CN205677262U - A kind of large-span steel vestibule lifting means - Google Patents

A kind of large-span steel vestibule lifting means Download PDF

Info

Publication number
CN205677262U
CN205677262U CN201620582101.9U CN201620582101U CN205677262U CN 205677262 U CN205677262 U CN 205677262U CN 201620582101 U CN201620582101 U CN 201620582101U CN 205677262 U CN205677262 U CN 205677262U
Authority
CN
China
Prior art keywords
steel
joist
vestibule
steel vestibule
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620582101.9U
Other languages
Chinese (zh)
Inventor
侯鹏飞
胡淏
叶文启
林鸿炜
张建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201620582101.9U priority Critical patent/CN205677262U/en
Application granted granted Critical
Publication of CN205677262U publication Critical patent/CN205677262U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of large-span steel vestibule lifting means, including for support and drive the box joist that steel vestibule promotes and the lifting bracket installed on the high building roof of the steel vestibule left and right sides, being provided with lifter on described lifting bracket, described lifter is provided with fixes with box joist and drives the steel strand wires that box joist promotes.The utility model uses the picking-up equipment that box joist promotes as steel vestibule, and lower anchor point is arranged on box joist, thus replaces suspension centre under tradition and directly weld the form being anchored on steel construction, protects steel construction;In addition, stagger with steel construction in vertical direction in the position of lower anchor point, ensure that the lifting route that will not hinder lower floor's steel vestibule after steel vestibule lifting in upper strata completes, i.e. only need to arrange that a lifting bracket and lifter can complete steel vestibule and repeatedly promote at high building roof, thus avoid the secondary change of lifter position, enormously simplify construction process.

Description

A kind of large-span steel vestibule lifting means
Technical field
The utility model technical field of building construction, particularly belongs to steel vestibule lifting construction technology.
Background technology
For playing the aerial Steel corridor of connection function in skyscraper, not only construction environment becomes increasingly complex, and And steel structure also becomes increasingly complex: in irregular shape or need repeatedly promote in batches.For traditional steel vestibule several times The mode promoting, the lower anchor point of lifting is typically directly welded on steel vestibule, thus upper strata steel vestibule is after lifting completes, meeting Block the lifting circuit of lower floor's steel vestibule, lifter can only be varied to feasible location below the steel vestibule of upper strata and just can continue to lift up The variation of understructure, lifting bracket and lifter consumes very considerable labour cost, fee of material, economy benefit difference;And And construction process is loaded down with trivial details, fails to meet the time limit of a project.
Utility model content
Technical problem to be solved in the utility model is just to provide a kind of large-span steel vestibule joist type lifting means, side Just construct, reduce construction cost, reduction of erection time.
For solving above-mentioned technical problem, the utility model adopts the following technical scheme that a kind of large-span steel vestibule joist type Lifting means, including for support and drive the box joist that steel vestibule promotes and at steel vestibule left and right sides high building roof The lifting bracket installed, described lifting bracket is provided with lifter, and described lifter is provided with to be fixed with box joist and drive The steel strand wires that box joist promotes.
Preferably, described box joist is formed by the Plate Welding that model is Q345b, and described box joist includes putting down up and down The horizontal steel plate of row setting and edge are front and back to the vertical steel plate being vertically supported between two horizontal steel plate.
Preferably, the corresponding suspension centre that promotes of described box joist offers the hole passing through for steel strand wires, and described steel strand wires exist It is provided with earth anchor below box joist.
Preferably, described box joist respectively welds both sides before and after hole and steel vestibule with box joist contact point center There is reinforcement steel plate.
Preferably, described steel vestibule is provided with clamp with box joist contact position and is fixed.
Preferably, described clamp includes that in vertical section that bottom is welded and fixed with box joist and vertical section, direction side is prominent Go out and pressing is fixed on the nose section on steel vestibule bottom horizontal plate.
The utility model uses the picking-up equipment that box joist promotes as steel vestibule, and lower anchor point is arranged in box joist On, thus replace suspension centre under tradition and directly weld the form being anchored on steel construction, protect steel construction;Additionally, lower anchor point Position stagger with steel construction in vertical direction, it is ensured that upper strata steel vestibule promote complete after will not hinder lower floor's steel vestibule Lifting route, i.e. only need to arrange that a lifting bracket and lifter can complete steel vestibule and repeatedly promote at high building roof, from And avoid the secondary change of lifter position, and enormously simplify construction process, good above-mentioned solution tradition steel vestibule is repeatedly The problem that hoisting way exists.
Brief description
With detailed description of the invention, the utility model is further described below in conjunction with the accompanying drawings:
Fig. 1 is that steel vestibule promotes system joist position elevation;
Fig. 2 is that steel vestibule promotes system joist bit plane figure;
Fig. 3 is that steel vestibule promotes system joist position profile;
Fig. 4 is that steel vestibule promotes system joist position 3D effect figure;
Fig. 5 is joist 3D effect figure;
Fig. 6 is that steel vestibule is at the assembled schematic diagram of moulding bed higher slice;
Fig. 7 is that upper strata steel vestibule integrally promotes schematic diagram;
Fig. 8 is that lower floor's steel vestibule promotes preparation schematic diagram;
Fig. 9 is that lower floor's steel vestibule integrally promotes schematic diagram;
In figure: 1. box joist, 2. steel vestibule, 3. hole, 4. steel strand wires, 5. clamp, 6. short steel column, 7. lifting bracket, 8. lifter, 9. upper strata steel vestibule, 10. earth anchor, 11. otic placodes, 12. lower floor's steel vestibules, 13. backing plates, 14. reinforcement steel plates, 15th floors Top.
Detailed description of the invention
As shown in Figures 1 to 5, a kind of large-span steel vestibule joist type lifting means, including for support and drive steel even The box joist 1 of corridor 2 lifting and the lifting bracket 7 installed on steel vestibule left and right sides high building roof 15, described lifting is propped up Being provided with lifter 8 on frame 7, described lifter is provided with fixes with box joist and drives the steel strand wires 4 that box joist promotes.This In embodiment, two-layer steel vestibule, i.e. upper strata steel vestibule 9 and lower floor's steel vestibule 12 are set.Steel vestibule uses bearing pin and ear with high building Plate 11 connects, and arranges bi-lug plate at high building, and steel vestibule end arranges monaural plate, bi-lug plate and monaural plate is arranged and passes through for bearing pin Pin-and-hole.
Wherein, the corresponding suspension centre that promotes of described box joist offers the hole 3 passing through for steel strand wires 4, and described steel strand wires exist It is provided with the earth anchor 10 of steel strand wires and the locking of steel vestibule below box joist, between earth anchor 10 and steel vestibule, be provided with backing plate 13.Institute State box joist both sides before and after hole and steel vestibule and box joist contact point center and be respectively welded with reinforcement steel plate 14.Described Steel vestibule is provided with clamp 5 with box joist contact position and is fixed.
In the utility model, steel vestibule promotes the box joist being suitable for, and is formed by the Plate Welding that model is Q345b, described Box joist includes that the horizontal steel plate be arrangeding in parallel up and down and edge are vertical to be vertically supported between two horizontal steel plate front and back Steel plate, box joist cross section sectional dimension is 300mm × 300mm × 20mm × 20mm.Offer accordingly promoting hoisting point position The hole of diameter 110mm, passes through for steel strand wires, hole location distance steel vestibule girder steel center 520mm, and at hole 3 Before and after center, before and after both sides and steel vestibule 2 and box joist 1 contact point center, the reinforcement steel of the thick Q345b of 20mm is respectively welded in both sides Plate 14, to strengthen node strength.
As it is shown in figure 1, earth anchor 10 is temporarily fixed at below box joist hole location, after putting on steel strand wires, by lifter Box joist is promoted to below steel vestibule, at each steel vestibule and box joist contact position, all uses 4 20mm thickness " ┓ " Shape clamp is fixed, and clamp includes that in vertical section that bottom is welded and fixed with box joist and vertical section, direction side highlights simultaneously Pressing is fixed on the nose section on steel vestibule bottom horizontal plate, and clamp lower end is only welded with box joist, and upper end is with steel vestibule not Do and connect.Hydraulic rockshaft configuration needs to meet bearing capacity redundancy > 1.25, and steel strand wires configuration need to meet bearing capacity and have more than needed Coefficient > 2.25.
Such as Fig. 6 to Fig. 9, technological principle of the present utility model is as follows:
Carry out layering assembly below the projection of steel vestibule predetermined installation site, at two ends high building roof 15, lifting bracket is installed 7 and lifter 8, utilize hydraulic lifting system integrally to promote steel vestibule and be controlled, by box joist 1 as promoting under Anchor point carrier, it is ensured that promote free pathway, thus only need to arrange that a lifting means can the gradation of steel vestibule at roof 15 It is promoted to precalculated position.Wherein the nucleus equipment used by lifting construction is hydraulic lifting system, and this system is twisted by lifter the 8th, steel Line the 4th, hydraulic pump source system, computer synchronous control and sensing and detecting system form with electric synchronization control system, can be by meter Calculation machine control system carries out entirety and single-point control to lifting process.
Concrete operation of the present utility model comprises following step:
Step 1: steel vestibule 2 is assembled, carries out the layering assembly of steel vestibule, cloth between upper and lower two-layer steel vestibule on the moulding bed of ground Putting the short steel column 6 of preferred 500mm height Q345 to be supported, short steel column is rolled section steel, its sectional dimension be HM400mm × 300mm×10mm×16mm;;The splicing of steel vestibule requires to carry out arch camber according to span 1/300 according to design, by short steel column pad Put the sheet metal of different-thickness to reach arch camber and require.
Step 2: lifting bracket 7 and lifter 8 are installed, on steel vestibule both sides high building roof 15 install lifting bracket 7 and Lifter 8, wherein lifting bracket 7 and top layer stiffened column are welded to connect, and two lifting brackets 7 are arranged H profile steel beam, lifter profit It is fixed on H profile steel beam with clamp 5;And 2m height guiding trestle is installed on lifting bracket;
Step 3: install box joist 1, utilize tower crane to be promoted to box joist 1 immediately below upper strata steel vestibule 9, to casting anchor On solid point i.e. box joist, hole center should promote suspension centre vertical alignment with floor top, after alignment, utilizes clamp 5 by box torr Beam 1 is fixed on steel vestibule 2;
Step 4: the 4th, steel strand wears earth anchor 10, and steel strand wires 4 penetrate from the bottom to top, it is ensured that steel strand wires 4 at earth anchor 10s extremely Rare 20cm surplus, then locks earth anchor 10;
Step 5: the system that promotes connects, and connects lifting system, uses hander and hydraulic power unit limit pointwise debugging lifter 7, after pointwise debugging completes, attended operation cabinet and computer, start overall debugging;
Step 6: examination promotes, utilizes lifter 7 to carry out the examination of upper strata steel vestibule 9 and promotes, hydraulic rockshaft 8 cylinder pressure by Gradually raise, be followed successively by the 3MPa of desirable pressure, in the case that Everything is fine, can continue to be loaded into 60%, 90%, 100%. Steel vestibule is promoted to hover 12 hours at 250mm;
Step 7: formally promote, as shown in Figure 4, upper strata steel vestibule 9 formally promotes, promote speed maintain 0.1m/min~ Between 0.2m/min, promote after putting in place, utilize lifter 8 pointwise to finely tune steel vestibule 9 to designed elevation;
Step 8: lifting process monitors, in each lift stroke, monitoring lifter duty in real time, often promote 6m, Lifter 7 pressure offset should be controlled and be less than 20%, also with apparatus measures steel vestibule each point absolute altitude, adjust structure appearance in time State, then proceedes to promote;
Step 9: promote docking in place, steel vestibule uses bearing pin to be connected with high building, arranges bi-lug plate, steel vestibule end at high building Portion arranges monaural plate, after otic placode welding, should carry out ultrasonic examination, it is ensured that welding quality, detect qualified after, use diameter 150mm Bearing pin connection fixes;
Step 10: unloading, unloads according to promoting the ascending order of counter-force successively step by step according to simulation result of calculation, will Box joist 1 is slowly dropped to ground, unclamps lower anchor point;
Step 11: lower floor's steel vestibule 12 promotes and prepares, and cuts away clamp 5, utilizes tower crane to be promoted to down box joist 1 Below layer steel vestibule 12, being again fixed on lower floor's steel vestibule 12 with clamp 5, concrete steps are with reference to step 3;
Step 12: lower floor's steel vestibule 12 examination lifting, formal lifting, contraposition connect, with reference to step 4~step 10.
The utility model is made that bigger improvement, box for tradition steel construction integral hoisting construction several times in technique Joist as steel vestibule lifting carrier, well solve tradition steel construction need when repeatedly promoting repeatedly to arrange lifting bracket and The problem of lifter, improves and significantly simplifies construction process, shorten the duration, saves material labour cost, therefore simultaneously Easy construction, applied widely, economic benefit is obvious, has good application value.

Claims (6)

1. a large-span steel vestibule joist type lifting means, it is characterised in that: include for support and drive steel vestibule to promote Box joist and on the high building roof of the steel vestibule left and right sides install lifting bracket, described lifting bracket is provided with and carries Rising device, described lifter is provided with fixes with box joist and drives the steel strand wires that box joist promotes.
2. a kind of large-span steel vestibule joist type lifting means according to claim 1, it is characterised in that: described box torr Beam is formed by the Plate Welding that model is Q345b, and described box joist includes the horizontal steel plate that be arranged in parallel up and down and along front The backward vertical steel plate being vertically supported between two horizontal steel plate.
3. a kind of large-span steel vestibule joist type lifting means according to claim 2, it is characterised in that: described box torr The corresponding suspension centre that promotes of beam offers the hole passing through for steel strand wires, and described steel strand wires are provided with earth anchor below box joist.
4. a kind of large-span steel vestibule joist type lifting means according to claim 3, it is characterised in that: described box torr Beam is respectively welded with reinforcement steel plate in both sides before and after hole and steel vestibule and box joist contact point center.
5. a kind of large-span steel vestibule joist type lifting means according to claim 1, it is characterised in that: described steel vestibule It is provided with clamp with box joist contact position to be fixed.
6. a kind of large-span steel vestibule joist type lifting means according to claim 5, it is characterised in that: described clamp bag In the vertical section being welded and fixed with box joist bottom including and vertical section, direction side is prominent and pressing is fixed on bottom steel vestibule Nose section on level board.
CN201620582101.9U 2016-06-14 2016-06-14 A kind of large-span steel vestibule lifting means Expired - Fee Related CN205677262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620582101.9U CN205677262U (en) 2016-06-14 2016-06-14 A kind of large-span steel vestibule lifting means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620582101.9U CN205677262U (en) 2016-06-14 2016-06-14 A kind of large-span steel vestibule lifting means

Publications (1)

Publication Number Publication Date
CN205677262U true CN205677262U (en) 2016-11-09

Family

ID=57433506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620582101.9U Expired - Fee Related CN205677262U (en) 2016-06-14 2016-06-14 A kind of large-span steel vestibule lifting means

Country Status (1)

Country Link
CN (1) CN205677262U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401198A (en) * 2016-06-14 2017-02-15 中天建设集团有限公司 Large-span steel gallery lifting equipment and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401198A (en) * 2016-06-14 2017-02-15 中天建设集团有限公司 Large-span steel gallery lifting equipment and construction method

Similar Documents

Publication Publication Date Title
CN106401198A (en) Large-span steel gallery lifting equipment and construction method
CN103318768B (en) Assembling method of quayside with low posture
CN201495027U (en) Hoisting tool for mill housing
CN102162774B (en) Steel-structure distribution-girder-type double-track whole opening box girder static load test device and construction method thereof
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN104831632B (en) A kind of bridge cable tower entablature and sill construction method
CN111576691B (en) Frame type glass curtain wall mounting method and glass curtain wall system
CN207211634U (en) A kind of segmented hoistway structure and integrated form hoistway elevator
CN102337782B (en) Lift system for constructing truss platform on top of tall and large space
CN110528678A (en) A kind of multilayer steel frame vestibule installation method between staggered floor high building
CN205558306U (en) Big profiled steel structure vestibule hoist and mount hoisting frame
CN102912991A (en) Track hosting device and track hoisting method of large curtain wall unit plate
CN105317052A (en) Tower crane foundation bolt fixing method
CN205677262U (en) A kind of large-span steel vestibule lifting means
CN207538483U (en) A kind of steel box-girder suspender
CN104533097A (en) Recursive stair type construction method for fabricated multi-layer building
CN202064281U (en) Slip form frame
CN108518071B (en) Installation method of double-layer large-span steel structure corridor
CN105887686A (en) Inward-tilting triangular arch-bridge steel arch rib closing method
CN108952002B (en) Oversized and ultra-wide double-spliced combined I-shaped steel beam and sectional division and installation method thereof
CN208037786U (en) Elevator assistance platform
CN217051458U (en) Lifting system for corridor multi-layer steel structure truss
CN208088520U (en) A kind of rack integral installation device
CN108755438A (en) A kind of Y types pier Construction of continuous beam π types holder and its construction method of installation
CN204940916U (en) A kind of Super High Core Walls Structure emergency escape passage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161109

Termination date: 20180614

CF01 Termination of patent right due to non-payment of annual fee