CN205654099U - Comfortable type building site is with throwing brick device - Google Patents

Comfortable type building site is with throwing brick device Download PDF

Info

Publication number
CN205654099U
CN205654099U CN201620273028.7U CN201620273028U CN205654099U CN 205654099 U CN205654099 U CN 205654099U CN 201620273028 U CN201620273028 U CN 201620273028U CN 205654099 U CN205654099 U CN 205654099U
Authority
CN
China
Prior art keywords
motor
iii
electric
rotating shaft
electric pushrod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620273028.7U
Other languages
Chinese (zh)
Inventor
高成志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin city 100 XinDa Construction Engineering Company Limited
Original Assignee
Guangdong Gaohang Intellectual Property Operation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Gaohang Intellectual Property Operation Co Ltd filed Critical Guangdong Gaohang Intellectual Property Operation Co Ltd
Priority to CN201620273028.7U priority Critical patent/CN205654099U/en
Application granted granted Critical
Publication of CN205654099U publication Critical patent/CN205654099U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a throw the brick device, especially relate to a comfortable type building site is with throwing brick device. The to -be -solved technical problem of the utility model is to provide a comfortable type building site is with throwing brick device that work efficiency height, labour saving and time saving, can not cause the accidental injury. In order to solve the technical problem, the utility model provides a such comfortable type building site is with throwing brick device, including the shallow, electric putter I, the left socle, electro -magnet I, motor I, bearing frame I, the right branch frame, the nut, electric putter II, electro -magnet III, the lead screw, bearing frame II, electro -magnet II, a spring, the lifter, the standing groove, electric putter III, the connecting rod, motor II and electric manipulator, be equipped with the left socle in proper order from a left side to the right side in the shallow, electric putter I and right branch frame, the left socle upper end is equipped with motor II, II upper ends in the motor are connected with the connecting rod. The utility model discloses reached comfortable, work efficiency is high, labour saving and time saving, can not cause the effect of accidental injury.

Description

A kind of comfortable type construction site is with throwing brick device
Technical field
This utility model relates to a kind of throwing brick device, particularly relates to a kind of comfortable type construction site and throws brick device.
Background technology
Construction site, Guangdong language claims building sites, construction domain, is called for short domain, and it is geobasin that mistake is write.
Brick, artificial small-sized bulk for building, point fired brick and no-firing brick, it is commonly called as brick.Clay brick with clay as primary raw material, through pug process, molding, be dried and roasting form.China has formulated square and elongated brick, the technology of Qin Han dynasty brickmaking and production scale, quality and pattern variety successively in the Spring and Autumn and the Warring States Periods and has all taken shape, and be referred in the world " Qin brick and Han tile ".
There are currently no comfortable type construction site and throw brick device, artificial brick of throwing exists that work efficiency is poor, the shortcoming of accidental injury of wasting time and energy, easily cause, and a kind of work efficiency is high, time saving and energy saving, do not result in the comfortable type construction site throwing brick device of accidental injury therefore to need research and development badly.
Utility model content
(1) to solve the technical problem that
Work efficiency is poor, the shortcoming of accidental injury of wasting time and energy, easily cause in order to overcome the most artificial throwing brick to exist for this utility model, and the technical problems to be solved in the utility model is to provide the comfortable type construction site throwing brick device that a kind of work efficiency is high, time saving and energy saving, do not result in accidental injury.
(2) technical scheme
nullIn order to solve above-mentioned technical problem,This utility model provides such a comfortable type construction site and throws brick device,Include go-cart、Electric pushrod I、Left socle、Electric magnet I、Motor I、Bearing block I、Right support、Nut、Electric pushrod II、Electric magnet III、Screw mandrel、Bearing block II、Electric magnet II、Spring、Elevating lever、Placing trough、Electric pushrod III、Connecting rod、Motor II and electric manipulator,Left socle it is sequentially provided with from left to right in go-cart、Electric pushrod I and right support,Left socle upper end is provided with motor II,Motor II upper end connects connecting rod,Connecting rod left end is provided with electric pushrod III,Electric pushrod III lower end connects electric manipulator,Electric pushrod I upper end connects electric magnet I,Bearing block II it is sequentially provided with from top to bottom on the left of right support、Bearing block I and motor I,Between bearing block II and bearing block I, screw mandrel is installed,Screw mandrel is provided with nut,Screw mandrel and nut screw connection,Screw mandrel lower end is connected with motor I,Electric pushrod II it is provided with on the left of nut,Electric pushrod II left end connects electric magnet III,Right support top has pilot hole,Spring it is provided with bottom right support,Lower spring end connects electric magnet II,Electric magnet II is positioned at directly over electric magnet I,Electric magnet II is provided with elevating lever,Elevating lever passes spring and pilot hole,Elevating lever upper end is provided with placing trough,Also include rotating shaft I、Bevel gear I、Bevel gear II、Rotating shaft II、Bearing block III and blade,Rotating shaft I is located at screw mandrel upper end,Rotating shaft I is through right support top,Rotating shaft I upper end connects bevel gear I,Right support upper right side is provided with bearing block III,Rotating shaft II is installed in bearing block III,Rotating shaft II left end connects bevel gear II,Bevel gear II engages with bevel gear I,Rotating shaft II right-hand member connects blade.
Operation principle: when needs carry out throwing brick operation, electric magnet I and the electric magnet II band opposite magnetic that is energized is attracting, start electric pushrod I to extend, after band motor magnet I moves upward to correct position, start electric pushrod I to shorten, band motor magnet I moves downward reset, thus band motor magnet II and placing trough move downward, and spring extends.Start electric pushrod III to extend, after actuating motor tool hands catches fragment of brick, start electric pushrod III and shorten reset, drive fragment of brick to move upward.Starting motor II and rotate 180 °, drive fragment of brick to rotate 180 °, now fragment of brick is positioned at directly over placing trough.Start electric pushrod III to extend, drive fragment of brick to move downward.When fragment of brick touches bottom placing trough, electric pushrod III stops elongation.After actuating motor tool hands decontrols fragment of brick, start electric pushrod III and shorten reset.Starting motor II and rotate 180 °, driving electric mechanical hand stops after rotating 180 ° of resets.Electric magnet I and the electric magnet II band same magnetic that is energized is repelled each other, and promotes electric magnet II, placing trough and fragment of brick entirety to move upward, and spring shortens and resets simultaneously, pulls electric magnet II fast upward motion, is thrown by fragment of brick, and people just can catch fragment of brick aloft.After throwing brick terminates, electric magnet I and electric magnet II power-off, moved downward reset by action of gravity electric magnet II and placing trough entirety.When needs carrying fragment of brick, start electric pushrod III and extend, after actuating motor tool hands catches fragment of brick, start electric pushrod III and shorten reset, drive fragment of brick to move upward.Starting motor II and rotate 180 °, drive fragment of brick to rotate 180 °, now fragment of brick is positioned at directly over placing trough.Start electric pushrod III to extend, drive fragment of brick to move downward.When fragment of brick touches bottom placing trough or during previous piece of fragment of brick top, and electric pushrod III stops elongation.After actuating motor tool hands decontrols fragment of brick, start electric pushrod III and shorten reset.Starting motor II and rotate 180 °, driving electric mechanical hand stops after rotating 180 ° of resets.Repeating above operation, can place a certain amount of fragment of brick, placing trough and electric magnet II in placing trough can be moved downward by action of gravity, and spring extends.After placing fragment of brick.Start motor I to rotate forward, drive nut to move downward by screw mandrel, thus band motor magnet III moves downward.When electric magnet III is positioned at electric magnet II front-right, motor I stops operating.Starting electric pushrod II to extend, band motor magnet III is to left movement, and when electric magnet III touches electric magnet II, electric pushrod II stops elongation.Electric magnet III and the electric magnet II band opposite magnetic that is energized is attracting.When fragment of brick needs to move up, start motor I and invert, drive nut to move upward by screw mandrel, thus drive fragment of brick to move upward.After fragment of brick moves upward to correct position, motor I stops operating.Now, workman can take the fragment of brick in placing trough away.After fragment of brick is taken, electric magnet III and electric magnet II power-off, start electric pushrod II and shorten reset.Spring band motor magnet II resets.Start motor I to rotate forward, drive nut to move downward by screw mandrel, thus after band motor magnet III moves downward reset, motor I stops operating.
Because also including rotating shaft I, bevel gear I, bevel gear II, rotating shaft II, bearing block III and blade, rotating shaft I is located at screw mandrel upper end, rotating shaft I is through right support top, rotating shaft I upper end connects bevel gear I, right support upper right side is provided with bearing block III, rotating shaft II is installed in bearing block III, rotating shaft II left end connects bevel gear II, bevel gear II engages with bevel gear I, rotating shaft II right-hand member connects blade, when starting motor I and rotating and reverse, rotated by rotating shaft I band dynamic bevel gear I, thus band dynamic bevel gear II, rotating shaft II and blade rotate, blade rotates and produces wind, people can be blown, people is lowered the temperature, people is made to work more comfortable.When motor I stops operating, rotating shaft I stops operating.
(3) beneficial effect
This utility model has reached comfortable, work efficiency is high, time saving and energy saving, do not result in the effect of accidental injury.
Accompanying drawing explanation
Fig. 1 is main TV structure schematic diagram of the present utility model.
Being labeled as in accompanying drawing: 1-go-cart, 2-electric pushrod I, 3-left socle, 4-electric magnet I, 5-motor I, 6-bearing block I, 7-right support, 8-nut, 9-electric pushrod II, 10-electric magnet III, 11-screw mandrel, 12-bearing block II, 13-electric magnet II, 14-spring, 15-pilot hole, 16-elevating lever, 17-placing trough, 18-electric pushrod III, 19-connecting rod, 20-motor II, 21-electric manipulator, 22-rotating shaft I, 23-bevel gear I, 24-bevel gear II, 25-rotating shaft II, 26-bearing block III, 27-blade.
Detailed description of the invention
With embodiment, this utility model is further described below in conjunction with the accompanying drawings.
Embodiment 1
nullA kind of comfortable type construction site is with throwing brick device,As shown in Figure 1,Include go-cart 1、Electric pushrod I 2、Left socle 3、Electric magnet I 4、Motor I 5、Bearing block I 6、Right support 7、Nut 8、Electric pushrod II 9、Electric magnet III 10、Screw mandrel 11、Bearing block II 12、Electric magnet II 13、Spring 14、Elevating lever 16、Placing trough 17、Electric pushrod III 18、Connecting rod 19、Motor II 20 and electric manipulator 21,Left socle 3 it is sequentially provided with from left to right in go-cart 1、Electric pushrod I 2 and right support 7,Left socle 3 upper end is provided with motor II 20,Motor II 20 upper end connects connecting rod 19,Connecting rod 19 left end is provided with electric pushrod III 18,Electric pushrod III 18 lower end connects electric manipulator 21,Electric pushrod I 2 upper end connects electric magnet I 4,Bearing block II 12 it is sequentially provided with from top to bottom on the left of right support 7、Bearing block I 6 and motor I 5,Screw mandrel 11 is installed between bearing block II 12 and bearing block I 6,Screw mandrel 11 is provided with nut 8,Screw mandrel 11 coordinates with nut 8,Screw mandrel 11 lower end is connected with motor I 5,Electric pushrod II 9 it is provided with on the left of nut 8,Electric pushrod II 9 left end connects electric magnet III 10,Right support 7 top has pilot hole 15,Spring 14 it is provided with bottom right support 7,Spring 14 lower end connects electric magnet II 13,Electric magnet II 13 is positioned at directly over electric magnet I 4,Electric magnet II 13 is provided with elevating lever 16,Elevating lever 16 is through spring 14 and pilot hole 15,Elevating lever 16 upper end is provided with placing trough 17,Also include rotating shaft I 22、Bevel gear I 23、Bevel gear II 24、Rotating shaft II 25、Bearing block III 26 and blade 27,Rotating shaft I 22 is located at screw mandrel 11 upper end,Rotating shaft I 22 is through right support 7 top,Rotating shaft I 22 upper end connects bevel gear I 23,Right support 7 upper right side is provided with bearing block III 26,Rotating shaft II 25 is installed in bearing block III 26,Rotating shaft II 25 left end connects bevel gear II 24,Bevel gear II 24 engages with bevel gear I 23,Rotating shaft II 25 right-hand member connects blade 27.
Operation principle: when needs carry out throwing brick operation, electric magnet I 4 is attracting with electric magnet II 13 energising band opposite magnetic, start electric pushrod I 2 elongation, after band motor magnet I 4 moves upward to correct position, start electric pushrod I 2 to shorten, band motor magnet I 4 moves downward reset, thus band motor magnet II 13 and placing trough 17 move downward, and spring 14 extends.Start electric pushrod III 18 elongation, after actuating motor tool hands 21 catches fragment of brick, start electric pushrod III 18 and shorten reset, drive fragment of brick to move upward.Starting motor II 20 and rotate 180 °, drive fragment of brick to rotate 180 °, now fragment of brick is positioned at directly over placing trough 17.Start electric pushrod III 18 elongation, drive fragment of brick to move downward.When fragment of brick touches bottom placing trough 17, electric pushrod III 18 stops elongation.After actuating motor tool hands 21 decontrols fragment of brick, start electric pushrod III 18 and shorten reset.Starting motor II 20 and rotate 180 °, driving electric mechanical hand 21 stops after rotating 180 ° of resets.Electric magnet I 4 repels each other with electric magnet II 13 energising band same magnetic, promoting electric magnet II 13, placing trough 17 and fragment of brick entirety to move upward, spring 14 shortens reset simultaneously, pulls electric magnet II 13 fast upward motion, being thrown by fragment of brick, people just can catch fragment of brick aloft.After throwing brick terminates, electric magnet I 4 and electric magnet II 13 power-off, moved downward reset by action of gravity electric magnet II 13 and placing trough 17 entirety.When needs carrying fragment of brick, start electric pushrod III 18 elongation, after actuating motor tool hands 21 catches fragment of brick, start electric pushrod III 18 shortening and reset, drive fragment of brick to move upward.Starting motor II 20 and rotate 180 °, drive fragment of brick to rotate 180 °, now fragment of brick is positioned at directly over placing trough 17.Start electric pushrod III 18 elongation, drive fragment of brick to move downward.When fragment of brick touches bottom placing trough 17 or during previous piece of fragment of brick top, and electric pushrod III 18 stops elongation.After actuating motor tool hands 21 decontrols fragment of brick, start electric pushrod III 18 and shorten reset.Starting motor II 20 and rotate 180 °, driving electric mechanical hand 21 stops after rotating 180 ° of resets.Repeating above operation, can place a certain amount of fragment of brick, placing trough 17 and electric magnet II 13 in placing trough 17 can be moved downward by action of gravity, and spring 14 extends.After placing fragment of brick.Start motor I 5 to rotate forward, drive nut 8 to move downward by screw mandrel 11, thus band motor magnet III 10 moves downward.When electric magnet III 10 is positioned at electric magnet II 13 front-right, motor I 5 stops operating.Starting electric pushrod II 9 elongation, band motor magnet III 10 is to left movement, and when electric magnet III 10 touches electric magnet II 13, electric pushrod II 9 stops elongation.Electric magnet III 10 is attracting with electric magnet II 13 energising band opposite magnetic.When fragment of brick needs to move up, start motor I 5 reversion, drive nut 8 to move upward by screw mandrel 11, thus drive fragment of brick to move upward.After fragment of brick moves upward to correct position, motor I 5 stops operating.Now, the fragment of brick in workman can take placing trough 17 away.After fragment of brick is taken, electric magnet III 10 and electric magnet II 13 power-off, start electric pushrod II 9 and shorten reset.Spring 14 band motor magnet II 13 resets.Start motor I 5 to rotate forward, drive nut 8 to move downward by screw mandrel 11, thus after band motor magnet III 10 moves downward reset, motor I 5 stops operating.
nullBecause also including rotating shaft I 22、Bevel gear I 23、Bevel gear II 24、Rotating shaft II 25、Bearing block III 26 and blade 27,Rotating shaft I 22 is located at screw mandrel 11 upper end,Rotating shaft I 22 is through right support 7 top,Rotating shaft I 22 upper end connects bevel gear I 23,Right support 7 upper right side is provided with bearing block III 26,Rotating shaft II 25 is installed in bearing block III 26,Rotating shaft II 25 left end connects bevel gear II 24,Bevel gear II 24 engages with bevel gear I 23,Rotating shaft II 25 right-hand member connects blade 27,When starting motor I 5 and rotating and reverse,Rotated by rotating shaft I 22 band dynamic bevel gear I 23,Thus band dynamic bevel gear II 24、Rotating shaft II 25 and blade 27 rotate,Blade 27 rotates and produces wind,People can be blown,People is lowered the temperature,People is made to work more comfortable.When motor I 5 stops operating, rotating shaft I 22 stops operating.
Embodiment described above only have expressed preferred implementation of the present utility model, and it describes more concrete and detailed, but therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, for the person of ordinary skill of the art, without departing from the inventive concept of the premise, it is also possible to making some deformation, improve and substitute, these broadly fall into protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be as the criterion with claims.

Claims (1)

  1. null1. a comfortable type construction site is with throwing brick device,It is characterized in that,Include go-cart (1)、Electric pushrod I (2)、Left socle (3)、Electric magnet I (4)、Motor I (5)、Bearing block I (6)、Right support (7)、Nut (8)、Electric pushrod II (9)、Electric magnet III (10)、Screw mandrel (11)、Bearing block II (12)、Electric magnet II (13)、Spring (14)、Elevating lever (16)、Placing trough (17)、Electric pushrod III (18)、Connecting rod (19)、Motor II (20) and electric manipulator (21),Left socle (3) it is sequentially provided with from left to right in go-cart (1)、Electric pushrod I (2) and right support (7),Left socle (3) upper end is provided with motor II (20),Motor II (20) upper end connects connecting rod (19),Connecting rod (19) left end is provided with electric pushrod III (18),Electric pushrod III (18) lower end connects electric manipulator (21),Electric pushrod I (2) upper end connects electric magnet I (4),Right support (7) left side is sequentially provided with bearing block II (12) from top to bottom、Bearing block I (6) and motor I (5),Screw mandrel (11) is installed between bearing block II (12) and bearing block I (6),Screw mandrel (11) is provided with nut (8),Screw mandrel (11) coordinates with nut (8),Screw mandrel (11) lower end is connected with motor I (5),Nut (8) left side is provided with electric pushrod II (9),Electric pushrod II (9) left end connects electric magnet III (10),Right support (7) top has pilot hole (15),Right support (7) bottom is provided with spring (14),Spring (14) lower end connects electric magnet II (13),Electric magnet II (13) is positioned at directly over electric magnet I (4),Electric magnet II (13) is provided with elevating lever (16),Elevating lever (16) passes spring (14) and pilot hole (15),Elevating lever (16) upper end is provided with placing trough (17),Also include rotating shaft I (22)、Bevel gear I (23)、Bevel gear II (24)、Rotating shaft II (25)、Bearing block III (26) and blade (27),Rotating shaft I (22) is located at screw mandrel (11) upper end,Rotating shaft I (22) is through right support (7) top,Rotating shaft I (22) upper end connects bevel gear I (23),Right support (7) upper right side is provided with bearing block III (26),Rotating shaft II (25) is installed in bearing block III (26),Rotating shaft II (25) left end connects bevel gear II (24),Bevel gear II (24) engages with bevel gear I (23),Rotating shaft II (25) right-hand member connects blade (27).
CN201620273028.7U 2016-04-05 2016-04-05 Comfortable type building site is with throwing brick device Expired - Fee Related CN205654099U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620273028.7U CN205654099U (en) 2016-04-05 2016-04-05 Comfortable type building site is with throwing brick device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620273028.7U CN205654099U (en) 2016-04-05 2016-04-05 Comfortable type building site is with throwing brick device

Publications (1)

Publication Number Publication Date
CN205654099U true CN205654099U (en) 2016-10-19

Family

ID=57390589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620273028.7U Expired - Fee Related CN205654099U (en) 2016-04-05 2016-04-05 Comfortable type building site is with throwing brick device

Country Status (1)

Country Link
CN (1) CN205654099U (en)

Similar Documents

Publication Publication Date Title
CN205700687U (en) A kind of useless brick efficiency crushing device for building
CN206242241U (en) A kind of ceramic production technology is with preliminary pugging device
CN205558309U (en) Dust type building site is with throwing brick device
CN209718108U (en) Glazing device is used in a kind of production of ceramic tile
CN205713007U (en) Wall tiling device used by a kind of finishing
CN205580108U (en) Energy -saving drying device is used to tombarthite material precursor
CN204579318U (en) A kind of greenhouse by solar heat clears the snow and cleaning system automatically
CN205652744U (en) Building site is with throwing brick device
CN206511658U (en) Glass handling mechanism
CN106827181B (en) A kind of cement brick production stable molding device
CN205654099U (en) Comfortable type building site is with throwing brick device
CN205854688U (en) Device quickly poured out by a kind of cement for building
CN205588486U (en) Environment -friendly clip device for building site
CN204874317U (en) Domestic ceramics automatic glazing machine
CN105036813A (en) Domestic ceramic automatic glazing machine
CN205651525U (en) Building site is with special brick cutting device
CN206344291U (en) The shaped device of ceramic pot pottery embryo is made using mud of making pottery
CN206124438U (en) Efficient operation's ceramic rendition equipment
CN104533032A (en) Automatic snow removal device for greenhouse
CN205700681U (en) A kind of the most broken brick device for building
CN104230385B (en) Novel pivoted arm automatic infiltration glaze device
CN204039275U (en) Novel pivoted arm automatic infiltration glaze device
CN205631012U (en) Building site is with safe type clip device
CN205572731U (en) Moisture -proof clip device for building site
CN205853171U (en) A kind of bag of cement retracting device for building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Yan Qiliang

Inventor before: Gao Chengzhi

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20161228

Address after: 300110 Tianjin city Nankai District mustard Park Road on the north side of Hongxiang building 3 homes 2 door 202A

Patentee after: Tianjin city 100 XinDa Construction Engineering Company Limited

Address before: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Patentee before: Guangdong Gaohang Intellectual Property Operation Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161019

Termination date: 20180405

CF01 Termination of patent right due to non-payment of annual fee