CN205581230U - Three -phase table - Google Patents

Three -phase table Download PDF

Info

Publication number
CN205581230U
CN205581230U CN201620203805.0U CN201620203805U CN205581230U CN 205581230 U CN205581230 U CN 205581230U CN 201620203805 U CN201620203805 U CN 201620203805U CN 205581230 U CN205581230 U CN 205581230U
Authority
CN
China
Prior art keywords
unit
photovoltaic
utility
treater
phase table
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620203805.0U
Other languages
Chinese (zh)
Inventor
刘江宁
徐强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU BAIRUI AUTOMATION TECHNOLOGY Co Ltd
Original Assignee
JIANGSU BAIRUI AUTOMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU BAIRUI AUTOMATION TECHNOLOGY Co Ltd filed Critical JIANGSU BAIRUI AUTOMATION TECHNOLOGY Co Ltd
Priority to CN201620203805.0U priority Critical patent/CN205581230U/en
Application granted granted Critical
Publication of CN205581230U publication Critical patent/CN205581230U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model discloses a three -phase table, including electric power acquisition circuit, ARM kernel treater, press unit and display element, electric power acquisition circuit, press unit and display element all with ARM kernel treater is connected, three -phase table still include with clock chip, 485 communication units, switching value input unit and switch quantity output unit that ARM kernel treater is connected, the utility model discloses a three -phase table can realize carrying out the theoretical generated energy analytical calculation of photovoltaic to difference statistics every day period, every month, annual measured data, reachs different statistics period measuring generated energy, can provide the reference for photovoltaic power generation system designer and decision -maker.

Description

A kind of three-phase meter
Technical field
This utility model relates to electric measuring instrument field, particularly to a kind of three-phase meter.
Background technology
Photovoltaic generating system is the electricity generation system utilizing solaode directly to convert solar energy into electric energy.It is characterized in reliability Height, length in service life, free from environmental pollution, can Independent Power Generation can be incorporated into the power networks again, the favor organized by every industry or trade.
Photovoltaic panel is the core of photovoltaic generating system, is also to be worth the highest part in photovoltaic generating system.By calculating light Volt generated energy, it is known that the generating efficiency of photovoltaic panel;And can be by the relative analysis result of generated energy, for photovoltaic system Operation maintenance personnel provide site inspection photovoltaic panel reference.In the photovoltaic generating system of 1MW, the quantity floor space of photovoltaic module It is about 35 mu.For large-scale photovoltaic generating system, only the maintenance of photovoltaic panel is for operation maintenance personnel, just occupies major part Time.
After traditional three-phase meter accesses in photovoltaic generating system, it is only capable of carrying out the measurement of voltage, electric current, electrical power etc., not During school, function and the relative analysis of photovoltaic power generation quantity and timesharing add up.Operation maintenance personnel cannot learn the ruuning situation of photovoltaic panel rapidly, Difficulty is added to the maintenance of photovoltaic panel.
Utility model content
For solving above-mentioned technical problem, this utility model provides a kind of three-phase meter, to reach to improve maintenance efficiency, reduces and safeguards Cost, the purpose increased economic efficiency.
For reaching above-mentioned purpose, the technical solution of the utility model is as follows:
A kind of three-phase meter, including power harvesting circuit, ARM core processor, push-button unit and display unit, described electric power is adopted Collector, push-button unit and display unit are all connected with described ARM core processor, it is characterised in that described three-phase meter also wraps Include clock chip, 485 communication units, On-off signal unit and the output switch parameter list being connected with described ARM core processor Unit.
In such scheme, described power harvesting circuit gathers core by three-phase power and is connected with described ARM core processor.
By technique scheme, the three-phase meter that this utility model provides compared with prior art, has the advantage that
1, this three-phase meter can preserve generated energy, and has history data store function, and user can be looked into by 485 bus access See that historical data, historical data include the generated energy on the photovoltaic array same day by this device, of that month generated energy, sending out then Electricity and gross generation;
2, operation maintenance personnel can be to whether checking that photovoltaic panel provides reference in the middle of the generated energy relative analysis of every day;
3, by this month or generated energy data then, operation maintenance personnel can check the generating efficiency of photovoltaic matrix.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment or existing In technology description, the required accompanying drawing used is briefly described.
Fig. 1 is the principle schematic of the three-phase meter disclosed in this utility model embodiment.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out clear, It is fully described by.
This utility model provides a kind of three-phase meter, as it is shown in figure 1, this three-phase meter has automatic time calibration function, and can carry out The timesharing of generated energy adds up and relative analysis, for the convenience safeguarding offer of photovoltaic panel.
Three-phase meter as shown in Figure 1, including power harvesting circuit, ARM core processor, push-button unit and display unit, electricity Power Acquisition Circuit, push-button unit and display unit are all connected with ARM core processor, and three-phase meter also includes and ARM kernel processes Clock chip, 485 communication units, On-off signal unit and the switch amount output unit that device connects;Power harvesting circuit passes through Three-phase power gathers core and is connected with ARM core processor.
In the present embodiment, power harvesting circuit and three-phase power gather core to parameters such as the voltage of photovoltaic circuit, electric current, electrical power It is acquired, and transmits to ARM core processor;ARM core processor carries out Treatment Analysis, and by analysis result by aobvious Show that unit shows, it is simple to operator obtain information in time;Push-button unit is used for checking data and the setting that three-phase meter gathers The parameter of three-phase meter;User can be transmitted a special modbus by 485 communication units and be instructed, and time command transmitted To clock chip, thus when realizing the school of three-phase meter;The various data analyzed and processed can be uploaded to main by 485 communication units CPU。
This three-phase meter owing to having time display function, can realize to different statistical time range every day, monthly, annual measurement data Carry out photovoltaic theory generated energy analytical calculation, it is intended to draw the generated energy that different statistical time range is measured, can be that photovoltaic generating system sets Meter personnel and decision-maker provide reference.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses this utility model.Right The multiple amendment of these embodiments will be apparent from for those skilled in the art, as defined herein typically Principle can realize in the case of without departing from spirit or scope of the present utility model in other embodiments.Therefore, this practicality The novel the embodiments shown herein that is not intended to be limited to, and be to fit to and principles disclosed herein and features of novelty phase The widest consistent scope.

Claims (2)

1. a three-phase meter, including power harvesting circuit, ARM core processor, push-button unit and display unit, described electric power Acquisition Circuit, push-button unit and display unit are all connected with described ARM core processor, it is characterised in that described three-phase meter is also Including the clock chip, 485 communication units, On-off signal unit and the output switch parameter that are connected with described ARM core processor Unit.
A kind of three-phase meter the most according to claim 1, it is characterised in that described power harvesting circuit is adopted by three-phase power Collection core is connected with described ARM core processor.
CN201620203805.0U 2016-03-10 2016-03-10 Three -phase table Expired - Fee Related CN205581230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620203805.0U CN205581230U (en) 2016-03-10 2016-03-10 Three -phase table

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620203805.0U CN205581230U (en) 2016-03-10 2016-03-10 Three -phase table

Publications (1)

Publication Number Publication Date
CN205581230U true CN205581230U (en) 2016-09-14

Family

ID=56868222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620203805.0U Expired - Fee Related CN205581230U (en) 2016-03-10 2016-03-10 Three -phase table

Country Status (1)

Country Link
CN (1) CN205581230U (en)

Similar Documents

Publication Publication Date Title
Chao et al. A remote supervision fault diagnosis meter for photovoltaic power generation systems
CN203491973U (en) System for measuring generation power of photovoltaic assemblies
CN103472331A (en) Photovoltaic power generation fault diagnosis system based on photovoltaic physical model
Nkoloma et al. SM 2: Solar monitoring system in Malawi
CN103543326B (en) A kind of system measuring the generated output of photovoltaic module
López-Vargas et al. Current challenges for the advanced mass scale monitoring of Solar Home Systems: A review
CN103543355B (en) A kind of system measuring solar energy power generating efficiency
KR101682412B1 (en) Energy Storage System and method for operating thereof
Othman et al. Automated monitoring system for small scale dual-tariff solar PV plant in UiTM Pulau Pinang
CN112736899B (en) Evaluation index calculation method and device for micro-grid planning scheme
CN207894996U (en) A kind of solar photovoltaic power plant electric energy metered system
CN106249042A (en) A kind of photovoltaic generation based on data analysis monitoring system and method
CN205581230U (en) Three -phase table
CN203102588U (en) Intelligent electric energy meter data acquisition device
CN105591470A (en) Solar photovoltaic generation data monitoring system
CN203643522U (en) System used for measuring solar photovoltaic generating efficiency
CN102607988A (en) Method for measuring content of impurities in phosphoric acid lithium cobalt
CN205265351U (en) Solar photovoltaic electricity generation data monitoring system
CN206162654U (en) Photovoltaic power plant subassembly environment power prediction system
CN205193155U (en) Electric energy meter of remote monitoring
CN103606325B (en) A kind of solar energy power generating synthesis experiment platform
Carrasco et al. Reliability of a 13 000‐SHS photovoltaic rural electrification programme
CN106295916A (en) A kind of photovoltaic power station component environment power prognoses system
CN202282375U (en) Solar cell panel laser reticle detection apparatus
CN207263825U (en) A kind of built photovoltaic power station power generation amount forecast system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914

Termination date: 20190310

CF01 Termination of patent right due to non-payment of annual fee