CN205603532U - A gasifier nozzle circulating water system for coal gasifier - Google Patents

A gasifier nozzle circulating water system for coal gasifier Download PDF

Info

Publication number
CN205603532U
CN205603532U CN201620233225.6U CN201620233225U CN205603532U CN 205603532 U CN205603532 U CN 205603532U CN 201620233225 U CN201620233225 U CN 201620233225U CN 205603532 U CN205603532 U CN 205603532U
Authority
CN
China
Prior art keywords
burner
cooling water
nozzle
water pump
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620233225.6U
Other languages
Chinese (zh)
Inventor
刘翠平
庞英慧
杨运超
刘向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Yuexin Dake New Energy Technology Co., Ltd.
Original Assignee
Chengdu Height Kodak Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Height Kodak Science And Technology Ltd filed Critical Chengdu Height Kodak Science And Technology Ltd
Priority to CN201620233225.6U priority Critical patent/CN205603532U/en
Application granted granted Critical
Publication of CN205603532U publication Critical patent/CN205603532U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a gasifier nozzle circulating water system for coal gasifier belongs to the coal chemical industry technology field, including constituting endless nozzle, at least one nozzle cooling water pump to reach heat transfer device, nozzle cooling water pump cools off water pitcher to still being equipped with at least one nozzle between the heat transfer device, still is equipped with the automatic valve that can open the drainage branch road when nozzle cooling water pump shuts down voluntarily between nozzle to the nozzle cooling water pitcher, has positive pressure differential between nozzle cooling water pitcher to the nozzle, when this positive pressure differential satisfies the shut down of nozzle cooling water pump, cools off the unimodal current power of water pitcher to the nozzle from the nozzle, adjacent its the preceding or back that is located with the nozzle of heat transfer device, adjacent its the preceding or back that is located with nozzle cooling water pump of automatic valve. The utility model relates to a nozzle circulating water system for coal gasifier 's economical and practical, low in cost, safe and reliable.

Description

A kind of gasifier nozzle circulation for coal gasification apparatus
Technical field
This utility model belongs to technical field of coal chemical industry, particularly relates to a kind of gasifier nozzle for gasifying powder coal device and circulates Water system.
Background technology
Coal is one of main fossil energy of China, occupies considerable status in China's energy production structure, the most each In level energy consumption structure, coal consumption accounts for the 2/3 of total amount consumed.World petroleum resource is in short supply so that Coal Chemical Industry petroleum replacing The development trend of chemical industry is the rapidest.Modern New Coal Chemical Industry to produce clean energy resource and the product of alternative petrochemical industry, The most state-of-the-art gasification furnace represent technology have shell stove, GSP stove, space flight stove, Huaneng Group stove, section's woods stove, Texaco stove, four Nozzle water-coal slurry furnace etc..
Burner water system closed cycle is related to, even if in this technique under whole audience power-off condition, burner is cold in these coal gasification apparatus But water pump can not be out of service, therefore, it is necessary to configuration first order load is powered, in order to can start standby under blackout condition immediately With power supply, it is ensured that burner cooling water pump runs continuously, thus protects burner.What first order load was powered involves great expense, and adds The cost of investment of whole device, is not suitable for middle-size and small-size chemical enterprise;Come into operation the most in time if first order load is powered, Yi Zao Become burner broken, cause the generation of security incident, reduce whole reliability of technology so that technique does not reaches essential safety.
Utility model content
The purpose of this utility model is: the shortcoming overcoming prior art, it is provided that a kind of economical and practical for coal gasification apparatus, Cheap, safe and reliable burner circulation.
The purpose of this utility model is realized by following technical proposals:
A kind of gasifier nozzle circulation for coal gasification apparatus, including constituting the burner of circulation, at least one burner Cooling water pump, and heat-exchanger rig, be additionally provided with at least one burner chilled water tank, burner between burner cooling water pump to burner Being additionally provided with the automatic valve that can automatically open up draining branch road when burner cooling water pump is shut down between burner chilled water tank, burner is cold But there is positive differential pressure in water pot between burner, when this positive differential pressure meets the shutdown of burner cooling water pump, from burner chilled water tank to burning Mouth arrives the unimodal current power of burner cooling water pump again;Heat-exchanger rig is adjacent with burner be positioned at it before or after, automatic valve and burner Cooling water pump is adjacent be positioned at it before or after.
As selection, between burner chilled water tank to burner, positive differential pressure is 0.1~10MPa.
As selection, it is passed through gas in burner chilled water tank and forms this positive differential pressure.
As selecting further, be passed through in burner chilled water tank gas control operation pressure in burner chilled water tank be 0.1~ 10MPa。
As selection, burner chilled water tank position height forms this positive differential pressure higher than burner and heat-exchanger rig.
As selection, being passed through gas in burner chilled water tank, burner chilled water tank position height is higher than burner and heat exchange dress simultaneously Put, in order to form this positive differential pressure.
As selection, in parallel between multiple burner chilled water tanks.
As selection, in parallel between multiple burner cooling water pumps.
As selection, heat-exchanger rig is heat exchanger or drum.
As selecting further, heat-exchanger rig is waste heat boiler.
As selection, automatic valve is electric and pneumatic automatic valve.
As selection, automatic valve is automatic switch valve or automatic regulating valve.
As selection, the aforementioned gas in order to form positive differential pressure is nitrogen or carbon dioxide.
Aforementioned this utility model main formula case and each further selection scheme thereof can be this with independent assortment to form multiple schemes Utility model can use and claimed scheme: such as this utility model, each non conflicting gets final product combination in any between selecting, this Skilled person can understand there is multiple combination according to prior art and common knowledge after understanding the present invention program, is this reality By novel claimed technical scheme, do not do exhaustive at this.
Workflow of the present utility model:
Burner cooling water is after burner water outlet, and pressure drop about 1.5MPa before and after burner, time properly functioning, burner cooling water enters After the pressurization of burner cooling water pump, return to the burner chilled water tank before burner, enter back into burner, carry out water circulation next time.
Burner chilled water tank it is provided with between burner cooling water pump and heat-exchanger rig, when burner cooling water pump shuts down, burner Cooling water relies on the pressure reduction between burner chilled water tank and burner to realize flowing, takes away heat of vaporization, burner and burner cooling water pump Between automatic valve open simultaneously, recirculated water is drained.
This pressure reduction can be formed in several ways, such as, is passed through gas from burner chilled water tank top and keeps burner cooling water In tank, operation pressure is 0.1~10MPa, and the liquid level of burner chilled water tank is for maintaining burner cooling water pump required when stopping Cooling water inflow.
The beneficial effects of the utility model:
(1) this utility model utilizes burner chilled water tank to flow automatically, and reduces the configuration that device first order load is powered, decreases equipment Input, reduce the cost of equipment investment;
(2) this utility model makes this circulation safe and reliable feasible;
(3) this utility model fundamentally protects the burner in coal gasification apparatus, eliminates due to first order load power supply trouble Damage the probability of burner, reduce the maintenance cost in running.
Accompanying drawing explanation
Fig. 1 is the device schematic flow sheet of this utility model embodiment;
Logistics labelling in flow chart: 1-is from the gas of synergic system;
Arrow mark in flow chart: circulating water flow to;
Equipment, instrument markings in flow chart: 2-burner chilled water tank, 3-burner, 4-automatic valve, 5-burner cooling water pump, 6-waste heat boiler.
Detailed description of the invention
Below in conjunction with specific embodiments and the drawings, this utility model is further described.
With reference to shown in Fig. 1, a kind of gasifier nozzle circulation for coal gasification apparatus, including constitute circulation burner 3, At least one burner cooling water pump 5, and heat-exchanger rig (such as waste heat boiler 6), burner cooling water pump 5 to burner 3 it Between be additionally provided with at least one burner chilled water tank 2, being additionally provided with between burner 3 to burner chilled water tank 2 can be at burner cooling water pump , there is positive differential pressure between burner chilled water tank 2 to burner 3, this malleation in 5 automatic valves 4 automatically opening up draining branch road when shutting down Difference meets burner cooling water pump 5 when shutting down, from burner chilled water tank 2 to burner 3 again to the unidirectional water of burner cooling water pump 5 Mobilization force;Heat-exchanger rig is adjacent with burner 3 be positioned at burner 3 before or after, automatic valve 4 is adjacent with burner cooling water pump 5 to be positioned at Before or after burner cooling water pump 5.As preferably, between burner chilled water tank 2 to burner 3, positive differential pressure is more than 1.5MPa. The mode forming this positive differential pressure has multiple, such as, is passed through gas and forms this positive differential pressure in burner chilled water tank 2, and burner cools down Being passed through in water pot 2 in gas controls burner chilled water tank 2 and operating pressure is 0.1~10MPa;Or, burner chilled water tank 2 Position height forms this positive differential pressure higher than waste heat boiler 6 and burner 3;Or, it is passed through gas in burner chilled water tank 2, with Time burner chilled water tank 2 position height higher than waste heat boiler 6 and burner 3, in order to form this positive differential pressure.As selection, such as this Shown in embodiment Fig. 1, burner chilled water tank 2 is one, when burner chilled water tank more than 2, and multiple burner chilled water tanks 2 Between in parallel;As selection, as shown in the present embodiment Fig. 1, burner cooling water pump 5 is one, when burner cooling water pump 5 Time multiple, in parallel between multiple burner cooling water pumps 5, form backup.As selection, automatic valve 4 be electric and pneumatic from Dynamic valve, automatic valve 4 is automatic switch valve or automatic regulating valve.
Burner circulation of the present utility model carries out flow process description further:
With reference to shown in Fig. 1, burner cooling water from burner 3 out after, before and after burner 3, pressure drop is up to about 1.5MPa, normally During operation, burner cooling water enters burner cooling water pump 5 and pressurizes, and returns to burner chilled water tank 2, enters back under burner 3 carries out Water circulation.
Between burner cooling water pump 5 and waste heat boiler 6, it is provided with burner chilled water tank 2, is passed through from burner chilled water tank 2 top It is 0.1~10MPa that gas 1 operates pressure in keeping burner chilled water tank 2, and the liquid level of burner chilled water tank 2 is used for maintaining burning The cooling water inflow that mouth cooling water pump 5 is required when stopping.When burner cooling water pump 5 shuts down, burner cooling water relies on and burns Pressure reduction between mouth chilled water tank 2 and burner 3 realizes flowing, takes away heat of vaporization, between burner 3 and burner cooling water pump 5 Automatic valve 4 is opened simultaneously, is drained by recirculated water.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all in this practicality Any amendment, equivalent and the improvement etc. made within novel spirit and principle, should be included in guarantor of the present utility model Within the scope of protecting.

Claims (10)

1. for a gasifier nozzle circulation for coal gasification apparatus, including constituting the burner of circulation, the cooling of at least one burner Water pump, and heat-exchanger rig, it is characterised in that: it is additionally provided with at least one burner chilled water tank between burner cooling water pump to burner, Burner can automatically open up the automatic valve of draining branch road, burner to being additionally provided with between burner chilled water tank when burner cooling water pump is shut down There is positive differential pressure in chilled water tank between burner, when this positive differential pressure meets the shutdown of burner cooling water pump, from burner chilled water tank to burning Mouth arrives the unimodal current power of burner cooling water pump again;Heat-exchanger rig is adjacent with burner be positioned at it before or after, automatic valve is cold with burner But water pump is adjacent be positioned at it before or after.
2. the gasifier nozzle circulation for coal gasification apparatus as claimed in claim 1, it is characterised in that: burner cooling water Tank is 0.1~10MPa to positive differential pressure between burner.
3. the gasifier nozzle circulation for coal gasification apparatus as claimed in claim 1, it is characterised in that: burner cooling water It is passed through gas in tank and forms this positive differential pressure.
4. the gasifier nozzle circulation for coal gasification apparatus as claimed in claim 3, it is characterised in that: burner cooling water Being passed through in tank in gas controls burner chilled water tank and operating pressure is 0.1~10MPa.
5. the gasifier nozzle circulation for coal gasification apparatus as claimed in claim 1, it is characterised in that: burner cooling water Tank position height forms this positive differential pressure higher than burner and heat-exchanger rig.
6. the gasifier nozzle circulation for coal gasification apparatus as claimed in claim 1, it is characterised in that: burner cooling water Being passed through gas in tank, burner chilled water tank position height is higher than burner and heat-exchanger rig simultaneously, in order to form this positive differential pressure.
7. the gasifier nozzle circulation for coal gasification apparatus as claimed in claim 1, it is characterised in that: multiple burners are cold But in parallel between water pot.
8. the gasifier nozzle circulation for coal gasification apparatus as claimed in claim 1, it is characterised in that: multiple burners are cold But in parallel between water pump.
9. the gasifier nozzle circulation for coal gasification apparatus as claimed in claim 1, it is characterised in that: automatic valve is electricity Dynamic or pneumatic automatic valve.
10. the gasifier nozzle circulation for coal gasification apparatus as claimed in claim 1, it is characterised in that: automatic valve is Automatic switch valve or automatic regulating valve.
CN201620233225.6U 2016-03-24 2016-03-24 A gasifier nozzle circulating water system for coal gasifier Expired - Fee Related CN205603532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620233225.6U CN205603532U (en) 2016-03-24 2016-03-24 A gasifier nozzle circulating water system for coal gasifier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620233225.6U CN205603532U (en) 2016-03-24 2016-03-24 A gasifier nozzle circulating water system for coal gasifier

Publications (1)

Publication Number Publication Date
CN205603532U true CN205603532U (en) 2016-09-28

Family

ID=56964547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620233225.6U Expired - Fee Related CN205603532U (en) 2016-03-24 2016-03-24 A gasifier nozzle circulating water system for coal gasifier

Country Status (1)

Country Link
CN (1) CN205603532U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090314A (en) * 2017-07-06 2017-08-25 华东理工大学 The cooling means and cooling system of gasification burner tip

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090314A (en) * 2017-07-06 2017-08-25 华东理工大学 The cooling means and cooling system of gasification burner tip
CN107090314B (en) * 2017-07-06 2023-07-14 华东理工大学 Cooling method and cooling system of gasification burner

Similar Documents

Publication Publication Date Title
CN107940538B (en) Graded heat storage system for cogeneration unit and peak shaving method thereof
CN204457891U (en) A kind of steam turbine generator lubrication system for subsequent use
CN205603532U (en) A gasifier nozzle circulating water system for coal gasifier
CN111121288A (en) Bathing water preparing system
CN208332243U (en) A kind of steam boiler power failure automatic water replenishing device
CN205603539U (en) A gasifier water -cooling wall circulating water system for coal gasifier
CN205876403U (en) Open circulation cooling water system
CN205503389U (en) Colliery pressure fan, pit water energy recovery utilize system
CN105401985B (en) Distributed busbar protection gasification LNG system and method
CN202119095U (en) Waste heat recovery and heat exchange device
CN208687994U (en) Split type gas thermal power plant unit
CN104406148B (en) Rectifying column air cooler waste heat recovery generating system
CN203687009U (en) Automatic water replenishing device of boiler water seal tank
CN206828445U (en) Using the coke oven coke oven uprising tube residual neat recovering system of combined cycle
KR20100103025A (en) System for providing hot-water generated by combined heat and power plant
CN205603536U (en) A gasifier quench jar circulating water system for coal gasifier
CN211876356U (en) Bathing water preparing system
CN210564980U (en) Waste heat recovery device of air compressor
CN204026808U (en) Energy-saving environmental-protection boiler heating static pressure modernization system
CN207865515U (en) Mobile hot source station
CN205717449U (en) A kind of coal-burning power plant high back pressure condensate system
CN205957147U (en) Exhaust -heat boiler enlarges water supply system of economizer
CN204335679U (en) A kind of meat animal based on carbon dioxide air source heat pump is shedded system
CN104807338A (en) Coal gas, converter steam and sintering waste heat combined power generation device and waste heat utilization method
CN104390207A (en) Heat recovering and utilizing system for low-temperature flue gas

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190412

Address after: 610000 No. 30, 6th Floor, Unit 1, Building 4, Chadianzi Anrong Road, Jinniu District, Chengdu City, Sichuan Province

Patentee after: Sichuan Yuexin Dake New Energy Technology Co., Ltd.

Address before: 610041 Chengdu City, Sichuan Province, Wuhou District Aviation Road No. 6 4, Unit 2, 7 Floor 702

Patentee before: Chengdu height Kodak Science and Technology Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20200324

CF01 Termination of patent right due to non-payment of annual fee