CN205593241U - Stifled energy -conserving defeated ice system that prevents that is used for concrete production - Google Patents

Stifled energy -conserving defeated ice system that prevents that is used for concrete production Download PDF

Info

Publication number
CN205593241U
CN205593241U CN201620125300.7U CN201620125300U CN205593241U CN 205593241 U CN205593241 U CN 205593241U CN 201620125300 U CN201620125300 U CN 201620125300U CN 205593241 U CN205593241 U CN 205593241U
Authority
CN
China
Prior art keywords
ice
icebox
defeated
air duct
conserving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620125300.7U
Other languages
Chinese (zh)
Inventor
覃尚贵
邓滨
朱辉煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 5 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 5 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 5 Engineering Co Ltd filed Critical China Gezhouba Group No 5 Engineering Co Ltd
Priority to CN201620125300.7U priority Critical patent/CN205593241U/en
Application granted granted Critical
Publication of CN205593241U publication Critical patent/CN205593241U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

The utility model provides a stifled energy -conserving defeated ice system that prevents that is used for concrete production, includes that roots's fan, condensing evaporator, defeated ice pipeline, mix building store up icebox and return -air duct, and roots's fan passes through air supply pipeline with condensing evaporator to be connected, and condensing evaporator and mix building store up the icebox to be passed through the return -air duct and is connected with roots's fan through defeated ice pipe connection, mix building storage icebox, the defeated ice pipeline that condensing evaporator and mix building stored up between the icebox is equipped with screw conveyer, screw conveyer's discharge gate and defeated ice pipe connection, and screw conveyer's the other end lies in the icebox, and the icebox top surface is equipped with piece ice maker, the inside harrow ice maker that is equipped with of icebox. Through adopting above -mentioned structure, can effectively solve the flake ice and at the pneumatic transmission in -process, arouse pipe blockage's problem because of air feed temperature height leads to flake ice surface humidity to make the pipeline cooling time shorter, the refrigerator number of starts is few, and operating duration is short, reaches energy saving and consumption reduction's purpose, reduces the running cost.

Description

A kind of block-proof energy-conserving for concrete production defeated ice system
Technical field
This utility model relates to concrete production equipment field, a kind of block-proof energy-conserving for concrete production defeated ice system.
Background technology
Pneumatic transporting ice system is used widely at a lot of concrete production systems, at present air-flow mode of movement is air inlet → cool down → send ice → little icebox, this mode is limited due to vaporizer amount of cooling water, under high atmospheric temperature, roots blower inlet temperature constantly raises, cause flake ice surface moisture adhesion in course of conveying, easily cause pipeline obstruction, and sheet ice temperature can not meet concrete production demand;The waste of labor cleaning's pipeline is relatively big, and workload is big, the time is longer, and the system that has a strong impact on normally produces;And pipeline temperature fall time is longer, increase equipment operating cost.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of block-proof energy-conserving for concrete production defeated ice system, can effectively solve the problem that flake ice is during pneumatic transmission, because air themperature high two makes the problem that flake ice surface moisture causes line clogging, and make pipeline temperature fall time shorter, additionally it is possible to reduce the purpose of use cost.
For solving above-mentioned technical problem, this utility model be the technical scheme is that a kind of block-proof energy-conserving for concrete production defeated ice system, including roots blower, condenser/evaporator, ice transport pipe, mixing building ice bank and return-air duct, roots blower is connected by air duct with condenser/evaporator, condenser/evaporator is connected by ice transport pipe with mixing building ice bank, and ice transport pipe is connected with roots blower by return-air duct;
Ice transport pipe between condenser/evaporator and mixing building ice bank is provided with conveying worm, and the discharging opening of conveying worm is connected with ice transport pipe, and the other end of conveying worm is positioned at icebox, and icebox end face is provided with slice ice machine, and icebox inner bottom surface is provided with rake ice maker.
Preferably in scheme, described mixing building ice bank is provided with filter vat with the link position of return-air duct.
Preferably in scheme, described roots blower is additionally provided with air filter.
Preferably in scheme, described rake ice maker by the flake ice in icebox by icebox bottom surface to conveying worm direction raking.
This novel provided a kind of block-proof energy-conserving for concrete production defeated ice system, by using said structure, avoid and pipeline carries hot-air always, condenser/evaporator cannot freeze in time, in causing pipeline, temperature rises, sheet ice-out is bonding causes line clogging, and the running efficiency of system caused reduces situation;Make air cycle refrigeration in pipeline, alleviate the refrigeration work amount of condenser/evaporator, reduce equipment operating cost;Meet the Production requirement of concrete, it is to avoid the temperature situation causing concrete to consolidate too early the most up to standard.
Accompanying drawing explanation
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is overall structure schematic diagram of the present utility model.
In figure: roots blower 1, condenser/evaporator 2, ice transport pipe 3, mixing building ice bank 4, return-air duct 5, slice ice machine 6, harrow ice maker 7, icebox 8, conveying worm 9, filter vat 10, air filter 11, air duct 12.
Detailed description of the invention
A kind of block-proof energy-conserving for concrete production defeated ice system, including roots blower 1, condenser/evaporator 2, ice transport pipe 3, mixing building ice bank 4 and return-air duct 5, it is characterized in that: roots blower 1 is connected by air duct 12 with condenser/evaporator 2, condenser/evaporator 2 is connected by ice transport pipe 3 with mixing building ice bank 4, and ice transport pipe 3 is connected with roots blower 1 by return-air duct 5;
Ice transport pipe 3 between condenser/evaporator 2 and mixing building ice bank 4 is provided with conveying worm 9, the discharging opening of conveying worm 9 is connected with ice transport pipe 3, the other end of conveying worm 9 is positioned at icebox 8, and icebox 8 end face is provided with slice ice machine 6, and icebox 8 inner bottom surface is provided with rake ice maker 7.
Preferably in scheme, described mixing building ice bank 4 is provided with filter vat 10 with the link position of return-air duct 5.Set filter vat, it can be avoided that flake ice enters in roots blower by return-air duct, causes the damage of roots blower.
Preferably in scheme, described roots blower 1 is additionally provided with air filter 11.Set air filter 11, the bulk impurity being used in air filtering, it is to avoid impurity enters blocking pipeline or impacts concrete quality.
Use said structure, it is possible to effectively solution flake ice, during pneumatic transmission, because air themperature high two makes flake ice surface moisture cause the problem of line clogging, and makes pipeline temperature fall time shorter, additionally it is possible to reduce the purpose of use cost.

Claims (3)

1. the block-proof energy-conserving defeated ice system for concrete production, including roots blower (1), condenser/evaporator (2), ice transport pipe (3), mixing building ice bank (4) and return-air duct (5), it is characterized in that: roots blower (1) is connected by air duct (12) with condenser/evaporator (2), condenser/evaporator (2) is connected by ice transport pipe (3) with mixing building ice bank (4), and ice transport pipe (3) is connected with roots blower (1) by return-air duct (5);
Ice transport pipe (3) between condenser/evaporator (2) and mixing building ice bank (4) is provided with conveying worm (9), the discharging opening of conveying worm (9) is connected with ice transport pipe (3), the other end of conveying worm (9) is positioned at icebox (8), icebox (8) end face is provided with slice ice machine (6), and icebox (8) is internal is provided with rake ice maker (7).
A kind of block-proof energy-conserving for concrete production the most according to claim 1 defeated ice system, it is characterised in that: described mixing building ice bank (4) is provided with filter vat (10) with the link position of return-air duct (5).
A kind of block-proof energy-conserving for concrete production the most according to claim 1 defeated ice system, it is characterised in that: it is additionally provided with air filter (11) on described roots blower (1).
CN201620125300.7U 2016-02-18 2016-02-18 Stifled energy -conserving defeated ice system that prevents that is used for concrete production Expired - Fee Related CN205593241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620125300.7U CN205593241U (en) 2016-02-18 2016-02-18 Stifled energy -conserving defeated ice system that prevents that is used for concrete production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620125300.7U CN205593241U (en) 2016-02-18 2016-02-18 Stifled energy -conserving defeated ice system that prevents that is used for concrete production

Publications (1)

Publication Number Publication Date
CN205593241U true CN205593241U (en) 2016-09-21

Family

ID=56927931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620125300.7U Expired - Fee Related CN205593241U (en) 2016-02-18 2016-02-18 Stifled energy -conserving defeated ice system that prevents that is used for concrete production

Country Status (1)

Country Link
CN (1) CN205593241U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110044110A (en) * 2019-04-24 2019-07-23 中国葛洲坝集团第五工程有限公司 The defeated ice system electrical automation deicing of mixing building and trash ice method
CN111546498A (en) * 2020-05-08 2020-08-18 中电建十一局工程有限公司 Processing method for blocking ice outlet of ice house of mixing plant

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110044110A (en) * 2019-04-24 2019-07-23 中国葛洲坝集团第五工程有限公司 The defeated ice system electrical automation deicing of mixing building and trash ice method
CN110044110B (en) * 2019-04-24 2023-12-22 中国葛洲坝集团路桥工程有限公司 Electric automatic ice crushing device and method for mixing building ice conveying system
CN111546498A (en) * 2020-05-08 2020-08-18 中电建十一局工程有限公司 Processing method for blocking ice outlet of ice house of mixing plant
CN111546498B (en) * 2020-05-08 2021-10-08 中电建十一局工程有限公司 Processing method for blocking ice outlet of ice house of mixing plant

Similar Documents

Publication Publication Date Title
CN205593241U (en) Stifled energy -conserving defeated ice system that prevents that is used for concrete production
CN105627713B (en) A kind of band drier
CN209101647U (en) A kind of reciprocating type mesh belt tunnel instant freezer
CN103727649B (en) The air-cooled air conditioner unit of a kind of band auxiliary water cooling device and control method
CN207497678U (en) A kind of novel roots blower conveying material device
CN206145872U (en) Quick ice -cold air conditioning equipment of ice -melt formula
CN108812885A (en) A kind of grain drying machine
CN208832825U (en) A kind of efficient supply air system of screw fast refreezer
CN205258516U (en) Blast furnace blowing and dehumidifying system
CN201066225Y (en) Air automatic defrosting device
CN205772131U (en) Silo is closed a position machine
CN206339070U (en) A kind of driving type low temperature drying device
CN101922776A (en) Temperature and humidity control device in water-jet loom workshop
CN208410378U (en) A kind of recovery processing of nylon reworked material utilizes system
CN205448119U (en) Inside air cooling device is carried to malleation
CN208972534U (en) A kind of candy molding cooling device
CN210267879U (en) Soup ladle cooling machine
CN208720747U (en) Flour wheat bran heat pump drying device
CN207076540U (en) A kind of closed loop booster-type powder production system
CN207256848U (en) A kind of plastic tube product line
CN206658632U (en) Rice nursery substrate compression molding forming machine
CN206257841U (en) A kind of hot gas defrosting energy saver
CN209371570U (en) The refrigerant Pre-cooling equipment of freezing crusher
WO2018010305A1 (en) Grain cleaning device
CN208182197U (en) A kind of nylon feed device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160921

Termination date: 20210218