A kind of reduce molten steel device of nitrogen pick-up during continuous casting
Technical field
This utility model relates to a kind of reducing molten steel device of nitrogen pick-up during continuous casting, belongs to continuous casting equipment
Technical field.
Background technology
For most of steel grades, nitrogen is harmful element, nitrogen plasticity, impact flexibility, magnetic and electric conductivity etc. to steel
Performance all has an impact, and nitrogen also can cause the ageing of steel simultaneously, and can cause the cold short of steel as phosphorus, nitrogen also can with in steel
The element such as titanium, aluminum forms nitride inclusion, affects the quality of steel.Therefore IF steel, electrical sheet, high-grade pipe line steel etc. are desirable that steel
In nitrogen content the lowest more good.Along with the development of iron and steel enterprise, people are more and more higher to the requirement of quality, and nitrogen in steel content is also got over
More receiving publicity, the control of nitrogen in steel content also becomes the limiting element in R&D process, how to be controlled by nitrogen in steel content
In the striving direction that lower scope has become in casting process.
Utility model content
Technical problem to be solved in the utility model is to provide and a kind of reduces molten steel device of nitrogen pick-up in casting process,
This device can make during continuous casting Metal in Tundish ullage formed one layer of argon shield, isolation air with
Metal in Tundish liquid level contacts, it is to avoid in casting process, liquid steel level passes through pouring basket liquid level nitrogen pick-up.
The technical scheme solving above-mentioned technical problem is:
A kind of reducing molten steel device of nitrogen pick-up during continuous casting, it includes that argon is jetted pipeline, argon nozzle, argon
Exhaust switch valve, argon winding-up pipeline is arranged on close at bag mouth inside tundish, and the inlet end of argon winding-up pipeline is put down with continuous casting
Argon pipeline on platform is connected, and the other end of argon winding-up pipeline uses encapsulation process, installs many on argon winding-up pipeline
Individual argon nozzle, multiple argon nozzle are evenly distributed on argon winding-up pipeline, and argon nozzle exports towards pouring basket liquid level, argon
The entrance point in gas blowout blowpipe road is provided with argon switch valve.
Above-mentioned reduction molten steel device of nitrogen pick-up during continuous casting, described argon winding-up pipeline is arranged on tundish bag
In lining, argon winding-up pipeline is around the inclusion of tundish, a diameter of 20-30mm of argon winding-up pipeline.
Above-mentioned reduction molten steel device of nitrogen pick-up during continuous casting, described argon nozzle is 8-14, argon nozzle
Direction is with the horizontal 0-45 DEG C.
Above-mentioned reduction molten steel device of nitrogen pick-up during continuous casting, the entrance point of described argon winding-up pipeline is also installed
Having argon flow amount to regulate valve, argon switch valve is in series with argon flow amount regulation valve.Argon switch valve controls the break-make of argon, argon
The size of air-flow adjustable valve scalable argon flow amount, argon flow amount controls at 10-50L/min.
The beneficial effects of the utility model are:
This utility model installs argon winding-up pipeline and argon nozzle inside continuous casting production at bag mouth, and argon sprays
Mouth is jetted argon at Metal in Tundish liquid level, can form one layer of argon shield, isolation at Metal in Tundish ullage
Air contacts with the liquid steel level in tundish, effectively controls the nitrogen pick-up of molten steel in tundish in casting process, reduces in molten steel
Nitrogen content.Before this utility model is implemented, during continuous casting, the average nitrogen increased amount of molten steel is 12ppm, uses this utility model
After, it is possible to during controlling continuous casting, molten steel nitrogen increased amount is at 3-8ppm, and average nitrogen increased amount is 5ppm, significantly reduces continuous casting
During the nitrogen increased amount of molten steel.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure, labelling is as follows: tundish 1, tundish cylinder-packing 2, argon winding-up pipeline 3, argon nozzle 4, argon switch valve 5,
Argon flow amount regulation valve 6.
Detailed description of the invention
This utility model is made up of argon winding-up pipeline 3, argon nozzle 4, argon switch valve 5, argon flow amount regulation valve 6.
Showing in figure, it is internal at bag mouth that argon winding-up pipeline 3 is arranged on tundish 1, during argon winding-up pipeline 3 is positioned at
Between in bag cylinder-packing 2, argon winding-up pipeline 3 is around the inclusion of tundish 1.On the inlet end of argon winding-up pipeline 3 and continuous casting platform
Argon pipeline be connected, argon winding-up pipeline 3 the other end use encapsulation process.A diameter of 20-of argon winding-up pipeline
30mm。
Showing in figure, installing multiple argon nozzle 4 on argon winding-up pipeline 3, multiple argon nozzle 4 are evenly distributed on argon
On gas blowout blowpipe road 3, argon nozzle 4 is 8-14.Argon nozzle 4 exports towards tundish 1 liquid level, argon nozzle direction and water
Plane becomes 0-45 DEG C.
Showing in figure, the entrance point of argon winding-up pipeline 3 is provided with argon switch valve 5 and argon flow amount regulation valve 6, argon
Switch valve 5 is in series with argon flow amount regulation valve 6.Argon switch valve 5 can control the break-make of argon, argon flow amount regulation valve 6
The size of scalable argon flow amount, argon flow amount controls at 10-50L/min.
Work process of the present utility model is as follows:
Continuous casting the first stove is opened before watering, and tundish 1 carries out emptying operation, after emptying operation, opens the argon of argon winding-up pipeline 3
Exhaust switch valve 5, is utilized argon regulation valve 6 to control argon flow amount, is jetted argon by argon nozzle 4, in centre in tundish 1
Bag mouth is formed about one layer of argon shield.After continuous casting is opened and watered, argon nozzle 4 continues winding-up argon in tundish 1, it is ensured that
All the time there is argon shield near tundish mouth, stop air to contact with liquid steel level in tundish, in preventing molten steel from passing through
Between bag liquid steel level contact with nitrogen and cause nitrogen pick-up, thus reduce nitrogen content in molten steel.