CN205637550U - Building shelf - Google Patents
Building shelf Download PDFInfo
- Publication number
- CN205637550U CN205637550U CN201620281490.1U CN201620281490U CN205637550U CN 205637550 U CN205637550 U CN 205637550U CN 201620281490 U CN201620281490 U CN 201620281490U CN 205637550 U CN205637550 U CN 205637550U
- Authority
- CN
- China
- Prior art keywords
- screw
- hole
- groove
- sides
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides a building shelf, the package rubbing board body, plate body one end is equipped with the recess, limit portion both sides are equipped with the dog in the recess, the inner end is equipped with the spring in the recess, spring coupling has the shelves strip, the gusset plate is connected to the shelves strip, the plate body other end is equipped with the fixed slot with gusset plate matched with. Gusset plate surface one side is equipped with the through -hole, both sides are equipped with the screw about the recess, be equipped with the screw rod in the screw, the screw rod passes the through -hole and connects with another screw, both sides are equipped with the screw hole about the fixed slot. The utility model discloses make two building shelf firm in connection, be difficult for breaking away from convenient to use.
Description
Technical field
This utility model relates to a kind of scaffold board for building.
Background technology
Scaffold board for building is generally laid on scaffold use, needs in use to be sequentially connected multiple scaffold board for building to connect use, and scaffold board for building be sequentially connected connect after connect insecure each other, be easily separated, use inconvenience.
Summary of the invention
The purpose of this utility model is for above-mentioned deficiency, it is provided that a kind of scaffold board for building.
Described purpose is achieved by the following scheme:
A kind of scaffold board for building, including plate body, described plate body one end is provided with groove, in described groove, edge both sides are provided with block, and in described groove, inner end is provided with spring, and described spring connects a grade bar, described shelves bar reinforcement by connection plate, the described plate body other end is provided with the fixing groove matched with securing plate.
Side, described securing plate surface is provided with through hole, and the upper and lower both sides of described groove are provided with screw, are provided with screw rod in described screw, and described screw rod connects through through hole and another screw, and the described upper and lower both sides of fixing groove are provided with screwed hole.
This utility model makes two scaffold board for building be connected firmly, and is not easily disconnected from, easy to use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Wherein, 1-plate body, 2-groove, 3-block, 4-spring, 5-shelves bar, 6-securing plate, 7-fixes groove, 8-through hole, 9-screw, 10-screw rod, 11-screwed hole.
Detailed description of the invention
Elaborate this utility model below in conjunction with the accompanying drawings preferred embodiment.
A kind of scaffold board for building, including plate body, described plate body 1 one end is provided with groove 2, in described groove 2, edge both sides are provided with block 3, in described groove 2, inner end is provided with spring 4, described spring 4 connects grade bar 5, described shelves bar 5 reinforcement by connection plate 6, and described plate body 1 other end is provided with the fixing groove 7 matched with securing plate 6.
Side, described securing plate 6 surface is provided with through hole 8, and the upper and lower both sides of described groove are provided with screw 9, is provided with screw rod 10 in described screw 9, and described screw rod 10 connects through through hole 8 and another screw, and the described upper and lower both sides of fixing groove are provided with screwed hole 11.
During use, scaffold board for building of the present utility model is sequentially connected connect time, screw rod 10 on one scaffold board for building is back-outed in screw 9, in securing plate 6 is advanced the fixing groove 7 on another scaffold board for building by shelves bar 5 by spring 4, block 3 plays the securing plate 6 stoping shelves bar 5 to connect and comes off in groove 2, screw rod 10 is connected another screwed hole 11 through the through hole 8 on screwed hole 11 and securing plate 6, play fixing groove 7 and the fixing effect of securing plate 6, when using complete, again screw rod 10 is back-outed in screwed hole 11, fixed plate 6 is retracted in groove 2, screw rod 10 is again passed through screw 9 and through hole 8 connects another screw 9, fixed plate 6 is fixed in groove 2.Multiple scaffold board for building can be sequentially connected as stated above and connect.
Present embodiment does not simply limit its protection domain to the exemplary illustrated of this patent; those skilled in the art can also carry out local to it and change; as long as no the spirit beyond this patent, all it is considered as the equivalent to this patent, all at the protection domain of this patent.
Claims (2)
1. a scaffold board for building, including plate body, it is characterized in that: described plate body one end is provided with groove, in described groove, edge both sides are provided with block, in described groove, inner end is provided with spring, described spring connects a grade bar, and described shelves bar reinforcement by connection plate, the described plate body other end is provided with the fixing groove matched with securing plate.
A kind of scaffold board for building the most according to claim 1, it is characterized in that: side, described securing plate surface is provided with through hole, the upper and lower both sides of described groove are provided with screw, are provided with screw rod in described screw, described screw rod connects through through hole and another screw, and the described upper and lower both sides of fixing groove are provided with screwed hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620281490.1U CN205637550U (en) | 2016-04-07 | 2016-04-07 | Building shelf |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620281490.1U CN205637550U (en) | 2016-04-07 | 2016-04-07 | Building shelf |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205637550U true CN205637550U (en) | 2016-10-12 |
Family
ID=57067348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620281490.1U Expired - Fee Related CN205637550U (en) | 2016-04-07 | 2016-04-07 | Building shelf |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205637550U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112144851A (en) * | 2020-09-22 | 2020-12-29 | 湖南汇渠建筑科技有限公司 | Temporary passing jumping frame structure for house building construction |
CN112502426A (en) * | 2020-11-26 | 2021-03-16 | 青海送变电工程有限公司 | Portable foundation construction work platform |
-
2016
- 2016-04-07 CN CN201620281490.1U patent/CN205637550U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112144851A (en) * | 2020-09-22 | 2020-12-29 | 湖南汇渠建筑科技有限公司 | Temporary passing jumping frame structure for house building construction |
CN112502426A (en) * | 2020-11-26 | 2021-03-16 | 青海送变电工程有限公司 | Portable foundation construction work platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205637550U (en) | Building shelf | |
CN204095840U (en) | Building ground multifunctional trolley | |
CN204568240U (en) | A kind of packing box of flow instrument | |
CN205121992U (en) | Teaching show board | |
CN205160666U (en) | Frame | |
CN204163386U (en) | A kind of convenient disc type scaffold installed | |
CN204282696U (en) | Two line-pressing section moulded by wood | |
CN207049133U (en) | A kind of attachment structure being used between aluminium section bar | |
CN202689437U (en) | Positioning device for stone slab of outer wall | |
CN205421896U (en) | Springboard for building | |
CN204753920U (en) | Can have enough to meet need formula metallic interconnect pendant | |
CN205637654U (en) | Support for building | |
CN204549755U (en) | The connection structure of elevator car wall and bottom muscle | |
CN204172017U (en) | A kind of hammer hanger | |
CN204343651U (en) | A kind of scaffold board for building | |
CN207321291U (en) | A kind of network switch easy to suspension | |
CN204569023U (en) | Novelly anti-scratch cable sheath cable drum window structure | |
CN206738317U (en) | A kind of rear plate positioning device of cabinet | |
CN204343653U (en) | Scaffold board for building | |
CN204363491U (en) | A kind of Fixed latches for turnover table bed | |
CN203205634U (en) | Fixing structure of USB port | |
CN203049858U (en) | Curtain wall connector | |
CN204628193U (en) | A kind of beach buggy connecting pin | |
CN205829069U (en) | The wall sideline that a kind of reassembling type that slides can connect up | |
CN205012815U (en) | Special handle hasp of apartment furniture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20170407 |
|
CF01 | Termination of patent right due to non-payment of annual fee |