CN205677540U - Attachment cleaning plant in pipeline - Google Patents

Attachment cleaning plant in pipeline Download PDF

Info

Publication number
CN205677540U
CN205677540U CN201620363517.1U CN201620363517U CN205677540U CN 205677540 U CN205677540 U CN 205677540U CN 201620363517 U CN201620363517 U CN 201620363517U CN 205677540 U CN205677540 U CN 205677540U
Authority
CN
China
Prior art keywords
rock drill
stand alone
alone type
winch
balladeur train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620363517.1U
Other languages
Chinese (zh)
Inventor
崔哲
郭建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 1 Construction Co Ltd
Original Assignee
China Coal No 1 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 1 Construction Co Ltd filed Critical China Coal No 1 Construction Co Ltd
Priority to CN201620363517.1U priority Critical patent/CN205677540U/en
Application granted granted Critical
Publication of CN205677540U publication Critical patent/CN205677540U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

nullAttachment cleaning plant in pipeline,Including stand alone type rock drill,At stand alone type rock drill, drilling rod is installed,Stand alone type rock drill is arranged on rig balladeur train,Attachment cleaning drill bit is installed in the end of drilling rod,It is additionally provided with the drilling rod supporting plate with U-type groove in the front end of rig balladeur train,Tail end at rig balladeur train is provided with winch,It is provided with wheel bracket in the front end of rig balladeur train,By wheel frame, guide wheel is installed on the top of wheel bracket,Lay winding wire ropes on winch,One end of steel wire rope is fixed with stand alone type rock drill,The other end of steel wire rope is walked around guide wheel and is fixed with stand alone type rock drill,Stand alone type rock drill be rotated into air port and impact air inlet respectively by rotating air-duct and impact airduct with operate valve rotate air port and impact air port and connect,The air inlet of operation valve is provided with air intake band,Air intake band connects with pressure wind regime.The utility model easily realizes that old pipeline secondary effectively utilizes, and saves the expense newly purchasing pipeline, reaches the purpose of " repairing the old and utilizing scraps ".

Description

Attachment cleaning plant in pipeline
Technical field
The utility model relates to a kind of Pipeline dredger, attachment cleaning plant in especially a kind of pipeline.
Background technology
Old channel interior often causes internal diameter serious " shrink " because of corrosion, incrustation scale, cement adhesion foreign material etc., not only affects again Secondary using effect, and the weight virtually adding pipeline is very unfavorable to the safety on shaft construction column pipe road.This at present Waste disposal typically worked as by pipeline, virtually adds construction cost.Therefore, design and a kind of can efficiently clear up old channel interior Attachment cleaning plant in the pipeline of corrosion and adhesion foreign material, is to be presently required to solve the technical problem that.
Content of the invention
Technical problem to be solved in the utility model be to provide a kind of corrosion that can efficiently clear up old channel interior and Attachment cleaning plant in the pipeline of adhesion foreign material.
The technical scheme in the invention for solving the technical problem is:
Attachment cleaning plant in pipeline, including stand alone type rock drill, is provided with drilling rod at stand alone type rock drill, stand alone type Rock drill is arranged on rig balladeur train, is provided with attachment cleaning drill bit in the end of drilling rod, also sets in the front end of rig balladeur train Being equipped with the drilling rod supporting plate with U-type groove, the tail end at rig balladeur train is provided with winch, is provided with guide wheel in the front end of rig balladeur train and props up Frame, is provided with guide wheel on the top of wheel bracket by wheel frame, lay winding wire ropes on winch, one end of steel wire rope and independence Formula rock drill is fixed, and the other end of steel wire rope is walked around guide wheel and fixed with stand alone type rock drill, being rotated into of stand alone type rock drill Air port and impact air inlet respectively by rotating air-duct and impact airduct with operation valve rotate air port and impact air port connect Logical, the air inlet of operation valve is provided with air intake band, air intake band connects with pressure wind regime.
As a kind of preferred version of the present utility model, described winch is air hoist, and described operation valve is three Operation valve, the air inlet of winch passes through winch airduct and the winch air port connection of three operation valves.Operating air pressure: 0.5 MPa~ 0.7 MPa, air consumption: 8m3/min。
As a kind of preferred version of the present utility model, described free-standing rock drill is the stand alone type rock drilling of YGZ-70 type Machine.
As a kind of preferred version of the present utility model, described attachment cleaning drill bit is steel pipe, the external diameter of steel pipe with The internal diameter coupling of pipeline for clearance, there is a closure rear end of steel pipe, and closure is connected with drilling rod to be fixed, at the 10mm of steel pipe front end with It is all welded with several drill bit special metals as cutter teeth at steel pipe tail end 10mm.Drill bit diameter 38~millimeter.
As a kind of preferred version of the present utility model, the drill bit special metals number of welding is 8.
As a kind of preferred version of the present utility model, described drilling rod is B25-5.5m hollow hexagonal drilling rod;Steel wire rope For φ 12.5mm haulage cable, rope capacity is 25m;The specification of guide wheel is φ 200.
As a kind of preferred version of the present utility model, a length of 7000mm of rig balladeur train.
The operation principle of the utility model preferred version:
Open three operation valves and switch air-supply startup rock drill rotation and impact accordingly, then operate three operation valve controls Make pneumatic puffer at the uniform velocity haulage cable, promote rock drill to advance on balladeur train to steel duct eliminating impurities.
Installation of the present utility model, debugging:
1. must be levelling to operating location before installing, make rock drill balladeur train front and back end holding level, and by rock drill balladeur train Fixed.
2. rock drill and puffer must be overhauled before installing, it is ensured that machine run is normal.
3. each position oil filling puts in place.
4. steel wire rope must go through before using, and forbids to use when being found to have the phenomenons such as fracture of wire, disconnected stock, corrosion be serious.
5. wind band must use pipe clamp to connect fastening, forbids to use the article such as iron wire to substitute.
6. pipeline place must level, consistent with drill bit drilling rod direction, before operation U-shaped to be used fasten firm.
Using method of the present utility model:
1. first by needing the steel pipe levelling capturing of cleaning, fasten in this device drill bit end with U-shaped.
2. pneumatic puffer, rock drill, three pneumatic operation valve air source pipelines are connected on air line valve and open Valve.
3. an operated by personnel three operation valve, starts sinking machine and rotates and impact, then operates three operation valves Control pneumatic puffer at the uniform velocity haulage cable, advance rock drill to start to steel duct eliminating impurities, when being advanced into 5m position, Close pneumatic puffer and rock drill, and open the card pricker device on rock drill, take off directive wheel, then operate three operation valve controls Make pneumatic puffer opposite direction haulage cable and rock drill is led back former original position, then the prolongation of the 5m length that continues is bored Bar, continues the pneumatic puffer of operation three operation valve startup and rock drill carries out steel duct eliminating impurities work.
4., when removing a steel pipe, staff takes off the directive wheel being plugged on the fixed mount of balladeur train end, so Rear operation three operation valve does not cut out rock drill and rotates and under the front topic of impact, equal control pneumatic puffer haulage cable, Rock drill is drawn to original position, the removing work of steel duct foreign material can be completed.
Safety operation points for attention of the present utility model:
1. operating personnel must correctly wear related articles for labour protection by regulation.
2. have to fixed before pipeline prune job.
3. wind band must clean out termination, uses standard pipe card to connect fastening, forbids to use iron wire or other article to replace Generation.
4. steel wire rope must go through before using, have fracture of wire, disconnected stock, corrosion serious conditions forbid use.
5. three-dimensional operation valve must be operated by special messenger, and other staff forbid to tamper.
6., during clearing up pipeline, personnel avoid puffer front and rear, hurt sb.'s feelings in case steel wire rope is broken.
7. All Jobs personnel must carry out self-insurance, mutually guarantor, UNPROFOR.
Compared with prior art, the utility model easily realizes that old pipeline secondary effectively utilizes, thus saves and newly purchase pipeline Expense, reach the purpose of " repairing the old and utilizing scraps ".In cleaning pipeline, foreign material ratio is up to 95%;The pipeline of length 10m is per hour at least 4 can be cleared up.
Brief description
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
As it can be seen, attachment cleaning plant in pipeline, including stand alone type rock drill 13, install at stand alone type rock drill 13 There is drilling rod 2, it is characterised in that stand alone type rock drill 13 is arranged on rig balladeur train 14, is provided with attachment in the end of drilling rod 2 Cleaning drill bit 1, is additionally provided with the drilling rod supporting plate 3 with U-type groove in the front end of rig balladeur train 14, and the tail end at rig balladeur train 14 is installed There is winch 12, be provided with wheel bracket 15 in the front end of rig balladeur train 14, be provided with by wheel frame 4 on the top of wheel bracket 15 Guide wheel 5, lay winding wire ropes 6 on winch 12, one end of steel wire rope 6 is fixing with stand alone type rock drill 13, the other end of steel wire rope 6 Walking around guide wheel 5 to fix with stand alone type rock drill 13, the air port that is rotated into of stand alone type rock drill 13 leads to respectively with impact air inlet again Cross rotating air port and impacting air port and connect of rotating air-duct 9 and impact airduct 10 and operation valve 8, at the air intake operating valve 8 Being provided with air intake band 7 on Kou, air intake band 7 connects with pressure wind regime.
Described winch 12 is air hoist, and described operation valve 8 is three operation valves, and the air inlet of winch 12 is by strand Car airduct 11 connects with the winch air port of three operation valves.Described free-standing rock drill 13 is the stand alone type rock drilling of YGZ-70 type Machine.Described attachment cleaning drill bit 1 is steel pipe, and the external diameter of steel pipe mates with the internal diameter of pipeline for clearance, and the rear end of steel pipe has Closure, closure is connected fixing with drilling rod 2, bores being all welded with several at the 10mm of steel pipe front end and at steel pipe tail end 10mm Head special metals is as cutter teeth.The drill bit special metals number of welding is 8.Described drilling rod 2 is B25-5.5m hollow hexagonal Drilling rod;Steel wire rope is φ 12.5mm haulage cable, and rope capacity is 25m;The specification of guide wheel is φ 200.Rig balladeur train 14 A length of 7000mm.

Claims (6)

1. attachment cleaning plant in pipeline, including stand alone type rock drill (13), is provided with drilling rod in stand alone type rock drill (13) (2), it is characterised in that stand alone type rock drill (13) is arranged on rig balladeur train (14), is provided with attachment in the end of drilling rod (2) Thing cleaning drill bit (1), is additionally provided with the drilling rod supporting plate (3) with U-type groove, in rig balladeur train (14) in the front end of rig balladeur train (14) Tail end winch (12) is installed, be provided with wheel bracket (15) in the front end of rig balladeur train (14), upper at wheel bracket (15) Portion is provided with guide wheel (5) by wheel frame (4), in the upper lay winding wire ropes (6) of winch (12), one end of steel wire rope (6) and independence Formula rock drill (13) is fixed, and the other end of steel wire rope (6) is walked around guide wheel (5) and fixed with stand alone type rock drill (13), stand alone type The air port that is rotated into of rock drill (13) is passed through rotating air-duct (9) and impact airduct (10) respectively with impact air inlet and operates valve (8) the air port that rotates connects with impacting air port, is provided with air intake band (7), air intake band on the air inlet of operation valve (8) (7) connect with pressure wind regime.
2. attachment cleaning plant in pipeline according to claim 1, it is characterised in that described winch (12) is pneumatic Winch, described operation valve (8) is three operation valves, and the air inlet of winch (12) is by winch airduct (11) and three operation valves Winch air port connection.
3. attachment cleaning plant in pipeline according to claim 1, it is characterised in that described free-standing rock drill (13) it is YGZ-70 type stand alone type rock drill.
4. attachment cleaning plant in pipeline according to claim 1, it is characterised in that described attachment cleaning drill bit (1) being steel pipe, the external diameter of steel pipe mates with the internal diameter of pipeline for clearance, and there is closure the rear end of steel pipe, and closure is connected with drilling rod (2) Fixing, at the 10mm of steel pipe front end and at steel pipe tail end 10mm, it is all being welded with several drill bit special metals as gear wheel Tooth.
5. attachment cleaning plant in pipeline according to claim 4, it is characterised in that the drill bit special metals number of welding It is 8.
6. attachment cleaning plant in pipeline according to claim 1, it is characterised in that rig balladeur train (14) a length of 7000mm。
CN201620363517.1U 2016-04-27 2016-04-27 Attachment cleaning plant in pipeline Active CN205677540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620363517.1U CN205677540U (en) 2016-04-27 2016-04-27 Attachment cleaning plant in pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620363517.1U CN205677540U (en) 2016-04-27 2016-04-27 Attachment cleaning plant in pipeline

Publications (1)

Publication Number Publication Date
CN205677540U true CN205677540U (en) 2016-11-09

Family

ID=57439035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620363517.1U Active CN205677540U (en) 2016-04-27 2016-04-27 Attachment cleaning plant in pipeline

Country Status (1)

Country Link
CN (1) CN205677540U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781430A (en) * 2016-04-27 2016-07-20 中煤第建设有限公司 Device for cleaning deposit in pipeline

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781430A (en) * 2016-04-27 2016-07-20 中煤第建设有限公司 Device for cleaning deposit in pipeline

Similar Documents

Publication Publication Date Title
CN105149300B (en) Novel underground drain road sewage disposal apparatus
CN104453751A (en) Outburst-prevention, dust collection and slag discharging integrated device for coal roadway drilling construction
CN105863513A (en) Horizontal drilling machine
CN205677540U (en) Attachment cleaning plant in pipeline
CN103769288A (en) Bent feeding connection pipe for mill
CN205638228U (en) Horizontal rig
CN201202400Y (en) Baseboard anchorage cable drill
CN105781430A (en) Device for cleaning deposit in pipeline
CN208050701U (en) A kind of door of elevator production hole punched device
CN103498682B (en) The haulage gear of jumbo traction rig walking
CN104368574B (en) pneumatic pipeline dredging machine
CN205400768U (en) Anchor rope integration platform truck
CN204208862U (en) Pneumatic pipeline dredging machine
CN205765863U (en) A kind of heavy-duty machinery spanner
CN204711530U (en) A kind of hydraulic pressure pulls formula tooth and buys or get by illegal means cover machine
CN103831781A (en) Novel puller
CN203663978U (en) Mill feeding connecting bend
CN208364168U (en) A kind of coal mine tunnel device for reducing dust
CN103752395B (en) A kind of mill feeding elbow
CN2937450Y (en) Self-control clamping device without gap of hydraulic pliers
CN205577015U (en) Motor -pumped well pressurizing equipment
CN201208976Y (en) Hydraulic parking device for channel drilling machine
CN202105824U (en) Dredging machine of underground filling pipeline of mine
CN202344521U (en) Disassembly and assembly maintenance frame for return pressure valve
CN205297359U (en) Rig and mast thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant