CN2056170U - Reinforcement terminal connector - Google Patents
Reinforcement terminal connector Download PDFInfo
- Publication number
- CN2056170U CN2056170U CN 89217606 CN89217606U CN2056170U CN 2056170 U CN2056170 U CN 2056170U CN 89217606 CN89217606 CN 89217606 CN 89217606 U CN89217606 U CN 89217606U CN 2056170 U CN2056170 U CN 2056170U
- Authority
- CN
- China
- Prior art keywords
- tube connector
- reinforced bar
- bar
- reinforced
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model relates to a connecting pipe for reinforced bar joints, which is particularly processed and used for connecting reinforced bar joints in reinforced concrete engineering. One end of the connecting pipe forms a double-peak and double-valley shape, or is processed to be a plane end whose inner wall is provided with a concave groove, and the end is used for the processing in a plant; the other end is a plane end and is used on the spot. The utility model aims to be suitable for various connections for the reinforced bar joints in the reinforced concrete engineering and under the specific construction condition, obtaining reinforced bar butt joints with reliable quality. The quality of the reinforced bar joints can be effectively ensured through the utility model, the construction time of the reinforced bar construction on the spot can be shortened, and the cost of the reinforced concrete engineering can be reduced; simultaneously, the specific requirements of various reinforced bar engineering can be satisfied.
Description
The utility model belongs to the reinforced bar engineering technical field of construction of building and hydraulic engineering.
Reinforced concrete structure is the most widely used structure of building hydraulic engineering, and characteristics and construction needs according to engineering structures have a large amount of bar splices to connect at the construction field (site).The method of present domestic reinforced bar engineering job site spreading reinforcing bar mainly adopts arc welding and colligation overlap joint, reinforcing bar binding joint (particularly particle size reinforcing bar binding joint) stressed effect is relatively poor, arrangement of cloth muscle and concreting etc. are all made troubles, to consume steel simultaneously more, thereby improve the reinforced concrete works expense, though the reinforcing bar arc-welded joint is both economical, but because construction condition is relatively poor, the construction disturbing factor is many, therefore work efficiency is lower, often influences whole workmanship and duration thus.
The purpose of this utility model is to design one group of bar splice tube connector and comes connecting reinforcement, makes this bar splice tube connector can become reliable quality reinforcing bar banjo fixing butt jointing, shortens the reinforced bar engineering on-site construction time significantly, reduces the reinforced concrete works expense simultaneously.
The bar splice tube connector is the steel sleeve through special processing, and bar splice tube connector one end is planar end surface, and the other end is processed into the double-peak and double valley shape of symmetry; Perhaps two end faces of bar splice tube connector are planar end surface, select (comprising the reinforcing bar nominal diameter, strength grade and reinforcing bar profile) the bar splice tube connector of respective type according to engine request and reinforcing bar state to be connected.Tube connector one end is a double-peak and double valley shape, the other end is planar end surface, when steel bar end to be connected inserts tube connector double peak to valley one end, weld along the relevant place of reinforcing bar with arc welding with tube connector peak valley line, because this filler weld is symmetrically distributed on the end reinforced different cross section, it all is more rational that the performance of this end tube connector and reinforcing bar joint portion is analyzed from structural stress state and hot-working metallurgy viewpoint.Simultaneously, this end arc welding work is finished in the reinforcement yard of building site, because reinforcement yard's production welding condition is more superior than the job site, disturbing factor is few, so work efficiency than higher, also guarantees weldquality easily.Tube connector is an end of planar end surface, inside pipe wall is provided with many annular grooves, article two, symmetrical longitudinal fluting and annular groove vertical connection, also be furnished with a tapping hole and an air vent on the longitudinal fluting, this bar splice tube connector in reinforcement yard with arc welding finish joint half, second half finishes joint with the method for attachment of the molten lock of aluminothermy casting ingot at the construction field (site), forms complete reliable bar splice; Perhaps tube connector one end is a double-peak and double valley shape, in factory with arc welding finish joint half, the other end, this end tube connector inwall is provided with two symmetries, the groove that total length connects, this end is finished with the mechanical presses method of attachment at the construction field (site), forms complete reliable bar splice; Be double-peak and double valley shape perhaps at tube connector one end, in factory with arc welding finish joint half, the tube connector other end is planar end surface, this end tube connector inwall is processed into screw thread, finishes with the spiral connection method at the construction field (site), forms complete reliable bar splice; Perhaps two end faces of tube connector are planar end surface, tube connector inwall one end be provided with two grooves in factory with the mechanical presses connection method finish joint half, tube connector other end inwall is provided with many annular grooves, also have two longitudinal flutings to communicate with it, be furnished with a tapping hole and an air vent on the longitudinal fluting, this end is finished with the method for attachment of the molten lock of aluminothermy casting ingot at the construction field (site), forms complete reliable bar splice; Perhaps two end faces of tube connector are planar end surface, tube connector inwall one end is provided with two grooves, in factory with the mechanical presses connection method finish joint half, tube connector other end inwall is processed into screw thread, this end is finished with the spiral connection method at the construction field (site), forms complete reliable bar splice; Perhaps two end faces of tube connector are planar end surface tube connector inwall and are provided with the groove that two total lengths connect, tube connector one end in factory with mechanical presses connect method finish joint half, second half finishes joint with the mechanical presses method at the construction field (site), forms complete reliable bar splice.But the utility model connecting reinforcement scope is 20 millimeters to 50 millimeters of diameters.
The utility model major advantage: the specific execution conditions that can adapt to all kinds of reinforced concrete workss, and can make full use of constructor's existence conditions, use technology is simple, can guarantee effectively that bar splice becomes the reliable quality banjo fixing butt jointing, can shorten the reinforced bar engineering on-site construction time significantly, reduce the reinforced concrete works expense simultaneously.
Accompanying drawing 1 is to be applicable to use arc welding in the factory, the on-the-spot bar splice tube connector schematic diagram that uses aluminothermy lock ingot connection method to connect.Among the figure: the 1st, U-shaped peak, the 2nd, U-shaped paddy, the 3rd, annular groove, the 4th, longitudinal fluting, the 5th, tapping hole, the 6th, air vent, the 7th, planar ends.
Accompanying drawing 2 is to be applicable to use arc welding in the factory, an on-the-spot bar splice tube connector schematic diagram that uses the spiral connection method to connect, among the figure: the 1st, U-shaped peak, the 2nd, U-shaped paddy, the 7th, planar ends, the 8th, screw thread.
Accompanying drawing 3 is to be applicable to use arc welding in the factory, the on-the-spot bar splice tube connector schematic diagram that uses the mechanical presses connection method to connect.Among the figure: the 1st, U-shaped peak, the 2nd, U-shaped paddy, the 7th, planar ends, the 9th, groove.
Accompanying drawing 4 is to be applicable in the factory to connect with mechanical presses, the on-the-spot reinforcing bar tube connector schematic diagram that uses aluminothermy lock ingot connection method to connect.Among the figure: the 3rd, annular groove, the 4th, longitudinal fluting, the 5th, tapping hole, the 6th, air vent, the 7th, planar ends, the 9th, groove.
Accompanying drawing 5 is to be applicable in the factory to connect with mechanical presses, the on-the-spot bar splice tube connector schematic diagram that uses the spiral connection method to connect, among the figure: the 7th, planar ends, the 8th, screw thread, the 9th, groove.
Accompanying drawing 6 is to be applicable in the factory to finish joint half with the mechanical presses connection, second half bar splice tube connector schematic diagram that connects with the mechanical presses connection method at the scene of joint.Among the figure: the 7th, planar ends, the 9th, groove.
Embodiment, a kind of diameter that designs and produces by the above-mentioned technical characterictic of the utility model is the bar splice tube connector of 40 millimeters II level notched barss, the tube connector grade of steel is the 35# steel, tube connector length is 175 millimeters, external diameter is 68 millimeters, pipe thickness is 10.5 millimeters, article seven, the groove size of annular groove is wide 6 millimeters, dark 2 millimeters, the adjacent annular groove is spaced apart 6 millimeters, and two longitudinal flutings of symmetry are of a size of wide 5 millimeters, dark 2 millimeters, the tapping hole diameter is 13 millimeters, and the air vent diameter is 4 millimeters, and U-shaped valley portions to planar ends length is 110 millimeters.This tube connector is applicable to that diameter is that 40 millimeters II level notched bars is finished tube connector double peak to valley one end (i.e. half joint) with arc welding in the reinforcement yard of building site, second half finishes joint with the method for attachment of the molten lock of aluminothermy casting ingot at the construction field (site), forms complete reliable bar splice.The bar splice tube connector can be selected for use according to engine request and reinforcing bar state (comprising the reinforcing bar nominal diameter, strength grade and reinforcing bar outer shape) to be connected.
Claims (2)
1, one group of bar splice tube connector is the steel sleeve through special processing, it is characterized in that bar splice tube connector one end is to be processed into double-peak and double valley shape, or the tube connector inwall is provided with the planar end surface of groove, the other end is planar end surface, the tube connector inwall is provided with many annular grooves, and the longitudinal fluting of two symmetries also is furnished with a tapping hole and air vent, perhaps the tube connector inwall is processed into screw thread, and perhaps the tube connector inwall is provided with the groove of the total length perforation of two symmetries.
2, bar splice tube connector according to claim 1 is characterized in that the annular groove of tube connector one end inwall and vertical the communicating of longitudinal fluting of two symmetries.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 89217606 CN2056170U (en) | 1989-09-30 | 1989-09-30 | Reinforcement terminal connector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 89217606 CN2056170U (en) | 1989-09-30 | 1989-09-30 | Reinforcement terminal connector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2056170U true CN2056170U (en) | 1990-04-18 |
Family
ID=4872835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 89217606 Expired - Lifetime CN2056170U (en) | 1989-09-30 | 1989-09-30 | Reinforcement terminal connector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2056170U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852284A (en) * | 2012-09-01 | 2013-01-02 | 青岛森林金属制品有限公司 | Taper-sleeve locking-type steel bar connection joint |
CN103821230A (en) * | 2014-02-27 | 2014-05-28 | 王睿敏 | Reinforced concrete structure connection component, manufacturing method and construction method thereof |
CN111075117A (en) * | 2019-12-30 | 2020-04-28 | 周建 | Binding and welding sleeve for connecting reinforcing steel bars and using method thereof |
-
1989
- 1989-09-30 CN CN 89217606 patent/CN2056170U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852284A (en) * | 2012-09-01 | 2013-01-02 | 青岛森林金属制品有限公司 | Taper-sleeve locking-type steel bar connection joint |
CN103821230A (en) * | 2014-02-27 | 2014-05-28 | 王睿敏 | Reinforced concrete structure connection component, manufacturing method and construction method thereof |
CN111075117A (en) * | 2019-12-30 | 2020-04-28 | 周建 | Binding and welding sleeve for connecting reinforcing steel bars and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211774635U (en) | Assembly and splicing structure for reverse bending points between precast concrete columns | |
CN2758349Y (en) | Fast connected reinforced bar joint | |
CN115653098A (en) | Assembled reinforced concrete beam-column connecting structure and construction method thereof | |
WO2022161085A1 (en) | Equivalent steel concrete precast column and construction method therefor | |
CN203701435U (en) | Composite connection joint for grouting connection and compression connection | |
CN108797799B (en) | Side plate connection type steel pipe concrete prefabricated column connection node and construction method | |
CN100519963C (en) | Node of round carbon fiber reinforced plastic steel pipe concrete column and armoured concrete frame girder | |
CN210067238U (en) | Half grout sleeve | |
CN2056170U (en) | Reinforcement terminal connector | |
CN2287654Y (en) | Steel reinforcement looping connection joint with rib | |
CN216787102U (en) | High-shear prestressed concrete pile | |
CN115680116A (en) | Assembled frame beam column connecting node and construction method thereof | |
CN210500792U (en) | Double-tube type steel bar connecting structure between precast concrete components | |
CN210508061U (en) | Improved generation connection structure suitable for steel bar connection between assembled concrete member | |
CN2182209Y (en) | Connector for reinforcing bar | |
CN2182210Y (en) | Connecting device for reinforcing bar | |
CN2385010Y (en) | External mounted square steel tube concrete beam and column connecting node | |
CN214302200U (en) | BIM assembled cold-formed thin-wall truss girder and section steel girder parameterization connecting node | |
CN221346076U (en) | Mechanical reverse buckle grouting sleeve steel bar connecting component | |
CN215052936U (en) | Concatenation formula concrete pipe pile | |
CN109972726A (en) | A kind of steel skeleton construction room | |
CN2314138Y (en) | Mechanical joint for deformed steel bar with ribs | |
CN219604689U (en) | Reinforcing steel bar connection structure for house construction | |
CN216075509U (en) | Assembled concrete structure beam column node connection structure | |
CN216739592U (en) | Precast concrete pile connecting sleeve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CX01 | Expiry of patent term |