CN205673812U - The blade assembly welding tooling of CAP1400 initial separator - Google Patents

The blade assembly welding tooling of CAP1400 initial separator Download PDF

Info

Publication number
CN205673812U
CN205673812U CN201620633151.5U CN201620633151U CN205673812U CN 205673812 U CN205673812 U CN 205673812U CN 201620633151 U CN201620633151 U CN 201620633151U CN 205673812 U CN205673812 U CN 205673812U
Authority
CN
China
Prior art keywords
blade
mounting base
top board
blade assembly
cap1400
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620633151.5U
Other languages
Chinese (zh)
Inventor
谢瑞忠
葛建春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jiacheng kinetic energy technology Co.,Ltd.
Original Assignee
Jiaxing Good Sincere Kinetic Energy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Good Sincere Kinetic Energy Equipment Co Ltd filed Critical Jiaxing Good Sincere Kinetic Energy Equipment Co Ltd
Priority to CN201620633151.5U priority Critical patent/CN205673812U/en
Application granted granted Critical
Publication of CN205673812U publication Critical patent/CN205673812U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automatic Assembly (AREA)

Abstract

The utility model relates to initial separator process equipment field, the blade assembly welding tooling of especially a kind of CAP1400 initial separator, it includes mounting base, installs top board and blade locating piece, connect post by roof and floor connect at mounting base and the periphery installed between top board, four pieces of blade locating pieces are evenly spaced to be arranged on mounting base and installs between top board, described blade locating piece overlaps towards the surface installing top board blade shape bent with blade assembly, and four blade locating pieces are consistent at mounting base and the hand of spiral installed between top board;The center of mounting base and installation top board is provided with manhole, and described manhole is for the central tube positioning to blade assembly.The blade assembly welding tooling of the CAP1400 initial separator obtained by the utility model, can realize the positioning between the central tube of blade assembly and bent blade simply and easily, and positioning precision is high, thus improve welding precision;Other knockout course is simple and convenient.

Description

The blade assembly welding tooling of CAP1400 initial separator
Technical field
The utility model relates to initial separator process equipment field, the leaf of especially a kind of CAP1400 initial separator Chip module welding tooling.
Background technology
At present owing to the blade component structure of initial separator is relative complex, and precision requirement is higher, in welding process In, needing to be welded on four bent spacing with blades uniformly the side of central tube, song blade is in the shape of a spiral simultaneously, for four songs Positioning difficulty on central tube for the blade is very big, easily causes the inaccurate problem of welding.
Utility model content
The purpose of this utility model is to provide a kind of simple in construction to solve the deficiency of above-mentioned technology, can be right accurately The bent blade of blade assembly and central tube carry out the blade assembly welding tooling of the CAP1400 initial separator of positioning welding.
In order to achieve the above object, the blade assembly Welder of the CAP1400 initial separator designed by the utility model Filling, it includes mounting base, installs top board and blade locating piece, and the periphery between mounting base and installation top board is by the top end Panel connecting column connects, and the quantity of described blade locating piece is four pieces, and four pieces of blade locating pieces are evenly spaced is arranged on installation Between base plate and installation top board, described blade locating piece is towards the surface installing top board and song blade shape weight in blade assembly Closing, four blade locating pieces are consistent at mounting base and the hand of spiral installed between top board;Mounting base and installation top board Center is provided with manhole, and described manhole is for the central tube positioning to blade assembly.
Technique scheme, by installing the combination of top board, mounting base and four blade locating pieces, by four bent blades Being fitted on blade locating piece, can realizing to bent blade in the positioning of all directions, precision is high, and bent blade is in welding process The clamping device such as aids such as clip can be used to make it be fitted on blade locating piece, simple and convenient;Simultaneously at mounting base Positioning central tube with in the manhole of installation top board, central tube contacts with the relevant position of bent blade, for both Welding provides basis;And accurate positioning between the two, welding precision is high, improves working (machining) efficiency and welding quality.
It is provided with low head pressure ring in the lower end of mounting base, be connected by pressure ring between low head pressure ring and mounting base Post connects, and the center of low head pressure ring is positioning pipe, and the straight line at the place, axle center of positioning pipe is on mounting base, installation top board The center of manhole.Due to the lower end hemispherical of central tube, then can realize being accurately positioned central tube by positioning pipe, Precision is high, simple and convenient.
Being provided with the ring-shaped step of indent at the manhole installing top board, the described diameter at ring-shaped step is equal to The external diameter of the central tube of blade assembly.This structure can realize positioning the upper end of central tube, it is thus possible to improve further right Positioning precision between central tube, bent blade.
The centre of blade locating piece is provided with engraved structure.Blade assembly after the convenient welding of this structure positions from blade Take off on block, convenient operation.
The centre that described roof and floor connects post is cylinder, and two ends are screw rod, and screw rod passes through mounting base and installs top board On screw, and fixed by nut, and each roof and floor to connect the cylinder length of post consistent.
The centre that described pressure ring connects post is cylinder, and two ends are screw rod, and screw rod passes through mounting base and low head pressure ring On screw, and fixed by nut, and each pressure ring to connect the cylinder length of post consistent.
The blade assembly welding tooling of the CAP1400 initial separator obtained by the utility model, can be real simply and easily Positioning between the central tube of existing blade assembly and bent blade, and positioning precision is high, thus improve welding precision;The other demoulding Process is simple and convenient.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is upward view of the present utility model;
Fig. 3 is installation top board structure schematic diagram of the present utility model;
Fig. 4 is mounting base structural representation of the present utility model;
Fig. 5 is blade positioning block structure schematic diagram of the present utility model;
Fig. 6 is the stereogram of blade locating piece of the present utility model.
Detailed description of the invention
The utility model will be further described to combine accompanying drawing below by embodiment.
Embodiment 1:
The blade assembly welding tooling of the CAP1400 initial separator that the present embodiment describes, it includes that the 1st, mounting base pacifies Dress top board 2 and blade locating piece 3, connect post 4 by roof and floor connect at mounting base 1 and the periphery installed between top board 2, institute The quantity of the blade locating piece 3 stated is four pieces, and four pieces of blade locating pieces 3 are evenly spaced to be arranged on mounting base 1 and installs top Between plate 2, described blade locating piece 3 overlaps towards the surface installing top board 2 blade shape bent with blade assembly, four leaves Piece locating piece 3 is consistent at mounting base 1 and the hand of spiral installed between top board 2;Mounting base 1 and the center installing top board 2 Being provided with manhole 8, described manhole 8 is for the central tube positioning to blade assembly.
By blade locating piece 3, bent blade is positioned, by installing the manhole on top board the 2nd, mounting base 1 8 and by supplementary means, central tube is positioned, it is achieved both precision positioning, welding.
Embodiment 2:
As shown in Figure 1, Figure 2, Figure 3, Figure 4, the blade assembly Welder of the CAP1400 initial separator that the present embodiment describes Dress, it includes that the 1st, mounting base installs top board 2 and blade locating piece 3, leads at mounting base 1 and the periphery installed between top board 2 Crossing roof and floor to connect post 4 and connect, the quantity of described blade locating piece 3 is four pieces, and four pieces of blade locating pieces 3 are evenly spaced to be set Put at mounting base 1 and install between top board 2, described blade locating piece 3 towards install the surface of top board 2 with in blade assembly Bent blade shape overlaps, and four blade locating pieces 3 are consistent at mounting base 1 and the hand of spiral installed between top board 2;The end, is installed The center of plate 1 and installation top board 2 is provided with manhole 8, and described manhole 8 is for determining to the central tube of blade assembly Position.
It is provided with low head pressure ring 5 in the lower end of mounting base 1, between low head pressure ring 5 and mounting base 1, pass through pressure ring Connecting post 6 to connect, the center of low head pressure ring 5 is positioning pipe 7, and the straight line at the place, axle center of positioning pipe 7 is through mounting base the 1st, The center of the manhole 8 on installation top board 2.It is provided with the ring-shaped step 9 of indent, institute at the manhole 8s installing top board 2 The diameter at ring-shaped step 9 stated is equal to the external diameter of the central tube of blade assembly.
As shown in Figure 5, Figure 6, the centre at blade locating piece 3 is provided with engraved structure 10.After the convenient welding of this structure Blade assembly takes off from blade locating piece 3, convenient operation.
The centre that described roof and floor connects post 4 is cylinder, and two ends are screw rod, and screw rod passes through mounting base 1 and installs top Screw on plate 2, and fixed by nut, and the cylinder length of each roof and floor connection post 4 is consistent.
The centre that described pressure ring connects post 6 is cylinder, and two ends are screw rod, and screw rod passes through mounting base 1 and low head pressure Screw on ring 5, and fixed by nut, and the cylinder length of each pressure ring connection post 6 is consistent.

Claims (6)

1. a blade assembly welding tooling for CAP1400 initial separator, is characterized in that: it includes mounting base, installs top Plate and blade locating piece, connect post by roof and floor connect at mounting base and the periphery installed between top board, described blade The quantity of locating piece is four pieces, and four pieces of blade locating pieces are evenly spaced to be arranged on mounting base and installs between top board, described Blade locating piece overlap towards the surface installing top board blade shape bent with blade assembly, four blade locating pieces are in installation Base plate and the hand of spiral installed between top board are consistent;The center of mounting base and installation top board is provided with manhole, institute The manhole stated is for the central tube positioning to blade assembly.
2. the blade assembly welding tooling of a kind of CAP1400 initial separator according to claim 1, is characterized in that: The lower end of mounting base is provided with low head pressure ring, is connected post by pressure ring and connects between low head pressure ring and mounting base, under The center of end socket pressure ring is positioning pipe, and the straight line at the place, axle center of positioning pipe leads to through mounting base, the circle installed on top board The center in hole.
3. the blade assembly welding tooling of a kind of CAP1400 initial separator according to claim 1 and 2, is characterized in that: Being provided with the ring-shaped step of indent at the manhole installing top board, the described diameter at ring-shaped step is equal to blade assembly The external diameter of central tube.
4. the blade assembly welding tooling of a kind of CAP1400 initial separator according to claim 3, is characterized in that: The centre of blade locating piece is provided with engraved structure.
5. the blade assembly welding tooling of a kind of CAP1400 initial separator according to claim 1 and 2, is characterized in that: The centre that described roof and floor connects post is cylinder, and two ends are screw rod, and screw rod passes through mounting base and the screw installed on top board, And fixed by nut, and the cylinder length of each roof and floor connection post is consistent.
6. the blade assembly welding tooling of a kind of CAP1400 initial separator according to claim 2, is characterized in that: institute The centre that the pressure ring stated connects post is cylinder, and two ends are screw rod, and screw rod passes through the screw on mounting base and low head pressure ring, and Fixed by nut, and the cylinder length of each pressure ring connection post is consistent.
CN201620633151.5U 2016-06-24 2016-06-24 The blade assembly welding tooling of CAP1400 initial separator Active CN205673812U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620633151.5U CN205673812U (en) 2016-06-24 2016-06-24 The blade assembly welding tooling of CAP1400 initial separator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620633151.5U CN205673812U (en) 2016-06-24 2016-06-24 The blade assembly welding tooling of CAP1400 initial separator

Publications (1)

Publication Number Publication Date
CN205673812U true CN205673812U (en) 2016-11-09

Family

ID=57429112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620633151.5U Active CN205673812U (en) 2016-06-24 2016-06-24 The blade assembly welding tooling of CAP1400 initial separator

Country Status (1)

Country Link
CN (1) CN205673812U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108422074A (en) * 2018-05-11 2018-08-21 天津航天机电设备研究所 A kind of spiral weld electro-beam welding clamper and heat dissipation tool
CN110919284A (en) * 2019-11-06 2020-03-27 西安西矿环保科技有限公司 Welding tool for cyclone structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108422074A (en) * 2018-05-11 2018-08-21 天津航天机电设备研究所 A kind of spiral weld electro-beam welding clamper and heat dissipation tool
CN108422074B (en) * 2018-05-11 2023-11-10 天津航天机电设备研究所 Spiral weld electron beam welding fixture and heat dissipation tool
CN110919284A (en) * 2019-11-06 2020-03-27 西安西矿环保科技有限公司 Welding tool for cyclone structure
CN110919284B (en) * 2019-11-06 2024-02-13 西安西矿环保科技有限公司 Welding tool for cyclone structure

Similar Documents

Publication Publication Date Title
CN205673812U (en) The blade assembly welding tooling of CAP1400 initial separator
CN104015028A (en) Pin pressing and mounting equipment
CN106238992A (en) Full-automatic oxygen sensor nut welding machine
CN206140026U (en) Full -automatic oxygen sensor nut welding machine
CN214816246U (en) Welding tool for air pipe assembly
CN105118733A (en) Temperature controller pedestal and manufacturing technique
CN101693330A (en) Welding tool
CN102814770A (en) Fixture for four-hole flanges
CN105241358A (en) Experiment clamp with an angle adjusting function and a height adjusting function
CN105729384A (en) Adjustable-angle suspension bushing press-fitting fixture
CN107088638A (en) A kind of assembling device that self-locking nut is assembled for thin-walled parts
CN202716179U (en) Flange clamp with four holes
CN105033544B (en) Welding jig for small four-way part of harvester
CN203804480U (en) Round pipe welding tool
CN203818020U (en) Vehicle combination switch vibration testing clamp
CN204491652U (en) The architecture basics great diameter and long foundation bolt high-precision ring device of installing flare tower frame
CN209110458U (en) A kind of Combined omnidirectional fast positioning clamping device
CN202877796U (en) Bent pipe welding device
CN108723437B (en) Punching auxiliary device for electric power fitting and using method thereof
CN204975835U (en) Return bend type tail pipe welds frock
CN102248350A (en) Positioning die for arranging elbow pipe on powder concentrator shell
CN205290735U (en) Hub machining tool
CN204430588U (en) Steel tubular beam assembly welding auxiliary stand
CN202273632U (en) Horizontal position adjusting structure for sleeve head clamping device
CN204677897U (en) A kind of reusable assembly type adjustment coil holder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No.159, Huicheng Road, Huimin street, Jiashan County, Jiaxing City, Zhejiang Province, 314100

Patentee after: Zhejiang Jiacheng kinetic energy equipment Co.,Ltd.

Address before: No.159, Huicheng Road, Huimin street, Jiashan County, Jiaxing City, Zhejiang Province, 314100

Patentee before: JIAXING JIACHENG KINETIC ENERGY EQUIPMENT CO.,LTD.

Address after: No.159, Huicheng Road, Huimin street, Jiashan County, Jiaxing City, Zhejiang Province, 314100

Patentee after: Zhejiang Jiacheng kinetic energy technology Co.,Ltd.

Address before: No.159, Huicheng Road, Huimin street, Jiashan County, Jiaxing City, Zhejiang Province, 314100

Patentee before: Zhejiang Jiacheng kinetic energy equipment Co.,Ltd.