CN205603055U - Marble hoist of hanging futilely for building - Google Patents

Marble hoist of hanging futilely for building Download PDF

Info

Publication number
CN205603055U
CN205603055U CN201620271291.2U CN201620271291U CN205603055U CN 205603055 U CN205603055 U CN 205603055U CN 201620271291 U CN201620271291 U CN 201620271291U CN 205603055 U CN205603055 U CN 205603055U
Authority
CN
China
Prior art keywords
marble
hoist
building
futilely
upper portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620271291.2U
Other languages
Chinese (zh)
Inventor
庞慧超
韩秀军
程建凯
王先飞
马全丽
张鹏
梁渊
徐向华
王帅
王众
邢玉斌
任杰
刘亮亮
张贤
马应平
朱洪超
杨雪林
曹传波
张轩
张艳鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201620271291.2U priority Critical patent/CN205603055U/en
Application granted granted Critical
Publication of CN205603055U publication Critical patent/CN205603055U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a marble hoist of hanging futilely for building, this hoist include semicircle annular upper portion connecting piece and sub -unit connection spare, upper portion connecting piece and sub -unit connection spare the summit department that connect in two semicircles rings is held with the bolt reel shaft, the connecting rod is installed respectively, two in the upper portion annular both ends of connecting piece semicircle the other end gathering of connecting rod is connected in the solid fixed ring of top hoist and mount, the connection is held rather than the matched with of foot anchor clamps with the bolt reel shaft respectively in the annular lower part both ends of sub -unit connection spare semicircle, two the other end of anchor clamps respectively through the steel wire line connection in the annular both ends department of upper portion connecting piece semicircle. Its advantage is: convenient to use, the flexibility is good, can be under construction fast, labour saving and time saving, press from both sides tight state well and hoist and mount firm, avoided when hoist and mount are binded to the rope for the prior art because hang futilely that the marble rocks, the phenomenon caused hangs the condition that the marble damaged futilely for dropout etc. Can guarantee hoist and mount safe with the integrality of hanging the marble futilely.

Description

A kind of cladding marble suspender for building
Technical field
This utility model relates to a kind of building element, and more specifically, this utility model relates to a kind of novel Cladding marble suspender for building.
Background technology
In the related, cladding marmorean hanging method is generally: bundlees with rope, then hangs with crane Dress, not only lifts difficulty, and cladding marble is easily damaged, and wastes time and energy.
Utility model content
The purpose of this utility model solves the problems referred to above exactly, and provides a kind of cladding marble for building for this Suspender, so that it is time saving and energy saving to construct, and keeps cladding marble integrity in hoisting process.
The technical solution of the utility model is:
A kind of cladding marble suspender for building, including upper attachment and the lower attachment of semi-annular shape, institute Upper attachment and the lower attachment stated are connected to the apex of two semicircular ring with bolt or bearing;Described The two ends of upper attachment semi-annular shape are separately installed with connecting rod, and the other end of two described connecting rods is assembled It is connected to top lifting retainer ring;The two ends, bottom of described lower attachment semi-annular shape are respectively with bolt or axle Holding and connect the fixture matched with its foot, the other end of two described fixtures is connected to by wire respectively At the two ends of described upper attachment semi-annular shape.
The length dimension scope of described fixture is 100mm~150mm.
The radius size scope of described upper attachment is 150-300mm.
The radius size scope of described lower attachment is 300-600mm.
This utility model compared with prior art, provides the benefit that:
(1) simple to operate, easy to use, motility is good, can rapid construction, time saving and energy saving.
(2) clamped condition is good and lifting is firm, it is ensured that Hoisting Security and cladding marmorean integrity.
(3) when avoiding the binding lifting of prior art rope due to cladding marble rock, the phenomenon such as dropout The situation that the cladding marble caused damages, has good practicality.
Accompanying drawing explanation
Fig. 1 is use view of the present utility model.
Fig. 2 is the sectional view of Fig. 1.
Labelling in figure: 1-cladding marble suspender for building;The cladding marble of 2-;11-upper attachment; 12-connecting rod;13-top lifting retainer ring;14-lower attachment;The summit of two semicircular ring of 15-; 16-fixture;17-wire.
Detailed description of the invention
It is understood for making this utility model be easier to, below in conjunction with the accompanying drawings with specific embodiment to this practicality Novel technical scheme is described in detail.
Fig. 1 illustrates use state of the present utility model.
As seen from Figure 1, cladding marble suspender 1 for building is used for lifting cladding marble 2.
Fig. 2 illustrates the section view state of Fig. 1.
From Figure 2 it can be seen that described for building cladding marble suspender 1, the top including semi-annular shape connects Part 11 and lower attachment 14, described upper attachment 11 and lower attachment 14 are with bolt or bearing It is connected at the summit 15 of two semicircular ring;The two ends of described upper attachment 11 semi-annular shape are respectively mounted Having connecting rod 12, the other end gathering of two described connecting rods 12 is connected to top lifting retainer ring 13;Institute The bottom stating lower attachment 14 semi-annular shape connects, with bolt or bearing, the folder matched with its foot respectively Tool 16, the other end of two described fixtures 16 is connected to described upper attachment 11 by wire 17 respectively At the two ends of semi-annular shape.
Described upper attachment 11, lower attachment 14 and described fixture 16 are all with cast iron materials Make, own form can be kept constant.With spiral shell between described upper attachment 11 and lower attachment 14 Bolt or bearing realize connecting, flexibility and reliability, reasonable stress;Described fixture 16 is by wire 7 and institute The upper attachment 11 stated is connected, and can join with the Liang Ge foot of described lower attachment 14 when lifting Close and cladding marble 2 is played clamping action, thus when lifting construction, both can ensure that lifting was firm, again Can effectively carry the total amount of cladding marble 2, with the cladding marble 2 described in holding in hoisting process Integrity and safety.
In order to ensure to lift reliably effect, in arrangement above:
The length dimension scope of described fixture 16 is 100mm~150mm;
The radius size scope of described upper attachment 11 is 150-300mm;
The radius size scope of described lower attachment 14 is 300-600mm.
This utility model marmorean lifting of exterior wall dried hanging in construction, its using method is:
(1) when carrying out lifting construction, first by cladding marble 2 block pattern row pattern at described lower attachment Between the Liang Ge foot of 14;
(2) make to be formed institute between two described fixtures 16 and the Liang Ge foot of described lower attachment 14 State the desire clamped condition of cladding marble 2;
(3) with crane, described top lifting retainer ring 13 is lifted by crane, make described wire 7 drive institute State fixture 16 to connect and carry on one end of described wire 7, thus the cladding marble 2 of block pattern row pattern is pressed from both sides Tight and sling.
Above by reference to drawings and Examples, the technical solution of the utility model is schematically described, should Describe the most restricted.Those skilled in the art will be understood that in actual applications, in this utility model Certain technical characteristic be likely to occur some and change, and other staff are likely to make similar under it enlightens Design.Special needs to be pointed out is: without departing from design aim of the present utility model, all obviously Variations in detail or similar Design, within being all contained in protection domain of the present utility model.

Claims (4)

1. a cladding marble suspender for building, including upper attachment and lower attachment, its feature Being: described upper attachment and lower attachment are semi-annular shape, both connect with bolt or bearing It is connected to the apex of two semicircular ring;The semi-annular shape two ends of described upper attachment are separately installed with connection Bar, the other end gathering of two described connecting rods is connected to top lifting retainer ring;Described lower attachment The two ends, bottom of semi-annular shape connect the fixture matched with its foot, two institutes with bolt or bearing respectively The other end stating fixture is connected to by wire at the two ends of described upper attachment semi-annular shape respectively.
One the most according to claim 1 cladding marble suspender for building, it is characterised in that: institute The length dimension scope stating fixture is 100mm~150mm.
One the most according to claim 1 cladding marble suspender for building, it is characterised in that: institute The radius size scope stating upper attachment is 150-300mm.
One the most according to claim 1 cladding marble suspender for building, it is characterised in that: institute The radius size scope stating lower attachment is 300-600mm.
CN201620271291.2U 2016-03-31 2016-03-31 Marble hoist of hanging futilely for building Active CN205603055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620271291.2U CN205603055U (en) 2016-03-31 2016-03-31 Marble hoist of hanging futilely for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620271291.2U CN205603055U (en) 2016-03-31 2016-03-31 Marble hoist of hanging futilely for building

Publications (1)

Publication Number Publication Date
CN205603055U true CN205603055U (en) 2016-09-28

Family

ID=56964248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620271291.2U Active CN205603055U (en) 2016-03-31 2016-03-31 Marble hoist of hanging futilely for building

Country Status (1)

Country Link
CN (1) CN205603055U (en)

Similar Documents

Publication Publication Date Title
CN101659369A (en) Triangle-type hanger
CN203428736U (en) Electrode hoisting fixture of electric melting furnace
CN102275808A (en) Device for hoisting irregular-shape object
CN205603055U (en) Marble hoist of hanging futilely for building
CN109231019A (en) A kind of hanging device of non-woven fabrics
CN203033638U (en) Lifting device for hoisting slewing support rings of excavator
CN104876117A (en) Stator core hoisting clamp device
CN205241057U (en) Simple and easy grapple is used in pipeline hoist and mount
CN203877726U (en) Multi-hoisting-point hoisting beam for turning over and hoisting equipment
CN203889942U (en) Lifting device
CN103287966A (en) Hanging tool for guide wheel of slicing machine
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN202609781U (en) Hanger special for pipeline
CN204569139U (en) Facilitate the lifting appliance that object is laid
CN205772956U (en) Novel tower crane counterweight is from dismantling device
CN204490327U (en) Joist steel hoisting clamp
CN203513104U (en) Hoisting sling for pipeline
CN102211735A (en) Lifting appliance special for spool
CN203229307U (en) Flexible hoisting structure of supporting roller
CN205687389U (en) A kind of slipping tail suspension rod for the lifting of tower kind equipment
CN101734549A (en) Lifting sling
CN201619944U (en) Sling instrument
CN207175211U (en) A kind of oil cooler anticreep hoisting fixture
CN204897153U (en) Slings for lifting loads
CN205740014U (en) A kind of three lower limb chain riggings

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant