CN205634426U - Double -contracting area pay off rack - Google Patents

Double -contracting area pay off rack Download PDF

Info

Publication number
CN205634426U
CN205634426U CN201620049490.9U CN201620049490U CN205634426U CN 205634426 U CN205634426 U CN 205634426U CN 201620049490 U CN201620049490 U CN 201620049490U CN 205634426 U CN205634426 U CN 205634426U
Authority
CN
China
Prior art keywords
guide
tension force
rack
guide rod
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620049490.9U
Other languages
Chinese (zh)
Inventor
杨政国
贾健佳
邹海鸥
杜兴源
秦磊
齐刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Twentsche Cable Co Ltd
Original Assignee
Zhangjiagang Twentsche Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Twentsche Cable Co Ltd filed Critical Zhangjiagang Twentsche Cable Co Ltd
Priority to CN201620049490.9U priority Critical patent/CN205634426U/en
Application granted granted Critical
Publication of CN205634426U publication Critical patent/CN205634426U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Unwinding Of Filamentary Materials (AREA)

Abstract

The utility model provides a double -contracting area pay off rack for only pay off rack of needs can when the band cladding in stage is extruded to the sheath for two cables. The toughened glass storage apparatus comprises a pedestal, arrange on the base perpendicularly to the riser, its characterized in that: be provided with drawing drum, lower drawing drum on the riser, upward the top of drawing drum has been arranged and has been guided the roller, on guide the ejection of compact direction position department of roller to be provided with tension control guide arm system, the lower end of drawing drum has been arranged down and has been guided the roller down, the ejection of compact direction position department that guides the roller down is provided with down tension control guide arm system, go up the below of the delivery side of tension control guide arm system and arranged a direction regulation guide arm, the top of the delivery side of tension control guide arm system has been arranged another direction and has been adjusted the guide arm, every down the direction is adjusted the guide arm and is adorned in the guide holder respectively, the guide holder is perpendicularly to arranging, the guide arm is adjusted to the direction can be for the guide holder perpendicularly to the removal.

Description

A kind of double-contracting band pay off rack
Technical field
This utility model relates to cable and makes the technical field of frock, is specially a kind of double-contracting band pay off rack.
Background technology
Existing double cables use Working table structure in the sheathing stage, the pan feeding of band needs two independent band pay off racks, band does not mates with cable unwrapping wire angle, need to adjust respectively the incidence angle of the band of two band pay off racks every time, needing mobile belt unreeling device to coordinate the angle of cable, its adjustment is complicated, inconvenient.
Summary of the invention
For the problems referred to above, this utility model provides a kind of double-contracting band pay off rack, double cables are made to have only to a pay off rack when the band in sheathing stage is coated with, band only need to adjust the position of a pay off rack when the unwrapping wire angle automatching of cable, and it has regulation front and back and angle regulating function, actively identical tension keep, and double branch cable covered effects are brought the biggest facility.
nullA kind of double-contracting band pay off rack,Its technical scheme is such that it and includes base,Be disposed with on described base vertically to riser,It is characterized in that: on described riser, be provided with draw drum、Lower draw drum,Described upper draw drum be arranged above guide reel,The position, discharging direction of described upper guide reel is provided with tension force and controls direct lever system,The arranged beneath of described lower draw drum has lower guide reel,The position, discharging direction of described lower guide reel is provided with lower tension force and controls direct lever system,The arranged beneath of the exit side that described upper tension force controls direct lever system has a direction regulation guide rod,Described lower tension force controls another root direction that is arranged above of the exit side of direct lever system and regulates guide rod,Every described direction regulation guide rod is loaded in guide holder respectively,Described guide holder is vertically arranged,Described direction regulation guide rod can be relative to guide holder vertically to movement,The coupling part of two described guide holders is set with the guide rod arranged in horizontal cross,Two described guide holders can be relative to guide rod slide anteroposterior,Described upper tension force controls direct lever system、Lower tension force controls direct lever system and includes installation base plate respectively、Guide post、A piece tension force controls guide rod,The interior plate of described installation base plate is fastenedly connected described riser,The outer panel of described installation base plate is perpendicular to described riser and arranges,The axle head of described guide post fastens and is perpendicular to the outer panel of described installation base plate,Described tension force controls the axle head of guide rod and is plugged in long guide groove,The length direction of described long guide groove is perpendicular to described riser and arranges,The axle head of described tension force control guide rod is installed in slide block after externally protruding out in described long guide groove,Run through in described slide block and have lead,Described lead is parallel to described long guide groove and arranges,Limit, location is located close to the position of described riser,The two ends of spring are mounted on limit, described location respectively、Slide block,Make spring that power is continuingly acted on slide block,And then make tension force control guide rod drive band to process tensioning state all the time.
It is further characterized by
Described upper draw drum, lower draw drum are lower vertically upward on described riser to be arranged so that whole pay off rack is neat;
The quantity of the guide post that described upper tension force controls direct lever system, lower tension force control direct lever system is comprised is identical, all include the first access guide post, the second guide post, the 3rd adjustable guide post, corresponding band sequentially passes through the first access guide post, tension force and enters the direction regulation guide rod of correspondence after controlling guide rod, the second guide post, the 3rd adjustable guide post, then passes to the Working gantry at rear;
Described 3rd adjustable guide post is anchored on connecting plate, long slot bore is had on described connecting plate, the length direction of described long slot bore is perpendicular to described riser, two screws are anchored on the outer panel of described installation base plate after running through described long slot bore, the length of long slot bore is more than the distance of the fixing threaded hole on the outer panel corresponding to two screws so that the 3rd adjustable guide post can determine restraint location as required;The Main Function of the 3rd adjustable guide post is to allow band can be adjusted as required to the position of guide post, and the position change of connecting plate staggers band position;
Described direction regulation guide rod is anchored on described mounting blocks by screw rod, described mounting blocks is installed in two vertical guide pillars of guide holder, it is provided with vertical to screwed hole on described mounting blocks, stud runs through the top board rear thread of guide holder and connects described vertical to screwed hole, stud rotates and then drive mounting blocks is vertically to motion, and then described direction regulation guide rod can be relative to guide holder vertically to movement;
Described upper draw drum, the dorsal part importation of rotary shaft of lower draw drum connect respective work drive motor by belt;
The control of two described work drive motors is partially attached to electric cabinet, described upper tension force controls direct lever system, lower tension force controls to be provided with tension force acquisition module on the tension force control guide rod of direct lever system, described tension force acquisition module is connected to described electric cabinet by data wire respectively, described electric cabinet is fastenedly connected the side of described riser, described electric cabinet is internally provided with data analysis system, by tension data being analyzed the rotating speed of reasonable distribution work drive motor and then ensureing the reasonable output of band;
Described upper guide reel, lower guide reel include two guide rollers respectively, it is ensured that guide optimal;
The axle head of adjusting knob is threaded and presses one end of described spring after running through limit, described location, the effect of described spring is the size of regulation tension force, adjusting knob rotates, and then drive its axle head to exert a force relative to spring, deform upon on its length, thus control the spring active force to slide block, the stroke of slide block and then can change, the setting of tensioned percentage ratio on electric cabinet, controls motor by gathering the stroke of slide block.
nullAfter using technique scheme,Volume two bands are set with in upper draw drum、Lower draw drum,And by respective guide reel、Tension force controls direct lever system and guarantees to guide and the tension force of band,And eventually through the most independent direction regulation guide rod rearward Working gantry conveying band,Tension force controls guide rod and guarantees the tension force of two bands the most all the time,And both direction regulation guide rod can carry out up-down adjustment according to structures such as cable location and front and back regulate、Left and right adjusting,The angle making two bands is respectively regulated independently,Make the angle that double branch cable cable core unwrapping wire maintains like to two bands in this segment distance of sheath head and cable core、Will not get together and then produce interference,Overcome original technological deficiency needing two band pay off racks,It makes double cables have only to a pay off rack when the band in sheathing stage is coated with,Band only need to adjust the position of a pay off rack when the unwrapping wire angle automatching of cable,And it has front and back regulation and angle regulating function、Actively identical tension keeps,Double branch cable covered effects are brought the biggest facility,In actually used,This structure applies also for the double-contracting band cladding of single cable core and single band cladding of single cable core,There is front and back regulation and angle regulating function equally、Actively identical tension keeps,Covered effect is brought convenience.
Accompanying drawing explanation
Fig. 1 is axonometric chart structural representation one of the present utility model;
Fig. 2 is axonometric chart structural representation two of the present utility model;
Fig. 3 is axonometric chart structural representation three of the present utility model;
Fig. 4 is front view structural representation of the present utility model;
Fig. 5 is partial enlargement structural representation at the A of Fig. 2;
Fig. 6 is band structure for conveying schematic diagram;
In figure, the title corresponding to sequence number is as follows:
Base 1, riser 2, upper draw drum 3, lower draw drum 4, upper guide reel 5, upper tension force controls direct lever system 6, lower guide reel 7, lower tension force controls direct lever system 8, direction regulation guide rod 9, guide holder 10, guide rod 11, installation base plate 12, tension force controls guide rod 13, interior plate 14, outer panel 15, long guide groove 16, slide block 17, lead 18, limit 19, location, spring 20, first accesses guide post 21, second guide post 22, 3rd adjustable guide post 23, connecting plate 24, long slot bore 25, screw 26, mounting blocks 27, vertical guide pillar 28, stud 29, belt 30, work drive motor 31, electric cabinet 32, tension force acquisition module 33, data wire 34, adjusting knob 35, band 36, screw rod 37.
Detailed description of the invention
nullA kind of double-contracting band pay off rack,See Fig. 1~Fig. 6: it includes base 1,Be disposed with on base 1 vertically to riser 2,Draw drum 3 it is provided with on riser 2、Lower draw drum 4,Upper draw drum 3 be arranged above guide reel 5,The position, discharging direction of upper guide reel 5 is provided with tension force and controls direct lever system 6,The arranged beneath of lower draw drum 4 has lower guide reel 7,The position, discharging direction of lower guide reel 7 is provided with lower tension force and controls direct lever system 8,The arranged beneath of the exit side that upper tension force controls direct lever system 6 has a direction regulation guide rod 9,Lower tension force controls another root direction that is arranged above of the exit side of direct lever system 8 and regulates guide rod 9,Every direction regulation guide rod 9 is loaded in guide holder 10 respectively,Guide holder 10 is vertically arranged,Direction regulation guide rod 9 can be vertical relative to guide holder 10 to movement,The coupling part of two guide holders 10 is set with the guide rod 11 arranged in horizontal cross,Two guide holders 10 can be relative to guide rod 11 slide anteroposterior,Upper tension force controls direct lever system 6、Lower tension force controls direct lever system 8 and includes installation base plate 12 respectively、Guide post、A piece tension force controls guide rod 13,The interior plate 14 of installation base plate 12 is fastenedly connected riser 2,The outer panel 15 of installation base plate 12 is perpendicular to riser 2 and arranges,The axle head of guide post fastens and is perpendicular to the outer panel 15 of installation base plate 12,Tension force controls the axle head of guide rod 13 and is plugged in long guide groove 16,The length direction of long guide groove 16 is perpendicular to riser 2 and arranges,The axle head of tension force control guide rod 13 is installed in slide block 17 after externally protruding out in long guide groove 16,Run through in slide block 17 and have lead 18,Lead 18 is parallel to long guide groove 16 and arranges,Limit 19, location is located close to the position of riser 2,The two ends of spring 20 are mounted on limit 19, location respectively、Slide block 17,Make spring 20 that power continuingly act on slide block 17,And then make tension force control guide rod 13 drive band to process tensioning state all the time.
Upper draw drum 3, lower draw drum 4 are lower vertically upward on riser 2 to be arranged so that whole pay off rack is neat;
The quantity of the guide post that upper tension force controls direct lever system 6, lower tension force control direct lever system 8 is comprised is identical, all include the first adjustable guide post 23 of access guide post the 21, second guide post the 22, the 3rd, corresponding band sequentially passes through the first access guide post 21, tension force and enters the direction regulation guide rod 9 of correspondence after controlling the adjustable guide post 23 of guide rod the 13, second guide post the 22, the 3rd, then passes to the Working gantry at rear;
3rd adjustable guide post 23 is anchored on connecting plate 24, long slot bore 25 is had on connecting plate 24, the length direction of long slot bore 25 is perpendicular to riser 2, two screws 26 are anchored on the outer panel 15 of described installation base plate 12 after running through described long slot bore 25, the length of long slot bore 25 is more than the distance of the fixing threaded hole on the outer panel 15 corresponding to two screws 26, the length of long slot bore 25 makes the 3rd adjustable guide post 23 can determine restraint location as required, the Main Function of the 3rd adjustable guide post 23 is to allow band can be adjusted as required to the position of guide post 9, the position change of connecting plate 24 drives the position change of the 3rd adjustable guide post 23, and then staggered in the band position corresponding to the 3rd adjustable guide post 23 and direction regulation guide rod 9;
Direction regulation guide rod 9 is anchored on mounting blocks 27 by screw rod 37, mounting blocks 27 is installed in two vertical guide pillars 28 of guide holder 10, it is provided with vertical to screwed hole on mounting blocks 27, it is vertical to screwed hole that stud 29 runs through that the top board rear thread of guide holder 10 connects on mounting blocks 27, stud 29 rotates and then drives mounting blocks 27 vertical to motion, and then direction regulation guide rod 9 can be vertical relative to guide holder 10 to movement;Direction regulation guide rod 9 is in addition to up-down adjustment, it is also possible to level angle regulates, and is realized by the screw rod 37 being fastened on mounting blocks 27, unclamps and fasten after being adjusted to proper angle again;
Upper draw drum 3, the dorsal part importation of rotary shaft of lower draw drum 4 connect respective work drive motor 31 by belt 30;
The control of two work drive motors 31 is partially attached to electric cabinet 32, upper tension force controls direct lever system 6, lower tension force controls the tension force of direct lever system 8 and controls to be respectively provided with tensioned acquisition module 33 on guide rod 13, tension force acquisition module 33 is connected to electric cabinet 32 by data wire 34 respectively, electric cabinet 32 is fastenedly connected the side of riser 2, electric cabinet 32 is internally provided with data analysis system, first numeral sets Tensity size, again by collecting feedback tension information control motor speed, by tension data being analyzed the rotating speed of reasonable distribution work drive motor 31, and then ensure the reasonable output of band;
Upper guide reel 5, lower guide reel 7 include two guide rollers respectively, it is ensured that guide optimal;
The axle head of adjusting knob 35 is threaded and presses one end of described spring 20 after running through limit, described location 19, the effect of described spring 20 is the size of regulation tension force, adjusting knob 35 rotates, and then drive its axle head to exert a force relative to spring 20, deform upon in spring 20 length, thus control the spring 20 active force to slide block 17, the stroke of slide block 17 and then can change, the setting of tensioned percentage ratio on electric cabinet 32, it is to control work drive motor 31 by the stroke of collection slide block 17, it guarantees that tension data is analyzed the rotating speed of reasonable distribution work drive motor 31 by electric cabinet 32, and then ensure the reasonable output of band.
In figure, 36 is band, and the material of band 36 is generally aluminium foil.
It has the beneficial effect that:
1, can put two bands on a pay off rack, economic saving is saved with space;
2. band on the device can up and down, front and back and angular adjustment;
3. this equipment has independent electric cabinet 32, setting tension value and actual tension value can be shown, formula band draw drum symmetrical above and below, controlled to put tape speed by independent motor, upper draw drum 3, lower draw drum 4 are by work drive motor 31 active drive, i.e. band equipment is active to put band system, can keep a given tension force from dishful start to finish;
4. coordinating double the product electric properties that Working gantry is coated with out superior with this equipment, product external diameter is less than the product that legacy equipment produces, and appearance looks elegant and cost advantage are obvious.
This structure includes but not limited to carry out single band cladding of double the claddings of cable double-contracting band, single cable core double-contracting band cladding, single cable core.
Above specific embodiment of the utility model is described in detail, but content has been only the preferred embodiment that this utility model is created, it is impossible to be considered for limiting the practical range that this utility model is created.All impartial changes made according to this utility model creation application range and improvement etc., within all should still belonging to patent covering scope of the present utility model.

Claims (9)

  1. null1. a double-contracting band pay off rack,It includes base,Be disposed with on described base vertically to riser,It is characterized in that: on described riser, be provided with draw drum、Lower draw drum,Described upper draw drum be arranged above guide reel,The position, discharging direction of described upper guide reel is provided with tension force and controls direct lever system,The arranged beneath of described lower draw drum has lower guide reel,The position, discharging direction of described lower guide reel is provided with lower tension force and controls direct lever system,The arranged beneath of the exit side that described upper tension force controls direct lever system has a direction regulation guide rod,Described lower tension force controls another root direction that is arranged above of the exit side of direct lever system and regulates guide rod,Every described direction regulation guide rod is loaded in guide holder respectively,Described guide holder is vertically arranged,Described direction regulation guide rod can be relative to guide holder vertically to movement,The coupling part of two described guide holders is set with the guide rod arranged in horizontal cross,Two described guide holders can be relative to guide rod slide anteroposterior,Described upper tension force controls direct lever system、Lower tension force controls direct lever system and includes installation base plate respectively、Guide post、A piece tension force controls guide rod,The interior plate of described installation base plate is fastenedly connected described riser,The outer panel of described installation base plate is perpendicular to described riser and arranges,The axle head of described guide post fastens and is perpendicular to the outer panel of described installation base plate,Described tension force controls the axle head of guide rod and is plugged in long guide groove,The length direction of described long guide groove is perpendicular to described riser and arranges,The axle head of described tension force control guide rod is installed in slide block after externally protruding out in described long guide groove,Run through in described slide block and have lead,Described lead is parallel to described long guide groove and arranges,Limit, location is located close to the position of described riser,The two ends of spring are mounted on limit, described location respectively、Slide block.
  2. 2. a kind of double-contracting band pay off rack as claimed in claim 1, it is characterised in that: described upper draw drum, lower draw drum are lower vertically upward on described riser to be arranged.
  3. 3. a kind of double-contracting band pay off rack as claimed in claim 1, it is characterized in that: the quantity of the guide post that described upper tension force controls direct lever system, lower tension force control direct lever system is comprised is identical, all include the first access guide post, the second guide post, the 3rd adjustable guide post, corresponding band sequentially passes through the first access guide post, tension force and enters the direction regulation guide rod of correspondence after controlling guide rod, the second guide post, the 3rd adjustable guide post, then passes to the Working gantry at rear.
  4. 4. a kind of double-contracting band pay off rack as claimed in claim 3, it is characterized in that: described 3rd adjustable guide post is anchored on connecting plate, long slot bore is had on described connecting plate, the length direction of described long slot bore is perpendicular to described riser, two screws are anchored on the outer panel of described installation base plate after running through described long slot bore, the length of long slot bore is more than the distance of the fixing threaded hole on the outer panel corresponding to two screws.
  5. 5. a kind of double-contracting band pay off rack as claimed in claim 1, it is characterized in that: described direction regulation guide rod is anchored on mounting blocks by screw rod, described mounting blocks is installed in two vertical guide pillars of guide holder, being provided with vertical to screwed hole on described mounting blocks, stud runs through the top board rear thread of guide holder and connects described vertical to screwed hole.
  6. 6. double-contracting band pay off rack as claimed in claim 1 a kind of, it is characterised in that: described upper draw drum, the dorsal part importation of rotary shaft of lower draw drum connect respective work drive motor by belt.
  7. 7. a kind of double-contracting band pay off rack as claimed in claim 6, it is characterized in that: the control of two described work drive motors is partially attached to electric cabinet, described upper tension force controls direct lever system, lower tension force controls to be provided with tension force acquisition module on the tension force control guide rod of direct lever system, described tension force acquisition module is connected to described electric cabinet by data wire respectively, and described electric cabinet is fastenedly connected the side of described riser.
  8. 8. a kind of double-contracting band pay off rack as claimed in claim 1, it is characterised in that: described upper guide reel, lower guide reel include two guide rollers respectively.
  9. 9. double-contracting band pay off rack as claimed in claim 1 a kind of, it is characterised in that: the axle head of adjusting knob is threaded and presses one end of described spring after running through limit, described location.
CN201620049490.9U 2016-01-19 2016-01-19 Double -contracting area pay off rack Withdrawn - After Issue CN205634426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620049490.9U CN205634426U (en) 2016-01-19 2016-01-19 Double -contracting area pay off rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620049490.9U CN205634426U (en) 2016-01-19 2016-01-19 Double -contracting area pay off rack

Publications (1)

Publication Number Publication Date
CN205634426U true CN205634426U (en) 2016-10-12

Family

ID=57078609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620049490.9U Withdrawn - After Issue CN205634426U (en) 2016-01-19 2016-01-19 Double -contracting area pay off rack

Country Status (1)

Country Link
CN (1) CN205634426U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105502074A (en) * 2016-01-19 2016-04-20 张家港特恩驰电缆有限公司 Double-wrapping-tape pay-off rack
CN108492930A (en) * 2018-03-15 2018-09-04 张家港特恩驰电缆有限公司 A kind of turning guide wheel group
CN112750578A (en) * 2018-11-27 2021-05-04 成都大唐线缆有限公司 Single-side composite aluminum foil belt conveying mechanism for symmetrical cable belt wrapping machine
CN113772494A (en) * 2021-10-15 2021-12-10 安徽英杰精工机械有限公司 Inclined support longitudinal wrapping device for cable paying-off

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105502074A (en) * 2016-01-19 2016-04-20 张家港特恩驰电缆有限公司 Double-wrapping-tape pay-off rack
CN105502074B (en) * 2016-01-19 2018-05-15 张家港特恩驰电缆有限公司 A kind of double-contracting band pay off rack
CN108492930A (en) * 2018-03-15 2018-09-04 张家港特恩驰电缆有限公司 A kind of turning guide wheel group
CN108492930B (en) * 2018-03-15 2023-08-25 上海电气集团腾恩驰科技(苏州)有限公司 Steering guide wheel set
CN112750578A (en) * 2018-11-27 2021-05-04 成都大唐线缆有限公司 Single-side composite aluminum foil belt conveying mechanism for symmetrical cable belt wrapping machine
CN112750578B (en) * 2018-11-27 2022-10-25 成都大唐线缆有限公司 Single-side composite aluminum foil belt conveying mechanism for symmetrical cable belt wrapping machine
CN113772494A (en) * 2021-10-15 2021-12-10 安徽英杰精工机械有限公司 Inclined support longitudinal wrapping device for cable paying-off

Similar Documents

Publication Publication Date Title
CN205634426U (en) Double -contracting area pay off rack
CN105502074B (en) A kind of double-contracting band pay off rack
CN105600581B (en) A kind of cable unwinding device
CN105538646B (en) A kind of pair of branch shields data cable Working gantry
CN109317537A (en) Metal roll bending straightener
CN206108471U (en) Sheet metal material feeding unit
CN205522387U (en) Two shadow data cable work bench
CN206088580U (en) Aluminum -clad steel wire laying tension adjusting device
CN104889293B (en) A kind of cleaning ball flat filament forming machine
CN207642870U (en) A kind of polishing tool of welding product
CN108662402A (en) A kind of Intelligent flat computer bracket
CN210837305U (en) High-speed stranding machine for copper wires
CN112234553B (en) Locking equipment convenient to maintenance
CN208747367U (en) A kind of active actinobacillus frame
CN113764139A (en) High-speed stranding machine for cable production
CN209577744U (en) Centering guiding mechanism and composite rolling unit
CN208361547U (en) A kind of multiple-spindle winding machine
CN106379766A (en) Monofilament-winding feeding and reel pressure-adjusting device of zipper forming machine
CN214114548U (en) Wire harness length adjusting mechanism for automobile accessory machining sliding jig
CN207302750U (en) A kind of strand winder
CN208978058U (en) A kind of automatic charging device and automatic mulch applicator
CN217215722U (en) Multi-thread storehouse supplies line equipment
CN206014052U (en) Optical fiber wire releasing device
CN216628516U (en) Mouse pain measuring device
CN218403102U (en) Tension automatic adjustment type annealing doubling take-up machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20161012

Effective date of abandoning: 20180515