CN205667183U - Fructus actinidiae chinensis scalable plantation frame - Google Patents

Fructus actinidiae chinensis scalable plantation frame Download PDF

Info

Publication number
CN205667183U
CN205667183U CN201620556575.6U CN201620556575U CN205667183U CN 205667183 U CN205667183 U CN 205667183U CN 201620556575 U CN201620556575 U CN 201620556575U CN 205667183 U CN205667183 U CN 205667183U
Authority
CN
China
Prior art keywords
horizontal support
vertical supports
actinidiae chinensis
fructus actinidiae
contiguous block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620556575.6U
Other languages
Chinese (zh)
Inventor
张生旭
张�浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingchuan Hongyu Kiwi Berry Plantation Professional Cooperatives
Original Assignee
Qingchuan Hongyu Kiwi Berry Plantation Professional Cooperatives
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingchuan Hongyu Kiwi Berry Plantation Professional Cooperatives filed Critical Qingchuan Hongyu Kiwi Berry Plantation Professional Cooperatives
Priority to CN201620556575.6U priority Critical patent/CN205667183U/en
Application granted granted Critical
Publication of CN205667183U publication Critical patent/CN205667183U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Plants (AREA)

Abstract

The utility model discloses one and set up simplicity, it is possible to the Fructus actinidiae chinensis scalable plantation frame of recycling.This Fructus actinidiae chinensis scalable plantation frame, including horizontal support, vertical supports, union joint;Described vertical supports at least one end is provided with connecting hole;Described union joint includes that connector, described connector upper end are provided with the first connection post, and lower end is provided with the second connection post;The surrounding of described connector is provided with four contiguous blocks becoming cross distribution;It is provided with U-lag on described contiguous block;Pin shaft hole it is provided with on contiguous block;Described first connection post or second connects post and coordinates with the connecting hole of vertical supports one end;Described U-lag and the one end fits of horizontal support, be provided with bearing pin in described pin shaft hole, described bearing pin is through horizontal support in U-lag;Being provided with fixing device on described horizontal support and vertical supports, described vertical supports uses telescoping shoring column.This plantation frame is used to set up simplicity, it is possible to carrying out altitude mixture control, cost is relatively low, and the suitability is good.

Description

Fructus actinidiae chinensis scalable plantation frame
Technical field
This utility model relates to a kind of support, especially a kind of Fructus actinidiae chinensis scalable plantation frame.
Background technology
Known: Fructus actinidiae chinensis is when result, owing to its trunk is more fragile, when the fruit tied on actinidia tree is more Time, easily by curved for actinidia tree dry-pressing, serious will break actinidia tree dry-pressing;Thus cause the underproduction of Fructus actinidiae chinensis.Tradition Method be carry out Fructus actinidiae chinensis plantation time, many cement support columns are set in planting site, then the trunk of Fructus actinidiae chinensis are led to Cross fixing device to be fixed on concrete column.And on concrete column, set up steel wire so that the tree of Fructus actinidiae chinensis emits and is positioned at steel wire On, by concrete column and steel wire, the trunk of Fructus actinidiae chinensis is supported.The plantation frame of conventionally employed cement pillar, construction cost Higher, simultaneously need to fixed point is configured, it is impossible to mobile, it is impossible to recycle, spacing cannot be realized after being provided with Regulation.The most traditional concrete column cannot realize the regulation of height.
Utility model content
Technical problem to be solved in the utility model is to provide one and sets up simplicity, it is possible to adapt to the growth of Fructus actinidiae chinensis trunk Carry out the Fructus actinidiae chinensis scalable plantation frame of altitude mixture control.
This utility model solves the technical scheme is that Fructus actinidiae chinensis of its technical problem scalable plantation frame, including horizontal stroke To support, vertical supports, union joint;Described vertical supports at least one end is provided with connecting hole;Described horizontal support two ends are all provided with It is equipped with and is perpendicular to horizontal support axis direction and runs through the pin-and-hole of horizontal support;Described union joint includes connector, described connector Upper end is provided with the first connection post, and lower end is provided with the second connection post;The surrounding of described connector is provided with four contiguous blocks, institute State four contiguous blocks and become cross distribution;The U-lag mated with horizontal support it is provided with on described contiguous block;Set on described contiguous block Being equipped with pin shaft hole, described pin shaft hole passes U-lag;First connection post of described union joint or second connects post and vertical supports The connecting hole of one end coordinates;U-lag on described contiguous block and the one end fits of horizontal support, be provided with pin in described pin shaft hole Axle, described bearing pin is connected through the pin-and-hole of horizontal support in U-lag, described horizontal support by bearing pin and contiguous block are fixing;Institute State the fixing device being provided with in horizontal support and vertical supports for fixing Fructus actinidiae chinensis trunk.
Further, described horizontal support uses telescoping shoring column.
Further, at least provided with two pin shaft holes on described contiguous block, described pin shaft hole on contiguous block along U-lag Axis direction be uniformly distributed.
Preferably, described fixing device uses rope.
Further, described first connection post is coaxial with the second connection post.
The beneficial effects of the utility model are: Fructus actinidiae chinensis described in the utility model scalable plantation frame, including laterally propping up Frame, vertical supports and union joint, be attached horizontal support and vertical supports by union joint thus form plantation frame;Cause This Fructus actinidiae chinensis described in the utility model scalable plantation frame manufactures simplicity, sets up simplicity, and cost is relatively low, and the suitability is good.Secondly Owing to vertical supports uses telescoping shoring column, therefore according to the growing state of Fructus actinidiae chinensis, the height of vertical supports can be adjusted Joint.Remain that the position that the trunk of Fructus actinidiae chinensis is supported by support is optimum position.Simultaneously can be according to the kind of Fructus actinidiae chinensis Situation of planting adjusts spacing, it is possible to carry out removing recycling.
Accompanying drawing explanation
Fig. 1 is the axonometric chart of Fructus actinidiae chinensis scalable plantation frame in this utility model embodiment;
Fig. 2 is the axonometric chart of union joint in this utility model embodiment;
Fig. 3 is the front view of union joint in this utility model embodiment;
Indicating in figure: 1-horizontal support, 2-vertical supports, 3-union joint, 31-connector, 32-contiguous block, 33-second is even Connecing post, 34-first connects post, 35-pin shaft hole, 4-fixing device.
Detailed description of the invention
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, Fructus actinidiae chinensis described in the utility model scalable plantation frame, including horizontal support 1, vertically Support 2, union joint 3;Described vertical supports 2 at least one end is provided with connecting hole;Described horizontal support 1 two ends are provided with vertically The pin-and-hole of horizontal support 1 is run through in horizontal support 1 axis direction;Described union joint 3 includes connector 31, on described connector 31 End is provided with the first connection post 34, and lower end is provided with the second connection post 33;The surrounding of described connector 31 is provided with four connections Block 32, described four contiguous blocks 32 become cross distribution;It is provided with, on described contiguous block 32, the U-lag mated with horizontal support 1;Institute Stating and be provided with pin shaft hole 35 on contiguous block, described pin shaft hole 35 is through U-lag;Described union joint 3 first connection post 34 or Second connects post 33 coordinates with the connecting hole of vertical supports 2 one end;U-lag on described contiguous block 32 and the one of horizontal support 1 End coordinates, and is provided with bearing pin in described pin shaft hole 35, described bearing pin through the pin-and-hole of horizontal support 1 in U-lag, described horizontal Frame 1 is connected by bearing pin is fixing with contiguous block 32;It is provided with for fixing Mi on described horizontal support 1 and vertical supports 2 The fixing device 4 that monkey peach tree is dry;Described vertical supports 2 uses telescoping shoring column.
During application:
First union joint 3 is arranged in vertical supports 1, then according to the plantation situation of on-the-spot Fructus actinidiae chinensis, at planting site Upper installation vertical supports 1 and adjust the spacing between vertical supports 1, then sets up horizontal support between vertical rack 1 2.Select the horizontal support 2 of appropriate length, the two ends of horizontal support 2 are placed in the U-lag of contiguous block 32, then use bearing pin Locked.After support has been set up, support is provided with fixing device 4, simultaneously by the trunk of Fructus actinidiae chinensis by fixing dress Put 4 to be fixed on support;And above horizontal support, set up steel wire.When after the time of Kiwi growth one end, according to Mi The height of monkey Fructus Persicae, regulates the height of horizontal support 1 by vertical supports 2 so that the growth that horizontal support 1 adapts to actinidia tree is high Degree.
In sum, Fructus actinidiae chinensis described in the utility model scalable plantation frame, including horizontal support 1, vertical supports 2 with And union joint 3, by union joint 3 horizontal support 1 and vertical supports 2 it is attached thus forms plantation frame;Therefore this practicality Novel described Fructus actinidiae chinensis scalable plantation frame manufactures simplicity, sets up simplicity, and cost is relatively low, and the suitability is good.Secondly because it is vertical Support 1 uses telescoping shoring column, therefore can be adjusted the height of vertical supports 1 according to the growing state of Fructus actinidiae chinensis.Begin The position keeping support to be supported the trunk of Fructus actinidiae chinensis eventually is optimum position.Simultaneously can be according to the plantation situation of Fructus actinidiae chinensis Adjust spacing, it is possible to carry out removing recycling.
In order to realize the length adjustment of horizontal support 2, further, described horizontal support 1 uses telescoping shoring column.
Horizontal support 1 is avoided to rotate for the ease of fixed lateral support 1;Further, described contiguous block 32 at least sets Being equipped with two pin shaft holes 35, described pin shaft hole 35 axis direction along U-lag on contiguous block 32 is uniformly distributed.
The Main Function of described fixing device 4 is to be fixed on support by the trunk of Fructus actinidiae chinensis, and described fixing device 4 is permissible Employing various ways realizes, and as a kind of embodiment therein, concrete described fixing device 4 uses rope.
In order to ensure when setting up two-layer vertical supports 2, upper and lower vertical supports 2 is coaxial, and further, described first connects It is coaxial that post 34 is connected post 33 with second.

Claims (5)

1. Fructus actinidiae chinensis scalable plantation frame, it is characterised in that: include horizontal support (1), vertical supports (2), union joint (3);Institute State vertical supports (2) at least one end and be provided with connecting hole;Described horizontal support (1) two ends are provided with and are perpendicular to horizontal support (1) axis direction runs through the pin-and-hole of horizontal support (1);Described union joint (3) includes connector (31), on described connector (31) End is provided with the first connection post (34), and lower end is provided with the second connection post (33);The surrounding of described connector (31) is provided with four Individual contiguous block (32), described four contiguous blocks (32) become cross distribution;It is provided with on described contiguous block (32) and horizontal support (1) The U-lag of coupling;Being provided with pin shaft hole (35) on described contiguous block, described pin shaft hole (35) passes U-lag;Described union joint (3) the first connection post (34) or second connects post (33) and coordinates with the connecting hole of vertical supports (2) one end;Described contiguous block (32) U-lag on and the one end fits of horizontal support (1), be provided with bearing pin in described pin shaft hole (35), described bearing pin passes U The pin-and-hole of horizontal support (1) in shape groove, described horizontal support (1) is connected by bearing pin and contiguous block (32) are fixing;Described laterally The fixing device (4) for fixing Fructus actinidiae chinensis trunk it is provided with on support (1) and vertical supports (2);Described vertical supports (2) telescoping shoring column is used.
2. Fructus actinidiae chinensis scalable plantation frame as claimed in claim 1, it is characterised in that: described horizontal support (1) uses can be stretched Contracting support.
3. Fructus actinidiae chinensis scalable plantation frame as claimed in claim 2, it is characterised in that: on described contiguous block (32) at least provided with Having two pin shaft holes (35), described pin shaft hole (35) axis direction along U-lag on contiguous block (32) is uniformly distributed.
4. Fructus actinidiae chinensis scalable plantation frame as claimed in claim 3, it is characterised in that: described fixing device (4) uses rope.
5. Fructus actinidiae chinensis scalable plantation frame as claimed in claim 4, it is characterised in that: described first connects post (34) and second Connect post (33) coaxial.
CN201620556575.6U 2016-06-07 2016-06-07 Fructus actinidiae chinensis scalable plantation frame Expired - Fee Related CN205667183U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620556575.6U CN205667183U (en) 2016-06-07 2016-06-07 Fructus actinidiae chinensis scalable plantation frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620556575.6U CN205667183U (en) 2016-06-07 2016-06-07 Fructus actinidiae chinensis scalable plantation frame

Publications (1)

Publication Number Publication Date
CN205667183U true CN205667183U (en) 2016-11-02

Family

ID=57191716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620556575.6U Expired - Fee Related CN205667183U (en) 2016-06-07 2016-06-07 Fructus actinidiae chinensis scalable plantation frame

Country Status (1)

Country Link
CN (1) CN205667183U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106954521A (en) * 2017-05-11 2017-07-18 四川倍恩农业科技有限公司 Holder device and branch trailer system for drawing plantation
CN107535282A (en) * 2017-09-18 2018-01-05 安徽秋歌农业开发有限公司 A kind of fixing device of fruit tree trunk
CN113039990A (en) * 2021-04-06 2021-06-29 中国农业科学院郑州果树研究所 Kiwi fruit shaping method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106954521A (en) * 2017-05-11 2017-07-18 四川倍恩农业科技有限公司 Holder device and branch trailer system for drawing plantation
CN107535282A (en) * 2017-09-18 2018-01-05 安徽秋歌农业开发有限公司 A kind of fixing device of fruit tree trunk
CN113039990A (en) * 2021-04-06 2021-06-29 中国农业科学院郑州果树研究所 Kiwi fruit shaping method
CN113039990B (en) * 2021-04-06 2022-06-17 中国农业科学院郑州果树研究所 Kiwi fruit shaping method

Similar Documents

Publication Publication Date Title
CN205667183U (en) Fructus actinidiae chinensis scalable plantation frame
CN202799806U (en) Adjustable tree supporting device
CN204762466U (en) Watermelon rattan support
CN206561403U (en) A kind of adjustable civil engineering pipe fitting rack
CN105210720A (en) A kind of special cultivating stand of tomato and cultivation method
CN205663284U (en) Electric power transportation hydraulic stretching bracing piece
CN107750723A (en) A kind of adjustable flower planting frame
CN209234499U (en) A kind of gardens cultivation trees supporting device
CN205727292U (en) Fructus actinidiae chinensis plantation frame
CN204104440U (en) Tree support frame
CN105804633B (en) A kind of multi-functional step ladder of servicing unit and the application servicing unit
CN208242365U (en) A kind of vegetable cultivation auxiliary stand
CN206658658U (en) A kind of ceiling support of intelligent Greenhouse
CN205922179U (en) Municipal administration is with split type rack cultivated in a pot
CN105156015B (en) Power distribution rod tower identification board special-purpose ladder
CN204975859U (en) Door frame jacking bed -jig
CN210519649U (en) Grape planting frame
CN107752600A (en) A kind of Stereo flower frame
CN210726213U (en) Branch fixing device is planted to plum tree
CN205855169U (en) Conveyer bridge
CN210263825U (en) Place stable scaffold frame for construction
CN207476597U (en) A kind of animal raising rail fence
CN205830553U (en) A kind of application frame
CN206479382U (en) A kind of controllable soil sample sampling machine
CN208691914U (en) A kind of grape trellis suitable for northern greenhouse

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161102

Termination date: 20210607

CF01 Termination of patent right due to non-payment of annual fee