CN205613260U - SF6 gas gathering system - Google Patents

SF6 gas gathering system Download PDF

Info

Publication number
CN205613260U
CN205613260U CN201620240876.8U CN201620240876U CN205613260U CN 205613260 U CN205613260 U CN 205613260U CN 201620240876 U CN201620240876 U CN 201620240876U CN 205613260 U CN205613260 U CN 205613260U
Authority
CN
China
Prior art keywords
gas
gathering system
pipeline
trap
storage device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620240876.8U
Other languages
Chinese (zh)
Inventor
董方舟
车瑶
张琛
刘弘景
石磊
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620240876.8U priority Critical patent/CN205613260U/en
Application granted granted Critical
Publication of CN205613260U publication Critical patent/CN205613260U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The utility model provides a SF6 gas gathering system, include: gaseous storage device, the transformer room intercommunication of gaseous storage device through collecting the pipeline and having the SF6 transformer, gaseous purifier, gaseous purifier install on the collecting pipe way to make the SF6 gas that comes out from SF6 transformer internal leakage flow in in the gaseous storage device after gaseous purifier's purification, wherein, gaseous purifier includes gas separator, gas separator's air inlet and transformer room intercommunication, gas separator's gas outlet and gaseous storage device intercommunication, gas separator is last to be provided with first return -air mouth, and first return -air mouth is through first pipeline and transformer room intercommunication to make gas reflux in the gas separator to the transformer room in. The utility model provides a SF6 gas gathering system has solved the problem that makes SF6 take place to leak and then arouse environmental pollution easily when the indoor SF6 transformer among the prior art breaks down.

Description

SF6Gas gathering system
Technical field
This utility model relates to harmful field of gas treatment, in particular to a kind of SF6Gas gathering system.
Background technology
Along with the continuous propelling of Urbanization Process In China, standing in great numbers in urban skyscraper, population is the most intensive, power consumption, transformator Quantity is also being continuously increased.The oil mass of Conventional mass oil-filled transformer is relatively big, once catches fire the life to people because of fault Property safety constitutes a serious threat.Therefore, six-component force balance transformator has been widely used in China city since the sixties in last century Underground substation, city.
Compared with traditional filling transformer, due to SF6Non-combustible and the most combustion-supporting property of gas so that six-component force balance transformator does not has There is the Potential feasibility of initiation fire, and its noise in running is low, particularly suitable at bustling commercial center and population Intensive residential block uses.
SF6Although gas-insulated performance is superior, but it must be carried out strict quality surveillance and safety according to relevant regulatory requirements Management.This is because SF6Gas in process of production or under the effect of the high energy factor, can decompose that generation is some poisonous even to be had Severe toxicity, the objectionable impurities of severe corrosive.When system exists moisture, air (oxygen), electrode material, equipment and materials, can make Obtaining catabolic process to complicate, cause catabolite value volume and range of product substantially to increase, hazardness strengthens.
SF6The harm of gaseous impurity mainly shows as toxicity and the corrosivity of catabolite.SF6Impurity in gas and catabolite Middle acid substance particularly HF, SO2Existence can cause the corrosion of sulfur hexafluoride insulation electrical equipment material;The existence of moisture exists Electric property may be caused under certain condition to deteriorate (the various electric arc analytes of sulfur hexafluoride gas and SF6Gas produces through hydrolysis Fluohydric acid gas (HF) and sulphuric acid (H2SO4), some metal object and insulating part can be produced corrosiveness, and then leak, shadow Ring the service life of electrical equipment), even cause serious equipment breakdown.And such as SF present in sulfur hexafluoride4、SOF2、 SF2、SO2F2, HF etc. be toxicity and the extremely strong compound of corrosivity, very big to harm, it is possible to cause the pernicious person Accident.
But, owing to the workmanship of six-component force balance transformator, mounting process, aging, the blowing pressure of potted component etc. are former Because causing SF in transformator6Gas leakage is difficult to avoid that.Once there is leakage failure in six-component force balance transformator, it is interior Sulfur hexafluoride gas will escape in a large number, the SF leaked out6Gas and analyte thereof, in the accumulation of indoor low layer space, cause local Anoxia and band poison, cause serious harm to the health entering indoor maintenance and the personnel of tour.
At present, when six-component force balance transformator occurs the emergencies such as a large amount of leakages, the common processing method of transformer station is: let out After leakage alarm sends warning, staff should withdraw rapidly scene, if occurring in indoor location place, should open room ventilation Device.Do not wear a gas mask or positive-pressure air respirator personnel no admittance, only through sufficient natural exhaust or pressure Air draft, and through SF6Leakage monitoring system monitors SF6After gas, oxygen content are up to standard, personnel are just accurate to be entered.
Above-mentioned ventilation emptying process scheme is not suitable for being positioned at the underground substation six-component force balance transformer leakage event of down town Barrier.If leakage failure still selects ventilation emptying measure will make SF after occurring6Gas and equipment During Process of Long-term Operation produce Toxicity and the extremely strong complicated catabolite such as SF of corrosivity4、SOF2、SF2、SO2F2, HF etc. pollute ground air, over the ground Dough figurine group produces body harm, and may cause pernicious personal injury.
Visible, underground substation six-component force balance transformator once Sudden Leakage fault, be in a short period of time to Interior Space In between, the sulfur hexafluoride gas of leakage reclaims, and makes gas leakage accidents scene be rapidly achieved the state that can carry out rushing to repair.
Utility model content
Main purpose of the present utility model is to provide a kind of SF6Gas gathering system, to solve the SF of indoor of the prior art6 SF is easily made when transformator breaks down6There is leakage and then the problem causing environmental pollution.
To achieve these goals, this utility model provides a kind of SF6Gas gathering system, including: gas storage device, gas Body storage device passes through collecting and has SF6Transformer room's connection of transformator;Gas cleaning plant, gas cleaning plant is pacified It is contained in collecting, so that from SF6Transformator internal leakage SF out6Gas flows into gas after the purification of gas cleaning plant In body storage device;Wherein, gas cleaning plant includes gas trap, and the air inlet of gas trap connects with transformer room, The gas outlet of gas trap connects with gas storage device;Being provided with the first gas returning port on gas trap, the first gas returning port leads to Cross the first pipeline to connect with transformer room, so that the gas backstreaming in gas trap is in transformer room.
Further, SF6Gas gathering system also includes: the first check valve, and the first check valve is arranged on the first pipeline, first The air inlet of check valve connects with the first gas returning port of gas trap.
Further, SF6Gas gathering system also includes: on-off control valve, and on-off control valve is arranged on the first pipeline.
Further, SF6Gas gathering system also includes: aerator, and aerator is arranged on the first pipeline, in making the first pipeline Air-flow flow in transformer room from gas cleaning plant.
Further, gas cleaning plant also includes: water separation module, and water separation module is arranged on the upstream of gas trap.
Further, gas trap is provided with the second gas returning port, SF6Gas gathering system also includes the second pipeline, the second pipe The one end on road connects with the second gas returning port, and the other end of the second pipeline is separated from water the air inlet connection of module, so that gas separates Gas backstreaming in device is in water separation module.
Further, gas cleaning plant also includes: filtering foreign module, and filtering foreign module is arranged on the upper of water separation module Trip, one end away from gas trap of the second pipeline is connected to filtering foreign module and is separated from water between module.
Further, SF6Gas gathering system also includes: the second check valve, and the second check valve is arranged on the second pipeline, second The air inlet of check valve connects with the second gas returning port of gas trap.
SF in this utility model6Gas gathering system includes gas storage device and gas cleaning plant, due to gas storage device Being connected with transformer room by collecting, gas cleaning plant is arranged in collecting, so, just can make from SF6Transformation Device internal leakage SF out6Gas is after the purification of gas cleaning plant in inflow gas storage device, and then reaches to collect leakage SF6The purpose of gas, thus solve the SF of indoor of the prior art6SF is easily made when transformator breaks down6Let out The problem leaked into and cause environmental pollution.
Accompanying drawing explanation
The Figure of description of the part constituting the application is used for providing being further appreciated by of the present utility model, of the present utility model Schematic description and description is used for explaining this utility model, is not intended that improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 shows according to SF of the present utility model6The structural representation of the embodiment of gas gathering system.
Wherein, above-mentioned accompanying drawing includes the following drawings labelling:
10, gas storage device;20, collecting;30, transformer room;31、SF6Transformator;40, gas cleaning plant; 41, gas trap;42, water separation module;43, filtering foreign module;51, the first pipeline;52, the second pipeline;61、 First check valve;62, the second check valve;70, on-off control valve;80, aerator.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can be mutually combined. Describe this utility model below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
Present embodiments provide a kind of SF6Gas gathering system, refer to Fig. 1, this SF6Gas gathering system includes: gas stores up Cryopreservation device 10, gas storage device 10 passes through collecting 20 and has SF6The transformer room 30 of transformator 31 connects;Gas Body purifier 40, gas cleaning plant 40 is arranged in collecting 20, so that from SF6Transformator 31 internal leakage is out SF6Gas is after the purification of gas cleaning plant 40 in inflow gas storage device 10;Wherein, gas cleaning plant 40 wraps Including gas trap 41, the air inlet of gas trap 41 connects with transformer room 30, the gas outlet of gas trap 41 and gas Body storage device 10 connects;Being provided with the first gas returning port on gas trap 41, the first gas returning port is by the first pipeline 51 and change Depressor room 30 connects, so that the gas backstreaming in gas trap 41 is in transformer room 30.
SF in the present embodiment6Gas gathering system includes gas storage device 10 and gas cleaning plant 40, owing to gas stores Device 10 is connected with transformer room 30 by collecting 20, and gas cleaning plant 40 is arranged in collecting 20, so, Just can make from SF6Transformator 31 internal leakage SF out6Gas inflow gas after the purification of gas cleaning plant 40 stores In device 10, and then reach to collect the SF of leakage6The purpose of gas, thus solve the SF of indoor of the prior art6Transformation SF is easily made when device breaks down6There is leakage and then the problem causing environmental pollution.
It addition, gas cleaning plant 40 includes that gas trap 41, the air inlet of gas trap 41 connect with transformer room 30, The gas outlet of gas trap 41 connects with gas storage device 10, and first time its mouth of gas trap 41 passes through the first pipeline 51 connect with transformer room 30, as such, it is possible to make the portion gas in gas trap 41 be back in transformer room 30, no It is only capable of the air pressure in holding transformer room 30, moreover it is possible to gas is filtered again, it is ensured that collect in gas storage device 10 The purity of gas.
In the present embodiment, SF6Gas gathering system also includes: the first check valve 61, and the first check valve 61 is arranged on the first pipe On road 51, the air inlet of the first check valve 61 connects with the first gas returning port of gas trap 41.In this manner it is ensured that first Airflow direction in pipeline 51.
In order to control the gas break-make in the first pipeline 51, SF6Gas gathering system also includes: on-off control valve 70, break-make control Valve 70 processed is arranged on the first pipeline 51.
In the present embodiment, SF6Gas gathering system also includes: aerator 80, and aerator 80 is arranged on the first pipeline 51, The air-flow in the first pipeline 51 is made to flow in transformer room 30 from gas cleaning plant 40.
In order to separate the moisture in gas, gas cleaning plant 40 also includes: water separation module 42, and water separation module 42 is arranged Upstream at gas trap 41.
In the present embodiment, gas trap 41 is provided with the second gas returning port, SF6Gas gathering system also includes the second pipeline 52, one end of the second pipeline 52 connects with the second gas returning port, and the other end of the second pipeline 52 is separated from water the air inlet of module 42 Connection, so that the gas backstreaming in gas trap 41 is in water separation module 42.
By arranging the second pipeline 52, the portion gas in gas trap 41 can be back between water separation module 42, Carry out again water to separate, it is ensured that water separating effect, it is achieved circularly purifying.
Preferably, the first gas returning port is arranged on the bottom of gas trap 41, and the second gas returning port is arranged on gas trap 41 Top.
In order to remove the foreign material in gas, gas cleaning plant 40 also includes: filtering foreign module 43, filtering foreign module 43 Being arranged on the upstream of water separation module 42, one end away from gas trap 41 of the second pipeline 52 is connected to filtering foreign module 43 are separated from water between module 42.
In order to prevent the gas reverse flow in the second pipeline 52, SF6Gas gathering system also includes: the second check valve 62, the Two check valves 62 are arranged on the second pipeline 52, the air inlet of the second check valve 62 and the second gas returning port of gas trap 41 Connection.
SF in the present embodiment6Gas gathering system is come in collecting chamber six by three or multiple gas automatic collecting device arranged side by side Sulfur hexafluoride gas mixture in sulfur fluoride gas-insulated transformer leakage failure rear space.Gas automatic collecting device is fixed on six The vent of sulfur fluoride gas-insulated transformer room (transformer room 30) underground, when there is leakage accident, collects container certainly Dynamic closing, reclaims the passage providing airtight for rear class gas.
Accident treatment terminates, and collects container and automatically opens wide, it is ensured that original channels open.The six-component force balance transformation in which room Device generation leakage failure, the gas automatic collecting device of its underground starts when receiving leakage alarm signal and closes, and collects sky Sulfur hexafluoride between and the mixed gas of air.
The leakage sulfur hexafluoride gas collected enters dust filter unit and the analyte of concatenation through gas pipeline by electromagnetic valve V1 Filter, filters out the dust in mixed gas;By the sulfur hexafluoride gas of dust filter unit at centrifugal blower and vortex pneumatics Under the effect of machine, enter water separator and contaminant filter (filters SF6Catabolite, oil, micro-water) by a large amount of water in gas Divide and other magazins' layout.
Gas after filtration, purification continues through pipeline and flows through the first buffer tank, electromagnetic valve V2, air separation module successively, passes through Sulfur hexafluoride gas concentration after secondary air segregation apparatus is the highest (70%), can keep in the second buffer tank.First Buffer tank, electromagnetic valve V2, air separation module, each gateway of the second buffer tank are connected by pipeline, air separation module And it is provided with electromagnetic valve V3 on the pipeline that second between buffer tank.Air separation module is the membrane separation technique used, the second-order separation Sulfur hexafluoride gas and air sufficiently can be separated, to separate air, improve the concentration of sulfur hexafluoride gas.
The sulfur hexafluoride gas that concentration in second buffer tank is higher, in addition it is also necessary to store up with storage in liquid to sulfur hexafluoride gas after compression In cryopreservation device, emission treatment after waiting follow-up Recovery Purifying or reaching environmental protection standard.If sulfur hexafluoride gas storage device be by The sulfur hexafluoride caching pipe composition of dry series connection.The sulfur hexafluoride gas that concentration in second buffer tank is higher is flowed successively by pipeline Through electromagnetic valve V4, needle-valve C1, and under the effect of compressor bank (needing 2 compressor parallels to constitute), pass through along pipeline Electromagnetic valve V5 enters sulfur hexafluoride gas storage device;Sulfur hexafluoride gas storage device is in series by multiple holding vessels, each phase It is each provided with 1 electromagnetic valve between the adjacent tank connected pipeline of storage.
The electromagnetic valve related in this emergent flow process is in opening, and other valves being not related to are closed.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for this area For technical staff, this utility model can have various modifications and variations.All within spirit of the present utility model and principle, institute Any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (8)

1. a SF6Gas gathering system, it is characterised in that including:
Gas storage device (10), described gas storage device (10) passes through collecting (20) and has SF6Transformation Transformer room (30) connection of device (31);
Gas cleaning plant (40), described gas cleaning plant (40) is arranged in described collecting (20), so that From described SF6Transformator (31) internal leakage SF out6Gas flows after the purification of described gas cleaning plant (40) Enter in described gas storage device (10);
Wherein, described gas cleaning plant (40) includes gas trap (41), entering of described gas trap (41) QI KOU connects with described transformer room (30), the gas outlet of described gas trap (41) and described gas storage device (10) connection;Being provided with the first gas returning port on described gas trap (41), described first gas returning port is by the first pipe Road (51) connects with described transformer room (30), so that the gas backstreaming in described gas trap (41) is to described In transformer room (30).
SF the most according to claim 16Gas gathering system, it is characterised in that described SF6Gas gathering system also includes:
First check valve (61), described first check valve (61) is arranged on described first pipeline (51), and described first The air inlet of check valve (61) connects with the first gas returning port of described gas trap (41).
SF the most according to claim 16Gas gathering system, it is characterised in that described SF6Gas gathering system also includes:
On-off control valve (70), described on-off control valve (70) is arranged on described first pipeline (51).
SF the most according to claim 16Gas gathering system, it is characterised in that described SF6Gas gathering system also includes:
Aerator (80), described aerator (80) is arranged on described first pipeline (51), makes described first pipeline (51) Interior air-flow flows in described transformer room (30) from described gas cleaning plant (40).
SF the most according to claim 16Gas gathering system, it is characterised in that described gas cleaning plant (40) also includes:
Water separation module (42), described water separation module (42) is arranged on the upstream of described gas trap (41).
SF the most according to claim 56Gas gathering system, it is characterised in that described gas trap is provided with on (41) Second gas returning port, described SF6Gas gathering system also includes the second pipeline (52), one end of described second pipeline (52) Connect with described second gas returning port, the other end of described second pipeline (52) and the air inlet of described water separation module (42) Mouth connection, so that the gas backstreaming in described gas trap (41) is interior to described water separation module (42).
SF the most according to claim 66Gas gathering system, it is characterised in that described gas cleaning plant (40) also includes:
Filtering foreign module (43), described filtering foreign module (43) is arranged on the upstream of described water separation module (42), One end away from described gas trap (41) of described second pipeline (52) is connected to described filtering foreign module (43) And between described water separation module (42).
SF the most according to claim 66Gas gathering system, it is characterised in that described SF6Gas gathering system also includes:
Second check valve (62), described second check valve (62) is arranged on described second pipeline (52), and described second The air inlet of check valve (62) connects with the second gas returning port of described gas trap (41).
CN201620240876.8U 2016-03-25 2016-03-25 SF6 gas gathering system Active CN205613260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620240876.8U CN205613260U (en) 2016-03-25 2016-03-25 SF6 gas gathering system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620240876.8U CN205613260U (en) 2016-03-25 2016-03-25 SF6 gas gathering system

Publications (1)

Publication Number Publication Date
CN205613260U true CN205613260U (en) 2016-10-05

Family

ID=57031433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620240876.8U Active CN205613260U (en) 2016-03-25 2016-03-25 SF6 gas gathering system

Country Status (1)

Country Link
CN (1) CN205613260U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106744711A (en) * 2016-12-21 2017-05-31 河南省日立信股份有限公司 The purification-recovery system of mixed gas in six-component force balance transformer leakage rear chamber

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106744711A (en) * 2016-12-21 2017-05-31 河南省日立信股份有限公司 The purification-recovery system of mixed gas in six-component force balance transformer leakage rear chamber

Similar Documents

Publication Publication Date Title
CN105864633A (en) SF6 gas collection system
CN106512671A (en) Electrified on-line dehumidifying and purifying system of sulfur hexafluoride electric equipment
CN106744711A (en) The purification-recovery system of mixed gas in six-component force balance transformer leakage rear chamber
CN104417420B (en) A kind of air emergency break down lorry
CN205613260U (en) SF6 gas gathering system
CN104638557B (en) Gas purification method
CN104069707B (en) A kind of lead-acid accumulator industry purification equipment for separating lead powder from air and purification method thereof
CN105664676A (en) SF6 gas collection system
CN205504458U (en) SF6 gas gathering system
CN105233620A (en) Hydrogen drying and purifying system of hydrogen-cooled generator set
KR101086311B1 (en) Gas filter device of sf6-gas insulated switchgear
CN204165151U (en) Vehicular air purifier
CN113193505A (en) Power distribution website trouble early warning device
CN217568087U (en) SF under GIS indoor burst fault 6 Quick recovery system of gas leakage
CN211374671U (en) Monitoring device for dangerous gas of underground pipe network
CN106710787B (en) Sulfur hexafluoride gas Emergency recovery cleaning system after underground substation transformer leakage
CN206282679U (en) Sulfur hexafluoride gas Emergency recovery cleaning system after underground substation transformer leakage
CN217057809U (en) Exhaust and purification integrated device
CN205980481U (en) Refrigerant belt cleaning device and refrigerant piping cleaning module
CN205504459U (en) SF6 gas gathering system
CN205868003U (en) Combination formula processing apparatus of industrial fumes waste gas
CN106422602B (en) A kind of circulating industrial waste gas treatment device
CN206094225U (en) Oil fume purification system
CN212370701U (en) Self-cleaning device of medium-efficiency electronic air purification equipment
CN114100309A (en) SF under GIS indoor burst fault6Quick recovery system and device for gas leakage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant