CN205626456U CN201620277571.4U CN201620277571U CN205626456U CN 205626456 U CN205626456 U CN 205626456U CN 201620277571 U CN201620277571 U CN 201620277571U CN 205626456 U CN205626456 U CN 205626456U
Authority
CN
China
Prior art keywords
fumigation chamber
chamber
preheating cavity
postoperative
tonic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620277571.4U
Other languages
Chinese (zh)
Inventor
王欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620277571.4U priority Critical patent/CN205626456U/en
Application granted granted Critical
Publication of CN205626456U publication Critical patent/CN205626456U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an urological department postoperative fumigator, belongs to the medical instrument field. Stifling chamber (7) in including shell (1) and arranging shell (1) in, stifling chamber (7) upper end opening to correspond its characterized in that with the opening of shell (1) up end: stifling chamber (7) below be provided with and preheat chamber (19), stifling chamber (7) with preheat chamber (19) and pass through liquid medicine supply unit connection, it sprays flushing unit still to be provided with in stifling chamber (7) with in preheating chamber (19). In this urological department postoperative fumigator, preheat chamber and liquid medicine supply unit through the setting, can the gradation carry out the liquid medicine supply to stifling chamber, reduced the quantity of the liquid medicine that stifling intracavity heats at every turn, reduced stifling latency, the accessible sprays flushing unit respectively to preheat the chamber and stifling chamber is washed simultaneously.

Description

A kind of postoperative fumigating device of urology department
Technical field
A kind of postoperative fumigating device of urology department, belongs to medical instruments field.
Background technology
In medical and health industry, the process of the patient of urologic disease wound healing after surgery is the most painful.It was verified that Boil with some Chinese medicine and then rinse, or utilize the steam issued from liquid medicine steaming to smoke bath wound, energy anti-inflammatory analgetic, invigorating blood circulation Become silted up, to promoting that wound healing is highly effective.Traditional method is;Place the drug in metal basin, add suitable quantity of water, be placed on stove On boil after take off, allow patient squat above it and be rinsed, or carry out smoked bath treatment.But owing to after operation in patients, health is more Weakness, patient uses squatting position simultaneously, easily causes wound pain, therefore can not reach good therapeutic effect.In prior art In, there is also some postoperative fumigating device, medicinal liquid is placed in chamber therein, and patient is sitting in the top of chamber and smokes Steam, greatly reduce discomfort when patient fumigates, in stifling chamber, be additionally provided with heater simultaneously, can be greatly prolonged smoked The steaming time, improve therapeutic effect, but the fumigating device of prior art, generally there are following defect:
(1), when carrying out stifling in the prior art, all medicinal liquids are poured in the medicinal liquid cavity of fumigating device by needs together, in profit Need when heating with the heater in medicinal liquid cavity all medicinal liquids to be heated simultaneously simultaneously, if the merit of therefore heater Rate is excessive, then can consume the substantial amounts of energy, also strengthen network load simultaneously, if the power of heater is less, then when heating Between longer, inefficient;(2) existing fumigating device does not generally have the wiper mechanism in later stage, smoked due to required for different patients Steaming the medicinal hebrs liquid may be different, therefore after previous patient has fumigated, when later patient carries out stifling according to Different medicinal liquid, it is likely that there will be untoward reaction, therefore the suitability is relatively low.If by being manually carried out, then can Consuming substantial amounts of manpower and time, health during manual cleaning is also difficult to ensure that simultaneously.
Summary of the invention
The technical problems to be solved in the utility model is: overcome the deficiencies in the prior art, it is provided that a kind of by arranging preheating Chamber and medicinal liquid supply unit, can carry out medicinal liquid supply to fumigation chamber by several times, the medicinal liquid every time heated in decreasing fumigation chamber Quantity, decreases the stifling waiting time, can be rinsed preheating cavity and fumigation chamber respectively by spray irrigation unit simultaneously The postoperative fumigating device of urology department.
This utility model solves its technical problem and be the technical scheme is that the postoperative fumigating device of this urology department, including outside Shell and the fumigation chamber being arranged in shell, fumigation chamber upper end open, and corresponding with the opening of shell upper surface, its feature exists In: below described fumigation chamber, it is provided with preheating cavity, fumigation chamber and preheating cavity is connected by medicinal liquid supply unit;At fumigation chamber Be additionally provided with spray irrigation unit in preheating cavity.
Preferably, described medicinal liquid supply unit includes tonic pipe, tonic pump and tonic pipe electromagnetic valve, tonic pipe one end Connecting with bottom described preheating cavity, the other end connects the entrance of tonic pump, and tonic delivery side of pump series connection tonic pipe electromagnetic valve is even Receiving in fumigation chamber extension tube attached, fumigation chamber extension tube attached is internal with described fumigation chamber to be connected.
Preferably, described spray irrigation unit includes the fumigation chamber spray thrower being separately positioned in fumigation chamber, preheating cavity With preheating cavity spray thrower, the flush pipe connecting external water source is connected with the entrance of flushing pump, rinses delivery side of pump by pipeline string It is connected with fumigation chamber spray thrower and preheating cavity spray thrower respectively after connection flush pipe electromagnetic valve.
Preferably, there is spray head at described fumigation chamber spray thrower and preheating cavity spray thrower surface configuration.
Preferably, the bottom of described fumigation chamber is provided with drainage cell, the drain pipe one end in drainage cell with set Put the fumigation chamber extension tube attached bottom fumigation chamber to connect, be connected with the entrance of draining pump after other end series connection drain pipe electromagnetic valve, Draining delivery side of pump leads to housing exterior.
Preferably, at described fumigation chamber upper end open, it is provided with web plate.
Preferably, in described fumigation chamber and preheating cavity, fumigation chamber heater and preheating cavity heater it are respectively arranged with;
The inwall of described fumigation chamber is respectively arranged with on fumigation chamber liquidometer under liquidometer and fumigation chamber, described Preheating cavity in be provided with preheating cavity liquidometer;
It is also respectively provided with temperature sensor in described fumigation chamber and preheating cavity.
Preferably, described fumigation chamber and preheating cavity all have heat-insulation layer to wrap up.
Preferably, described housing exterior is provided with medicinal liquid feed tube, medicinal liquid feed tube through after shell with described Preheating cavity connects.
Compared with prior art, this utility model is had the beneficial effect that
1, in the postoperative fumigating device of this urology department, by arranging preheating cavity and medicinal liquid supply unit, it is possible to achieve will preheating The medicinal liquid of intracavity is fed in fumigation chamber several times, the quantity of the medicinal liquid every time heated in therefore decreasing fumigation chamber, decreases The stifling waiting time, improve stifling efficiency.
2, in the postoperative fumigating device of this urology department, by arranging spray irrigation unit, can be the most right after stifling end Preheating cavity and fumigation chamber are rinsed, it is to avoid different patients are likely to occur because medicinal liquid is different when using different liquid medicine fumigating Not reaction, the suitability is wider.
3, by fumigation chamber spray thrower and preheating cavity spray thrower surface configuration spray head, improve spraying effect.
4, arranging web plate by the opening part at fumigation chamber, the steam given out in fumigation chamber is by the mesh on web plate Uniformly scatter, it is to avoid steam is centrally located at the situation at and occurs.
5, by arranging preheating cavity heater in preheating cavity, the medicinal liquid in preheating cavity can be preheated, make part On a preset temperature, it is to avoid the fluid temperature being fed in fumigation chamber is crossed cool and caused fumigation chamber long for heat time heating time.
6, by arranging heat-insulation layer outside fumigation chamber and preheating cavity, can effectively reduce fumigation chamber and preheating cavity heat is too much Waste.
Accompanying drawing explanation
Fig. 1 is urology department postoperative fumigating device structural representation.
Wherein: 1, shell 2, heat-insulation layer 3, fumigation chamber spray thrower 4, spray head 5, stifling mouth 6, web plate 7, fumigation chamber 8, liquidometer 11 under liquidometer 10, fumigation chamber, fumigation chamber extension tube attached 12, tonic pipe electricity on fumigation chamber heater 9, fumigation chamber Magnet valve 13, drain pipe electromagnetic valve 14, draining pump 15, drain pipe 16, tonic pipe 17, tonic pump 18, preheating cavity liquidometer 19, preheating cavity 20, preheating cavity heater 21, preheating cavity spray thrower 22, medicinal liquid feed tube 23, flush pipe electromagnetic valve 24, punching Wash pump 25, flush pipe.
Detailed description of the invention
Fig. 1 is most preferred embodiment of the present utility model, and 1 pair of this utility model is described further below in conjunction with the accompanying drawings.
As it is shown in figure 1, a kind of postoperative fumigating device of urology department, including shell 1, in shell 1, it is provided with airtight preheating cavity 19, it is provided above the fumigation chamber 7 of upper end open, preheating cavity 19 and fumigation chamber 7 at preheating cavity 19 and is wrapped by heat-insulation layer 2 Wrap up in.Being provided with opening on the upper surface of shell 1, this opening is the most corresponding with the position of fumigation chamber 7 upper end open.At fumigation chamber 7 Opening part be provided with web plate 6 simultaneously, the steam given out in fumigation chamber 7 is uniformly scattered by the mesh on web plate 6, it is to avoid Steam is centrally located at the situation at and occurs.Be additionally provided with medicinal liquid feed tube 22 in the outside of shell 1, medicinal liquid feed tube 22 to The shell 1 that sequentially passes through of lower inclination connects with preheating cavity 19 with heat-insulation layer 2.
Fumigation chamber spray thrower 3 and preheating cavity spray thrower 21 it is provided with respectively, stifling in fumigation chamber 7 and preheating cavity 19 It is provided with spray head 4 on chamber spray thrower 3 and preheating cavity spray thrower 21.Flush pipe 25 one end connects the entrance of flushing pump 24, separately One end connects water source through shell 1.Through the heat-insulation layer 2 of relevant position after the outlet series connection flush pipe electromagnetic valve 23 of flushing pump 24 It is connected with fumigation chamber spray thrower 3 and preheating cavity spray thrower 21 respectively.Control system it is additionally provided with in the postoperative fumigating device of this urology department System (being not drawn in figure), the duty of flushing pump 24 and flush pipe electromagnetic valve 23 is controlled by control system.
When needs are rinsed fumigation chamber 7 and preheating cavity 19 are internal, control system controls flushing pump 24 work simultaneously Controlling flush pipe electromagnetic valve 23 to open, external water source respectively enters fumigation chamber 7 through flush pipe 25 under the effect of flushing pump 24 With in the fumigation chamber spray thrower 3 in preheating cavity 19 and preheating cavity spray thrower 21, and from spray head 4 spray, inside is completed punching Wash.For ensureing rinsing quality, fumigation chamber spray thrower 3 and preheating cavity spray thrower 21 can set respectively in fumigation chamber 7 and preheating cavity 19 Put many groups.
Be provided with fumigation chamber extension tube attached 11 in the bottom of fumigation chamber 7, fumigation chamber extension tube attached 11 is divided after drawing through heat-insulation layer 2 For two-way: a road is connected to one end of tonic pipe electromagnetic valve 12 in tonic pipe 16, one end of tonic pipe electromagnetic valve 12 is connected to mend The outlet of Teat pipette 17, the entrance of tonic pump 17 passes the bottom UNICOM of heat-insulation layer 2 and preheating cavity 19 by pipeline;Another road connects One end of drain pipe electromagnetic valve 13 in drain pipe 15, the other end of drain pipe electromagnetic valve 13 connects the porch of draining pump 14, The exit of draining pump 14 is drawn after shell 1.Tonic pipe electromagnetic valve 12, drain pipe electromagnetic valve 13, draining pump 14 and benefit The duty of Teat pipette 17 is controlled by control system.
Fumigation chamber heater 8 and preheating cavity heater 20 it is respectively arranged with, respectively in the bottom of fumigation chamber 7 and preheating cavity 19 Medicinal liquid in fumigation chamber 7 and preheating cavity 19 is heated, the duty of fumigation chamber heater 8 and preheating cavity heater 20 by Control system is controlled.The sidewall of fumigation chamber 7 is separately installed with on fumigation chamber liquidometer under liquidometer 9 and fumigation chamber 10, the liquid level in fumigation chamber 7 is detected;The sidewall of preheating cavity 19 is simultaneously installed with the liquid level to preheating cavity 19 carry out The preheating cavity liquidometer 18 of detection, on fumigation chamber, under liquidometer 9 and fumigation chamber, liquidometer 10 and preheating cavity liquidometer 18 be simultaneously It is connected with control system, the liquid level information detected is delivered in control system.Set the most respectively in fumigation chamber 7 and preheating cavity 19 It is equipped with the temperature sensor (being not drawn in figure) being connected with control system, respectively by the fumigation chamber 7 detected and preheating cavity 19 The temperature data of medicinal liquid is delivered in control system.
Specific works process and operation principle are as follows:
Before carrying out fumigating, first pass through medicinal liquid feed tube 22 and medicinal liquid is sent in preheating cavity 19.Then control system Control tonic pump 17 and tonic pipe electromagnetic valve 12 is opened, the medicinal liquid in preheating cavity 19 is sent in fumigation chamber 7.When in fumigation chamber 7 When the liquid level of medicinal liquid rises on fumigation chamber at liquidometer 9, control system controls tonic pump 17 and tonic pipe electromagnetic valve 12 cuts out, Suspend and enter medicine in fumigation chamber 7.
Now control system control fumigation chamber heater 8 works, and the medicinal liquid in fumigation chamber 7 is carried out heating fumigating, due to Medicinal liquid in fumigation chamber 7 is less, can be thermally generated steam by adding the most in the short period of time, and steam is up and passes through to arrange Web plate 6 at fumigation chamber 7 upper end open uniformly scatters, and patient is carried out fumigation treatment.In control system is by fumigation chamber 7 Temperature sensor learn when the medicinal liquid in fumigation chamber 7 has reached stifling required temperature, control preheating cavity heater 20 and open Beginning work, is preheated the medicinal liquid in preheating cavity 19 by preheating cavity heater 20, during preheating, in preheating cavity 19 Fluid temperature in preheating cavity 19 is monitored by temperature sensor in real time, and controls preheating cavity heater 20 by control system Carry out discontinuous work so that at a temperature of the medicinal liquid in preheating cavity 19 is in the preheating of preheating.
Along with fumigation chamber 7 inner liquid medicine constantly evaporates, its interior medicinal liquid gradually decreases, when the medicinal liquid liquid level in fumigation chamber 7 drops As little as under fumigation chamber at liquidometer 10 time, control system controls tonic pump 17 again and tonic pipe electromagnetic valve 12 is opened, to stifling Medicinal liquid in chamber 7 carries out tonic, when the liquid level of fumigation chamber 7 inner liquid medicine rises on fumigation chamber at liquidometer 9 again, controls system System controls tonic pump 17 and tonic pipe electromagnetic valve 12 cuts out, and suspends and enters medicine in fumigation chamber 7, and so forth.When in preheating cavity 19 Liquid level when being reduced at preheating cavity liquidometer 18, first control system controls preheating cavity heater 20 and quits work, work as preheating Chamber heater 20 quit work after medicinal liquid liquid level in fumigation chamber 7 when being again lowered under fumigation chamber at liquidometer 10, control system System controls fumigation chamber heater 8 and quits work, and stifling process terminates.
Needing to be rinsed fumigation chamber 7 and preheating cavity 19 after stifling end, control system controls flushing pump 24 work Making to control flush pipe electromagnetic valve 23 to open, external water source respectively enters smoked through flush pipe 25 under the effect of flushing pump 24 simultaneously Steam in the fumigation chamber spray thrower 3 in chamber 7 and preheating cavity 19 and preheating cavity spray thrower 21, and spray from spray head 4, complete to inside Become to rinse.After completing to rinse, control system controls tonic pump 17 and tonic pipe electromagnetic valve 12 is opened, by rushing in preheating cavity 19 Wash water is all delivered in fumigation chamber 7, then controls tonic pump 17 and tonic pipe electromagnetic valve 12 cuts out, and controls drain pipe electricity Magnet valve 13 and draining pump 14 are opened, and by the liquid emptying in fumigation chamber 7, whole flushing process terminates.
The above, be only preferred embodiment of the present utility model, is not that this utility model is made other form Restriction, any those skilled in the art are changed possibly also with the technology contents of the disclosure above or are modified as equivalent The Equivalent embodiments of change.But every without departing from technical solutions of the utility model content, real according to technology of the present utility model Any simple modification, equivalent variations and the remodeling that confrontation above example is made, still falls within the guarantor of technical solutions of the utility model Protect scope.

Claims (9)

1. the postoperative fumigating device of urology department, including shell (1) and the fumigation chamber (7) that is arranged in shell (1), fumigation chamber (7) upper end open, and corresponding with the opening of shell (1) upper surface, it is characterised in that: arrange in described fumigation chamber (7) lower section Preheating cavity (19), fumigation chamber (7) and preheating cavity (19) is had to be connected by medicinal liquid supply unit;At fumigation chamber (7) and preheating cavity (19) spray irrigation unit it is additionally provided with in.
The postoperative fumigating device of urology department the most according to claim 1, it is characterised in that: described medicinal liquid supply unit includes mending Pencil (16), tonic pump (17) and tonic pipe electromagnetic valve (12), tonic pipe (16) one end and described preheating cavity (19) bottom Connection, the other end connects the entrance of tonic pump (17), and outlet series connection tonic pipe electromagnetic valve (12) of tonic pump (17) is connected to smoke Steaming in chamber extension tube attached (11), fumigation chamber extension tube attached (11) is internal with described fumigation chamber (7) to be connected.
The postoperative fumigating device of urology department the most according to claim 1, it is characterised in that: described spray irrigation unit includes point It is not arranged on the fumigation chamber spray thrower (3) in fumigation chamber (7), preheating cavity (19) and preheating cavity spray thrower (21), connects external water The flush pipe (25) in source is connected with the entrance of flushing pump (24), and the outlet of flushing pump (24) is by pipeline series connection flush pipe electromagnetic valve (23) it is connected with fumigation chamber spray thrower (3) and preheating cavity spray thrower (21) respectively after.
The postoperative fumigating device of urology department the most according to claim 3, it is characterised in that: at described fumigation chamber spray thrower (3) Spray head (4) is had with preheating cavity spray thrower (21) surface configuration.
The postoperative fumigating device of urology department the most according to claim 1, it is characterised in that: in the bottom of described fumigation chamber (7) It is provided with drainage cell, the drain pipe one end in drainage cell and the fumigation chamber extension tube attached (11) being arranged on fumigation chamber (7) bottom Connecting, other end series connection drain pipe electromagnetic valve (13) entrance with draining pump (14) afterwards is connected, the outlet extraction of draining pump (14) Outside to shell (1).
The postoperative fumigating device of urology department the most according to claim 1, it is characterised in that: open in described fumigation chamber (7) upper end Web plate (6) it is provided with at Kou.
The postoperative fumigating device of urology department the most according to claim 1, it is characterised in that: in described fumigation chamber (7) and preheating Fumigation chamber heater (8) and preheating cavity heater (20) it is respectively arranged with in chamber (19);
The inwall of described fumigation chamber (7) is respectively arranged with liquidometer (10) under liquidometer on fumigation chamber (9) and fumigation chamber, It is provided with preheating cavity liquidometer (18) in described preheating cavity (19);
It is also respectively provided with temperature sensor in described fumigation chamber (7) and preheating cavity (19).
The postoperative fumigating device of urology department the most according to claim 1, it is characterised in that: described fumigation chamber (7) and preheating cavity (19) heat-insulation layer (2) is all had to wrap up.
The postoperative fumigating device of urology department the most according to claim 1, it is characterised in that: in the outside setting of described shell (1) Having medicinal liquid feed tube (22), medicinal liquid feed tube (22) connects with described preheating cavity (19) afterwards through shell (1).
CN201620277571.4U 2016-04-06 2016-04-06 Urological department postoperative fumigator Expired - Fee Related CN205626456U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620277571.4U CN205626456U (en) 2016-04-06 2016-04-06 Urological department postoperative fumigator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620277571.4U CN205626456U (en) 2016-04-06 2016-04-06 Urological department postoperative fumigator

Publications (1)

Publication Number Publication Date
CN205626456U true CN205626456U (en) 2016-10-12

Family

ID=57066219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620277571.4U Expired - Fee Related CN205626456U (en) 2016-04-06 2016-04-06 Urological department postoperative fumigator

Country Status (1)

Country Link
CN (1) CN205626456U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108464925A (en) * 2018-05-28 2018-08-31 张婷 A kind of Chinese medicinal fumigating treatment device that section being immunized for rheumatism
CN109999268A (en) * 2019-05-07 2019-07-12 西安交通大学医学院第一附属医院 A kind of anesthesia outfit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108464925A (en) * 2018-05-28 2018-08-31 张婷 A kind of Chinese medicinal fumigating treatment device that section being immunized for rheumatism
CN109999268A (en) * 2019-05-07 2019-07-12 西安交通大学医学院第一附属医院 A kind of anesthesia outfit

Similar Documents

Publication Publication Date Title
CN204016705U (en) The integrated cleaning device of a kind of central authorities
CN205672200U (en) A kind of novel smoked cleaning device of obstetrics and gynecology department
CN2910086Y (en) Toilet to relax bowels and clean pudendum
CN201179187Y (en) Ozone anus fumigation-washing therapeutical instrument
CN205626456U (en) Urological department postoperative fumigator
CN204261151U (en) Tcm internal medicine atomization chemical spraying device
CN106344315A (en) Novel intelligent urination and defecation nursing device and nursing bed including same
CN206026648U (en) Fumigation and washing of gynaecology device
CN207941068U (en) Urology Surgery flusher
CN201533911U (en) Closet-type fumigating and washing device
CN202933197U (en) Spraying hip bath fumigator
CN211024004U (en) Rheumatism immunity branch of academic or vocational study is with medicine fumigation treatment device
CN209187795U (en) A kind of tcm internal medicine atomization chemical spraying device
CN207563335U (en) A kind of medical instrument flusher
CN2796701Y (en) Bidet
CN200951227Y (en) Electric control and constant temperature type vesicoclysis device
CN203694210U (en) Rinser for urinary surgery nursing
CN201643118U (en) Medical colon therapeutic apparatus
CN208989628U (en) The chemicals dosing plant and fumigating instrument of fumigating instrument
CN208823410U (en) A kind of gynecological nursing sitting bath
CN201361233Y (en) Multifunctional irrigator used after urology surgery operation
CN206566286U (en) A kind of flusher that Gynecoiatry apparatus is atomized suitable for ozone
CN217853824U (en) Stifling purger of uropoiesis surgery nursing
CN204766457U (en) Basin is fumigated to traditional chinese medical science
CN215840390U (en) Traditional chinese medicine fumigation and washing bucket is used in gynaecology's disease nursing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

Termination date: 20170406

CF01 Termination of patent right due to non-payment of annual fee