CN205603041U - Hanging beam is increased to ton bag - Google Patents
Hanging beam is increased to ton bag Download PDFInfo
- Publication number
- CN205603041U CN205603041U CN201620372969.6U CN201620372969U CN205603041U CN 205603041 U CN205603041 U CN 205603041U CN 201620372969 U CN201620372969 U CN 201620372969U CN 205603041 U CN205603041 U CN 205603041U
- Authority
- CN
- China
- Prior art keywords
- hanging beam
- jumbo bag
- bag
- jumbo
- beam body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to a hanging beam, especially a hanging beam is increased to ton bag, include: the hanging beam body that has lug and jack -up mechanical connection, arrange to a plurality of interval the hanging beam body below lower hoisting point, the upper end with lower hoisting point fixed connection's rings, the upper end with the chain sling connected of the lower extreme of rings, the lower extreme of chain sling be equipped with and be used for hanging a lifting hook that connects the ton bag. This hanging beam is increased to ton bag can hoist many ton bags at every turn, reduces hoist and mount number of cycles, improves work efficiency, reduces the cost.
Description
Technical field
This utility model relates to a kind of hanging beam, and particularly a kind of jumbo bag increases hanging beam.
Background technology
Port enterprise to as be used mostly when aluminium oxide, sugar, chemical fertilizer, coloured ore deposit and other items transport diameter 1-1.2m synthetic bag pack carry out fill, then by carrying out horizontal transport after lorry loading, because after fill, goods part weight is many between 0.8-1.5 ton, generally habitual referred to as " jumbo bag " by us.
The automobile of existing loading jumbo bag horizontal transport mostly is flat car, and compartment board is about 13m, wide about 2.5m, rated load 50 tons.General loading 1 layer of 2 row's jumbo bag, often row 11 bag, 2 rows amount to 22 bags, and existing door machine, crane use jumbo bag special hanger the most at most to hang 2 bags when loading jumbo bag, complete 1 row 10 bag and increase and at least need 5 works to circulate, inefficient, and time and effort consuming increases cost.
Summary of the invention
The technical problems to be solved in the utility model is for the deficiencies in the prior art, proposes a kind of jumbo bag and increases hanging beam, and this jumbo bag increases hanging beam can lift more than one piece jumbo bag every time, reduces lifting cycle-index, improves work efficiency, reduces cost.
The technical problems to be solved in the utility model is achieved through the following technical solutions.This utility model is that a kind of jumbo bag increases hanging beam, and its feature is, including:
The hanging beam body being connected with hoisting machinery with hanger;
Several compartment of terrains are arranged in the lower suspension centre below described hanging beam body;
The suspension ring being connected are fixed, with described lower suspension centre, in upper end;
The chain sling that upper end is connected with the lower end of described suspension ring, the lower end of described chain sling is provided with for hanging the suspension hook connecing jumbo bag.
This utility model one jumbo bag is increased in hanging beam technical scheme, and further preferred technical scheme feature is: the left and right two ends of described hanging beam body are equipped with holds suspension centre, and described holding is equipped with described hanger on suspension centre.
This utility model one jumbo bag is increased in hanging beam technical scheme, and further preferred technical scheme feature is: described hanging beam body is provided with towing pad, and described towing pad is provided with pull rope.
This utility model one jumbo bag is increased in hanging beam technical scheme, and further preferred technical scheme feature is: described towing pad is located at middle part or the two ends of described hanging beam body.
This utility model one jumbo bag is increased in hanging beam technical scheme, and further preferred technical scheme feature is: described hanging beam body uses seamless steel pipe to make.
This utility model one jumbo bag is increased in hanging beam technical scheme, and further preferred technical scheme feature is: the quantity of described lower suspension centre is 5.
This utility model one jumbo bag is increased in hanging beam technical scheme, and further preferred technical scheme feature is: the interval between described lower suspension centre is than the little 1cm-1.5cm of maximum cross-section diameter of jumbo bag.
Compared with prior art, this utility model has the following technical effect that:
1) hanging beam body of the present utility model selects the seamless steel pipe that bending strength is good, can shorten hanging beam length, delay hanging beam flexural deformation trend, increase the service life;
2) by rationally arranging multiple lower suspension centre on hanging beam body, more than one piece jumbo bag can be lifted every time, reduce lifting cycle-index, improve work efficiency, reduce cost;Further, according to job demand, the quantity of lower suspension centre being arranged to 5, this quantity is corresponding to the separate room weight of the lifted load of hoisting machinery and jumbo bag, it is possible to improves work efficiency to greatest extent, and can save material;
4) each lower suspension centre at hanging beam body connects chain hook by suspension ring, facilitates workman to pluck, hangs jumbo bag bag, improves work efficiency further;
5) suspension centre on appropriate design hanging beam: jumbo bag increases 2 suspension centres of hanging beam upper design, makes steel wire rope stress within safe load, uses safer;
6) each lower suspension centre line space design of hanging beam body is 1.05m, is slightly less than jumbo bag bag hides diameter, it can be ensured that can closely line up 1 row after jumbo bag lifting, too small jumbo bag is out of line and highly has deviation, has gap easily to rock and pile up irregular between excessive jumbo bag;
7) arranging towing pad on hanging beam body, bolt overhanging cable in operation, by workman's assist control hanging beam traffic direction, it is simple to fall on automobile uniform for jumbo bag.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Referring to the drawings, concrete technical scheme of the present utility model is further described, in order to those skilled in the art is further understood that this utility model, and does not constitute the restriction of its right.
Embodiment 1, with reference to Fig. 1, a kind of jumbo bag increases hanging beam, including:
The hanging beam body 1 being connected with hoisting machinery with hanger, hanging beam body is selected the seamless steel pipe that bending strength is good, is selected seamless steel pipe can shorten hanging beam length, delay hanging beam flexural deformation trend, increase the service life;
Several compartment of terrains are arranged in described hanging beam body 1 lower suspension centre below;
The suspension ring 11 being connected are fixed, with described lower suspension centre, in upper end;
The chain sling 2 that upper end is connected with the lower end of described suspension ring, the lower end of described chain sling is provided with for hanging the suspension hook 3 connecing jumbo bag 4.
Embodiment 2, the jumbo bag described in embodiment 1 is increased in hanging beam: the left and right two ends of described hanging beam body are equipped with holds suspension centre, and described holding is equipped with described hanger 14 on suspension centre.Hanger 14 is connected with the suspension hook of door machine or crane by steel wire rope 15.Holding suspension centre 2 of hanging beam upper design, use diameter 28mm, long 5m to be connected with door machine and hoist lifting hook with the steel wire rope of diameter 24mm, long 4m respectively, steel wire rope angle is less than 60 °, and steel wire rope stress is within safe load.
Embodiment 3, jumbo bag described in embodiment 1 is increased in hanging beam: described hanging beam body is provided with towing pad 12, described towing pad is provided with pull rope 13, by workman by pull rope 13 assist control hanging beam traffic direction, it is simple to fall on automobile uniform for jumbo bag.
Embodiment 4, the jumbo bag described in embodiment 1 is increased in hanging beam: described towing pad 12 is located at middle part or the two ends of described hanging beam body.
Embodiment 5, the jumbo bag described in embodiment 1 is increased in hanging beam: described hanging beam body uses seamless steel pipe to make.Diameter 140 × 10 seamless steel pipe makes, and long 3.5m conducts oneself with dignity 200 kilograms, can bear load 7 tons, safety coefficient 4;10 tons of door machine jumbo bags are increased hanging beam and are selected the seamless steel pipe of diameter 180 × 12 to make, and long 4.5m conducts oneself with dignity 300 kilograms, can bear load 10 tons, safety coefficient 4.
Embodiment 6, the jumbo bag described in embodiment 1 is increased in hanging beam: the quantity of described lower suspension centre is 5.Playing heavy load in 10 tons of whole amplitudes of door machine is 10 tons, designs 5 lower suspension centres, can lift by crane 5 bag jumbo bags simultaneously, and 2 cycle of operation can complete an automobile jumbo bag and add high workload;25 tons of crane (in 10m amplitude) safe loads are 7 tons, design 4 lower suspension centres, and front 2 lifting 4 bag jumbo bags, the 3rd lifting 2 bag jumbo bags, 3 cycle of operation can complete an automobile jumbo bag and add high workload.
Embodiment 7, the jumbo bag described in embodiment 1 is increased in hanging beam: the interval between described lower suspension centre is than the little 1cm-1.5cm of maximum cross-section diameter of jumbo bag, it is preferred that the interval between lower suspension centre is than little 1cm or 1.2cm of maximum cross-section diameter of jumbo bag.Can closely line up 1 row after may insure that jumbo bag lifting, too small jumbo bag is out of line and highly has deviation, has gap easily to rock and pile up irregular between excessive jumbo bag.
Simple in construction of the present utility model, economic output is notable:
(1) jumbo bag increases the average manufacturing cost of hanging beam is 0.4 ten thousand yuan/part, and 6 total manufacturing costs of hanging beam are about 2.4 ten thousand yuan, substantially can meet the bulk goods jumbo bags such as Workplace aluminium powder, chemical fertilizer and increase operation needs;
(2) calculate by former process program, door machine, crane often hang 2 bag jumbo bags, time-consuming 2 minutes of every cycle of operation, power consumption 2 degree, calculate with electricity price for industrial uses 1.2 yuan/degree, spend 2 degree × 1.2 yuan/degree=2.4 yuan altogether, per car increases 5 cycle of operation time-consuming=5 times × 2 minute/time=10 minute altogether of 10 bag 15 tons (calculating with 1.5 tons of jumbo bags), and power consumption=2.4 yuan/time × 5 times=12 yuan, if the jumbo bag being fully completed 240,000 tons increases operation, the most time-consuming=240000 tons/15 tons × 10 minutes=160000 minutes, close 2667 hours;Power consumption=240000 ton/15 ton × 12 yuan=192000 yuan altogether;
(3) jumbo bag is used to increase hanging beam, by existing technology Calculation, door machine hangs 5 bag jumbo bags every time, every time-consuming 2.5 minutes of cycle of operation (satchel time long point), power consumption 2.5 degree, calculates with electricity price for industrial uses 1.2 yuan/degree, spends 2.5 degree × 1.2 yuan/degree=3 yuan altogether, per car increases 2 cycle of operation time-consuming=2 times × 2.5 minute/time=5 minute altogether of 10 bag 15 tons (calculating with 1.5 tons of jumbo bags), and power consumption=3 yuan/time × 2 times=6 yuan;If the jumbo bag being fully completed 120,000 tons increases operation, the most time-consuming=120000/15 ton × 5 minutes=40000 minutes, close 667 hours;Power consumption=120000 ton/15 ton × 6 yuan=48000 yuan altogether.
(4) jumbo bag is used to increase hanging beam, by existing technology Calculation, crane hangs 4 bag jumbo bags first 2 times every time, hang 2 bag jumbo bags 3rd time, average every time-consuming 2.2 minutes of cycle of operation (satchel time the longest point), power consumption 2.2 degree, calculate with electricity price for industrial uses 1.2 yuan/degree, spend 2.2 degree × 1.2 yuan/degree=2.64 yuan altogether, per car increases 3 cycle of operation time-consuming=3 times × 2.2 minute/time=6.6 minute altogether of 10 bag 15 tons (calculating with 1.5 tons of jumbo bags), power consumption=2.64 yuan/time × 3 times=7.92 yuan, if the jumbo bag being fully completed 120,000 tons increases operation, the most time-consuming=120000 tons/15 tons × 6.6 minutes=52800 minutes, close 880 hours;Power consumption=120000 ton/15 ton × 7.92 yuan=63360 yuan altogether;
(5) in sum, jumbo bag is used to increase hanging beam, time-consuming=2667-667-880=1120(hour), account for the working time of 42%;Indirectly can create benefit 200,000 yuan, power cost saving=192000-48000-63360=80640(unit), account for the electricity charge of 43%.
Economic benefit total=20+8-2.4=25.6 (ten thousand yuan).
Claims (7)
1. a jumbo bag increases hanging beam, it is characterised in that including:
The hanging beam body being connected with hoisting machinery with hanger;
Several compartment of terrains are arranged in the lower suspension centre below described hanging beam body;
The suspension ring being connected are fixed, with described lower suspension centre, in upper end;
The chain sling that upper end is connected with the lower end of described suspension ring, the lower end of described chain sling is provided with for hanging the suspension hook connecing jumbo bag.
Jumbo bag the most according to claim 1 increases hanging beam, it is characterised in that: the left and right two ends of described hanging beam body are equipped with holds suspension centre, and described holding is equipped with described hanger on suspension centre.
Jumbo bag the most according to claim 1 increases hanging beam, it is characterised in that: described hanging beam body is provided with towing pad, and described towing pad is provided with pull rope.
Jumbo bag the most according to claim 3 increases hanging beam, it is characterised in that: described towing pad is located at middle part or the two ends of described hanging beam body.
5. increase hanging beam according to the jumbo bag described in any one of claim 1-4, it is characterised in that: described hanging beam body uses seamless steel pipe to make.
6. increase hanging beam according to the jumbo bag described in any one of claim 1-4, it is characterised in that: the quantity of described lower suspension centre is 5.
7. increase hanging beam according to the jumbo bag described in any one of claim 1-4, it is characterised in that: the interval between described lower suspension centre is than the little 1cm-1.5cm of maximum cross-section diameter of jumbo bag.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620372969.6U CN205603041U (en) | 2016-04-28 | 2016-04-28 | Hanging beam is increased to ton bag |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620372969.6U CN205603041U (en) | 2016-04-28 | 2016-04-28 | Hanging beam is increased to ton bag |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205603041U true CN205603041U (en) | 2016-09-28 |
Family
ID=56971449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620372969.6U Expired - Fee Related CN205603041U (en) | 2016-04-28 | 2016-04-28 | Hanging beam is increased to ton bag |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205603041U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113562588A (en) * | 2021-09-23 | 2021-10-29 | 河南卫华重型机械股份有限公司 | Sling of unloading with automatic cutout ton bag function |
-
2016
- 2016-04-28 CN CN201620372969.6U patent/CN205603041U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113562588A (en) * | 2021-09-23 | 2021-10-29 | 河南卫华重型机械股份有限公司 | Sling of unloading with automatic cutout ton bag function |
CN113562588B (en) * | 2021-09-23 | 2021-12-14 | 河南卫华重型机械股份有限公司 | Sling of unloading with automatic cutout ton bag function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204281034U (en) | The suspender that a kind of applicable fork truck lifts part miscellany goods | |
CN202465025U (en) | Sling special for prefabricated panel | |
CN205603041U (en) | Hanging beam is increased to ton bag | |
CN205045703U (en) | Hoist of a convenient loading and unloading miscellany goods | |
CN202988558U (en) | Multi-purpose furnace burden plate hanger device | |
CN203513086U (en) | Special lifting appliance for long-bundle-shaped material | |
CN2892790Y (en) | Bagged goods lifting device | |
CN208071100U (en) | It is a kind of can multinomial while operation lifting pipeline device | |
CN203513083U (en) | Combined hanger special for bundled slender materials | |
CN202390076U (en) | Special lifting device for electrode | |
CN204281030U (en) | A kind of special hanger lifting section bar | |
CN205973429U (en) | Coil of strip class goods hoist | |
CN202284116U (en) | Lifting appliance special for large equipment | |
CN202321964U (en) | Special lift for double-coil goods | |
CN204569150U (en) | A kind of tyre crane driver's cab hoisting fixture | |
CN202829276U (en) | Special lifting hook for container bag operation of excavator | |
CN202897783U (en) | Special hoist for thread steel | |
CN202529725U (en) | Novel crane | |
CN201605087U (en) | Goods hoisting device | |
CN201385980Y (en) | Lifting bent of combined crane for gantry grate | |
CN206580218U (en) | A kind of belt collet roll change tools | |
CN218520883U (en) | Automatic balance hook device | |
CN203624810U (en) | Special lifting tool for steel material with a huge section | |
CN204778302U (en) | Aluminium alloy transport frock | |
CN204281040U (en) | A kind of forklift slings lifting section bar in freight container |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160928 Termination date: 20170428 |