CN205605130U - A Y connects for double pump technology tubular column - Google Patents

A Y connects for double pump technology tubular column Download PDF

Info

Publication number
CN205605130U
CN205605130U CN201620223254.4U CN201620223254U CN205605130U CN 205605130 U CN205605130 U CN 205605130U CN 201620223254 U CN201620223254 U CN 201620223254U CN 205605130 U CN205605130 U CN 205605130U
Authority
CN
China
Prior art keywords
bypass pipe
sealing drum
steel ball
sealed steel
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620223254.4U
Other languages
Chinese (zh)
Inventor
解会军
龙江桥
郭雯霖
罗少锋
闫国栋
杨德华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Botians Science & Technology Co Ltd
Original Assignee
Tianjin Botians Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Botians Science & Technology Co Ltd filed Critical Tianjin Botians Science & Technology Co Ltd
Priority to CN201620223254.4U priority Critical patent/CN205605130U/en
Application granted granted Critical
Publication of CN205605130U publication Critical patent/CN205605130U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Details Of Reciprocating Pumps (AREA)

Abstract

The utility model discloses a Y connects for double pump technology tubular column, including the person in charge and the bypass pipe that communicates each other be equipped with the single current valve in the bypass pipe, the single current valve includes sealing drum, sealed steel ball and compression spring, the sealing drum rigid coupling is in in the bypass pipe the upper portion of sealing drum with be formed with the annular space between the bypass pipe, the annular space with be responsible for the intercommunication be equipped with on the upper portion lateral wall of sealing drum with the discharge orifice excessively of annular space intercommunication be formed with the valve ball seat in the sealing drum, the valve ball seat in cross the below of discharge orifice be equipped with in the sealing drum with the anastomotic sealed steel ball of valve ball seat the top of sealed steel ball is equipped with compression spring, the compression spring cramping is in sealed steel ball with between the upper base of bypass pipe. The utility model discloses can improve total effective operating duration of individual well charge pump system greatly, pump period is examined in the extension.

Description

A kind of Y-shaped connector for two-pump process tubing string
Technical field
This utility model relates to a kind of tool in oil well, a kind of Y-shaped connector for two-pump process tubing string.
Background technology
Offshore platform cost of winning is high, for reducing development cost, Bohai Bay Oil recent years more newly-built chain-wales or nothing People's chain-wales, these platforms share a workover rig without workover rig or several platform.Therefore these Platform Requirements have In the longer electric motor drive oil pump system cycle, reduce well repairing and pump checking operation.For solving this difficult problem, latent with entering two sets at present in oil well Oil electric pump, forms individual well double electric pump combination oil extraction system, will be connected to same oil pipe by Y-shaped connector by two set pumping systems On post, every electric pump is individually powered and controls by independent cable, by reasonably determining the working time of two set electric pumps Make they alternate runs, improve total effective run time of the double pumping systems of individual well, extend pump detection period.But giving birth to During product, often occur because Y-shaped connector and electric pump unit junction ball-and-seat fail to solve electric pump unit passage Sealing problem, when double pump produces, lower face-pumping group intact and upper face-pumping group ball-and-seat is revealed, and causes the following unit cannot be normal Produce.
Summary of the invention
This utility model provides a kind of Y for two-pump process tubing string to connect for solving technical problem present in known technology Head, uses this joint can be greatly improved total effective run time of the double pumping systems of individual well, extends pump detection period.
This utility model is adopted the technical scheme that by solving technical problem present in known technology: a kind of be used for double pump The Y-shaped connector of process pipe string, including the supervisor being interconnected and bypass pipe, is provided with ball-and-seat in described bypass pipe, described Ball-and-seat includes that sealing drum, sealed steel ball and compression spring, described sealing drum are fixed in described bypass pipe, described close Being formed with annular space between top and the described bypass pipe of sealed tube, described annular space connects, at described sealing drum with described supervisor Upper portion side wall is provided with the flowing hole connected with described annular space, is formed with valve ball seat, described valve ball seat in described sealing drum It is positioned at the lower section of described flowing hole, in described sealing drum, is provided with the sealed steel ball coincideing with described valve ball seat, described close Sealing the compression spring that is arranged over of steel ball, described compression spring clamped at the upper end of described sealed steel ball and described bypass pipe it Between.
Seating nipple on the upper end of described supervisor connects and has, connects in the lower end of described supervisor and has lower seating nipple.
The bottom of described sealing drum is stretched out outside the lower end of described bypass pipe, is provided with in the bottom of described sealing drum and adopts The screw thread that oil electric pump connects.
Described flowing hole has multiple, and multiple described flowing holes are evenly arranged along the circumference of described sealing drum.
This utility model has the advantage that with good effect: uses the structure arranging ball-and-seat in bypass pipe, connects at Y When head and electric pump unit junction ball-and-seat lost efficacy, it is possible to make the oil recovery passage of stopping production electric pump realize effectively and seal, solve double When pump produces, the intact problem that cannot normally produce because revealing at upper pump group ball-and-seat in lower submersible electric pump pump group, And then total effective run time of raising individual well pumping systems, extend pump detection period, reduce workman's workload, extend and produce The normal production cycles of well, stable yields, the volume increase to producing well, there is the biggest facilitation.And this utility model seals Reliably, simple in construction, and construction safety reliability height, strong operability, operation are simple, assembling and execute-in-place convenient. Single Y-shaped connector two-pump process tubing string and double Y-shaped connector two-pump process tubing strings can be applicable to, be suitable to that hole condition is poor, well depth relatively greatly, The oil well that production cycle is shorter, inspection pump is inconvenient.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is sealing drum structural representation of the present utility model.
In figure: 1, upper seating nipple;2, bypass pipe;3, compression spring;4, sealed steel ball;5, sealing drum;6, under Seating nipple;7, supervisor;8, annular space;9, flowing hole.
Detailed description of the invention
For summary of the invention of the present utility model, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate Accompanying drawing describes in detail as follows:
Referring to Fig. 1 and Fig. 2, a kind of Y-shaped connector for two-pump process tubing string, including the supervisor 7 being interconnected and bypass Pipe 2, is provided with ball-and-seat in described bypass pipe 2, and described ball-and-seat includes sealing drum 5, sealed steel ball 4 and compression spring 3, described sealing drum 5 is fixed in described bypass pipe 2, shape between the top and described bypass pipe 2 of described sealing drum 5 Become to have annular space 8, described annular space 8 to connect with described supervisor 7, the upper portion side wall of described sealing drum 5 is provided with and described ring The flowing hole 9 of empty 8 connections, is formed with valve ball seat in described sealing drum 5, and described valve ball seat is positioned at described flowing hole 8 Lower section, in described sealing drum 5, be provided with the sealed steel ball 4 coincideing with described valve ball seat, upper at described sealed steel ball 4 Side is provided with compression spring 3, and described compression spring 3 clamps at described sealed steel ball 4 and at the upper end of described bypass pipe 2.
Above-mentioned Y-shaped connector can directly apply to double Y-shaped connector two-pump process tubing string.It is applied to double Y-shaped connector two-pump process tubing string Time, entering down two Y-shaped connectors, the bypass pipe of each Y-shaped connector respectively hangs the electric pump unit of a platform independent, the master of Y-shaped connector Pipe is as TCH test channel, and by steel wire operation or wireline operation, pulling in main pipeline produces blanking plug, test blanking plug, Realize alternate run and the dynamic test of double pump.General first delivery lower Y-shaped connector production blanking plug, machine under then starting Group produces, if upper unit ball-and-seat has leakage, then input separation sleeve is by upper Y-shaped connector oil-producing channel blockage, under restarting Unit produces, and lower unit durability the most then, is restarted upper unit and produced.
When above-mentioned Y-shaped connector is applied to single Y-shaped connector two-pump process tubing string by needs, need in the upper end of described supervisor 7 even Connect seating nipple 1, seating nipple 6 under the lower end of described supervisor 7 connects.When being applied to single Y-shaped connector two-pump process tubing string: One Y-shaped connector hangs two set electric pump unit, successively enables bypass pipe, main siphunculus electric pump unit, to extend pump detection period, First starting bypass pipe electric pump to produce, if main siphunculus ball-and-seat seals bad, then put into blanking plug and remedy, continuation starts other Siphunculus electric pump produces.Extremely, then main siphunculus electric pump is started in the bypass pipe electric pump life-span;If bypass pipe ball-and-seat seals bad, Then put into isolating cylinder to remedy, start main siphunculus electric pump and produce.Until the main siphunculus electric pump life-span is to the greatest extent, lift pipe string inspection pump.
In above-mentioned Y-shaped connector, the bottom of described sealing drum 5 is stretched out outside the lower end of described bypass pipe 2, described close The bottom of sealed tube 5 is provided with the screw thread being connected with oil-extraction electric pump.Described flowing hole 9 has multiple, multiple described flowing holes 9 Circumference along described sealing drum 5 is evenly arranged.
Although preferred embodiment of the present utility model being described above in conjunction with accompanying drawing, but this utility model not office Being limited to above-mentioned detailed description of the invention, above-mentioned detailed description of the invention is only schematically, is not restrictive, this The those of ordinary skill in field, under enlightenment of the present utility model, is being protected without departing from this utility model objective and claim In the case of the scope protected, it is also possible to make a lot of form, within these belong to protection domain of the present utility model.

Claims (4)

1. for a Y-shaped connector for two-pump process tubing string, including the supervisor being interconnected and bypass pipe, it is characterised in that Being provided with ball-and-seat in described bypass pipe, described ball-and-seat includes sealing drum, sealed steel ball and compression spring, described sealing Cylinder is fixed in described bypass pipe, is formed with annular space, described annular space between the top of described sealing drum and described bypass pipe Connect with described supervisor, the upper portion side wall of described sealing drum is provided with the flowing hole connected with described annular space, described close Being formed with valve ball seat in sealed tube, described valve ball seat is positioned at the lower section of described flowing hole, is provided with described in described sealing drum The sealed steel ball that valve ball seat is coincide, in the compression spring that is arranged over of described sealed steel ball, described compression spring clamps in institute State at the upper end of sealed steel ball and described bypass pipe.
Y-shaped connector for two-pump process tubing string the most according to claim 1, it is characterised in that described supervisor's Upper end connects upper seating nipple, and connecting in the lower end of described supervisor has lower seating nipple.
Y-shaped connector for two-pump process tubing string the most according to claim 1 and 2, it is characterised in that described sealing The bottom of cylinder is stretched out outside the lower end of described bypass pipe, is provided with in the bottom of described sealing drum and to be connected with oil-extraction electric pump Screw thread.
Y-shaped connector for two-pump process tubing string the most according to claim 1 and 2, it is characterised in that described mistake is flowed Hole has multiple, and multiple described flowing holes are evenly arranged along the circumference of described sealing drum.
CN201620223254.4U 2016-03-22 2016-03-22 A Y connects for double pump technology tubular column Expired - Fee Related CN205605130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620223254.4U CN205605130U (en) 2016-03-22 2016-03-22 A Y connects for double pump technology tubular column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620223254.4U CN205605130U (en) 2016-03-22 2016-03-22 A Y connects for double pump technology tubular column

Publications (1)

Publication Number Publication Date
CN205605130U true CN205605130U (en) 2016-09-28

Family

ID=56963611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620223254.4U Expired - Fee Related CN205605130U (en) 2016-03-22 2016-03-22 A Y connects for double pump technology tubular column

Country Status (1)

Country Link
CN (1) CN205605130U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812497A (en) * 2017-02-20 2017-06-09 中国石油化工股份有限公司 A kind of annular space ball-and-seat

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812497A (en) * 2017-02-20 2017-06-09 中国石油化工股份有限公司 A kind of annular space ball-and-seat

Similar Documents

Publication Publication Date Title
CN105804680B (en) A kind of oil gas field workover operation device with pressure and method
CN201018253Y (en) Cable abutting joint device for oil-submersible electric pump well oil conduit
CN206693997U (en) Oil field separates adopts technology tubular column
CN204436320U (en) A kind of hydraulic releasing big orifice packer
CN202832438U (en) Long-acting layered water injection string for deep well
CN106761538A (en) Long packing element packer for oil field isolation
CN106761577A (en) Oil field separates adopts technology tubular column
CN205605130U (en) A Y connects for double pump technology tubular column
CN205605156U (en) Workover device is pressed in oil gas field area
CN101338658B (en) Hermetic electric submersible pump production completion system capable of proceeding steel wire operation
CN203022700U (en) Machine pumping-speed pipe composite water drainage gas production device
CN106050181A (en) Thermal recovery casing head
CN202451097U (en) Differential motion hydraulic pressure booster for horizontal section of horizontal well
CN210087252U (en) Underground continuous pipe cable separation sealing adapter
CN205743862U (en) Carbon dioxide drives oil well wellhead assembly
CN203335042U (en) Electric submersible pump production tubular column with hydraulic control valve
CN201902190U (en) Blowout prevention pressure testing device
CN202249899U (en) Pressure isolation device for wellhead Christmas tree
CN109763787A (en) A kind of device and its operating procedure of composite continuous oil pipe pulling submersible electric pump
CN110359875A (en) Extension gas lift device and method
CN204782960U (en) Integrated tubular column of water water injection sand control is adopted to individual well
CN206091954U (en) Charge device is arranged to gas well bubble
CN202788729U (en) Multifunctional sucker rod hanging blowout preventer
RU2481464C1 (en) Method for well operation at simultaneous separate pumping of working medium
CN209818031U (en) Oil extraction device of canned composite continuous oil pipe conveyor unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20190322