CN205584105U - Photovoltaic cell board cleans equipment - Google Patents

Photovoltaic cell board cleans equipment Download PDF

Info

Publication number
CN205584105U
CN205584105U CN201620160553.8U CN201620160553U CN205584105U CN 205584105 U CN205584105 U CN 205584105U CN 201620160553 U CN201620160553 U CN 201620160553U CN 205584105 U CN205584105 U CN 205584105U
Authority
CN
China
Prior art keywords
rail
detachable section
fixed support
section
disconnected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620160553.8U
Other languages
Chinese (zh)
Inventor
钱祥忠
桑枚乘
宋鉷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Shun Hai Photovoltaic Technology Co., Ltd.
Original Assignee
Shanghai Shunhai Photovoltaic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shunhai Photovoltaic Technology Co Ltd filed Critical Shanghai Shunhai Photovoltaic Technology Co Ltd
Priority to CN201620160553.8U priority Critical patent/CN205584105U/en
Priority to PCT/CN2016/082133 priority patent/WO2017148005A1/en
Priority to US16/081,366 priority patent/US10892705B2/en
Application granted granted Critical
Publication of CN205584105U publication Critical patent/CN205584105U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model relates to a photovoltaic cell board cleans equipment is applied to and arranges the photovoltaic unit who constitutes in proper order by a N photovoltaic panel battle array, and the equipment that should clean contains the guide rail mechanism that sets up respectively in each photovoltaic panel battle array, set up scraper mechanism in each guide rail mechanism, stimulate the stay cord mechanism of each scraper mechanism motion. Wherein, stay cord mechanism contains last stay cord and the lower tension cords who is connected with each scraper mechanism, and go up, lower tension cords has partly to wear to establish respectively in upper and lower rail, and be equipped with the first section of dismantlement respectively in the upper and lower rail and the second can the section of dismantlement. Compare with prior art, the staff can be convenient takes out scraper mechanism from first and second positions of can the section of dismantlement being removed to examine and repair, and can so that go up, impaired position exposes at the position of being removed among the lower tension cords, the staff of being convenient for will go up, impaired position is wiped out among the lower tension cords, and the reconnection, and need not not remove whole upper and lower rail, thereby promote work efficiency, reduce cost of maintenance.

Description

Photovoltaic battery panel cleaning equipment
Technical field
This utility model relates to cleaning equipment, particularly to a kind of photovoltaic battery panel cleaning equipment being applied to photovoltaic panel battle array.
Background technology
Photovoltaic generation is the clean energy resource that a kind of prospect is boundless, and China is up to 100,000,000 kilowatts to the year two thousand twenty solar electrical energy generation installed capacity, and the solar electrical energy generation installed capacity of other countries is to the year two thousand twenty in the world, also can reach a new peak.Desert region is long because of the sunshine-duration, and intensity of illumination is higher, compares and is suitable for utilizing solar electrical energy generation.But, owing to the air quality of desert area is poor, the dust in air has a strong impact on the generating efficiency of photovoltaic module.Data show, within 1 year, do not clean light panel components plate, affect generating efficiency and reach more than 20%.
And in order to improve the efficiency that photovoltaic panel is cleaned, it is accomplished by providing a kind of cleaning equipment that photovoltaic panel is cleaned, existing part cleaning equipment is by installing multiple guide rails in the both sides up and down of photovoltaic panel battle array, and utilize the stay cord installed in guide rail to drive scraper mechanism that the surface of each photovoltaic panel battle array is cleaned, but scraper mechanism is during long-play, it is likely to occur fault, overhaul it is thus desirable to disassemble, and stay cord also can be likely to occur fracture because wearing and tearing for a long time, so that change and investigation.
But, in the prior art, during keeping in repair cleaning equipment, staff needs first to be dismantled by whole guide rail, scraper mechanism and stay cord could be disassembled and repair or replace, cause the inconvenience of maintenance, and add maintenance cost.
Therefore, how to facilitate staff that scraper mechanism and upper and lower stay cord are keeped in repair, promote work efficiency, reduce maintenance cost, be problem to be solved in the utility model.
Utility model content
The purpose of this utility model is to provide a kind of photovoltaic battery panel cleaning equipment, it is possible to facilitates staff to keep in repair scraper mechanism and upper and lower stay cord, promotes work efficiency, reduces maintenance cost.
For solving above-mentioned technical problem, embodiment of the present utility model provides a kind of photovoltaic battery panel cleaning equipment, it is applied to be arranged in order, by N number of photovoltaic panel battle array, the photovoltaic cells constituted, comprises and be separately positioned on the guide rail mechanism that each upper and lower both sides of photovoltaic panel battle array are made up of upper rail and lower rail, the scraper mechanism being separately positioned on each guide rail mechanism;Wherein, described N is natural number;
Described cleaning equipment also comprises: pull each scraper mechanism to carry out the pull rope mechanism moved along the length direction of described guide rail mechanism;Wherein, described pull rope mechanism comprises the lower stay cord that the upper stay cord being connected with the top of each scraper mechanism is connected with the afterbody of each scraper mechanism, and described upper stay cord has part to be located in the upper rail of each guide rail mechanism, and lower stay cord has part to be located in the lower rail of each guide rail mechanism:
In described upper rail, at least part is the first detachable section for disconnecting described upper rail, and at least part is the second detachable section for disconnecting described lower rail in described lower rail, wherein, described first detachable section is identical with the length of the described second detachable section, and more than the width of described scraper mechanism, and the position of the described first detachable section and the described second detachable section is the most corresponding.
Embodiment of the present utility model is in terms of existing technologies, upper due to whole cleaning equipment, lower rail is respectively provided with first, second detachable section, so that staff can easily by scraper mechanism from first, the position that second detachable section is removed is taken out, and overhaul, and can be by upper, the rope closing of lower stay cord or put the motion of rope, make, in lower stay cord, impaired position is exposed to the position being removed, it is easy to staff by upper, in lower stay cord, impaired position is wiped out, and reconnect, and whole upper rail or lower rail need not be removed, and then staff can be facilitated scraper mechanism and upper, lower stay cord keeps in repair, and lifting work efficiency, reduce maintenance cost.
Further, in order to meet the assembling demand in actual application, promoting overhaul efficiency, the described first detachable section is arranged on the optional position of described upper rail, and the described second detachable section is arranged on the optional position of described lower rail.It follows that first, second detachable section can be reasonably arranged on the optional position of upper and lower rail by staff according to actual situation, thus staff is facilitated scraper mechanism to be taken out on upper rail and lower rail.
Further, the length of the described first detachable section is respectively less than the two-part length that described upper rail is disconnected, and the length of the described second detachable section is respectively less than the two-part length that described lower rail is disconnected.Two parts being disconnected less than upper and lower rail respectively due to the length of first, second detachable section so that the two-part length that upper and lower rail is disconnected is longer, can promote rail and the intensity of lower rail.
Further, two parts that the described first detachable section is disconnected also by upper locking device and described upper rail are locked;Two parts that described second detachable section is disconnected also by lower locking device and described lower rail are locked.Thus during stay cord drives scraper mechanism to move on upper rail and lower rail, owing to the first detachable section and the second detachable section are fixed by upper and lower locking device respectively, make the first detachable section and the second detachable section will not produce slip in upper rail or lower rail or loosen, thus ensure that scraper mechanism can carry out stable motion in upper rail and lower rail.
Further, described upper locking device comprises on first be slidably disposed in respectively on two parts that described upper rail is disconnected fixed support on fixed support and second, is arranged on described first locking member on first on fixed support, is arranged on described second locking member on second on fixed support;Wherein, locking member fixed support on described first slides into when the upper rail corresponding with it is disconnected the binding site of part and the described first detachable section and is locked on described first;On described second, locking member fixed support on described second slides into when the upper rail corresponding with it is disconnected part with the binding site of the described second detachable section and is locked.It can thus be appreciated that, owing on fixed support and second on first, fixed support is slidably disposed on upper rail, therefore when two parts that the first detachable section and upper rail are disconnected are attached, fixed support on first and second can be respectively slid to the binding site of two parts that upper rail is disconnected and the first detachable section, and respectively fixed support on first and second is locked by locking member on first and second, it is achieved the first detachable section be disconnected with upper rail two-part fixing be connected.And when removing first detachable section, only need to loosen on first and second after locking member, fixed support on fixed support on first and second is respectively slid in two parts that upper rail is disconnected, the coupling mechanism force of two parts that the first detachable section is disconnected can be cancelled with upper rail, to facilitate staff that the first detachable section is removed.
Further, offer, on fixed support, the groove that gets on the right track the most respectively on fixed support and described second on described first, and two parts that the described first detachable section and described upper rail are disconnected are respectively provided with described in insertion the upper insertion section getting on the right track in groove;Wherein, the both sides cell wall of the described groove that gets on the right track the most gradually draws in the center of the described groove that gets on the right track, and the cross sectional shape of described upper insertion section is identical with the cross sectional shape of the described groove that gets on the right track, and after in the groove that gets on the right track described in the insertion of insertion section on described, described upper insertion section is locked the Shu Shang insertion section, cell wall back-off residence of described groove side of getting on the right track.Owing to offering, on fixed support, the groove that gets on the right track respectively on first, second, two parts that first detachable section and upper rail are disconnected are respectively provided with and insert the upper insertion section getting on the right track in groove, and the center of the both sides cell wall of the groove that gets on the right track the most gradually upward trajectory groove is drawn in, so that after the first detachable section of upper rail is in groove is got on the right track in insertion, by the both sides cell wall of the groove that gets on the right track, the upper insertion section of the first detachable section and upper rail can be locked, realize on the first detachable section, upper rail and first, second installation between fixed support with this.
Further, on locking member and described second, locking member is bolt on first.
Further, described lower locking device comprises the first time fixed support being slidably disposed in respectively on two parts that described lower rail is disconnected and second time fixed support, the first time locking member being arranged on described first time fixed support, second time locking member being arranged on described second time fixed support;Wherein, described first time locking member slides into when the lower rail corresponding with it is disconnected part with the binding site of the described second detachable section at described first time fixed support and is locked;Described second time locking member slides into when the lower rail corresponding with it is disconnected part with the binding site of the described second detachable section at described second time fixed support and is locked.It can thus be appreciated that, due to first, second time, fixed support is slidably disposed on lower rail, therefore when two parts that the second detachable section and lower rail are disconnected are attached, first and second times fixed supports can be respectively slid to lower rail two parts being disconnected and the position that the second detachable section is combined, and respectively first and second times fixed supports are locked by first and second times locking members, it is achieved that the second detachable section be disconnected with lower rail two-part fixing be connected.And when removing second detachable section, only need to be after loosening first and second times locking members, first time fixed support and second time fixed support are respectively slid in two parts that lower rail is disconnected, the coupling mechanism force of two parts that the second detachable section is disconnected can be cancelled with lower rail, to facilitate staff that the second detachable section is removed.
Further, described first time fixed support and described second time fixed support offer lower railway groove the most respectively, and two parts that the described second detachable section and described lower rail are disconnected are respectively provided with the lower insertion section inserted in described lower railway groove;Wherein, the both sides cell wall of described lower railway groove the most gradually draws in the center of described lower railway groove, and the cross sectional shape of described lower insertion section is identical with the cross sectional shape of described lower railway groove, and after described lower insertion section is inserted in described lower railway groove, described lower insertion section is locked the Shu Xia insertion section, cell wall back-off residence of described lower railway groove side.Owing to offering lower railway groove respectively under first, second time fixed support, and first two parts of being disconnected of detachable section and lower rail be respectively provided with the lower insertion section inserted in lower railway groove, and the center gathering of the both sides cell wall rail groove the most gradually downward of lower railway groove, so that the second detachable section of lower rail is after inserting in lower railway groove, by the both sides cell wall of lower railway groove, the lower insertion section of the first detachable section and lower rail can be locked, realize the second detachable section, installation between lower rail and first, second time fixed support with this.
Further, described first time locking member and described second time locking member are bolt.
Accompanying drawing explanation
Fig. 1 is the structural representation of the photovoltaic battery panel cleaning equipment of this utility model the first embodiment;
Fig. 2 is that in this utility model the first embodiment, upper and lower fixed support slips away view when being removed position;
Schematic cross-section when Fig. 3 is that in this utility model the first embodiment, scraper mechanism moves to first, second detachable section;
Fig. 4 is the cross section structure schematic diagram after amplifying at A in Fig. 3;
Fig. 5 is the sectional view of the second detachable section in this utility model the first embodiment;
Structural representation after first, second detachable section is removed in Fig. 6 this utility model the first embodiment;
View when Fig. 7 is that in this utility model the first embodiment, scraper mechanism is pulled to the position that the second detachable section is removed.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing, each embodiment of the present utility model is explained in detail.But, it will be understood by those skilled in the art that in each embodiment of this utility model, in order to make reader be more fully understood that, the application proposes many ins and outs.But, even if there is no these ins and outs and many variations based on following embodiment and amendment, it is also possible to realize the application each claim technical scheme required for protection.
First embodiment of the present utility model relates to a kind of photovoltaic battery panel cleaning equipment, as shown in Figure 1, it is applied to be arranged in order, by multiple photovoltaic panel battle arrays 4, the photovoltaic cells constituted, the both sides up and down of each photovoltaic panel battle array 4 are respectively arranged with rail 1-1 and lower rail 1-2, constitute the guide rail mechanism of photovoltaic panel battle array 4, and on each guide rail mechanism, be respectively arranged with scraper mechanism 5.
Wherein, as it is shown in figure 1, in cleaning equipment, it is additionally provided with and pulls each scraper mechanism 5 to carry out the pull rope mechanism moved along the length direction of guide rail mechanism.And the lower stay cord 11 that the afterbody that pull rope mechanism comprises upper the stay cord 10 and each scraper mechanism 5 being connected with the top of each scraper mechanism 5 is connected, and upper stay cord 10 has part to be located in the upper rail 1-1 of each guide rail mechanism, and lower stay cord 11 has part to be located in the lower rail 1-2 of each guide rail mechanism.
Further, by Fig. 1 analysis, in the upper rail 1-1 and lower rail 1-2 of cleaning equipment, one first detachable section 2 and the second detachable section 3 can be respectively provided with, be respectively used to connect the position that rail 1-1 and lower rail 1-2 breaks.Wherein, the first detachable section 2 position in upper rail 1-1 and the second detachable section 3 position in lower rail 1-2 are the most corresponding.It addition, for the structure simplifying upper and lower rail, in design and in application, the length of the first detachable section 2 and the second detachable section 3 can be set to identical, and its length is greater than the width of scraper mechanism 5.
By foregoing it is seen that, upper due to whole cleaning equipment, lower rail is respectively provided with first, second detachable section, and first, second detachable segment length is identical, and width is more than the width of scraper mechanism 5, so that scraper mechanism 5 can be taken out from the position being removed by staff easily, and overhaul, and can be by upper, the rope closing of lower stay cord or put the motion of rope, make, in lower stay cord, impaired position is exposed to the position being removed, it is easy to staff by upper, in lower stay cord, impaired position is wiped out, and reconnect, and whole upper rail 1-1 or lower rail 1-2 need not be removed, and then staff can be facilitated scraper mechanism 5 and upper, lower stay cord keeps in repair, and lifting work efficiency, reduce maintenance cost.
Specifically, as it is shown in figure 1, each photovoltaic panel battle array 4 in the above-mentioned photovoltaic cells being previously mentioned is provided with 5 the most altogether, and linear array is used to be placed equidistant.And, so that scraper mechanism 5 can be in upper rail 1-1 and the motion of the lower enterprising line stabilization of rail 1-2, the lower locking device that this photovoltaic battery panel cleaning equipment is provided with upper locking device that the two parts being disconnected the first detachable section 2 and upper rail 1-1 are locked, two parts of being disconnected the second detachable section 3 and lower rail 1-2 are locked.Thus during stay cord drives scraper mechanism 5 to move on upper rail 1-1 and lower rail 1-2, make the first detachable section 2 and the second detachable section 3 will not produce slip at the position that is disconnected of upper rail 1-1 or lower rail 1-2 or loosen, it is ensured that the stable operation of scraper mechanism 5.
Wherein, as can be known from Fig. 1, the upper locking device in present embodiment comprises fixed support 6-1 on first, fixed support 6-2 on second, and being arranged on two parts that rail 1-1 is disconnected of can sliding respectively of fixed support on first, second.And lower locking device also has identical structure, specifically comprise first time fixed support 7-1 and second time fixed support 7-2, and on two parts that under being arranged on that can slide respectively of first time fixed support 7-1 and second time fixed support 7-2, rail 1-2 is disconnected.
Additionally, locking member on first (not marking in figure), locking member (not marking in figure) on second is further respectively had on fixed support on first, second, and on first on fixed support 6-1 and second fixed support 6-2 slide into the upper rail 1-1 corresponding with it be disconnected part when the position that the first detachable section 2 is combined, on first, second, its position combined can be locked by locking member.And it is corresponding, first, second time fixed support is also respectively equipped with first time locking member (not marking in figure), second time locking member (not marking in figure), and when first time fixed support 7-1 and second time fixed support 7-2 slide into the lower rail 1-2 corresponding with it be disconnected part with the position that the second detachable section 3 is combined time, first, second time its position combined can be locked by locking member.
It follows that the upper locking device of present embodiment and lower locking device have identical structure, the most lower locking device is done concrete analysis and explanation.And
By foregoing, owing to first time fixed support 7-1 and second time fixed support 7-2 is slidably arranged under lower rail 1-2, therefore when two parts of the second detachable section 3 with the disconnection of lower rail 1-2 are attached, first and second times fixed supports can be respectively slid to lower rail 1-2 two parts being disconnected and the position that the second detachable section 3 is combined, and respectively first and second times fixed supports being locked by first and second times locking members, it is achieved thereby that two-part fixing being connected of being disconnected with lower rail 1-2 of the second detachable section 3.And when removing the second detachable section 3, only need to be after loosening first and second times locking members, first time fixed support 7-1 and second time fixed support 7-2 is respectively slid in two parts that lower rail 1-2 is disconnected, the coupling mechanism force of two parts that the second detachable section 3 is disconnected can be cancelled with lower rail 1-2, as in figure 2 it is shown, to facilitate staff that the second detachable section 3 is removed.
In addition, as depicted in figs. 1 and 2, by foregoing, when removing the first detachable section 1, also only need to loosen on first and second after locking member, fixed support 6-2 on fixed support 6-1 and second on first is respectively slid in two parts that upper rail 1-2 is disconnected, the coupling mechanism force of two parts that the first detachable section 2 is disconnected with upper rail 1-2 can be cancelled, to facilitate staff that the first detachable section 2 is removed.
And in actual applications, for upper rail 1-1, lower rail 1-2 is the nearest, staff removes during the second dismounting section 3 more convenient, thus can remove by prioritizing selection, so the two parts being the most only disconnected the second detachable section 3 and lower rail 1-2 are attached and demolishing process explanation for example.
Specifically, as shown in Figure 3 and Figure 4, first, second time fixed support of lower locking device offers lower railway groove (not marking in figure) the most respectively, and two parts that the second detachable section 3 and lower rail 1-2 are disconnected are respectively provided with the lower insertion section (not marking in figure) inserted in lower railway groove.Wherein, the center of the both sides cell wall rail groove the most gradually downward of lower railway groove is drawn in, and the cross sectional shape of lower insertion section is identical with the cross sectional shape of lower railway groove, and after lower insertion section is inserted in lower railway groove, be locked the cell wall back-off of lower railway groove side Hou Duixia insertion section, insertion section of staying.
It can thus be appreciated that, due to first, lower railway groove is offered respectively on second time fixed support, two parts that second detachable section 3 and lower rail 1-2 are disconnected are respectively provided with the lower insertion section inserted in lower railway groove, and the center of the both sides cell wall rail groove the most gradually downward of lower railway groove is drawn in, so that the second detachable section 3 of lower rail 1-2 is after inserting in lower railway groove, by the both sides cell wall of lower railway groove, the lower insertion section of the second detachable section 3 and lower rail 1-2 can be locked, the second detachable section 3 is realized with this, lower rail 1-2 and first, installation between second time fixed support.
Additionally, it should be noted that, in the present embodiment, on first, on fixed support 6-1 and second, on fixed support 6-2, offer the groove that gets on the right track the most respectively, and two parts that the first detachable section 2 and upper rail 1-1 are disconnected are respectively provided with the upper insertion section that insertion is got on the right track in groove.Wherein, get on the right track groove both sides cell wall the most gradually upward trajectory groove center draw in, and the cross sectional shape of upper insertion section is identical with the cross sectional shape of the groove that gets on the right track, and after upper insertion section is inserted in the groove that gets on the right track, the cell wall back-off of groove side of getting on the right track live in insertion section and upper insertion section is locked.Owing to the groove that gets on the right track also uses the structure identical with lower railway groove, therefore, in the present embodiment, do not make concrete illustration.
Additionally, it is worth mentioning that, during practical operation, operator are when installing the second detachable section 3 and remove, accordingly, it is also desirable to adopt when in the same way the first detachable section 2 being installed and removed, to facilitate upper and lower stay cord to drive scraper mechanism 5 to move on upper and lower rail, and scraper mechanism 5 is taken out from guide rail mechanism, therefore present embodiment only installation and demolishing process to the second detachable section 3 explains.
Specifically, staff, before being attached by two parts of the second detachable section 3 with the disconnection of lower rail 1-2, needs to respectively penetrate in lower rail 1-2 lower stay cord 11, and is connected with scraper mechanism 5.And, after the second detachable section 3 is fixed, in order to prevent lower stay cord 11 from driving scraper mechanism 5 to carry out that motor process occurs fracture or the phenomenon damaged in the detachable section 3 of lower rail 1-2 and second, thus in the present embodiment, lower stay cord 11 can be drawn respectively from the second detachable section 3 and lower rail 1-2.Therefore, as it is shown in figure 5, in the present embodiment, the cross sectional shape of the second detachable section 3 is one and carries hollow structure jaggy, and hollow space constitutes the cavity of the second detachable section 3, and the rail portion on breach forms the brim of a hat 21 for covering cavity.
Further, in actual applications, the second detachable section 3 is identical with the cross section structure of lower rail 1-2, so the most only illustrating as a example by the second detachable section 3.Specifically, as shown in Figure 5, lower stay cord 11 is when being attached scraper mechanism 5, in can having the cavity 19 partially passing through the second detachable section 3, and draw from the cavity 19 of the second detachable section 3, and the bottom of each scraper mechanism 5 is respectively equipped with the upper junction plate 20 inserted in lower rail 1-2 breach, it is fixedly connected with the lower stay cord 11 being positioned in the second detachable section 3 cavity 19 by upper junction plate 20, and the brim of a hat 21 is positioned on cavity 19 for covering cavity 19, and lower stay cord 11 is protected, when making lower stay cord 11 can carry out rope closing inside lower rail 1-2 or put the transmission of rope, outside avoiding lower stay cord 11 to be exposed to, so that lower stay cord 11 is in extreme circumstances, icing can be avoided the occurrence of, the fracture corroded and cause, the phenomenons such as damage.
In addition, in order to make each scraper mechanism 5 more smoothly when sliding in the second detachable section 3, upper junction plate 20 comprises the vertical connecting portion 20-1 that is connected fixing with scraper mechanism 5, also comprise one to insert in the cavity 19 of the second detachable section 3 from the breach of the second detachable section 3, and hook part 20-2 being fixedly connected with the lower stay cord 11 in the cavity 19 being positioned at the second detachable section 3.Wherein, hook part 20-2 on upper junction plate 20 is unsettled in the cavity 19 of the second detachable section 3.And lower connecting plate can use the structure identical with upper junction plate 20.
Therefore, after upper and lower stay cord is penetrated the first detachable section 2 and the second detachable section 3, and after being connected with scraper mechanism 5, upper and lower stay cord can be in rope closing or drive during putting rope scraper mechanism 5 to move smoothly on two parts that the first detachable section 2 and the second detachable section 3 and upper and lower rail are disconnected.
In addition, it is necessary to explanation, in the present embodiment, the length of the first detachable section 2 is all less than the two-part length that rail 1-1 is disconnected, and the length of the second detachable section 3 is the most all less than the two-part length that lower rail 1-2 is disconnected.So that upper rail 1-1 or lower rail 1-2 is realization and the first detachable section 2 and the second detachable when being reliably connected of section 3, also ensure that rail 1-1 and lower rail 1-2 has enough intensity, the weight of photovoltaic panel battle array 4 can be sustained and impact that scraper mechanism 5 produces when moving on upper rail 1-1 and lower rail 1-2.
And, process in practical operation, after upper and lower stay cord is penetrated upper and lower rails, after lower stay cord 11 can being inserted in the second detachable section 3, by the first, second time fixed support that slide, make in the lower railway groove that the second detachable section 3 is inserted on first, second time fixed support, then respectively the second detachable section 3 is locked by first, second time locking member.Accordingly, staff can adopt in the Shang Gui 1-1 road groove the first detachable section 2 inserted on first, second on fixed support in the same way, and utilizes on first locking member on locking member and second to be locked the first detachable section 2.And it is noted that in actual applications, multiple detachable section can be set according to the actual needs on upper and lower rail, and this is not made concrete restriction and explanation by present embodiment.
Additionally, in the present embodiment, preferential selection bolt is as first, locking member and first on second, second time locking member uses, specifically, during actual assembling, second detachable section 3 is disconnected with lower rail 1-2 on the position that part combines can offer corresponding screw respectively, thus first, second detachable section is upper with corresponding, lower fixed support, corresponding is upper, lower rail is disconnected when being partly combined, only by by external tool achieve that bolt and screw each other screw connection, thus on realizing, lower locking member is to first, fixing of second detachable section.
And, it should be noted that, in the present embodiment, on first, second, locking member and first, second time locking member respectively comprise a bolt, and in actual applications, the bolt quantity that each locking member comprises can also be multiple, and, each locking member can also select nut, screw etc., and this is not made concrete restriction and explanation by present embodiment.
As shown in Figure 6, staff to scraper mechanism 5 and on, when lower stay cord overhauls, have only to by outside instrument first by first, second time locking member is removed, again by simple manual operation, slip first, second time fixed support, just can remove out from lower rail 1-2 by the second detachable section 3, and, remove after the first detachable section 2 in a like fashion adopting, can by rope closing or put rope make stay cord drive scraper mechanism 5 move to the position that the second detachable section 3 is removed, and removed and overhaul, as shown in Figure 7, meanwhile, staff also can be pointed to be removed the upper of position, lower stay cord overhauls.
nullAdditionally,It is worth mentioning that,In order to meet assembling demand in actual applications,Promote overhaul efficiency,First detachable section 2 may be disposed at the optional position of rail 1-1,And the second detachable section 3 also may be disposed at the optional position of lower rail 1-2,So that the first detachable section 2 and the second detachable section 3 reasonably can be arranged on by staff according to actual situation、On lower rail,And make the first detachable section 2 and the second detachable section 3 upper、The position of lower rail is the most corresponding,And then can make staff position convenient to operate by the first detachable section 2 or the second detachable section from remove on rail 1-1 and lower rail 1-2,And by corresponding instrument, scraper mechanism 5 taking-up on upper rail 1-1 and lower rail 1-2 is overhauled,Simultaneously,Staff can also be by upper、Rope closing within lower rail or put on rope guarantees、The impaired portion of lower stay cord can come out at the position being removed,So that staff can detect timely、Hidden danger in lower stay cord,Ensure the properly functioning of photovoltaic battery panel cleaning equipment.
It will be understood by those skilled in the art that the respective embodiments described above are to realize specific embodiment of the utility model, and in actual applications, can to it, various changes can be made in the form and details, without departing from spirit and scope of the present utility model.

Claims (10)

1. a photovoltaic battery panel cleaning equipment, it is applied to be arranged in order, by N number of photovoltaic panel battle array, the photovoltaic cells constituted, comprises and be separately positioned on the guide rail mechanism that each upper and lower both sides of photovoltaic panel battle array are made up of upper rail and lower rail, the scraper mechanism being separately positioned on each guide rail mechanism;Wherein, described N is natural number;
Described cleaning equipment also comprises: pull each scraper mechanism to carry out the pull rope mechanism moved along the length direction of described guide rail mechanism;Wherein, described pull rope mechanism comprises the lower stay cord that the upper stay cord being connected with the top of each scraper mechanism is connected with the afterbody of each scraper mechanism, and described upper stay cord has part to be located in the upper rail of each guide rail mechanism, and lower stay cord has part to be located in the lower rail of each guide rail mechanism, it is characterised in that:
In described upper rail, at least part is the first detachable section for disconnecting described upper rail, and in described lower rail, at least part is the second detachable section for disconnecting described lower rail;
Wherein, the described first detachable section is identical with the length of the described second detachable section, and more than the width of described scraper mechanism, and the position of the described first detachable section and the described second detachable section is the most corresponding.
Photovoltaic battery panel cleaning equipment the most according to claim 1, it is characterised in that: the described first detachable section is arranged on the optional position of described upper rail, and the described second detachable section is arranged on the optional position of described lower rail.
Photovoltaic battery panel cleaning equipment the most according to claim 1, it is characterized in that: the length of the described first detachable section is respectively less than the two-part length that described upper rail is disconnected, and the length of the described second detachable section is respectively less than the two-part length that described lower rail is disconnected.
Photovoltaic battery panel cleaning equipment the most according to claim 1, it is characterised in that: two parts that the described first detachable section is disconnected also by upper locking device and described upper rail are locked;
Two parts that described second detachable section is disconnected also by lower locking device and described lower rail are locked.
Photovoltaic battery panel cleaning equipment the most according to claim 4, it is characterised in that: described upper locking device comprises on first be slidably disposed in respectively on two parts that described upper rail is disconnected fixed support on fixed support and second, is arranged on described first locking member on first on fixed support, is arranged on described second locking member on second on fixed support;
Wherein, locking member fixed support on described first slides into when the upper rail corresponding with it is disconnected the binding site of part and the described first detachable section and is locked on described first;On described second, locking member fixed support on described second slides into when the upper rail corresponding with it is disconnected part with the binding site of the described first detachable section and is locked.
Photovoltaic battery panel cleaning equipment the most according to claim 5, it is characterized in that: offer, on fixed support, the groove that gets on the right track the most respectively on fixed support and described second on described first, and two parts that the described first detachable section and described upper rail are disconnected are respectively provided with described in insertion the upper insertion section getting on the right track in groove;
Wherein, the both sides cell wall of the described groove that gets on the right track the most gradually draws in the center of the described groove that gets on the right track, and the cross sectional shape of described upper insertion section is identical with the cross sectional shape of the described groove that gets on the right track, and after in the groove that gets on the right track described in the insertion of insertion section on described, described upper insertion section is locked the Shu Shang insertion section, cell wall back-off residence of described groove side of getting on the right track.
Photovoltaic battery panel cleaning equipment the most according to claim 5, it is characterised in that: on first, on locking member and described second, locking member is bolt.
Photovoltaic battery panel cleaning equipment the most according to claim 4, it is characterised in that: described lower locking device comprises the first time fixed support being slidably disposed in respectively on two parts that described lower rail is disconnected and second time fixed support, the first time locking member being arranged on described first time fixed support, second time locking member being arranged on described second time fixed support;
Wherein, described first time locking member slides into when the lower rail corresponding with it is disconnected part with the binding site of the described second detachable section at described first time fixed support and is locked;Described second time locking member slides into when the lower rail corresponding with it is disconnected part with the binding site of the described second detachable section at described second time fixed support and is locked.
Photovoltaic battery panel cleaning equipment the most according to claim 8, it is characterized in that: offer lower railway groove on described first time fixed support and described second time fixed support the most respectively, and two parts that the described second detachable section and described lower rail are disconnected are respectively provided with the lower insertion section inserted in described lower railway groove;
Wherein, the both sides cell wall of described lower railway groove the most gradually draws in the center of described lower railway groove, and the cross sectional shape of described lower insertion section is identical with the cross sectional shape of described lower railway groove, and after described lower insertion section is inserted in described lower railway groove, described lower insertion section is locked the Shu Xia insertion section, cell wall back-off residence of described lower railway groove side.
Photovoltaic battery panel cleaning equipment the most according to claim 8, it is characterised in that: described first time locking member and described second time locking member are bolt.
CN201620160553.8U 2016-03-02 2016-03-02 Photovoltaic cell board cleans equipment Active CN205584105U (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201620160553.8U CN205584105U (en) 2016-03-02 2016-03-02 Photovoltaic cell board cleans equipment
PCT/CN2016/082133 WO2017148005A1 (en) 2016-03-02 2016-05-13 Sweeping device for photovoltaic panel
US16/081,366 US10892705B2 (en) 2016-03-02 2016-05-13 Sweeping device for the photovoltaic panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620160553.8U CN205584105U (en) 2016-03-02 2016-03-02 Photovoltaic cell board cleans equipment

Publications (1)

Publication Number Publication Date
CN205584105U true CN205584105U (en) 2016-09-14

Family

ID=56871296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620160553.8U Active CN205584105U (en) 2016-03-02 2016-03-02 Photovoltaic cell board cleans equipment

Country Status (1)

Country Link
CN (1) CN205584105U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112532172A (en) * 2020-12-04 2021-03-19 浙江龙能电力发展有限公司 Photovoltaic power plant cleans machine people

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112532172A (en) * 2020-12-04 2021-03-19 浙江龙能电力发展有限公司 Photovoltaic power plant cleans machine people
CN112532172B (en) * 2020-12-04 2022-02-08 浙江龙能电力发展有限公司 Photovoltaic power plant cleans machine people

Similar Documents

Publication Publication Date Title
US10892705B2 (en) Sweeping device for the photovoltaic panel
CN102062339A (en) Combination device for light source module and frame
CN205584105U (en) Photovoltaic cell board cleans equipment
CN101882639B (en) Building roof and photovoltaic component
CN107899331A (en) A kind of dust-extraction unit of easy disassembly
CN103295473B (en) Overhead line concrete pole number plate mounting method
CN201800616U (en) Expanded square cabin
CN207123634U (en) A kind of new ODF fibre distribution frames
CN205584106U (en) Equipment that cleans of photovoltaic cell board
CN103825222B (en) A kind of charged for replacement 220kV narrow base tower strain insulator string instrument
CN211405964U (en) Solar power generation device for bus stop
CN103825223B (en) Charged for replacement 220KV narrow base tower strain insulator string tool and operational method
CN208353743U (en) A kind of electric appliance box main body easy to repair
CN102760780A (en) Fixing device for solar battery component frame
CN109004460A (en) A kind of router network cable fixing device
CN102995846A (en) Fast-to-install photovoltaic assembly system of slope roof and installing mode of assembly system
CN205584103U (en) Photovoltaic cell board cleans scraper mechanism of equipment
CN213115119U (en) Detachable building curtain wall
CN202275566U (en) Light emitting diode (LED) display screen hoisting box and LED display screen
CN217335494U (en) Photovoltaic module system convenient for installation and connection of photovoltaic modules
CN212873148U (en) Screen module for large LED full-color display screen
CN208908348U (en) A kind of power equipment maintaining city cable laying protective device
CN219812103U (en) Photovoltaic module structure
CN220401325U (en) Cable fixing structure
CN217590151U (en) High-safety bus duct convenient to mount, dismount and maintain

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 311202 A-B102-920 room, 198 enlightenment Road, Xiaoshan economic and Technological Development Zone, Hangzhou, Zhejiang

Patentee after: Hangzhou Shun Hai Photovoltaic Technology Co., Ltd.

Address before: 201112 Shanghai city Minhang District Chang Road No. 27 Building No. 4 room A103

Patentee before: SHANGHAI SHUNHAI PHOTOVOLTAIC TECHNOLOGY CO., LTD.

CP03 Change of name, title or address