传
朱龙杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAOXING SHANGYU DISTRICT DRAINING MANAGEMENT Co Ltd
ZHEJIANG DONGYING PIPE CO Ltd
Original Assignee
SHAOXING SHANGYU DISTRICT DRAINING MANAGEMENT Co Ltd
ZHEJIANG DONGYING PIPE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAOXING SHANGYU DISTRICT DRAINING MANAGEMENT Co Ltd, ZHEJIANG DONGYING PIPE CO Ltd filed Critical SHAOXING SHANGYU DISTRICT DRAINING MANAGEMENT Co Ltd
Priority to CN201620459164.5U priority Critical patent/CN205689920U/en
Application granted granted Critical
Publication of CN205689920U publication Critical patent/CN205689920U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses a kind of PE pipeline, including pipe main body, tracing line, tracing line connector;Above-mentioned tracing line includes that PE external protection, layers of copper, steel core, above-mentioned layers of copper are wrapped in inside PE external protection, and steel core is wrapped in inside layers of copper;Tracing line connector is in outside pipe main body, and the height of this tracing line connector is 1 2cm;Tracing line connector centre position parcel tracing line, marginal position melts mode by heat and fits together with pipe main body 1.This utility model can solve the technical problem how making tracing line position not separate with PE pipeline.

Description

PE pipeline
Technical field
This utility model relates to a kind of PE pipeline with tracing line.
Background technology
Although PE pipeline has many good qualities, but owing to its intensity is relatively low, mark and tracing line etc. are often destroyed, on-the-spot Construction drawing data is easily lost.Municipal construction build in due to the accurate location of PE pipeline unclear, in work progress Easily dug by machinery disconnected, therefore, before construction, need detect the accurate location of existing underground PE pipeline and then avoid buried pipe Road, prevents underground PE pipeline from being dug disconnected and occurring leaking, leaking gas, even gas explosion lamp accident, but owing to PE pipe is non-conductive, no The characteristic of magnetic conduction, it is difficult to use battery wave method to detect.
Mainly there are earth's surface labelling method, warning tape tracer method, GPR method and electronics note mark in location currently for PE pipe Method.
Earth's surface labelling method refers to use the firm pressure material such as fiberglass, concrete prefabricated, cast iron to be made, and uses ground List notation, when pipeline detection, can save the process of detection pipeline, and some labelling can be made by combustion gas or tap water, inspection Have only to ground detector during leakage patrol along pipeline earth's surface.
Warning tape track method refer to solve PE pipeline buried after can in ground location to position and the problem of buried depth, Imbed a conductor wire during PE pipe laying construction together, be called for short tracing line.Additionally, the installation of present heavy caliber PE pipeline, typically Place a plastics warning tape being marked with printed words such as " under have gas pipeline ", this band service life and plastic conduit the most thereon Synchronize, when its effect essentially consists in manually or mechanical equivalent of light excavation is constructed, prevent from digging the most following bad gas pipeline, cause leakage thing Therefore.
Bottom out radar and launched electromagnetic wave by alignment underground, sky, produce anti-outside water cave, pipeline and stratum lamp change Ejected wave, echo is received by the antenna again, process after, radar image can be shown that, by the identification of radar image and explanation Differentiate.
Electronic marker method is to use the spontaneous of a kind of characteristic frequency electromagnetic wave and from receiving apparatus, when construction or after construction, Electronic marker is embedded in the certain position above pipeline, and during detection, the electromagnetic wave of characteristic frequency first launched by survey meter to underground Signal, when close to the labelling of Near Pipelines, electronic marker can the signal that sends of emission detection instrument, thus detected instrument finds letter Number, and by audio frequency change and the information of the data representation underground installation of screen display.
Owing to present urban duct gathers, various pipelines are staggered in length and breadth, arrange mark needs on earth's surface and take a large amount of soil Space, it is impossible to meet the demand of present pipe arrangement.Bottom out radar and electronic marker method due to underground piping more, exist bigger Interference, therefore these methods have bigger limitation.At present, more on market is exactly spike collimation method, relative to Other method, on the premise of reasonable construction, the method experienced interference is less, and accuracy is of a relatively high.Being usually at present will Individually tracing line as pipeline directly over, backfill soil the most again.But this method is higher to construction requirement, by construction level Affect bigger.The problem that traditional method is primarily present following several respects.When tracing line is buried in tunnel underground, tracing line is sometimes at pipeline The left side or the right, bury underground along pipeline straight line or helical form sometimes, sometimes againsts pipeline or has a certain distance to bury with pipeline again If etc., cause the position being difficult to accurately determine PE pipe according to tracing line.The tracing line off normal when down tube, backfill, causes detection Pipeline location inaccurate.Tracing line is easily torn in work progress, causes and cannot detect afterwards.
Utility model content
The purpose of this utility model is to provide a kind of PE pipeline, solves how to make tracing line position not divide with PE pipeline From technical problem.
PE pipeline, including pipe main body, tracing line, tracing line connector;Above-mentioned tracing line includes PE external protection, copper Layer, steel core, above-mentioned layers of copper is wrapped in inside PE external protection, and steel core is wrapped in inside layers of copper;Tracing line connector is in pipeline Outside main body, the height of this tracing line connector is 1-2cm;Tracing line connector centre position parcel tracing line, marginal position Melt mode by heat to fit together with pipe main body 1.
Described tracing line connector is PE bonding material.
Described tracing line connector outer surface is arc.
The beneficial effects of the utility model are, owing to using tracing line connector that tracing line and pipe main body are linked to be one Body, thus is avoided that in work progress that tracing line separates with pipe main body;Tracing line includes PE external protection, layers of copper, steel core, wherein PE external protection plays the effect of insulation, anti-corrosion and waterproof, and layers of copper can strengthen electric conductivity, can improve the signal of telecommunication, and steel core then can improve Resistance to drawing property.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of tracing line;
Fig. 2 is the schematic diagram that tracing line is connected with pipeline;
1. pipe main bodies, 2. tracing line, 21. PE external protections, 22. layers of copper, 23. steel cores, 3. spike in figure Wire connections.
Detailed description of the invention
Refer to Fig. 1 and Fig. 2, the PE pipeline in figure, including 1, tracing line of a pipe main body 2, or many Individual tracing line connector 3.
Pipe main body 1 is the former PE pipeline being not added with tracing line 2, and the bore of this PE pipeline 2 can select as required, Its use single screw rod fusion plastification PE material, die head extrusion, vacuum sizing, cool down, the technique such as cutting obtains the tubing of certain length.
Tracing line 2 includes one layer of PE external protection, 22, steel core 23 of 21, one layer of layers of copper, and above-mentioned layers of copper 22 is wrapped in PE External protection internal 21, it is internal that steel core 23 is wrapped in layers of copper 22.Above-mentioned tracing line 2 is one, in actual applications, it is possible to select Two.
Tracing line connector 3 is PE bonding material, and this PE bonding material uses screw extruder extrusion fusion plastification PE material to make, It wraps tracing line 2 while extrusion and is fitted on the outer surface of pipeline by tracing line 2 simultaneously, and after laminating, outer surface is Arc, such tracing line connector and pipe main body 1 heat are merged into an organic whole and are fitted closely, the parcel spike of PE bonding material centre position Line, marginal position and pipe main body 1 have a binding face.Tracing line connector 3 can add air in manufacturing process so that Tracing line connector 3 is internal has bubble, so makes tracing line connector 3 have elastic construction, thus keeps out external force to showing The destruction of track line 2.
For making the purpose of this utility model embodiment, technical scheme and advantage clearer, above in conjunction with this utility model Accompanying drawing in embodiment, has carried out clearly and completely describing to the technical scheme in this utility model embodiment, it is clear that retouched The embodiment stated is a part of embodiment of this utility model rather than whole embodiments.Generally described in the accompanying drawing herein and The assembly of this utility model embodiment illustrated can be arranged with various different configurations and design.
Therefore, the detailed description of the above embodiment of the present utility model to providing in the accompanying drawings is not intended to limit requirement The scope of the present utility model of protection, but it is merely representative of selected embodiment of the present utility model.Based in this utility model Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, all Belong to the scope of this utility model protection.

Claims (3)

1.PE pipeline, it is characterised in that: include pipe main body, tracing line, tracing line connector;Above-mentioned tracing line includes protecting outside PE Sheath, layers of copper, steel core, above-mentioned layers of copper is wrapped in inside PE external protection, and steel core is wrapped in inside layers of copper;At tracing line connector Outside pipe main body, the height of this tracing line connector is 1-2cm;Tracing line connector centre position parcel tracing line, limit Edge position is melted mode by heat and is fit together with pipe main body 1.
2. according to the PE pipeline described in claim 1, it is characterised in that: described tracing line connector is PE bonding material.
3. according to the PE pipeline described in claim 1, it is characterised in that: described tracing line connector outer surface is arc.
CN201620459164.5U 2016-05-19 2016-05-19 Pe pipeline Expired - Fee Related CN205689920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620459164.5U CN205689920U (en) 2016-05-19 2016-05-19 Pe pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620459164.5U CN205689920U (en) 2016-05-19 2016-05-19 Pe pipeline

Publications (1)

Publication Number Publication Date
CN205689920U true CN205689920U (en) 2016-11-16

Family

ID=57262053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620459164.5U Expired - Fee Related CN205689920U (en) 2016-05-19 2016-05-19 Pe pipeline

Country Status (1)

Country Link
CN (1) CN205689920U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109239785A (en) * 2018-09-26 2019-01-18 江苏史利姆智能测控技术有限公司 A method of prevent to dig disconnected optical cable
CN109375284A (en) * 2018-12-11 2019-02-22 北京沃尔斯特新技术有限公司 A kind of method and system of Underground plastic tube trend

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109239785A (en) * 2018-09-26 2019-01-18 江苏史利姆智能测控技术有限公司 A method of prevent to dig disconnected optical cable
CN109375284A (en) * 2018-12-11 2019-02-22 北京沃尔斯特新技术有限公司 A kind of method and system of Underground plastic tube trend

Similar Documents

Publication Publication Date Title
US10684112B2 (en) Structure for monitoring stability of existing subgrade/slope and construction method thereof
CN205689920U (en) Pe pipeline
CN102086972A (en) Method for detecting leaking point position of buried pipeline by gas
CN101696758B (en) Corrosion control method of trenchless construction large diameter pipeline
CN105700039A (en) Method for detecting underground pipe in urban road exploration construction
CN205175626U (en) Water supply and drainage pipe leak testing system
BR112019004391B1 (en) SIGNAL TAPE
CN103573269B (en) Shield tunnel grouting layer performance detection method
CN103697334A (en) Sleeve type automatic early warning system for underground buried object
CN113007611B (en) Monitoring system for gas pipeline crossing river bottom
CN205689896U (en) PE pipeline tracing line lays mechanism
CN103697332A (en) Device and method for online leakage detection of buried water conveying pipeline
CN106402510A (en) PE pipeline, PE pipeline trace line laying mechanism and trace line laying method
CN103176216A (en) Pipeline detection method and borehole antenna
Van Kleef et al. Water flood monitoring in an Oman carbonate reservoir using a downhole permanent electrode array
CN108470512A (en) Buried indicator
KR101567748B1 (en) A location detection of the Underground Pipe
CN205263307U (en) Portable ground penetrating radar car
CN203191570U (en) Tracing line
US20180274358A1 (en) System and Method for Detecting Cross Bores
CN203786308U (en) Imbedded plastic pipe detection device
CN105305063B (en) A kind of pipeline radar antenna for electricity channel damage check
CN208362472U (en) Flexible anode
CN211621691U (en) Leakage detection lead device
CN207541167U (en) A kind of detecting system of buried steel pipe exchange drain means

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161116