CN205680985U - Comprehensive testing device for transformer - Google Patents
Comprehensive testing device for transformer Download PDFInfo
- Publication number
- CN205680985U CN205680985U CN201620598248.7U CN201620598248U CN205680985U CN 205680985 U CN205680985 U CN 205680985U CN 201620598248 U CN201620598248 U CN 201620598248U CN 205680985 U CN205680985 U CN 205680985U
- Authority
- CN
- China
- Prior art keywords
- transformer
- warehouse
- arranges
- testing device
- comprehensive testing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Warehouses Or Storage Devices (AREA)
Abstract
The utility model discloses a kind of comprehensive testing device for transformer, including warehouse, below described warehouse, walking mechanism is set, described warehouse one end is connected with headstock, the described warehouse other end is arranged to be imported and exported and hermatic door, arranges handling apparatus, inspection platform, Work tool platform, conditioner inside described warehouse.The upkeep operation being transformer by mobile when side storehouse provides suitable environment, it is to avoid inside transformer part is caused damage by air moist, that dust is bigger, it is ensured that smooth, the safety of upkeep operation are carried out, and provide a great convenience for upkeep operation.
Description
Technical field
The utility model relates to transformer detection equipment technical field, is specifically related to a kind of comprehensive testing device for transformer.
Background technology
Transformer has the function of voltage, electric current or impedance transformation, is widely used in distribution system and various electrical equipment produces
Product.Which is the schematic diagram of existing device for transformer.This transformer is the principle utilizing electric energy and magnetic energy transformation induction, by the beginning of one
Level side coiling and two groups of coils of a primary side coiling curl up respectively on common iron core, by primary side winding and primary side around
The ratio of the curled up number of turn of line adjusts voltage and the electric current of input/output.In theory, the primary side winding of transformer and secondary
When the ratio of the curled up number of turn of side coiling is correct, necessarily can adjust correct input/output voltage and electric current to scale,
But, transformer often because the error of technique, causes its primary side winding and the curled up number of turn of primary side coiling during fabrication
Ratio incorrect, and correct input/output voltage and electric current cannot be adjusted to scale, therefore transformer is produced
After Laiing, need to first pass through can dispatch from the factory after non-defective unit is confirmed as in detection sells use.
Current 80kV current conversion station is positioned at remote village, Over-size transport inclement condition, and measure cost is high, and a lot of measure is
Temperature pier measure, after engineering puts into operation, if converter power transformer breaks down needs Disintegration overhaul, now returns factory and will there is big part
The uncertainty and risks such as transport difficult and expense height.The on-the-spot factory building of converter power transformer temporarily building 80kV is expensive and time-consuming,
And building equipment needed for factory building to should be noted that and transport, quantities is big, and factory building needs periodic maintenance after building up, just for this transformation
Device cost of investment is huge.Before this engineering, ± 50kV current conversion station and ± 50kV current conversion station are once after engineering puts into operation, and scene is taken
Building ad hoc inspection and repair factory building, the crane gear joining winding of can slinging realizes that the fault change of current becomes Disintegration overhaul, and after maintenance, equipment uses heat
Device body is dried by oil spraying method.But do not possess indoor experimental condition due to factory building, the converter power transformer after maintenance has only done can
The pilot project operating out of doors, does not carry out and requires the higher pilot project needing indoors to carry out to environmental condition.At this
The wide extra-high voltage project of cloud ± 80kV Chuxiong current conversion station before engineering once had 2 high-end converter power transformers little individually because of shielding line
Loosened screw defect, on-the-spot without maintenance factory building and experiment hall, do not possess the indoor experimental condition after maintenance and maintenance, be forced
Return factory and office's reason, return the costly and time consuming length of factory's not only freight.And the converter power transformer fault rate after the operation several years is higher, if needing
Disintegration overhaul and test, return factory and office's reason and will pay bigger cost and risk.In conventional engineering, ± 50kV Xingren current conversion station and ±
50kV natural bridge current conversion station once scene is built interim easy surviving factory building and is realized that the change of current becomes maintenance, but for ± 80kV change of current change
Depressor product, owing to small product size is big, Heavy Weight, compact conformation are complicated, if carrying out Disintegration overhaul work at the scene, need to be furnished with
The maintenance factory building of device body heavy lifting equipment;Meanwhile, ± 80kV converter power transformer product voltage insulation higher grade is, after maintenance
Product gas phase drying equipment should be used to be dried device body, and carry out comprehensive shop test project (include indoor test item
Mesh), whether to examine properties of product qualified, the disappearance of pilot project will leave major quality hidden danger and risk to equipment.
The utility model of Application No. 201210184052.X discloses a kind of Repair of Transformer platform, and it includes connecting the end
Seat, grid pedal and stepped fastener, wherein, described grid pedal is made up of two pieces of transverse slats and polylith riser, at the bottom of described connection
Seat includes fixed plate and connecting bottom board, and described fixed plate is provided with installing hole, and plate face four limit of described connecting bottom board is fixed respectively
Being connected with fixed plate, the plate face middle opening of described connecting bottom board, described opening part is provided with fixed dam, described grid pedal
Connected by the plurality of described stepped fastener and the described fixed dam being connected on base are fixing.This utility model can not be given
Maintenance provides a good environment, and cannot arrange fixing for small part during maintenance, and scene is more mixed and disorderly.
The utility model of Application No. 201520153296.0 discloses between a kind of Power Transformer in Field maintenance, including outside
Peripheral frame frame and the ceiling being removably attached to peripheral frame top, described peripheral frame encloses maintenance district, described inspection
Repair district and include transformer used area, platform area and the equipment installing zone for installation and repairing equipment;Described peripheral frame and ceiling
All using metal rod to be removably formed by connecting, described peripheral frame is provided with the hydrophobicity cloth of light-permeable, described
Ceiling is provided with the hydrophobicity paulin top cloth of light-permeable;Maintenance is provided with temperature sensor and humidity sensor in district;Repair apparatus bag
Include for transformer insulation oil is detected vacuum oil-filter, for carrying out vacuumizing the vacuum of process to transformer air chamber
Pump and for transformer part withering drying box;The utility model is easily installed dismounting, Rainproof moisture-proof, simultaneously
Ensure light transmission, it is achieved polytype test operation, meet wanting of timing maintenance, repair based on condition of component and provisional trouble hunting
Ask.But this utility model construction cost is high, builds a factory building cost well imagine for a transformer, and cannot create
Make environment, use limitation bigger;And during the broiling summer, sunshine ratio is stronger, solar radiation can make spin manifold temperature too high,
The accuracy of impact detection, what is more important side storehouse is very high, easily touches electric wire, easily gets an electric shock, and uses dangerous.
And, current prior art is when transformer Disintegration overhaul, and the parts especially iron core etc. under dismounting is longer
Parts reasonably do not put place, are often placed in ground, not convenient, inefficiency when cleaning polishing.Additionally, screw, nut and
The widgets such as pad are usually lost, are damaged.Transformer Disintegration overhaul works, be a kind of to standard operation exigent electric power make
Industry, nonstandard putting easily causes working site confusion, creates potential safety hazard, also cause strong influence to service work.
Utility model content
Problem to be solved in the utility model is to provide a kind of comprehensive testing device for transformer, by mobile when side storehouse is
The upkeep operation of transformer provides suitable environment, it is to avoid inside transformer part is caused damage by air moist, that dust is bigger
Wound, it is ensured that smooth, the safety of upkeep operation are carried out, and provide a great convenience for upkeep operation.
For solving above-mentioned technical problem, the technical solution adopted in the utility model is:
A kind of comprehensive testing device for transformer, including warehouse, arranges walking mechanism, described warehouse one end below described warehouse
Being connected with headstock, the described warehouse other end is arranged to be imported and exported and hermatic door, arranges handling apparatus, overhauls and put down inside described warehouse
Platform, Work tool platform, conditioner, described warehouse is provided with transformer.
Further, described handling apparatus includes the translation slide rail that two side roof parts are arranged in described warehouse, and described translation is sliding
Arranging on rail and building bridge, one end of described bridge formation arranges translation motor and driving wheel, described bridge formation arranges electric block.
Further, described inspection platform includes support frame, and described support frame upper end both sides arrange chute, corresponding institute
Stating chute to slide above in described support frame and arrange gripper shoe, described gripper shoe end arranges translation supporting mechanism, described
In support frame frame, rinsing table is set.
Further, described rinsing table uses supersonic wave cleaning machine, corresponding described support plate edge in described support frame
Activity arranges sealing ring.
Further, described Work tool platform includes rotary shaft, and described rotary shaft arranges singletree, described singletree
End arranges pallet, and described rotary shaft and electric rotating machine are in transmission connection.
Further, described conditioner includes Temperature Humidity Sensor, baroceptor, controller, heater, enters
Feed channel and discharge duct, arrange supply fan, drier and air intake valve, set in described discharge duct in described admission line
Put exhaust fan and drain tap, described Temperature Humidity Sensor, air pressure sensing gas, heater, supply fan and exhaust fan and described control
Device processed connects.
Further, described warehouse lower inside arranges one and irises out feed channel, described outlet pipe and described admission line
Connection, uniform on described outlet pipe arranges venthole.
Further, hinged with described warehouse on the downside of described hermatic door, described hermatic door arranges automatic open-close mechanism.
Further, described hermatic door week side arranges a circle groove, arranges pressure bladder, described blanket gas in described groove
Capsule is connected with air pump by pneumatic hose.
Further, the slide rail that climbs is set in the middle of described hermatic door, the described slide rail that climbs slides lifter plate is set, told
Static line body is set on lifter plate.
Further, described warehouse is provided above derricking gear.
The utility model provides a kind of comprehensive testing device for transformer, and the function in side storehouse is to provide one to be suitable at the scene
The environment of Repair of Transformer, operating environment disassembled by transformer can not be excessively moist, it is impossible to has dust, otherwise can be to inside transformer
Part causes damage, impact use subsequently.Walking mechanism below warehouse coordinates with headstock, according to the size of warehouse, composition
Full trailor and the form of semitrailer, provided power tractive warehouse to move by headstock, when disassembling maintenance to transformer, by storehouse
Body moves to the switch side needing maintenance, is delivered to transformer inside warehouse by suspension apparatus, then closes hermatic door, just
Airtight space for maintenance can be created into, by conditioner, the air parameters in warehouse is adjusted, excessively tide
Wet and dust content carries out intensification and adds row's ventilation when bigger, improve warehouse internal environment.Inspection platform is used for placing transformer, work
Utensil platform is arranged on the side of inspection platform, facilitates staff take instrument at any time or change parts, it is simple to work
Launch.
The beneficial effects of the utility model are:
1st, the upkeep operation being transformer by mobile when side storehouse provides suitable environment, it is to avoid humidity, dust are bigger
Inside transformer part is caused damage by air, it is ensured that smooth, the safety of upkeep operation are carried out, and provide greatly for upkeep operation
Facility;
2nd, handling apparatus can carry out handling to transformer inside warehouse, facilitates the carrying of heavy parts or device, subtracts
The burden of light work personnel;
3rd, inspection platform integrates platform and cleans, convenient to some Cleaning of Parts, such as insulator surface etc., and uses
Supersonic wave cleaning machine, can not be by cleaning agent, it is achieved hermetically sealed degreasing, go Fouling Cleaning, will not be to the environment in warehouse
Impact;
4th, using revolving Work tool platform, staff, when needs instrument or part, rotates Work tool platform just
Can obtain, greatly facilitate service work, mitigate the burden of maintainer, accelerate the speed of service work;
5th, humidity and the particle content of air in warehouse can be adjusted by conditioner, are service work
Create favourable environment.
Brief description
Below in conjunction with the accompanying drawings the utility model is further described:
Fig. 1 is the structural representation of the utility model comprehensive testing device for transformer;
Fig. 2 is the structural representation of the utility model handling apparatus;
Fig. 3 is the structural representation of the utility model inspection platform;
Fig. 4 is the structural representation of the utility model sealing ring;
Fig. 5 is the structural representation of the utility model Work tool platform;
Fig. 6 is the structural representation of the utility model hermatic door;
Fig. 7 is the structural representation of the utility model respirator.
Detailed description of the invention
Showing technical solutions of the utility model further below in conjunction with Fig. 1 to Fig. 6, detailed description of the invention is as follows:
Embodiment one
As depicted in figs. 1 and 2: present embodiments providing a kind of transformer synthesis test maintenance based on movable type side storehouse is
System, including warehouse 1, arranges walking mechanism 2 below described warehouse 1, described warehouse 1 one end is connected with headstock 3, and described warehouse 1 is another
One end arranges import and export 4 and hermatic door 5, and described warehouse 1 is internal arranges handling apparatus the 6th, inspection platform the 7th, Work tool platform the 8th, sky
Gas control device, described warehouse is provided with transformer, and when carrying out Repair of Transformer, Jiang Fangcang is parked in the transformer of Awaiting Overhaul
Side, uses insulator arrangement by the transformer on side storehouse and the transformers connected in parallel of Awaiting Overhaul, after allowing breaks Awaiting Overhaul transformer both sides
Open, do not have a power failure during maintenance transformer.
Maintainer can be according to transformer load and field condition, after having a power failure Awaiting Overhaul transformer, then by side storehouse
Transformer is connected with transmission line of electricity, reduces power-on time, it is ensured that job safety.
The function in side storehouse is to provide the environment of an applicable Repair of Transformer at the scene, and operating environment disassembled by transformer can not
Excessively moist, it is impossible to have dust, damage, impact use subsequently otherwise can be caused to inside transformer part.Below warehouse
Walking mechanism coordinates with headstock, according to the size of warehouse, the form of composition full trailor and semitrailer, is provided power tractive by headstock
Warehouse moves, and when disassembling maintenance to transformer, moves warehouse to the transformer side needing maintenance, is filled by suspention
Put and deliver to transformer inside warehouse, then hermatic door is closed, just can create into airtight space for maintenance, by air regulation dress
Put and the air parameters in warehouse is adjusted, excessively moist and carry out intensification when dust content is bigger and add row's ventilation, change
Kind warehouse internal environment.Inspection platform is used for placing transformer core etc., and Work tool platform is arranged on the side of inspection platform, side
Just staff takes instrument at any time or changes parts, it is simple to the expansion of work.In use, by opening hermatic door,
Transformer is delivered in warehouse, hermatic door is closed, in warehouse, carries transformer by handling apparatus enterprising to inspection platform
Row maintenance, the ambient parameter in conditioner control warehouse, dry, dustless working environment is provided.
Described handling apparatus 6 includes the translation slide rail 9 that two side roof parts are arranged in described warehouse 1, and described translation slide rail 9 sets
Putting bridge formation 10, one end of described bridge formation 10 arranges translation motor 11 and driving wheel 12, and described bridge formation 10 arranges electric block 13.
Translation slide rail is arranged on the top of warehouse, will not take the space in warehouse, and translation motor output power supply driving wheel rotates,
Driving motion on translation slide rail of building bridge, electric block realizes the function of lifting.
Embodiment two
As shown in Fig. 1, Fig. 3, Fig. 4 and Fig. 5: the present embodiment additionally provides a kind of comprehensive testing device for transformer, including storehouse
Body 1, arranges walking mechanism 2 below described warehouse 1, described warehouse 1 one end is connected with headstock 3, described warehouse 1 other end arrange into
Outlet 4 and hermatic door 5, described warehouse 1 is internal arranges handling apparatus the 6th, inspection platform the 7th, Work tool platform the 8th, conditioner,
Described warehouse is provided with transformer 50.
Described inspection platform 7 includes support frame 14, and described support frame 14 upper end both sides arrange chute 15, corresponding described
Chute 15 slides above in described support frame 14 and arranges gripper shoe 16, and described gripper shoe 16 end arranges translation supporting mechanism
17, in described support frame 14, rinsing table 18 is set.Transformer maintenance when place on the supporting plate, translation supporting mechanism by
Post and wheel composition, facilitate gripper shoe to translate, and when some parts is carried out by needs, translates gripper shoe, dew
Go out the rinsing table under support frame, it would be desirable to the parts of cleaning are put into rinsing table and processed, provide greatly for upkeep operation
Facility, substantially reduce the time of upkeep operation.
Described rinsing table 18 uses supersonic wave cleaning machine, corresponding described gripper shoe 16 edge movable in described support frame 14
Arranging sealing ring 19, supersonic wave cleaning machine utilizes Ultrasonic Cleaning principle, by applying ultrasonic wave to cleaning solvent so that it is produce
Substantial amounts of micro-bubble simultaneously vibrates, ruptures, and produces great air pressure and heat, it is not necessary to by cleaning agent in very low range,
Only just strong dispelling can be carried out to component surface dirt and greasy dirt with water, and cooperate with gripper shoe, clean
When by gripper shoe return, it is to avoid the situation that during Ultrasonic Cleaning, a large amount of water smokes diffuse, be conducive to the environment in control warehouse, no
Can cause making moist or the situation such as condensation of other parts, the sealing ring of setting can use flexible material to fill, or agrees with
The cover plate of support frame frame, it is achieved the sealing to gripper shoe and support frame contact surface.
Described Work tool platform includes rotary shaft 20, and described rotary shaft 20 arranges singletree 21, described singletree 21
End arranges pallet 22, and described rotary shaft 20 and electric rotating machine 23 are in transmission connection, and traditional Work tool is all to be deposited by cabinet,
Cabinet is further from inspection platform, and maintainer needs to go to cabinet side and selects, and loses time.Work of the present utility model
Utensil platform carrys out the quick-wear part of carrying tool and transformer by pallet, and is arranged on inspection platform side, at needs
During individual Work tool, making rotary shaft rotate by operating handle drives electric rotating machine, the rotation of the pallet of depositing correspondence is to being at one's side
Can take, will not delay and interrupt ongoing work, overhaul more convenient.
Embodiment three
Such as Fig. 1, shown in 7: the present embodiment additionally provides a kind of comprehensive testing device for transformer, including warehouse 1, described warehouse
Arranging walking mechanism 2 below 1, described warehouse 1 one end is connected with headstock 3, and described warehouse 1 other end is arranged to be imported and exported 4 and seals
Door 5, described warehouse 1 is internal arranges handling apparatus the 6th, inspection platform the 7th, Work tool platform the 8th, conditioner, on described warehouse
It is provided with transformer.
Described conditioner includes that the 27th, Temperature Humidity Sensor the 24th, baroceptor the 25th, controller the 26th, heater enters
Feed channel 28 and discharge duct 29, arrange supply fan the 30th, drier 31 and air intake valve 32 in described admission line 28, described
Exhaust fan 33 and drain tap 34 are set in discharge duct 29, described Temperature Humidity Sensor the 24th, air pressure sensing gas the 25th, heater
27th, supply fan 30 and exhaust fan 33 are connected with described controller 26.Temperature and humidity in Temperature Humidity Sensor monitoring warehouse, gas
Air pressure in pressure sensor monitoring warehouse, when humidity is bigger, heater heats up so that moisture sufficiently enters air
In, and open supply fan and exhaust fan, the wet gas in warehouse is discharged, after extraneous air is dried by drier
Introduce, it is achieved the regulation to humidity.When temperature in warehouse is too low, the operating flexibility degree of maintainer can be affected, by heating
Device heats up provides preferably maintenance environment for operating personnel, and drain tap and air intake valve can also coordinate exhaust fan to seek with ventilation fan
Produce subnormal ambient, it is adaptable to the turnaround of unit more accurate, insulating requirements is high, powerful.Heater can use electric heating
Silk heating, drier can use and be respectively connected with respirator on variable color silica gel, discharge duct and admission line, described respirator
52 two ends are provided with screen pack, are provided with variable color silica gel particle 53 between screen pack 54, and one end of respirator is connected with air-heater 55, institute
It is provided with color sensor 51 in stating respirator, when color sensor detects variable color silica gel particle for redness, PLC technology
Device control air-heater work, variable color silica gel particle is heated by hot blast, when silica gel particle color becomes blueness, Programmable Logic Controller
Control air-heater cuts out.
Described warehouse 1 lower inside arranges one and irises out feed channel 35, and described outlet pipe 35 is with described admission line 28 even
Logical, uniform on described outlet pipe 35 venthole 36 is set.Outlet pipe arranges a circle, can be filled with outside air uniformly
Bottom warehouse, it is simple to the original damp-heat air in warehouse is discharged from top.
Embodiment four
As shown in figures 1 to 6: the present embodiment additionally provides a kind of comprehensive testing device for transformer, including warehouse 1, described
Arranging walking mechanism 2 below warehouse 1, described warehouse 1 one end is connected with headstock 3, and described warehouse 1 other end is arranged imports and exports 4 Hes
Hermatic door 5, described warehouse 1 is internal arranges handling apparatus the 6th, inspection platform the 7th, Work tool platform the 8th, conditioner, described storehouse
Body is provided with transformer.
On the downside of described hermatic door 5 hinged with described warehouse 1, described hermatic door 5 arranges automatic open-close mechanism, described automatically
The folding motor 37 that open-and-close mechanism is arranged in including described warehouse 1, described folding motor 37 and power transmission shaft 38 are in transmission connection, described
Power transmission shaft 38 stretches out described warehouse 1 both sides, and described power transmission shaft 38 two ends are wound around and arrange 39, folding chain, described open with chain 39 with
Described hermatic door 5 connects, and described power transmission shaft 38 two ends arrange block 40.On the downside of hermatic door hinged with warehouse, hermatic door when opening
Upside contacts with ground, facilitates staff up and down, also the transport of beneficially transformer.Automatic open-close mechanism is rotated by power transmission shaft
To be wound around folding chain or extend, it is achieved the folding control to hermatic door.Power transmission shaft is arranged on the top of warehouse, folding chain
It is connected with two ends on the upside of hermatic door, uses safer, and space in warehouse and staff's work will not be impacted.
5 weeks sides of described hermatic door arrange a circle groove 41, arrange pressure bladder 42, described pressure bladder in described groove 41
42 are connected with air pump 44 by pneumatic hose 43, hermatic door Guan Bi after there is gap with import and export, now by air pump deliver to by
Pressure bladder is propped up, to sealing gap, and this sealing means simple in construction, very easy to use, and when not sealing,
Pressure bladder can be contracted in groove, will not should be extraneous sharp weapon and scratch and cause balloon rupture, affect sealing effectiveness.
Arranging the slide rail 45 that climbs in the middle of described hermatic door 5, the described slide rail 45 that climbs slides arranges lifter plate 46, told liter
On fall plate 46, static line body 47 is set.When transformer needs to be transported in warehouse, first place it on lifter plate, use static line
Body is fixed, and the handling apparatus in using warehouse catches on transformer, then by handling apparatus, transformer is oblique along the slide rail that climbs
To lifting, it is achieved the transport of transformer, it is ensured that the security when carrying for the transformer.
Described warehouse 1 is provided above derricking gear 48, if arranging derricking gear, need to install at warehouse correspondence position and reinforcing
Beam, it is ensured that the solidness of warehouse, warehouse both sides are preferably provided balancing pole, it is ensured that the stability during handling.Arrange rises
The transformer in high-altitude can be carried out installing or removing and lower by loop wheel machine structure, it is not necessary to extra crane helps, convenient
Upkeep operation.
Finally illustrate, above example only in order to the technical solution of the utility model to be described and unrestricted, this area
Those of ordinary skill the technical solution of the utility model is made other modification or equivalent, without departing from this practicality
The spirit and scope of new technique scheme, all should cover in the middle of right of the present utility model.
Claims (8)
1. a comprehensive testing device for transformer, it is characterised in that: include warehouse, walking mechanism, institute are set below described warehouse
Stating warehouse one end to be connected with headstock, the described warehouse other end is arranged to be imported and exported and hermatic door, arranges handling dress inside described warehouse
Put, inspection platform, Work tool platform, conditioner, described warehouse is provided with transformer.
2. comprehensive testing device for transformer as claimed in claim 1, it is characterised in that: described handling apparatus includes described warehouse
In two side roof parts arrange translation slide rail, on described translation slide rail arrange build bridge, one end of described bridge formation arrange translation motor and
Driving wheel, described bridge formation arranges electric block.
3. comprehensive testing device for transformer as claimed in claim 1, it is characterised in that: described inspection platform includes carriage
Frame, described support frame upper end both sides arrange chute, and corresponding described chute slides above in described support frame and arranges gripper shoe,
Described gripper shoe end arranges translation supporting mechanism, arranges rinsing table in described support frame.
4. comprehensive testing device for transformer as claimed in claim 3, it is characterised in that: described rinsing table uses Ultrasonic Cleaning
Machine, corresponding described support plate edge activity in described support frame arranges sealing ring.
5. comprehensive testing device for transformer as claimed in claim 1, it is characterised in that: described Work tool platform includes rotating
Axle, described rotary shaft arranges singletree, and the end of described singletree arranges pallet, and described rotary shaft is with electric rotating machine transmission even
Connect.
6. comprehensive testing device for transformer as claimed in claim 1, it is characterised in that: described conditioner includes warm and humid
Degree sensor, baroceptor, controller, heater, admission line and discharge duct, arrange air inlet in described admission line
Fan, drier and air intake valve, arrange exhaust fan and drain tap, described Temperature Humidity Sensor, gas in described discharge duct
Pressure sensing gas, heater, supply fan and exhaust fan are connected with described controller.
7. comprehensive testing device for transformer as claimed in claim 6, it is characterised in that: described warehouse lower inside arranges a circle
Outlet pipe, described outlet pipe connects with described admission line, uniform on described outlet pipe arranges venthole.
8. comprehensive testing device for transformer as claimed in claim 1, it is characterised in that: with described warehouse on the downside of described hermatic door
Hinged, described hermatic door arranges automatic open-close mechanism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620598248.7U CN205680985U (en) | 2016-06-20 | 2016-06-20 | Comprehensive testing device for transformer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620598248.7U CN205680985U (en) | 2016-06-20 | 2016-06-20 | Comprehensive testing device for transformer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205680985U true CN205680985U (en) | 2016-11-09 |
Family
ID=57430778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620598248.7U Expired - Fee Related CN205680985U (en) | 2016-06-20 | 2016-06-20 | Comprehensive testing device for transformer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205680985U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112379209A (en) * | 2020-11-02 | 2021-02-19 | 广东电网有限责任公司 | Performance detection device for transformer iron core |
-
2016
- 2016-06-20 CN CN201620598248.7U patent/CN205680985U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112379209A (en) * | 2020-11-02 | 2021-02-19 | 广东电网有限责任公司 | Performance detection device for transformer iron core |
CN112379209B (en) * | 2020-11-02 | 2022-02-08 | 广东电网有限责任公司 | Performance detection device for transformer iron core |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10259372B2 (en) | Mobile-type power equipment maintenance device | |
CN106124889A (en) | Transformer synthesis based on storehouse, movable type side test system | |
CN102830308B (en) | Combined environment test device | |
CN106770903A (en) | A kind of Combined frame structure Fire-resistance test system and test method | |
CN202535776U (en) | Annular current temperature reducing and dehumidifying granary | |
CN106229868A (en) | The regulator cubicle maintenance of a kind of transformer station monitors scavenging system with condensation | |
CN104315843A (en) | Vertical recycling, drying and calcining furnace for SCR (selective catalytic reduction) denitration catalysts | |
CN205680985U (en) | Comprehensive testing device for transformer | |
CN105107556B (en) | It is a kind of to move many integrated environment test system chambers of plate certainly | |
CN205921273U (en) | High pressure overhauls work platform | |
CN206855710U (en) | A kind of steam curing cover for concrete prefabricated element | |
CN106129878A (en) | A kind of comprehensive examination and repair system for power switch cabinet | |
CN106329360A (en) | Pole-mounted transformer maintenance system | |
CN207618049U (en) | A kind of backing plate automatic packing device | |
CN208546273U (en) | A kind of rotatable overhauling workbench device of wind-driven generator | |
CN105896359A (en) | Mobile square bin-based comprehensive maintenance system for combined electrical appliance | |
CN106300097A (en) | A kind of transformer Cooling oil oil temperature on-line monitoring and examination and repair system | |
CN106207816A (en) | A kind of transformer synthesis inspection platform | |
CN207160703U (en) | Vestibule combined steel plate silo | |
CN110280441A (en) | A kind of oxidation resistance liquid is used for oxidation-resistant graphite electrode anti-oxidant treatment production system | |
CN106207817B (en) | A kind of fan of dry type transformer apparatus for examination and repair | |
CN109719106A (en) | A kind of steel plant's house dust absorption plant | |
CN206882082U (en) | A kind of hinging type paint drying equipment | |
CN106058696A (en) | Isolating switch comprehensive overhauling system based on mobile square cabin | |
CN203104228U (en) | Dust-free constant-temperature and constant-humidity device for stator payoff installation of hydraulic turbine set |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161109 Termination date: 20170620 |