CN205586797U - Take sparge water to prevent desulfurization pipeline electric -magnetic flow meter measuring device who blocks up - Google Patents

Take sparge water to prevent desulfurization pipeline electric -magnetic flow meter measuring device who blocks up Download PDF

Info

Publication number
CN205586797U
CN205586797U CN201620180066.8U CN201620180066U CN205586797U CN 205586797 U CN205586797 U CN 205586797U CN 201620180066 U CN201620180066 U CN 201620180066U CN 205586797 U CN205586797 U CN 205586797U
Authority
CN
China
Prior art keywords
desulfurization
straight tube
desulfurization pipeline
pipeline
flushing water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620180066.8U
Other languages
Chinese (zh)
Inventor
刘玉新
刘畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Environment Industry Group Co Ltd
Original Assignee
Datang Environment Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Environment Industry Group Co Ltd filed Critical Datang Environment Industry Group Co Ltd
Priority to CN201620180066.8U priority Critical patent/CN205586797U/en
Application granted granted Critical
Publication of CN205586797U publication Critical patent/CN205586797U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a take sparge water to prevent desulfurization pipeline electric -magnetic flow meter measuring device who blocks up, include: an electric -magnetic flow meter has the export of a slurry inlet and a thick liquid, connect slurry inlet reaches an entry straight tube of desulfurization pipeline, its length is more than 5 times of desulfurization pipeline pipe diameter, connect the thick liquid export reaches an export straight tube of desulfurization pipeline, its length is more than 3 times of desulfurization pipeline pipe diameter, with stifled structure is prevented to a sparge water of the inside intercommunication of entry straight tube. Prevent stifled structure through the installation sparge water to the relevant dimension parameter of adjustment makes the flow value that the device can accurate measurement limestone slurry, and the long -term stability and reliability operation, in order to satisfy accurate controlling to desulfurization minimum discharge water need, limestone slurry, gypsum slurry material consumption. Avoid unnecessary extravagant, fall low running cost, simultaneously, ensure can not exceed standard through the limestone slurry that the pipeline got into the desulfurization absorption tower, also can be in case the less unable desulfurization effect who obtains the ideal of flow stopping volume.

Description

The desulfurization pipeline electromagnetic flowmeter survey device that a kind of band flushing water is anti-blocking
Technical field
This utility model relates to environmental technology field, particularly relates to Wet Flue Gas Desulfurization Technology field, is specifically related to a kind of band and rinses The desulfurization pipeline electromagnetic flowmeter survey device that water is anti-blocking.
Background technology
State Development and Reform Commission prints and distributes " coal electricity energy-saving and emission-reduction upgrading and transformation action plan (2014-2020) " atmospheric pollution of keeping under strict control Thing discharges.Newly-built Thermal generation unit (be contained in and build the unit having included country's construction of fire and electricity planning with project in) answers synchronized construction first Forward (FWD) flushing water, denitration and dust removal installation, must not arrange gas bypass passage.Eastern region (Liaoning, Beijing, Tianjin, 11 provinces and cities such as Hebei, Shandong, Shanghai, Jiangsu, Zhejiang, Fujian, Guangdong, Hainan) newly-built Thermal generation unit atmospheric pollution Thing concentration of emission basically reach gas turbine group emission limit (i.e. under the conditions of benchmark oxygen content 6%, flue dust, sulfur dioxide, nitrogen Emissions of oxides concentration is respectively no higher than 10,35,50 milligrams/cubic metre).Middle part (Heilungkiang, Jilin, Shanxi, peace 8 provinces such as emblem, Hubei, Hunan, Henan, Jiangxi) new-built unit is in principle close to or up gas turbine group emission limit, bulging Encourage west area new-built unit close to or up gas turbine group emission limit.Support that synchronization is carried out atmosphere pollution combination and cooperation and taken off Remove, reduce the pollutant emissions such as sulfur trioxide, hydrargyrum, arsenic.
Along with China's economic development, electricity needs persistently increases, haze long lasting effect, controls PM2.5 and refer to agenda. Local government, electric power enterprise propose " minimum discharge ", " near-zero release ", the construction of " reaching combustion engine discharge standard " one after another or change Make requirement." minimum discharge " technology, scientific guidance Thermal Power Generation Industry sustainable development ultra-clean is discharged.
In this context, in tradition flue gas desulphurization system, configured and the most no longer adapted to existing relevant regulations or requirement. Such as, the electromagnetic flowmeter in desulfurization pipeline does not has effective clogging-preventing measures, easily blocks, and once occurs blocking to may result in electricity Magnetic flowmeter is malfunctioning, thus cannot accurately control the concentration of lime stone slurry, and excessive concentration be will result in be entered by pipeline and absorbs The lime stone slurry concentration of tower is far longer than the SO entering absorption tower2Concentration, too much lime stone slurry can be carried to by flue gas Demister, the resistance that results in blockage increases, and air-introduced machine power consumption increases, and the soot emissions entering chimney exceed standard, and make desulphurization system not Minimum discharge and system stable operation can be met.And too low desulfuration efficiency and the effect of reducing of concentration, affect qualified discharge equally.
Utility model content
For the problems referred to above, the purpose of this utility model is to provide the desulfurization pipeline electromagnetic flowmeter survey that a kind of band flushing water is anti-blocking Device, by installing flushing water Anti-blocking structure, and adjusts relative dimensions parameter, enables devices to accurately measure lime stone slurry Flow value, and long time stability operation, to meet the water needed for desulfurization minimum discharge, lime stone slurry, gypsum slurries thing Material consume accurately control.Avoid unnecessary waste, cut operating costs;Simultaneously, it is ensured that enter desulfurization by pipeline and absorb The lime stone slurry of tower will not exceed standard;It is also possible to prevent that flow is less cannot obtain preferable desulfurized effect.
For reaching above-mentioned purpose, the concrete technical scheme that this utility model is taked is:
The desulfurization pipeline electromagnetic flowmeter survey device that a kind of band flushing water is anti-blocking, including:
One electromagnetic flowmeter, has an injection point and a serum outlet;
Connect an entrance straight tube of described injection point and described desulfurization pipeline, more than 5 times of its a length of desulfurization pipeline caliber;
Connect an outlet straight tube of described serum outlet and described desulfurization pipeline, more than 3 times of its a length of desulfurization pipeline caliber;
The flushing water Anti-blocking structure that connect internal with described entrance straight tube.
Further, described entrance straight tube and outlet straight tube are all connected by flange arrangement with desulfurization pipeline.
Further, 5-5.3 times of a length of desulfurization pipeline caliber of described entrance straight tube, a length of of described outlet straight tube takes off 3-3.3 times of sulfur pipeline caliber.
Further, described flushing water Anti-blocking structure includes a connection wash tub pipe within entrance straight tube, on described wash tub pipe One flushing water control valve is set.
Further, described outlet straight tube is coaxial with described entrance straight tube.
By taking technique scheme, by adjusting entrance straight tube and the dimensional structure of outlet straight tube, enable devices to accurately survey In amount desulfurization pipeline, the flow value of lime stone slurry, ensures the requirement of electromagnetic flowmeter survey device precision, feedback after measurement Data precision is high and stable, ensures desulfurization minimum discharge precision requirement.And rinsed by the timing of flushing water Anti-blocking structure, protect The steady running of fault device.
Accompanying drawing explanation
Fig. 1 is the installation of the desulfurization pipeline electromagnetic flowmeter survey device that a kind of band flushing water is anti-blocking in this utility model one embodiment Structural representation.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out clear, Complete description, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments. Based on the embodiment in this utility model, the institute that those of ordinary skill in the art are obtained under not making creative work premise There are other embodiments, broadly fall into the scope of this utility model protection.Coordinate institute's accompanying drawing that the features and advantages of the present invention are made in detail below Describe in detail bright.
As it is shown in figure 1, in one embodiment, it is provided that the desulfurization pipeline electromagnetic flowmeter survey device that a kind of band flushing water is anti-blocking, Including: electromagnetic flowmeter 2, there is an injection point and a serum outlet;The entrance connecting injection point and desulfurization pipeline 1 is straight Pipe 4, more than 5 times of its a length of desulfurization pipeline caliber;Connect serum outlet and the outlet straight tube 3 of desulfurization pipeline 1, its length For desulfurization pipeline caliber more than 3 times;The flushing water Anti-blocking structure 5 that connect internal with entrance straight tube 4.
Specifically, the flange arrangement that entrance straight tube 4 and outlet straight tube 3 are all sealed by band with desulfurization pipeline 1 is connected.
Preferably, 5-5.3 times of a length of desulfurization pipeline 1 caliber of entrance straight tube 4, a length of desulfurization pipe of outlet straight tube 3 3-3.3 times of road 1 caliber.
Flushing water Anti-blocking structure 5 includes a connection wash tub pipe within entrance straight tube, wash tub pipe arranges a flushing water and controls Valve.
Outlet straight tube 3 is coaxial with entrance straight tube 4.
In a Practical Project, use the desulfurization pipeline electromagnetic flowmeter survey device that in above-described embodiment, band flushing water is anti-blocking, logical Cross actual motion to observe, this device can stable operation more than more than 420 hours, and flow precision error is less than 1.25%. Other correlation techniques are coordinated to disclosure satisfy that the minimum discharge requirement of desulphurization system.

Claims (5)

1. the desulfurization pipeline electromagnetic flowmeter survey device that a band flushing water is anti-blocking, it is characterised in that including:
One electromagnetic flowmeter, has an injection point and a serum outlet;
Connect an entrance straight tube of described injection point and described desulfurization pipeline, more than 5 times of its a length of desulfurization pipeline caliber;
Connect an outlet straight tube of described serum outlet and described desulfurization pipeline, more than 3 times of its a length of desulfurization pipeline caliber;
The flushing water Anti-blocking structure that connect internal with described entrance straight tube.
2. the desulfurization pipeline electromagnetic flowmeter survey device that band flushing water as claimed in claim 1 is anti-blocking, it is characterised in that described entrance straight tube and outlet straight tube are all connected by flange arrangement with desulfurization pipeline.
3. the desulfurization pipeline electromagnetic flowmeter survey device that band flushing water as claimed in claim 1 is anti-blocking, it is characterised in that 5-5.3 times of a length of desulfurization pipeline caliber of described entrance straight tube, 3-3.3 times of a length of desulfurization pipeline caliber of described outlet straight tube.
4. the desulfurization pipeline electromagnetic flowmeter survey device that band flushing water as claimed in claim 1 is anti-blocking, it is characterised in that described flushing water Anti-blocking structure includes a connection wash tub pipe within entrance straight tube, and described wash tub pipe arranges a flushing water control valve.
5. the desulfurization pipeline electromagnetic flowmeter survey device that band flushing water as claimed in claim 1 is anti-blocking, it is characterised in that described outlet straight tube is coaxial with described entrance straight tube.
CN201620180066.8U 2016-03-09 2016-03-09 Take sparge water to prevent desulfurization pipeline electric -magnetic flow meter measuring device who blocks up Expired - Fee Related CN205586797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620180066.8U CN205586797U (en) 2016-03-09 2016-03-09 Take sparge water to prevent desulfurization pipeline electric -magnetic flow meter measuring device who blocks up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620180066.8U CN205586797U (en) 2016-03-09 2016-03-09 Take sparge water to prevent desulfurization pipeline electric -magnetic flow meter measuring device who blocks up

Publications (1)

Publication Number Publication Date
CN205586797U true CN205586797U (en) 2016-09-21

Family

ID=56928620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620180066.8U Expired - Fee Related CN205586797U (en) 2016-03-09 2016-03-09 Take sparge water to prevent desulfurization pipeline electric -magnetic flow meter measuring device who blocks up

Country Status (1)

Country Link
CN (1) CN205586797U (en)

Similar Documents

Publication Publication Date Title
CN205392185U (en) Gas boiler catalytic denitrification system
CN205607481U (en) Take slurry tank liquid level measurement device of sparge water
CN205607588U (en) Take sparge water to prevent desulfurization line pressure changer measuring device who blocks up
CN203916465U (en) A kind of equipment for denitrifying flue gas
CN205586797U (en) Take sparge water to prevent desulfurization pipeline electric -magnetic flow meter measuring device who blocks up
CN205586798U (en) Take sparge water to prevent desulfurization pipeline thick liquid pH analysis meter measuring device who blocks up
CN205340668U (en) High -efficient vortex agitator device of slurry tank
CN205586762U (en) Take sparge water to prevent desulfurization pipeline area circulation groove pH measuring device who blocks up
CN205607585U (en) Take sparge water to prevent absorption tower defroster differential pressure measuring device who blocks up
CN205607494U (en) Take slurry tank radar charge level indicator liquid level measurement device of sparge water
CN205607799U (en) Take sparge water to prevent desulfurization pipeline densimeter measuring device who blocks up
CN204582573U (en) A kind of coal-fired flue-gas pollutant minimum discharge system with swinging GGH
CN205586799U (en) Take desulfurization pipeline that sparge water prevents blocking up manometer measuring device on spot
CN205598934U (en) Take absorption tower liquid level measurement device of sparge water
CN105521728B (en) A kind of efficient flow-disturbing agitator device of slurry tank
CN205655883U (en) Calcium hydrate powder storehouse material level conduction device
CN205127726U (en) Double tower is two -way to spray multicycle desulfurization absorption tower
CN204987054U (en) A hierarchical heat transfer device for wet flue gas desulfurization system
CN205340556U (en) Absorption tower doublestage agitator device
CN208066118U (en) A kind of coke oven flue gas desulphurization denitration dedusting comprehensive treatment device
CN205340478U (en) Ejecting flue gas desulfurization reaction device
CN205340500U (en) High -efficient multi -functional flue gas discharging equipment in absorption tower
CN207894258U (en) It is a kind of to eliminate the flat device for burning sintering flue gas white plume of step-by-step movement
CN205127727U (en) Efficient desulfurizing absorption tower
CN106166455A (en) A kind of denitration ammonia gas for pretreatment system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160921