CN205662806U - Plastic track - Google Patents

Plastic track Download PDF

Info

Publication number
CN205662806U
CN205662806U CN201620539306.9U CN201620539306U CN205662806U CN 205662806 U CN205662806 U CN 205662806U CN 201620539306 U CN201620539306 U CN 201620539306U CN 205662806 U CN205662806 U CN 205662806U
Authority
CN
China
Prior art keywords
plastic cement
basic unit
infiltration
race track
cement race
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620539306.9U
Other languages
Chinese (zh)
Inventor
朱邦武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing State Sports Ground Engineering Co Ltd
Original Assignee
Nanjing State Sports Ground Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing State Sports Ground Engineering Co Ltd filed Critical Nanjing State Sports Ground Engineering Co Ltd
Priority to CN201620539306.9U priority Critical patent/CN205662806U/en
Application granted granted Critical
Publication of CN205662806U publication Critical patent/CN205662806U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a plastic track, its technical scheme main points are that the plastic track the superiors establish to the infiltration grained layer, and the infiltration grained layer is bonded with the micelle by the PU plastic and forms, and infiltration grained layer below is porous foam net, and porous foam side off the net is the basic unit, and the metalling has been laid the below by the basic unit, and the metalling below is the sandy soil layer, the utility model provides a plastic track's water permeability can be good, and ponding can be fast through runway itself to secret infiltration.

Description

A kind of plastic cement race track
Technical field
This utility model relates to sports equipment field, particularly to a kind of plastic cement race track.
Background technology
The permeability performance of plastic cement race track is extremely important, if the permeability performance of runway is the best, then run into sleety weather it After, although major part hydrops can be drained from sewer, but runway surface is still gone up and can be there is a small amount of hydrops, cannot in the short time Penetrating into the soil of bottom, cause runway wet and slippery, impact is normal to be used.The Chinese patent of Application No. 201520980632.9 is open A kind of plastic cement race track, bottom is provided with water leg, is provided with multiple osculum for draining bottom water leg.This utility model Owing to the basic unit on water leg uses concreting, and the permeability performance of concrete is poor, top layer remains not by The rainwater that osculum is drained is owing to being difficult to the basic unit made through concrete, it is impossible to enter in following water leg, causes few Amount hydrops remains on basic unit, and plastic cement race track still can become wet and slippery because of hydrops.
Utility model content
The purpose of this utility model is to provide a kind of plastic cement race track, and its advantage is to have good permeability performance, hydrops energy Enough by runway infiltration downwards itself.
Above-mentioned technical purpose of the present utility model has the technical scheme that a kind of plastic cement race track, moulds The glue runway the superiors are set to the granular layer that seeps water, and described infiltration granular layer is formed by PU plastic cement is bonding with micelle, described infiltration granule Being porous foam net below Ceng, described porous foam side off the net is basic unit, is equipped with metalling, described rubble below described basic unit It it is sandy soil layer below Ceng.
By above technical scheme, PU plastic cement and micelle bonding after, hydrops can permeate downwards in the gap between micelle; Porous foam net can strengthen the elasticity of runway, improves comfort level, water can be made again to permeate downwards from hole, strengthens runway infiltration Performance;Metalling can facilitate current to pass through, and is produced certain supporting role by basic unit, strengthens stablizing of plastic cement race track structure Property.The seepage of water of sandy soil is better than clayed soil or concrete, under water is easy to ooze from sandy soil;Aqueduct is permissible Quickly importing to substantial amounts of hydrops from basic unit drain the sandy soil of lower floor, remaining a small amount of hydrops is then by basic unit and sand Matter soil horizon permeates downwards.
This utility model is further arranged to: described basic unit is black rubber granular layer.
By above technical scheme, black rubber granule can be made up of elastomeric materials such as junked tires, can be cost-effective, More environmentally-friendly;And black rubber granule water preventing ability is poor, under water can relatively easily ooze.
This utility model is further arranged to: described basic unit is EPDM layer.
By above technical scheme, EPDM represents ethylene propylene diene rubber, and EPDM is substantially non-polar, to polarity Solution and chemicals have resistance, and water absorption rate is low, and water will not rest in basic unit.
This utility model is further arranged to: a diameter of 2 centimetres to 4 centimetres of described metalling medium stone.
By above technical scheme, between rubble, space is relatively big, can for larger amount of hydrops quickly through.
This utility model is further arranged to: the granularity of described micelle is 1~3mm.
By above technical scheme, the granularity of micelle is set to 1~3mm, and granularity is less, the micelle of unit mass and water The specific surface area of contact is the biggest, and the water capacity is easily passed through from micelle gap.
This utility model is further arranged to: be provided with wood fiber thin film between described porous foam net and described basic unit.
By above technical scheme, the wood fiber has superpower permeability, both can be supported runway, the most permissible Strengthen airing function and the water seepage function of runway.
In sum, this utility model has the advantages that
1, the permeability performance of runway is good, and hydrops can quickly move through runway to subsurface wastewater infiltration system;
2, runway is elastic good, can meet comfortableness during motion;
3, strength of runways is enough, it is to avoid deform after using time length.
Accompanying drawing explanation
Fig. 1 is the structural representation of 1 one kinds of plastic cement race tracks of embodiment;
Fig. 2 is the structural representation of 2 one kinds of plastic cement race tracks of embodiment.
In figure 1, infiltration granular layer;11, micelle;2, porous foam net;3, basic unit;4, metalling;5, sandy soil layer;6、 Wood fiber thin film.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in further detail.
1. 1 kinds of plastic cement race tracks of embodiment, as it is shown in figure 1, the superiors of plastic cement race track are infiltration granular layer 1, by PU plastic cement Bonding with micelle 11 forming, the granularity of micelle 11 is 1~3mm;The lower section of infiltration granular layer 1 is porous foam net 2, hole straight Footpath is set to 3 centimetres, both can strengthen runway elastic, current can be facilitated again to pass downwardly through;The lower section of porous foam net 2 is base Layer 3, basic unit 3 lays for black rubber granule and forms, and rubber grain can be formed by junked tire processing and manufacturing, twice laid, more Add ground environmental protection;Basic unit 3 can also use EPDM material;The lower section of basic unit 3 is metalling 4, and the diameter of rubble uses 2 centimetres to 4 Centimetre, facilitate current to pass through;It is sandy soil layer 5 below metalling 4, forms laying after sandy soil screening uniformly.
2. 1 kinds of plastic cement race tracks of embodiment, difference from Example 1 is, as in figure 2 it is shown, porous foam net 2 with Between basic unit 3, also posting one layer of wood fiber thin film 6, the adult cork self-characteristic used due to wood fiber thin film 6 is unfavorable for carefully Bacteria growing, adds that irregular natural space has superpower hydrophilicity, it is possible to rapidly by the water inspiration fiber of fabric face Inside, effective and antibacterial contention moisture, again because its superpower permeability is by moisture rapid evaporation, make body surface be dried, Cause antibacterial moisture needed for body surface can not get existence and breeding, the most just lose existence and the condition of breeding.Therefore, Wood fiber thin film 6 can stop smelly bacterium, the growth of mycete and breeding well, and has the best breathability, permissible Strengthen runway permeability and deodorant.
Work process: when raining, a large amount of hydrops on runway can be drained by drainage etc., and runway surface is remaining few Amount hydrops, after by infiltration granular layer 1, passes sequentially through porous foam net 2, wood fiber thin film 6, basic unit 3, metalling 4, enters Sand paper soil horizon 5 is absorbed, thus keeps runway surface to be dried, reduced runway surface hydrops.
This specific embodiment is only that it is not to restriction of the present utility model, ability to explanation of the present utility model The present embodiment can be made after reading this specification by field technique personnel as required does not has the amendment of creative contribution, but As long as all being protected by Patent Law in right of the present utility model.

Claims (6)

1. a plastic cement race track, is characterized in that: the plastic cement race track the superiors are set to the granular layer (1) that seeps water, described infiltration granular layer (1) Being formed by PU plastic cement is bonding with micelle (11), described infiltration granular layer (1) lower section is porous foam net (2), described porous foam Net (2) lower section is basic unit (3), and described basic unit (3) lower section is equipped with metalling (4), and described metalling (4) lower section is sandy soil Layer (5).
A kind of plastic cement race track the most according to claim 1, is characterized in that: described basic unit (3) is black rubber granular layer.
A kind of plastic cement race track the most according to claim 1, is characterized in that: described basic unit (3) is EPDM layer.
4. according to a kind of plastic cement race track described in Claims 2 or 3, it is characterized in that: described metalling (4) medium stone a diameter of 2 Centimetre to 4 centimetres.
A kind of plastic cement race track the most according to claim 4, is characterized in that: the granularity of described micelle (11) is 1~3mm.
A kind of plastic cement race track the most according to claim 5, is characterized in that: described porous foam net (2) and described basic unit (3) Between be provided with wood fiber thin film (6).
CN201620539306.9U 2016-06-02 2016-06-02 Plastic track Expired - Fee Related CN205662806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620539306.9U CN205662806U (en) 2016-06-02 2016-06-02 Plastic track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620539306.9U CN205662806U (en) 2016-06-02 2016-06-02 Plastic track

Publications (1)

Publication Number Publication Date
CN205662806U true CN205662806U (en) 2016-10-26

Family

ID=57155401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620539306.9U Expired - Fee Related CN205662806U (en) 2016-06-02 2016-06-02 Plastic track

Country Status (1)

Country Link
CN (1) CN205662806U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824126A (en) * 2018-07-05 2018-11-16 广州市花木公司 Environment friendly pervious slow runway
CN109554977A (en) * 2018-11-26 2019-04-02 李谦 A kind of ground structure of rapid infiltrated runway
CN110117929A (en) * 2018-02-07 2019-08-13 江苏集德环保路面材料有限公司 A kind of runway paving structure
CN110485236A (en) * 2019-08-26 2019-11-22 深圳市中安建工集团有限公司 Environment-friendly type plastic rubber runway and its construction technology

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110117929A (en) * 2018-02-07 2019-08-13 江苏集德环保路面材料有限公司 A kind of runway paving structure
CN108824126A (en) * 2018-07-05 2018-11-16 广州市花木公司 Environment friendly pervious slow runway
CN109554977A (en) * 2018-11-26 2019-04-02 李谦 A kind of ground structure of rapid infiltrated runway
CN110485236A (en) * 2019-08-26 2019-11-22 深圳市中安建工集团有限公司 Environment-friendly type plastic rubber runway and its construction technology
CN110485236B (en) * 2019-08-26 2021-03-23 深圳市中安建工集团有限公司 Environment-friendly plastic track and construction process thereof

Similar Documents

Publication Publication Date Title
CN205662806U (en) Plastic track
WO2012139263A1 (en) Water-permeable and water-absorbing eco-pavement
CN204047087U (en) The salt discharge of drainage flexible pipe and the anti-salt system of separation layer
CN206902493U (en) A kind of undisguised material permeable concrete ground structure
CN103174079B (en) A kind of roadway rainwater collection system for preventing surface gathered water
CN205839508U (en) Sponge city paved road structure
CN205893861U (en) Elasticity shock attenuation ground mat for artificial turf
CN203890834U (en) Water-permeable polyurethane plastic track
JP2020505532A (en) Riding surface and method for constructing the riding surface
CN206360221U (en) The water draining and accumulating layer construction of one planted roof
CN205529778U (en) Road brick that permeates water
CN111535098A (en) Rainwater drainage system for green belts and sidewalks of town roads and construction method
CN105803888A (en) Sponge type road paving structure
CN207277700U (en) A kind of roof rain water garden basis
CN207749382U (en) A kind of drainage pavement structure in sponge city
CN103485322B (en) The capillary retardance road structure of a kind of effective preventing and treating roadbed humidifying disease and construction method
KR20130066144A (en) The manufacture method of rubber material conatined rubber chip and that of using a rubber mat
CN206279413U (en) A kind of ecological permeable catchments overall road surface
CN206090204U (en) Height ecological road surface structure of permeating water
CN203160091U (en) A road pavement structure for preventing water from gathering on road surfaces
CN208136657U (en) A kind of pavement structure for sponge urban construction
TW201500617A (en) Man-made athletic field and athletic runway structure featuring eco-green building and construction method thereof
KR100798960B1 (en) The water storage reduction space playground structural altificial grass body
CN205259028U (en) Skid -proof shake ceramic tile of inhaling
CN211872473U (en) Waterproof type plastic course

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161026

Termination date: 20190602

CF01 Termination of patent right due to non-payment of annual fee