CN205577422U - Regularization template vertical installation positioner - Google Patents
Regularization template vertical installation positioner Download PDFInfo
- Publication number
- CN205577422U CN205577422U CN201620204558.6U CN201620204558U CN205577422U CN 205577422 U CN205577422 U CN 205577422U CN 201620204558 U CN201620204558 U CN 201620204558U CN 205577422 U CN205577422 U CN 205577422U
- Authority
- CN
- China
- Prior art keywords
- template
- canalization
- supported rod
- rod erecting
- positioning device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to the field of building -construction, the installation of concretely relates to regularization template location. A regularization template vertical installation positioner is proposed, form by two sets of locating racks, every group locating rack is including supporting pole setting and two piece at least location horizontal poles, support the pole setting vertical fixation the base on, the location horizontal pole on supporting the pole setting vertical interval distribution and with support the pole setting vertical fixation, the location horizontal pole stretches out two sections of supporting the pole setting and is insertion section and counter weight section respectively, insertion section's length is greater than monolithic regularization mould plate thickness, is provided with the balancing weight on the tip of counter weight section, be provided with the drawknot montant between the counter weight section of adjacent location horizontal pole, two sets of locating racks pass through the drawknot horizontal pole and connect. The utility model discloses an use the locating rack fixed in advance regularization vertical form setting position, shortened vertical template installation time and adjust the time, guaranteed the installation quality, straightness hangs down to the technological problem that the vertical first piece form setting speed of regularization template is slow, the precision is low has effectively been solved.
Description
Technical field
This utility model relates to the realm of building construction, is specifically related to canalization Template Location and installs.
Background technology
At present, the development of Novel framework system is varied, aluminum frame plank sheathing with the fastest developing speed, aluminum alloy mould plate, steel frame wooden template etc., wherein when installing first piece of vertical formwork, speed is slow, when being mainly reflected in install, location is slow, degree control and the fixation problem after connecting when connecting, thus causing that model sheetinstallat efficiency is low, installation deviation big, the later stage adjusts the time to be increased.
Summary of the invention
The purpose of this utility model is to provide a kind of vertical mounting and positioning device of canalization template, locating rack is used to fix in advance when installing first piece of vertical formwork, shorten vertical formwork set-up time and the time of adjustment, ensure model sheetinstallat quality, perpendicularity, thus efficiently solve canalization template (aluminum frame plank sheathing, aluminum alloy mould plate, the steel frame wooden template etc.) technical barrier that the most first piece model sheetinstallat speed is slow, precision is low.
For achieving the above object, the technical solution adopted in the utility model is as follows: propose a kind of canalization model sheetinstallat positioner, it is made up of two groups of locating racks, often group locating rack includes supported rod erecting and at least two retention bar, on the base that supported rod erecting is vertically fixed on, retention bar longitudinally spaced distribution vertical with supported rod erecting fix on supported rod erecting, every retention bar stretch out supported rod erecting two sections are respectively inserting paragraph and counterweight section, the length of inserting paragraph, more than the thickness of monolithic canalization template, the end of counterweight section is provided with balancing weight;It is provided with drawknot montant between the counterweight section of adjacent positioned cross bar;Two groups of locating racks are connected by drawknot cross bar.
The two ends of described drawknot cross bar supported rod erecting with two groups of locating racks respectively is welded and fixed.
Being fixed with brace on described base, brace one end is welded to connect with supported rod erecting, and the other end is welded to connect with base.
Described brace has two, and every brace is with supported rod erecting in angle of 45 degrees.
The length 20-40mm longer than the thickness of canalization template of the inserting paragraph of described retention bar.
Described supported rod erecting is 50 × 50mm angle steel, and retention bar is C16 reinforcing bar, supported rod erecting offer corresponding circular hole, retention bar through circular hole and is welded and fixed with supported rod erecting.
Described balancing weight be quality be the counterweight iron block of 5kg.
Described drawknot cross bar is the angle steel of 50 × 50mm.
Described canalization template includes aluminum frame plank sheathing, aluminum alloy mould plate and steel frame wooden template.
Described drawknot montant is the angle steel of 50 × 50mm.
This utility model uses two groups of locating racks to carry out first piece of vertical formwork installing pre-determined bit, after post wall line setting completes, two groups of locating rack levels are fixed on floor, building line absolute altitude confirms errorless or after having processed, after plug vertical formwork being first installed and external corner connecting piece being fixed, the retention bar of two groups of locating racks inserts the two ends of first piece of vertical formwork respectively, it is finally inserted pin and pin sheet is fixed, the horizontal location cross bar docking that another block vertical formwork of body of wall offside stretches out in first piece of vertical formwork is inserted and fixes with pin and pin sheet, the installation of the vertical canalization template in first piece of body of wall both sides can be completed, the convenient position controlling its rear pattern plate and perpendicularity.
This utility model is by using locating rack to fix in advance canalization vertical formwork installation site, shorten vertical formwork set-up time and adjustment time, ensure model sheetinstallat quality, perpendicularity, thus efficiently solve the most first piece of the canalization template technical barrier that model sheetinstallat speed is slow, precision is low.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is use state diagram of the present utility model;
Fig. 3 is the top view of Fig. 2.
In figure, 1-supported rod erecting, 2-the first retention bar, 3-balancing weight, 4-base, 5-brace, 6-drawknot montant, 7-drawknot cross bar, 8-the second retention bar.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described in detail.
Canalization model sheetinstallat positioner as Figure 1-3, is made up of two groups of locating racks, and two groups of locating racks are connected by drawknot cross bar 7.Often group locating rack includes supported rod erecting 1 and the first retention bar 2 and the second retention bar 8, and supported rod erecting 1 is vertically fixed on base 4, and base 4 is fixed with brace 5, and brace 5 one end is welded to connect with supported rod erecting 1, and the other end is welded to connect with base 4.Brace 5 is welded and fixed in angle of 45 degrees with supported rod erecting 1.Supported rod erecting 1 uses specification to be 50 × 50mm angle steel, and the first retention bar 2 and the second retention bar 8 are C16 reinforcing bar, and the correspondence of supported rod erecting 1 offers two circular holes,
First retention bar 2 through the circular hole on supported rod erecting 1 and is vertically welded on supported rod erecting 1, the first retention bar 2 distance structure ground 700mm;Equally, the second retention bar 8 is vertically fixed on supported rod erecting 1, and distance structure ground 600mm.Supported rod erecting 1 is all stretched out at the two ends of two retention bar, and the part that every retention bar is positioned at supported rod erecting both sides is respectively inserting paragraph and counterweight section, and wherein the length of inserting paragraph is than the long 20-40mm of thickness of monolithic canalization template;Balancing weight 3 it is provided with on the end of counterweight section;Balancing weight 3 is the counterweight iron block of 5kg.It is provided with drawknot montant 6 between first retention bar 2 and the counterweight section of the second retention bar 8.The two ends of drawknot cross bar 7 supported rod erecting 1 with two groups of locating racks respectively is welded and fixed.
Wherein brace 5, drawknot montant 6 and drawknot cross bar 7 are the angle steel that specification is 50 × 50mm.
During use, two groups of locating racks are respectively arranged at the both sides of first piece of canalization template, often organize in the first retention bar and the second retention bar template of the insertion of the pin-and-hole in canalization template simultaneously of locating rack, are inserted into pin and first piece of vertical formwork is fixed by pin sheet.First piece of vertical formwork of body of wall offside docks along the retention bar stretching out first piece of vertical formwork and inserts and fix with pin and pin sheet.
This utility model can be applicable to include the canalization templates such as aluminum frame plank sheathing, aluminum alloy mould plate and steel frame wooden template.By using locating rack to fix in advance canalization vertical formwork installation site, shorten vertical formwork set-up time and adjustment time, it is ensured that model sheetinstallat quality, perpendicularity.
Claims (10)
1. the vertical mounting and positioning device of canalization template, it is characterized in that: be made up of two groups of locating racks, often group locating rack includes supported rod erecting and at least two retention bar, on the base that supported rod erecting is vertically fixed on, retention bar longitudinally spaced distribution vertical with supported rod erecting fix on supported rod erecting, every retention bar stretch out supported rod erecting two sections are respectively inserting paragraph and counterweight section, the length of inserting paragraph is more than the thickness of monolithic canalization template, it is provided with balancing weight on the end of counterweight section, between the counterweight section of adjacent positioned cross bar, is provided with drawknot montant;Two groups of locating racks are connected by drawknot cross bar.
The vertical mounting and positioning device of canalization template the most according to claim 1, it is characterised in that: the two ends of described drawknot cross bar supported rod erecting with two groups of locating racks respectively is welded and fixed.
The vertical mounting and positioning device of canalization template the most according to claim 1, it is characterised in that: being fixed with brace on described base, brace one end is welded to connect with supported rod erecting, and the other end is welded to connect with base.
The vertical mounting and positioning device of canalization template the most according to claim 3, it is characterised in that: described brace has two, and every brace is with supported rod erecting in angle of 45 degrees.
The vertical mounting and positioning device of canalization template the most according to claim 1, it is characterised in that: the length 20-40mm longer than the thickness of canalization template of the inserting paragraph of described retention bar.
6. according to the arbitrary described vertical mounting and positioning device of canalization template of claim 1-5, it is characterized in that: described supported rod erecting is 50 × 50mm angle steel, retention bar is C16 reinforcing bar, supported rod erecting offer corresponding circular hole, retention bar through circular hole and is welded and fixed with supported rod erecting.
7. according to the arbitrary described vertical mounting and positioning device of canalization template of claim 1-5, it is characterised in that: described balancing weight be quality be the counterweight iron block of 5kg.
8. according to the arbitrary described vertical mounting and positioning device of canalization template of claim 1-5, it is characterised in that: described drawknot cross bar is the angle steel of 50 × 50mm.
9. according to the arbitrary described vertical mounting and positioning device of canalization template of claim 1-5, it is characterised in that: described canalization template includes aluminum frame plank sheathing, aluminum alloy mould plate and steel frame wooden template.
10. according to the arbitrary described vertical mounting and positioning device of canalization template of claim 1-5, it is characterised in that: described drawknot montant is the angle steel of 50 × 50mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620204558.6U CN205577422U (en) | 2016-03-17 | 2016-03-17 | Regularization template vertical installation positioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620204558.6U CN205577422U (en) | 2016-03-17 | 2016-03-17 | Regularization template vertical installation positioner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205577422U true CN205577422U (en) | 2016-09-14 |
Family
ID=56868512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620204558.6U Expired - Fee Related CN205577422U (en) | 2016-03-17 | 2016-03-17 | Regularization template vertical installation positioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205577422U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109392503A (en) * | 2018-11-08 | 2019-03-01 | 天津市澍丰农业科技有限公司 | The building structure of building greening top surface and construction method |
-
2016
- 2016-03-17 CN CN201620204558.6U patent/CN205577422U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109392503A (en) * | 2018-11-08 | 2019-03-01 | 天津市澍丰农业科技有限公司 | The building structure of building greening top surface and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104755681B (en) | Panel support bracket | |
CN202731297U (en) | Adjustable beam form support jacking bracket apparatus | |
CN106088587B (en) | A kind of Combined formwork support system | |
CN203514794U (en) | Adjustable large steel formwork support leg | |
CN104695557A (en) | Steel structure building construction method for one-step pre-burying of foundation bolts | |
CN106760495A (en) | A kind of floor construction method | |
CN212129960U (en) | Overhead installation device for frame beam reinforcing steel bars | |
CN110424724A (en) | A kind of tool-type beam slab mould holder and its mold method | |
CN102926554B (en) | Steel hanging seat formwork support and construction method thereof | |
CN205577422U (en) | Regularization template vertical installation positioner | |
CN205100119U (en) | Steel form device in self -propelled | |
CN110924678B (en) | Construction method and device for large-span variable-section haunch plate template | |
CN104652834B (en) | Limiting installation method of curtain wall embedded part and installation mold used by limiting installation method | |
CN116575738A (en) | Wall positioning device for assembled building and application method thereof | |
CN215670131U (en) | Device capable of quickly and accurately adjusting steel structure embedded part | |
CN210738079U (en) | Tool type beam slab die support | |
CN216945897U (en) | Precast beam framework of steel reinforcement stop device | |
CN214940389U (en) | Piping lane aluminum mould board equipment system | |
CN215671059U (en) | Simple reinforcing device for formwork next to double-column structure | |
CN219973860U (en) | Steel frame structure outer wall hanging basket fixed mounting device | |
CN221143287U (en) | Novel wall post template supporting structure | |
CN219754075U (en) | Positioning and mounting device for assembled wallboard | |
CN215848652U (en) | Variable angle veneer fair-faced concrete template cutting device | |
CN215256237U (en) | Telescopic temporary quick supporting structure for tunnel arch frame installation | |
CN211472496U (en) | SMW pile H-shaped steel insertion verticality control device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160914 |
|
CF01 | Termination of patent right due to non-payment of annual fee |