CN205670931U - A kind of tiller - Google Patents
A kind of tiller Download PDFInfo
- Publication number
- CN205670931U CN205670931U CN201620616717.3U CN201620616717U CN205670931U CN 205670931 U CN205670931 U CN 205670931U CN 201620616717 U CN201620616717 U CN 201620616717U CN 205670931 U CN205670931 U CN 205670931U
- Authority
- CN
- China
- Prior art keywords
- gear box
- speed gear
- change speed
- tiller
- transition segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Soil Working Implements (AREA)
Abstract
This utility model relates to agro-farming field of mechanical technique, particularly to a kind of tiller;Described tiller includes change speed gear box, change speed gear box transition segment, electromotor, engine transition joint, connects gripper shoe, collapsible power mounting assembly, arm-rest frame assembly, road wheel;Described tiller by engine transition joint, change speed gear box transition segment, connect gripper shoe, collapsible power mounting and realize the connection of each module of tiller, these junctions use pin or the fastening of Quick Release bolt, it is easy to the dismounting of each assembly of tiller, installation, facilitates the hand haulage of tiller.
Description
Technical field
This utility model relates to agro-farming field of mechanical technique, particularly to a kind of tiller.
Background technology
Agro-farming is requisite link in agricultural production process, and the use of agro-farming machinery is the most universal.Existing China mound
Mound and mountain area are in the majority, and management mode is based on family, and therefore small-scale agricultural machinery is extensively liked by peasant.Tiller weight
Gently, volume is little, simple in construction, is widely used in Plain, mountain area, the nonirrigated farmland on hills, paddy field, orchard etc., coordinates the corresponding facility can
Carry out drawing water, generate electricity, spray the operation such as medicine, spray.But due to mountain area, undulating topography complexity, tiller cannot use machinery fortune
Defeated, manpower transport can only be relied on, although and tiller is small-sized machine, still manpower transport is difficult.Existing tiller
Mostly being that each assembly is directly connected to, connective stability is poor, and the tiller strenuous vibration when operation easily damages each assembly;And it is each
The most quick detachable separation of assembly.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of tiller, uses engine transition in tiller
Circular location plane and the bolt hole of plane both sides on joint, change speed gear box transition segment realize electromotor and 2 one sides of change speed gear box
Connection, ensure be stably connected with while, facilitate disassembly and assembly, solve tiller manpower transport difficulty problem.
In order to solve above-mentioned technical problem, the technical solution adopted in the utility model is: this utility model provides a kind of micro-
The machine of ploughing, described tiller includes that change speed gear box, change speed gear box transition segment, electromotor, engine transition save;
Described change speed gear box connects change speed gear box transition segment;Described electromotor connects engine transition joint;Described engine transition
Joint connects change speed gear box transition segment;
Described change speed gear box transition segment includes the first location plane, ring flange installation base, the first alignment pin nail, fastening even
Pick up the ears in connecting bolt hole, the connection of Quick Release bolt, the first connecting pin bores;
Described first location plane is circular planes, is positioned at change speed gear box transition segment central authorities;Described first location plane central
Ring flange installation base is set, described ring flange installation base be shaped as annulus;Described first plane both sides, location arrange the
One location pin hole, described first alignment pin nail has two, the center of circle of described first alignment pin nail and the first location plane
The center of circle point-blank;Described fastening bolt hole has four, is symmetricly set in change speed gear box transition segment edge;Described soon
Tear open bolt connect pick up the ears be shaped as U-shaped, be positioned at change speed gear box transition segment both sides, opening direction is back to change speed gear box transition segment, vertically
Direction is provided with pin hole;Described change speed gear box transition segment top is provided with the first connecting pin bores;
Described change speed gear box includes ring flange, described ring flange and the ring flange installation base laminating on change speed gear box transition segment,
Described change speed gear box is provided with through hole, described change speed gear box transition segment and change speed gear box by bolt through fastening bolt hole and through hole
It is attached;
Described engine transition joint includes the second location plane, the first cooperation boss, fastening dormant bolt hole, the second location
Pin hole, the first connection pin block, Quick Release bolt support are picked up the ears;Described second location plane is circular planes, is positioned at electromotor mistake
Cross joint central authorities;Described first cooperation boss is circular, is positioned at the second location plane central;Described fastening dormant bolt hole has four
Individual, it is uniformly and symmetrically distributed in the second location plane;Described second alignment pin nail has two, is positioned at the second location plane two
Side, described second alignment pin nail positions the center of circle of plane on same straight line with second;Described connection pin block is positioned at and starts
Machine transition segment top, pin block arranges the pin-and-hole of horizontal direction;Described Quick Release bolt support picks up the ears to be positioned under engine transition joint
The both sides of side, horizontally arranged pin hole;
The first cooperation boss on described engine transition joint is fitted with electromotor, and described electromotor is provided with through hole, institute
State engine transition joint and electromotor is fastened by bolts described dormant bolt hole and through hole is attached;
The first alignment pin nail, the connection of Quick Release bolt on described change speed gear box transition segment are picked up the ears, the second connecting pin bores difference
Pick up the ears with the second alignment pin nail on engine transition joint, Quick Release bolt support, first be connected pin block and be bolted, change
The first location plane on speed case transition segment and the second location plane laminating on engine transition joint.
Described tiller also includes connecting gripper shoe;Described connection gripper shoe includes that the second connecting pin bores, the second cooperation are convex
Platform, fastening bolt holes;Described second connecting pin bores is positioned at connection gripper shoe both sides and highlights in structure;Described second coordinates boss to have
Two, it is shaped as bar shaped, is positioned at connection gripper shoe both sides;Described fastening bolt holes is positioned at the two ends coordinating boss;Described cooperation
Boss is fitted with electromotor, and the fastening bolt holes being bolted connection in gripper shoe connects electromotor.
Described tiller also includes collapsible power mounting;Described collapsible power mounting include elastic dynamic seat board,
Two connect pin block;Described elastic dynamic seat board is positioned at the top of collapsible power mounting;Described elastic dynamic seat board both sides are provided with
Second connects pin block;Described second connects pin block is bolted with the second connecting pin bores being connected in gripper shoe.
Ring flange on described change speed gear box installs gasket seal with the ring flange boss joint place on change speed gear box transition segment.
Described collapsible power mounting also includes spacing cutting ferrule, upper support link, lower support link;In described spacing cutting ferrule
Portion is provided with square hole in ladder, and in described ladder, square hole one end can coordinate with upper support link, and described spacing cutting ferrule can be in upper support
On connecting rod slidably, in described ladder, the square hole other end and two lower support link coordinate, and limit the phase of upper and lower support link
To motion.
Described collapsible power mounting also includes that U-shaped supervisor, described U-shaped supervisor are welded on elastic dynamic seat board, described U
Type supervisor's leading portion is upturned 130 degree, the front end welding beam between two horizontal tubes of U-shaped supervisor.
Described collapsible power mounting also includes that left and right sidesing wall plate, described left and right sidesing wall plate are vertically welded under elastic dynamic seat board
Side, described left and right sidesing wall plate uses 2.5mm through the steel plate of Overheating Treatment.
Described left and right sidesing wall plate front end welded end plate.
The beneficial effects of the utility model are: the tiller that this utility model relates to passes through change speed gear box transition segment, starts
Machine transition segment realizes the connection of electromotor and change speed gear box;Change speed gear box transition segment and engine transition joint are fixed by location Planar realization
Position, is connected by bolt and pin fastener;Change speed gear box is positioned by ring flange installation base with change speed gear box transition segment, passes through bolt
Connect;Electromotor saves by coordinating boss to position with engine transition, is bolted;This connected mode compares existing skill
The tiller connected mode stability mentioned in art is higher, when ploughing work, will not cause because of fuselage strenuous vibration even
Connect place's skew;And after operation completes, it is only necessary to pull out the pin between engine transition joint and change speed gear box transition segment, unload bolt
Electromotor can be realized separate with change speed gear box, facilitate the module of tiller to dismantle, more convenient and transport;Again open at tiller
Used time, it is only necessary to load onto corresponding bolt, pin can quick links electromotor and change speed gear box.
Accompanying drawing explanation
Fig. 1 is the structural representation of tiller;
Fig. 2 is change speed gear box transition segment schematic diagram;
Fig. 3 is that engine transition saves schematic diagram;
Fig. 4 is for connecting gripper shoe schematic diagram;
Fig. 5 Yu Fig. 6 is collapsible power mounting assembly schematic diagram.
Label declaration:
1, change speed gear box;
2, change speed gear box transition segment;2a, Quick Release bolt connect picks up the ears;2b, the first alignment pin nail;2c, fastening bolt
Hole;2d, the first connecting pin bores;2e, ring flange installation base;2f, the first location plane;
3, electromotor;
4, engine transition joint;4a, Quick Release bolt support are picked up the ears;4b, the second alignment pin nail;4c, fastening dormant bolt
Hole;4d, the first cooperation boss;4e, the first connection pin block;4f, the second location plane;
5, gripper shoe is connected;5a, the second connecting pin bores;5b, the second cooperation boss;5c, fastening bolt holes;
6, collapsible power mounting assembly;6a, U-shaped supervisor;6b, elastic dynamic seat board;6c, left and right sidesing wall plate;6d, end plate;
6e, upper connecting pin;6f, upper support link;6g, lower connecting pin;6h, lower support link;6i, fastening bolt;6j, limiting card
Set;6k, crossbeam;6l, the second connection pin block;
7, arm-rest frame;
8, road wheel.
Detailed description of the invention
By describing technology contents of the present utility model in detail, being realized purpose and effect, below in conjunction with embodiment and join
Conjunction accompanying drawing is explained.
The design of this utility model most critical is: use in tiller on engine transition joint, change speed gear box transition segment
The bolt hole of circular location plane and plane both sides realizes electromotor and the connection of 2 one sides of change speed gear box, stably connects in guarantee
While connecing, facilitate disassembly and assembly, facilitate hand haulage.
Refer to Fig. 1 to Fig. 6,
A kind of tiller, described tiller includes change speed gear box 1, change speed gear box transition segment 2, electromotor 3, engine transition joint 4;
Described change speed gear box connects change speed gear box transition segment;Described electromotor connects engine transition joint;Described engine transition
Joint connects change speed gear box transition segment;
Described change speed gear box transition segment 2 includes the first location plane 2f, ring flange installation base 2e, the first alignment pin nail
2b, fastening bolt hole 2c, Quick Release bolt connect pick up the ears 2a, the first connecting pin bores 2d;
Described first location plane is circular planes, is positioned at change speed gear box transition segment central authorities;Described first location plane central
Ring flange installation base is set, described ring flange installation base be shaped as annulus;Described first plane both sides, location arrange the
One location pin hole, described first alignment pin nail has two, the center of circle of described first alignment pin nail and the first location plane
The center of circle point-blank;Described fastening bolt hole has four, is symmetricly set in change speed gear box transition segment edge;Described soon
Tear open bolt connect pick up the ears be shaped as U-shaped, be positioned at change speed gear box transition segment both sides, opening direction is back to change speed gear box transition segment, vertically
Direction is provided with pin hole;Described change speed gear box transition segment top is provided with the first connecting pin bores;
Described change speed gear box 1 includes ring flange, described ring flange and the ring flange installation base laminating on change speed gear box transition segment,
Described change speed gear box is provided with through hole, described change speed gear box transition segment and change speed gear box by bolt through fastening bolt hole and through hole
It is attached;
Described engine transition joint 4 include the second location plane 4f, first coordinate boss 4d, fastening dormant bolt hole 4c,
Second alignment pin nail 4b, first connect pin block 4e, Quick Release bolt support and pick up the ears 4a;Described second location plane is that annulus is put down
Face, is positioned at engine transition joint central;Described first cooperation boss is circular, is positioned at the second location plane central;Described tightly
Gu dormant bolt hole has four, it is uniformly and symmetrically distributed in the second location plane;Described second alignment pin nail has two, is positioned at
Second plane both sides, location, described second alignment pin nail positions the center of circle of plane on same straight line with second;Described company
Pin block is positioned at engine transition joint top, and pin block arranges the pin-and-hole of horizontal direction;Described Quick Release bolt support picks up the ears to be positioned at
Both sides below engine transition joint, horizontally arranged pin hole;
The first cooperation boss on described engine transition joint is fitted with electromotor, and described electromotor is provided with through hole, institute
State engine transition joint and electromotor is fastened by bolts described dormant bolt hole and through hole is attached;
The first alignment pin nail, the connection of Quick Release bolt on described change speed gear box transition segment are picked up the ears, the second connecting pin bores difference
Pick up the ears with the second alignment pin nail on engine transition joint, Quick Release bolt support, first be connected pin block and be bolted, change
The first location plane on speed case transition segment and the second location plane laminating on engine transition joint.
Knowable to foregoing description, the beneficial effects of the utility model are: saved by change speed gear box transition segment, engine transition
Realize the connection of electromotor and change speed gear box;Change speed gear box transition segment is positioned by location Planar realization with engine transition joint, passes through
Bolt and pin fastener connect;Change speed gear box is positioned by ring flange installation base with change speed gear box transition segment, is bolted;Send out
Motivation saves by coordinating boss to position with engine transition, is bolted;This connected mode compared to existing technology in carry
And tiller connected mode stability higher, when ploughing work, junction will be caused inclined because of fuselage strenuous vibration
Move;And after operation completes, it is only necessary to pulling out the pin between engine transition joint and change speed gear box transition segment, unloading bolt can be real
Existing electromotor separates with change speed gear box, facilitates the module of tiller to dismantle, more convenient and transport;When tiller reactivates,
Only need to load onto corresponding bolt, pin can quick links electromotor and change speed gear box.
Further, described tiller also includes connecting gripper shoe 5;Described connection gripper shoe 5 includes the second connecting pin bores
5a, the second cooperation boss 5b, fastening bolt holes 5c;Described second connecting pin bores is positioned at connection gripper shoe both sides and highlights in structure;
Described second coordinates boss to have two, is shaped as bar shaped, is positioned at connection gripper shoe both sides;It is convex that described fastening bolt holes is positioned at cooperation
The two ends of platform;Described cooperation boss is fitted with electromotor, and the fastening bolt holes being bolted connection in gripper shoe connects to be sent out
Motivation.
Further, the ring flange on described change speed gear box is installed close with the ring flange boss joint place on change speed gear box transition segment
Gasket.
Seen from the above description, the use of gasket seal achieves the sealing of change speed gear box transition segment and change speed gear box periphery.
Described tiller also includes collapsible power mounting 6;Described collapsible power mounting 6 includes elastic dynamic seat board
6b, the second connection pin block 6l;Described elastic dynamic seat board is positioned at the top of collapsible power mounting;Described elastic dynamic seat board two
Side is provided with the second connection pin block;Described second connects pin block is bolted with the second connecting pin bores being connected in gripper shoe.
Seen from the above description, electromotor only need to be able to take out by being connected in gripper shoe connection with collapsible power mounting
Link collapsible power mounting to realize electromotor with the pin connected in gripper shoe and separate with frame.
Further, described collapsible power mounting also includes spacing cutting ferrule 6j, upper support link 6f, lower support link
6h, fastening bolt 6i;
Being provided with square hole in ladder inside described spacing cutting ferrule, in described ladder, square hole one end can coordinate with upper support link,
Described spacing cutting ferrule can in upper support link slidably, and in described ladder, the square hole other end and two lower support link are joined
Close, limit the relative motion of upper and lower support link, the fixing lower support link of described fastening bolt.
Seen from the above description, spacing cutting ferrule can the straight position of positioning power mounting, it is achieved the support of power mounting with
Fold.
Further, described collapsible power mounting also includes U-shaped supervisor 6a, and described U-shaped supervisor is welded on elastic dynamic
On seat board, described U-shaped supervisor's leading portion is upturned 130 degree, the front end welding beam 6k between two horizontal tubes of U-shaped supervisor.
Seen from the above description, the design that U-shaped supervisor's leading portion is upturned achieves the protection to electromotor, the horizontal stroke of welding
Beam strengthens the rigidity of U-shaped supervisor.
Further, described collapsible power mounting also includes that left and right sidesing wall plate, described left and right sidesing wall plate are vertically welded in elasticity
Below power seat board, described left and right sidesing wall plate uses 2.5mm through the steel plate of Overheating Treatment.
Seen from the above description, the steel plate that left and right sidesing wall plate is used has good rigidity, satisfactory mechanical property.
Further, described left and right sidesing wall plate front end welded end plate.
Seen from the above description, the use of end plate enhances the rigidity of left and right sidesing wall plate, improves left and right sidesing wall plate to power seat
The support strength of frame.
Embodiment:
A kind of tiller, including change speed gear box 1, change speed gear box transition segment 2, electromotor 3, engine transition joint 4;Connect gripper shoe
5;Collapsible power mounting 6;Arm-rest frame 7;Road wheel 8;
Described change speed gear box connects change speed gear box transition segment;Described electromotor connects engine transition joint;Described engine transition
Joint connects change speed gear box transition segment;Described electromotor connects gripper shoe;Described connection gripper shoe connects collapsible power mounting;
Described road wheel connects collapsible power mounting;
Described change speed gear box transition segment 2 includes the first location plane 2f, ring flange installation base 2e, the first alignment pin nail
2b, fastening bolt hole 2c, Quick Release bolt connect pick up the ears 2a, the first connecting pin bores 2d;
Described first location plane is circular planes, is positioned at change speed gear box transition segment central authorities;Described first location plane central
Ring flange installation base is set, described ring flange installation base be shaped as annulus;Described first plane both sides, location arrange the
One location pin hole, described first alignment pin nail has two, the center of circle of described first alignment pin nail and the first location plane
The center of circle point-blank;Described fastening bolt hole has four, is symmetricly set in change speed gear box transition segment edge;Described soon
Tear open bolt connect pick up the ears be shaped as U-shaped, be positioned at change speed gear box transition segment both sides, opening direction is back to change speed gear box transition segment, vertically
Direction is provided with pin hole;Described change speed gear box transition segment top is provided with the first connecting pin bores;
Described change speed gear box 1 includes ring flange, described ring flange and the ring flange installation base laminating on change speed gear box transition segment,
Described change speed gear box is provided with through hole, described change speed gear box transition segment and change speed gear box by bolt through fastening bolt hole and through hole
It is attached;Ring flange on described change speed gear box installs gasket seal with the ring flange boss joint place on change speed gear box transition segment;
Described engine transition joint 4 include the second location plane 4f, first coordinate boss 4d, fastening dormant bolt hole 4c,
Second alignment pin nail 4b, first connect pin block 4e, Quick Release bolt support and pick up the ears 4a;Described second location plane is that annulus is put down
Face, is positioned at engine transition joint central;Described first cooperation boss is circular, is positioned at the second location plane central;Described tightly
Gu dormant bolt hole has four, it is uniformly and symmetrically distributed in the second location plane;Described second alignment pin nail has two, is positioned at
Second plane both sides, location, described second alignment pin nail positions the center of circle of plane on same straight line with second;Described company
Pin block is positioned at engine transition joint top, and pin block arranges the pin-and-hole of horizontal direction;Described Quick Release bolt support picks up the ears to be positioned at
Both sides below engine transition joint, horizontally arranged pin hole;
The first cooperation boss on described engine transition joint is fitted with electromotor, and described electromotor is provided with through hole, institute
State engine transition joint and electromotor is fastened by bolts described dormant bolt hole and through hole is attached.
The first alignment pin nail, the connection of Quick Release bolt on described change speed gear box transition segment are picked up the ears, the second connecting pin bores difference
Pick up the ears with the second alignment pin nail on engine transition joint, Quick Release bolt support, first be connected pin block and be bolted, change
The first location plane on speed case transition segment and the second location plane laminating on engine transition joint.
Described connection gripper shoe 5 includes the second connecting pin bores 5a, the second cooperation boss 5b, fastening bolt holes 5c;Described
Two connecting pin bores are positioned at connection gripper shoe both sides and highlight in structure;Described second coordinates boss to have two, is shaped as bar shaped, is positioned at
Connect gripper shoe both sides;Described fastening bolt holes is positioned at the two ends coordinating boss;Described cooperation boss is fitted with electromotor, passes through
The fastening bolt holes that bolt is fastenedly connected in gripper shoe connects electromotor.
Described collapsible power mounting 6 includes U-shaped supervisor 6a;Elastic dynamic seat board 6b;Left and right sidesing wall plate 6c;End plate 6d;On
Connecting pin 6e;Upper support link 6f;Lower connecting pin 6g;Lower support link 6h;Fastening bolt 6i;Spacing cutting ferrule 6j;Crossbeam
6k;Second connects pin block 6l;Described elastic dynamic seat board is positioned at the top of collapsible power mounting;Described elastic dynamic seat board two
Side is provided with the second connection pin block;Described second connects pin block is bolted with the second connecting pin bores being connected in gripper shoe;
Being provided with square hole in ladder inside described spacing cutting ferrule, in described ladder, square hole one end can coordinate with upper support link, described spacing
Cutting ferrule can in upper support link slidably, and in described ladder, the square hole other end and two lower support link coordinate, in restriction
The relative motion of lower support link, the fixing lower support link of described fastening bolt;Described U-shaped supervisor is welded on elastic dynamic seat board
On, described U-shaped supervisor's leading portion is upturned 130 degree, the front end welding beam 6k between two horizontal tubes of U-shaped supervisor;A described left side
Right wallboard is vertically welded in below elastic dynamic seat board, and described left and right sidesing wall plate uses 2.5mm through the steel plate of Overheating Treatment;A described left side
Right wallboard front end welded end plate.
The fast quick-detach of tiller:
After tiller terminates operation, first unload the pin between change speed gear box transition segment 2 and engine transition joint 4 and spiral shell
Bolt, the bolt between unloaded engine 3 and engine transition joint 4, unload the bolt between change speed gear box 1 and change speed gear box transition segment 2,
Unload the latch connecting gripper shoe 5 with elastic dynamic seat board 6b, unload the bolt of other junctions;Secondly dismounting electromotor 3 He
Change speed gear box 1, slowly moves outwardly to electromotor 3 electromotor splined shaft and completely disengages from change speed gear box 1, then unload change speed gear box 1, unload
Lower change speed gear box transition segment 2 and engine transition joint 4;Finally unload road wheel 8 and arm-rest frame 7, by collapsible power mounting 6
Spacing cutting ferrule 6j upwards support link 6f is slided, thus folds lower support link 6h.
The quick assembling of tiller:
When reactivating tiller, first road wheel 8 and arm-rest frame 7 are fastened with bolt with collapsible power mounting 6
Connect;Secondly electromotor 3 is connected with change speed gear box transition segment 2, below electromotor 3 with engine transition joint 4, change speed gear box 1
Connect gripper shoe 5 to be connected with collapsible power mounting 6, fix each junction by bolt and pin;Finally launch collapsible dynamic
Lower support link 6h of power mounting 6, by spacing cutting ferrule 6j slide downward, support link under joggle, locks each Quick Release bolt.
In sum, the tiller that this utility model provides is started by change speed gear box transition segment, engine transition joint realization
Machine and the connection of change speed gear box;Change speed gear box transition segment is positioned, by bolt and pin by location Planar realization with engine transition joint
Clench and be solidly connected;Change speed gear box is positioned by ring flange installation base with change speed gear box transition segment, is bolted;Electromotor with send out
Motivation transition segment, by coordinating boss to position, is bolted;This connected mode compared to existing technology in mention micro-plough
Machine connected mode stability is higher, when ploughing work, junction will be caused to offset because of fuselage strenuous vibration;And making
After industry completes, it is only necessary to pull out the pin between engine transition joint and change speed gear box transition segment, unload bolt and can realize electromotor
Separate with change speed gear box, facilitate the module of tiller to dismantle, more convenient and transport;When tiller reactivates, it is only necessary to load onto
Corresponding bolt, pin can quick links electromotor and change speed gear boxes;Electromotor can prop up by being connected with collapsible power mounting
Connect on fagging, only need to take out the collapsible power mounting of link and can realize electromotor and frame with the pin being connected in gripper shoe
Separation;Spacing cutting ferrule can the straight position of positioning power mounting, it is achieved the support of power mounting and folding;Making of gasket seal
With the sealing achieving change speed gear box transition segment and change speed gear box periphery;The design that U-shaped supervisor's leading portion is upturned achieves starting
The protection of machine, the crossbeam of welding strengthens the rigidity of U-shaped supervisor;The steel plate that left and right sidesing wall plate is used has good rigidity, machine
Tool is functional;The use of end plate enhances the rigidity of left and right sidesing wall plate, improves the left and right sidesing wall plate support strength to power mounting.
The foregoing is only embodiment of the present utility model, not thereby limit the scope of the claims of the present utility model, every
Utilize the equivalents that this utility model description and accompanying drawing content are made, or be directly or indirectly used in relevant technology neck
Territory, is the most in like manner included in scope of patent protection of the present utility model.
Claims (8)
1. a tiller, it is characterised in that: described tiller includes change speed gear box, change speed gear box transition segment, electromotor, electromotor mistake
Cross joint;
Described change speed gear box connects change speed gear box transition segment;Described electromotor connects engine transition joint;Described engine transition joint is even
Connect change speed gear box transition segment;
Described change speed gear box transition segment includes the first location plane, ring flange installation base, the first alignment pin nail, is fastenedly connected spiral shell
The connection of keyhole, Quick Release bolt is picked up the ears, the first connecting pin bores;
Described first location plane is circular planes, is positioned at change speed gear box transition segment central authorities;Described first location plane central is arranged
Ring flange installation base, described ring flange installation base be shaped as annulus;It is fixed that described first plane both sides, location arrange first
Position pin hole, described first alignment pin nail has two, the center of circle of described first alignment pin nail and the first circle positioning plane
The heart is point-blank;Described fastening bolt hole has four, is symmetricly set in change speed gear box transition segment edge;Described Quick Release spiral shell
Tethering that to connect being shaped as of picking up the ears U-shaped, be positioned at change speed gear box transition segment both sides, opening direction is back to change speed gear box transition segment, vertical direction
It is provided with pin hole;Described change speed gear box transition segment top is provided with the first connecting pin bores;
Described change speed gear box includes ring flange, described ring flange and the ring flange installation base laminating on change speed gear box transition segment, described
Change speed gear box is provided with through hole, described change speed gear box transition segment and change speed gear box to be carried out through fastening bolt hole and through hole by bolt
Connect;
Described engine transition joint includes the second location plane, the first cooperation boss, fastening dormant bolt hole, the second shop bolt
Hole, the first connection pin block, Quick Release bolt support are picked up the ears;Described second location plane is circular planes, is positioned at engine transition joint
Central authorities;Described first cooperation boss is circular, is positioned at the second location plane central;Described fastening dormant bolt hole has four,
It is uniformly and symmetrically distributed in the second location plane;Described second alignment pin nail has two, is positioned at the second plane both sides, location, institute
State the second alignment pin nail and position the center of circle of plane on same straight line with second;Described connection pin block is positioned at engine transition
Joint top, pin block arranges the pin-and-hole of horizontal direction;Described Quick Release bolt support picks up the ears to be positioned at two below engine transition joint
Side, horizontally arranged pin hole;
The first cooperation boss and electromotor on described engine transition joint is fitted, and described electromotor is provided with through hole, described
Motivation transition segment and electromotor are fastened by bolts described dormant bolt hole and through hole is attached;
The first alignment pin nail on described change speed gear box transition segment, Quick Release bolt connect pick up the ears, the second connecting pin bores respectively with send out
The second alignment pin nail on motivation transition segment, Quick Release bolt support are picked up the ears, the first connection pin block is bolted, change speed gear box
The first location plane on transition segment and the second location plane laminating on engine transition joint.
Tiller the most according to claim 1, it is characterised in that: described tiller also includes connecting gripper shoe;Described company
Connect gripper shoe and include the second connecting pin bores, the second cooperation boss, fastening bolt holes;Described second connecting pin bores is positioned at connection and supports
Plate both sides highlight in structure;Described second coordinates boss to have two, is shaped as bar shaped, is positioned at connection gripper shoe both sides;Described tightly
Fixing bolt hole is positioned at the two ends coordinating boss;Described cooperation boss is fitted with electromotor, is bolted connection in gripper shoe
Fastening bolt holes connect electromotor.
Tiller the most according to claim 1 and 2, it is characterised in that described tiller also includes collapsible power mounting;
Described collapsible power mounting includes elastic dynamic seat board, the second connection pin block;Described elastic dynamic seat board is positioned at collapsible dynamic
The top of power mounting;Described elastic dynamic seat board both sides are provided with the second connection pin block;Described second connects pin block and is connected support
The second connecting pin bores on plate is bolted.
4. tiller as claimed in claim 1, it is characterised in that: on the ring flange on described change speed gear box and change speed gear box transition segment
Ring flange boss joint place install gasket seal.
5. tiller as claimed in claim 3, it is characterised in that: described collapsible power mounting also include spacing cutting ferrule, on
Support link, lower support link;Be provided with square hole in ladder inside described spacing cutting ferrule, in described ladder square hole one end can with upper
Supporting rod coordinates, and described spacing cutting ferrule can in upper support link slidably, in described ladder under the square hole other end and two
Support link coordinates, and limits the relative motion of upper and lower support link.
6. tiller as claimed in claim 3, it is characterised in that: described collapsible power mounting also includes U-shaped supervisor, described
U-shaped supervisor is welded on elastic dynamic seat board, and described U-shaped supervisor's leading portion is upturned 130 degree, two horizontal tubes of U-shaped supervisor it
Between front end welding beam.
7. tiller as claimed in claim 3, it is characterised in that: described collapsible power mounting also includes left and right sidesing wall plate, institute
Stating left and right sidesing wall plate and be vertically welded in below elastic dynamic seat board, described left and right sidesing wall plate uses 2.5mm through the steel plate of Overheating Treatment.
8. tiller as claimed in claim 7, it is characterised in that: described left and right sidesing wall plate front end welded end plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620616717.3U CN205670931U (en) | 2016-06-21 | 2016-06-21 | A kind of tiller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620616717.3U CN205670931U (en) | 2016-06-21 | 2016-06-21 | A kind of tiller |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205670931U true CN205670931U (en) | 2016-11-09 |
Family
ID=57431450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620616717.3U Expired - Fee Related CN205670931U (en) | 2016-06-21 | 2016-06-21 | A kind of tiller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205670931U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105917776A (en) * | 2016-06-21 | 2016-09-07 | 福建农林大学 | Mini-tiller |
-
2016
- 2016-06-21 CN CN201620616717.3U patent/CN205670931U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105917776A (en) * | 2016-06-21 | 2016-09-07 | 福建农林大学 | Mini-tiller |
CN105917776B (en) * | 2016-06-21 | 2018-01-30 | 福建农林大学 | A kind of mini-tiller |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104417964B (en) | Fragment assembled container, manufacture and stockpiling and transportation resources and finished product module | |
CN105984661B (en) | Fragment assembled container | |
CN205670931U (en) | A kind of tiller | |
CN202599497U (en) | Separated truck scale with hollow square steel joints | |
CN105917776B (en) | A kind of mini-tiller | |
CN105523085B (en) | A kind of auxiliary frame structure | |
CN205022855U (en) | Novel agricultural unmanned aerial vehicle | |
CN104067717B (en) | A kind of portable mini-size tillage machine rear wheel assembly and engine arrangement structure | |
CN106149890A (en) | A kind of modularized house | |
CN207339155U (en) | Marine GRP cable trough | |
CN205661647U (en) | Be applied to folding mechanism on unmanned aerial vehicle horn | |
CN205502562U (en) | Install railing base of walking bench | |
CN104179633A (en) | Flange assembly for a tower segment | |
CN108835072A (en) | A kind of foldable integrated type fog machine | |
CN104067710B (en) | A kind of mini-size tillage machine screw drive tank mounting structure | |
CN204047069U (en) | Mini-size tillage machine engine and screw drive tank mounting structure | |
CN204047080U (en) | Mini-size tillage machine screw drive case and handle bracket mounting structure | |
CN203996514U (en) | Miniature cultivator used on higher handle bracket and skeleton connection structure | |
CN203984942U (en) | Mini-size tillage machine screw drive tank mounting structure | |
CN101941531A (en) | Micro-satellite assembly and disassembly method based on large-span hanging | |
CN205890989U (en) | Multipurpose man of great strength's car base | |
CN203984936U (en) | Mini-size tillage machine frame | |
CN203998728U (en) | Chip jacking stock | |
CN203996517U (en) | Tiller driving engine and handle bracket mounting structure | |
CN205902252U (en) | Modularization rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161109 Termination date: 20180621 |