CN205646216U - Insulation is tested denso and is established earth connection auxiliary rod - Google Patents

Insulation is tested denso and is established earth connection auxiliary rod Download PDF

Info

Publication number
CN205646216U
CN205646216U CN201620402593.9U CN201620402593U CN205646216U CN 205646216 U CN205646216 U CN 205646216U CN 201620402593 U CN201620402593 U CN 201620402593U CN 205646216 U CN205646216 U CN 205646216U
Authority
CN
China
Prior art keywords
head
auxiliary rod
electroscope
earth connection
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620402593.9U
Other languages
Chinese (zh)
Inventor
吴跃华
王军
石涛
方鑫
张少斌
张亮
丁楠
王恒
李玉超
徐永林
马永奎
刘江伟
万小萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGWEI POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Original Assignee
ZHONGWEI POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGWEI POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co filed Critical ZHONGWEI POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Priority to CN201620402593.9U priority Critical patent/CN205646216U/en
Application granted granted Critical
Publication of CN205646216U publication Critical patent/CN205646216U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an insulation is tested denso and is established earth connection auxiliary rod, it includes insulator spindle, electroscope head, gets in touch head and insulating sheath, electroscope head and couple head, the fixed insulating sheath that is equipped with of the other end are connected to insulator spindle one end, the electroscope head with the couple head is connected on the insulator spindle, can change each other and install and remove, the insulator spindle is the telescopic structure, and the one end of just connecting electroscope head and couple head is fixed with a nut, the one end of electroscope head is equipped with the screw thread, the one end of couple head is equipped with the screw thread. Use this insulation is tested denso and is established earth connection auxiliary rod operation personnel large deflection strain insulator shaft tower with insulating sheath's shaft tower is equipped with on install the earth connection, only need carry insulation is tested denso and is established earth connection auxiliary rod, reduced intensity of labour, installation electroscope head carries out the circuit and tests the electricity, more changes the couple head into and installs the earth connection, has improved work efficiency, make things convenient for the staff to carry, guaranteed staff's personal safety.

Description

Insulation electricity-inspection installing auxiliary rod for grounding wire
Technical field:
This utility model relates to 35kV and the construction of above electric power line pole tower, safeguards and service technique Field, is specifically related to a kind of insulation electricity-inspection installing auxiliary rod for grounding wire.
Background technology:
In " State Grid Corporation of China's electric power safety working regulation ", regulation " after the clear and definite no-voltage of circuit experience, is answered Installing earth lead three-phase shortcircuit immediately ", " during installing earth lead, should first connect earth terminal, be followed by conductor wire end, Earth lead should contact well, and connection should be reliable.The order of dismounting ground wire is in contrast.Dress, dismounting ground wire are equal Insulating bar or special insulating cord should be used.Human body is forbidden to touch unearthed wire ", therefore staff needs When installing big corner strain rod tower and wire equipped with the tower grounding line of insulating sheath, priori open-wire line road true After no-voltage, then selecting the minimum effectively insulated lengths of insulating tool and insulating tool to be ensured, work people Member should keep enough safe distance with wire when carrying out installing earth lead.
But when big corner strain rod tower and wire install earth lead equipped with the shaft tower of insulating sheath, it is not equipped with specially With insulating tool, it is all that staff carries assembling at insulating bar (totally 2 joint) extremely installing earth lead, Length 1.7 meters after assembling, length or long, use this long insulating bar, not only work effect Rate is low, and when carrying this insulated measuring rod and climbing shaft tower, staff also causes the biggest inconvenience, can The personal safety of staff can be threatened because of carelessness.
Summary of the invention:
For the problem overcoming prior art to exist, this utility model provides a kind of insulation electricity-inspection installing earth lead Auxiliary rod, it is simple to staff carries, reduces labor intensity, improves work efficiency.
For solving above-mentioned technical problem, this utility model takes techniques below scheme:
A kind of insulation electricity-inspection installing auxiliary rod for grounding wire, including insulating bar, electroscope head, hook head and insulation Sheath, described insulating bar one end connects electroscope head and hook head, and the other end is fixing equipped with insulating sheath;Institute State electroscope head to be connected on insulating bar with described hook head, can mutually change and carry out mounting or dismounting.
Described insulating bar is telescopic structure, and the one end connecting electroscope head and hook head is fixed with a nut.
One end of described electroscope head is provided with a screw thread.
One end of described hook head is provided with screw thread.
The beneficial effects of the utility model are: this insulation electricity-inspection installing auxiliary rod for grounding wire improves existing electrical verification Device, solves at big corner strain rod tower and this is actual difficult equipped with installing earth lead on the shaft tower of insulating sheath Topic, its advantage: (1) operating personnel connects at big corner strain rod tower with equipped with installing on the shaft tower of insulating sheath Ground wire, only need to carry insulation electricity-inspection installing auxiliary rod for grounding wire, reduce labor intensity;(2) electrical verification is installed Device head carries out circuit electrical verification, is replaced with hook head installing earth lead, improves work efficiency;(3) work is facilitated Carry as personnel, it is ensured that the personal safety of staff.
Accompanying drawing illustrates:
Fig. 1 is the structural representation of this utility model insulation electricity-inspection installing auxiliary rod for grounding wire installing electroscope head;
Fig. 2 is the structural representation of this utility model insulation electricity-inspection installing auxiliary rod for grounding wire installing hook head;
In figure: 1-insulating bar, 2-electroscope head, 3-hook head, 4-insulating sheath, 5-nut.
Detailed description of the invention:
With detailed description of the invention, this utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, a kind of insulation electricity-inspection installing auxiliary rod for grounding wire, including insulating bar 1, electrical verification Device head 2, hook head 3 and insulating sheath 4, described insulating bar 1 one end connects electroscope head 2 and hook head 3, The other end is fixing equipped with insulating sheath 4;Described electroscope head 2 is connected on insulating bar 1 with described hook head 3, Can mutually change and carry out mounting or dismounting.
Described insulating bar 1 is telescopic structure, and the one end connecting electroscope head 2 and hook head 3 is fixed with One nut 5.
The front end of described electroscope head 2 is provided with screw thread, and its structure of modification does not affect galvanoscopic insulating properties.
One end of described hook head 3 is provided with screw thread.
Use this insulation electricity-inspection installing auxiliary rod for grounding wire at big corner strain rod tower and the bar equipped with insulating sheath When installing earth lead on tower, this auxiliary rod of operating personnel's portability is squatted and is mounted earth lead in cross-arm side, first stretches Insulating bar 1 is installed electroscope head 2 and is carried out circuit electrical verification, and then telescopic insulating bar 1 is replaced with hook head 3 and fills If earth lead, thus complete at big corner strain rod tower with equipped with installing earth lead on the shaft tower of insulating sheath Field operation, significantly reduces labor intensity, improves work efficiency.

Claims (4)

1. an insulation electricity-inspection installing auxiliary rod for grounding wire, it is characterised in that: include insulating bar (1), electrical verification Device head (2), hook head (3) and insulating sheath (4), described insulating bar (1) one end connects electroscope head (2) and hook head (3), the other end is fixing equipped with insulating sheath (4);Described electroscope head (2) and institute State hook head (3) to be connected on insulating bar (1), can mutually change and carry out mounting or dismounting.
Insulation electricity-inspection the most according to claim 1 installing auxiliary rod for grounding wire, it is characterised in that: described absolutely Edge bar (1) is telescopic structure, and connects described electroscope head (2) and one end of described hook head (3) It is fixed with a nut (5).
Insulation electricity-inspection the most according to claim 1 installing auxiliary rod for grounding wire, it is characterised in that: described One end of electroscope head (2) is provided with a screw thread.
Insulation electricity-inspection the most according to claim 1 installing auxiliary rod for grounding wire, it is characterised in that: described One end of hook head (3) is provided with screw thread.
CN201620402593.9U 2016-05-05 2016-05-05 Insulation is tested denso and is established earth connection auxiliary rod Expired - Fee Related CN205646216U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620402593.9U CN205646216U (en) 2016-05-05 2016-05-05 Insulation is tested denso and is established earth connection auxiliary rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620402593.9U CN205646216U (en) 2016-05-05 2016-05-05 Insulation is tested denso and is established earth connection auxiliary rod

Publications (1)

Publication Number Publication Date
CN205646216U true CN205646216U (en) 2016-10-12

Family

ID=57049698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620402593.9U Expired - Fee Related CN205646216U (en) 2016-05-05 2016-05-05 Insulation is tested denso and is established earth connection auxiliary rod

Country Status (1)

Country Link
CN (1) CN205646216U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942103A (en) * 2017-11-17 2018-04-20 国网山东省电力公司淄博供电公司 Double end electroscope
CN109142850A (en) * 2018-10-29 2019-01-04 广东电网有限责任公司 A kind of electroscope head guiding mechanism
CN111817042A (en) * 2020-08-04 2020-10-23 贵州电网有限责任公司 Ground wire device integrating electricity testing and installation
CN111986936A (en) * 2020-07-31 2020-11-24 国家电网有限公司 Brake pull rod with protection device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942103A (en) * 2017-11-17 2018-04-20 国网山东省电力公司淄博供电公司 Double end electroscope
CN109142850A (en) * 2018-10-29 2019-01-04 广东电网有限责任公司 A kind of electroscope head guiding mechanism
CN109142850B (en) * 2018-10-29 2023-08-01 广东电网有限责任公司 Guiding mechanism for electroscope head
CN111986936A (en) * 2020-07-31 2020-11-24 国家电网有限公司 Brake pull rod with protection device
CN111817042A (en) * 2020-08-04 2020-10-23 贵州电网有限责任公司 Ground wire device integrating electricity testing and installation

Similar Documents

Publication Publication Date Title
CN205646216U (en) Insulation is tested denso and is established earth connection auxiliary rod
CN203734209U (en) Live working device for cable bypass
CN203415716U (en) Power system electrified operation wiring clamp
CN204439667U (en) A kind of portable type current transformer testing clamp
CN203191410U (en) Zinc oxide arrester live testing junction device
CN205826695U (en) A kind of testing current in resistance property of lightning arrester junction pole
CN203573757U (en) Supporting assembly with lightning-protection function
CN103199474B (en) Method for 500KV large cross-section wire hot-line installation of phase to phase spacers
CN205656213U (en) Relay protection terminal row loss prevention evil device
CN203365556U (en) Temporary earthing device for public change earth resistance measurement
CN104314352A (en) Compact composite material power transmission line tower
CN204925181U (en) T type cable head convenient to high -voltage testing
CN203839911U (en) 12kV European front connector
CN203277934U (en) Grounding wire
CN207603091U (en) A kind of distribution overhead line lightning rod type insulator installation tool
CN202189907U (en) Grounding device with electricity testing function
CN203660276U (en) Gap lightning protection device
CN202111347U (en) 10 kV junction box grounding wire
CN205211967U (en) Join in marriage electric network line maintenance and use ground connection discharge device
CN205123077U (en) Hard connector of pile head extension under high -tension drop type fuse
CN204174992U (en) Composite material compact transmission line shaft tower
CN205029039U (en) Lightning -arrest puncture earth clamp
CN204088806U (en) A kind of lightning protection downlead syndeton
CN210692786U (en) Lightning protection grounding device for wind power station
CN207800949U (en) A kind of earthing wire clip

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

Termination date: 20170505