CN205577169U - Integral module ization fabricated product partition wall - Google Patents

Integral module ization fabricated product partition wall Download PDF

Info

Publication number
CN205577169U
CN205577169U CN201620013706.6U CN201620013706U CN205577169U CN 205577169 U CN205577169 U CN 205577169U CN 201620013706 U CN201620013706 U CN 201620013706U CN 205577169 U CN205577169 U CN 205577169U
Authority
CN
China
Prior art keywords
dividing plate
section bar
partition wall
vertical keel
installing port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620013706.6U
Other languages
Chinese (zh)
Inventor
严青华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620013706.6U priority Critical patent/CN205577169U/en
Application granted granted Critical
Publication of CN205577169U publication Critical patent/CN205577169U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses an integral module ization fabricated product partition wall, including day groove and geosyncline, still including locating many vertical keel between day groove and the geosyncline and locating the baffle between the adjacent vertical keel, on it groove and the geosyncline respectively the installation the first section bar of baffle installing port has, and relative, the opening in the baffle installing port position of first section bar is used for the installation in opposite directions on day groove, geosyncline the upper and lower border of baffle, on many vertical keel respectively the installation have a second section bar of baffle installing port, two vertical keel unilaterals installation second section bars in the outside wherein, the two side -mounting second section bars of other vertical keel, the baffle about the border correspondence install between adjacent two vertical keel that the position is relative, in the opening baffle installing port in opposite directions, have at least one still to be connected with and to be used for the fixed slot be connected with the wall on two vertical keel in the outside. The utility model discloses can realize modular assembly, installation, dismantlement convenience are suitable for extensive popularization.

Description

A kind of integral module assembled finished partition wall
Technical field
This utility model relates to partition for building, particularly relates to a kind of integral module fabricated product Partition wall.
Background technology
Cut off, be widely used in modern architecture is fitted up, and existing partition method be mostly can Profiled mounting space-like cuts off, and it is by dividing plates such as glass, plasterboard, density board, utilizes section bar solid It is scheduled on body of wall, such as common room, toilet, the space partition in bathroom.Above-mentioned partition is in structure Have following defects that on using
Need boring, welding when 1, installing, and fixture be many, operation complicated, noise is big, the cycle is long, Construction quality is difficult to ensure that, needs the cooperation of multiple installation personnel to implement, inefficiency;
2, after installing, most positions are fixed and immovable, part-structure tears down and reconstruct, shift after material Deform and cannot reuse, mostly therefore be Bullet structure, wasted resource, be unfavorable for environmental protection.
As can be seen here, above-mentioned existing partition wall structure with use on, it is clear that still suffered from inconvenience with Defect, and be urgently further improved.How to found a kind of modularity, assembling, convenient disassembly, It is easily achieved reusable new finished partition wall, the target that real genus current industry pole need to be improved.
Utility model content
The purpose of this utility model is to provide a kind of integral module assembled finished partition wall so that it is can Realize modularization assembling, installation, convenient disassembly, it is easy to accomplish reuse, and there is preferably dress Decorations effect, thus overcome existing partition wall install complexity, waste time and energy, not re-usable not Foot.
For achieving the above object, this utility model adopts the following technical scheme that
A kind of integral module assembled finished partition wall, including sky groove and use for being fixed on end face In being fixed on the geosyncline on ground, also include a plurality of vertical keel be located between described sky groove and geosyncline and It is located at the dividing plate between adjacent vertical keel;It is respectively mounted on described sky groove and geosyncline and there is dividing plate installation Mouthful the first section bar, and on sky groove, geosyncline the dividing plate installing port position of described first section bar relatively, open Mouthful in opposite directions, the lower edges correspondence of described dividing plate be arranged on the first section bar on described sky groove, geosyncline every In plate installing port;Second section bar with dividing plate installing port it is respectively mounted on described a plurality of vertical keel, The second section bar and dividing plate installing port are installed inwardly in the most outermost two vertical keel one side, and other erect Second section bar and dividing plate installing port are installed outwardly to Os Draconis bilateral, edge, the left and right correspondence peace of described dividing plate Be contained between adjacent two vertical keels position relatively, in opening dividing plate installing port in opposite directions;Described An at least fixing groove being also associated with for being connected with metope on two vertical keels in outside.
As improving further, described fixing groove include the kerve for being connected with metope and with the end The link slot of groove clamping, described link slot removably connects with described vertical keel.
Described second section bar is removably connected with vertical keel by connector.
Described connector one end is connected on described vertical keel, and the other end is screwed onto described second section bar On.
Described first section bar and described sky groove, geosyncline clamping.
Four limits of described dividing plate are connected in the dividing plate installing port of correspondence respectively.
The sealing strip for sealing described dividing plate four limit it is additionally provided with in the dividing plate installing port of described correspondence.
Described dividing plate includes forward and backward two-layer dividing plate, accordingly, on described first and second section bars respectively It is provided with former and later two dividing plate installing ports.
Described first, second section bar respectively includes two blocks of subtype materials being mutually lapped, described former and later two Dividing plate installing port is separately positioned on two blocks of subtype materials.
Being additionally provided with light modulation louver in the middle of described two-layer dividing plate, described light modulation louver is arranged on described first type On material.
Owing to using technique scheme, this utility model at least has the advantage that
(1) this utility model uses customization section bar as supporting construction, configures finished product dividing plate, is ensureing On the basis of partition wall structural strength, it is thus achieved that the assemblnig finished partition wall of modularity, easy accessibility, It is easily achieved and reuses, and there is preferable decorative effect, be suitable to be widely popularized.
(2) removably connect between each parts of this utility model mode many employings screw, buckle connection knot Structure, installs, dismantles more flexible, convenient, and do not interfere with the recycling of material, parts.
(3) kerve is connected with using buckle-type between dividing plate with link slot, section bar, more adjusts dividing plate Site error remains space, thus greatly reduces the requirement to construction precision, operates the simplest, Construction period is shorter.
(4) dividing plate can use fire proofing material, each parts junction can arrange fire prevention Expandable strip and sealing strip, Can play preferably stable, seal, sound insulation and flameproof effect, be more suitable for fire prevention, soundproof effect requirement Higher position is widely popularized use.
Accompanying drawing explanation
Above-mentioned is only the general introduction of technical solutions of the utility model, in order to it is new to better understand this practicality The technological means of type, makees the most in detail this utility model with detailed description of the invention below in conjunction with accompanying drawing Describe in detail bright.
Fig. 1 is the overall structure schematic diagram of this utility model finished partition wall.
Fig. 2 be in Fig. 1 AA to profile.
Fig. 3 be in Fig. 1 BB to profile.
Detailed description of the invention
Referring to shown in Fig. 1, this utility model provides a kind of integral module assembled finished partition wall, On the existing design dividing plate 1 architecture basics with shape of peripheral frame, will join between dividing plate 1 and shape of peripheral frame Close and connect, then shape of peripheral frame is connected with side wall by vertical keel, fixing groove, and pass through sky, Groove is connected with top board and ground.
Refer to Fig. 2, shown in 3, integral module assembled finished partition wall of the present utility model, bag Include the sky groove 31 for being fixed on end face and for being fixed on the geosyncline 32 on ground, also include being located at described A plurality of vertical keel 5 between it groove 31 with geosyncline 32 and be located between adjacent vertical keel 5 every Plate 1;First section bar with dividing plate installing port, and sky it is respectively mounted on described sky groove 31 and geosyncline 32 On groove 31, geosyncline 32 the dividing plate installing port position of described first section bar relatively, opening in opposite directions, described every The lower edges correspondence of plate 1 is arranged on the dividing plate installing port of the first section bar on described sky groove 31, geosyncline 32 In;Second section bar with dividing plate installing port it is respectively mounted on described a plurality of vertical keel 5, Inwardly, other are the most imperial for two vertical keels 5 unilateral installation second section bar in outside and dividing plate installing port Bone 5 bilateral installs the second section bar and dividing plate installing port outwardly, edge, the left and right correspondence peace of described dividing plate 1 Be contained between adjacent two vertical keels 5 position relatively, in opening dividing plate installing port in opposite directions;Described An at least fixing groove being also associated with for being connected with metope on outermost two vertical keels 5.
Being fixed on body of wall with three sides together shown in Fig. 1 below, side is fixed with the double-deck glass of section bar As a example by glass partition wall, illustrate the knot of integral module assembled finished partition wall of the present utility model Structure designs.
Please refer to Fig. 2, shown in 3, in this embodiment, described first, second section bar is all by two The subtype material that block is mutually lapped is constituted, and specifically, the shape of peripheral frame of employing relates to three kinds of structure shapes altogether Formula, is subtype material 2, subtype material 10 and subtype material 11 respectively.Wherein it is arranged on vertical keel 5 Second section bar and the first section bar being connected on geosyncline 32 are made up of two blocks of subtype materials 2 respectively, and connect The first section bar being connected on day groove 31 is made up of one block of subtype material 10 and one block of subtype material 11.
Referring to shown in Fig. 2, the vertical keel 5 near side wall realizes removable with body of wall by fixing groove Unloading connection, described fixing groove includes the kerve 7 being spirally connected with body of wall, and the link slot 6 of kerve 7 clamping, Link slot 6 is spirally connected with vertical keel 5.Due to kerve 7 and link slot 6 clamping so that between the two Spacing scalable, for construction provide convenient.
Fixed form between dividing plate 1 and side wall may be designed as: is first snapped fit onto respectively by two pieces of dividing plates 1 In dividing plate installing port in two blocks of subtype materials 2, form unified modules, then be utilized respectively connector 4 general Unified modules is connected on vertical keel 5.Wherein, connector 4 has " L " shape section, described " L " A limit be spirally connected with subtype material 2, another limit and vertical keel 5 clamping.Vertical keel 5 is square Shape pipe, vertical keel 5 and custom plug-in clamping, custom plug-in is respectively together with sky, geosyncline 31,32 It is bolted on end face, ground.
Please refer to shown in Fig. 3, the fixed form between dividing plate 1 and end face, ground may be designed as: It groove 31, geosyncline 32 are screwed onto on end face and ground respectively, clamping respectively on sky groove 31, geosyncline 32 First section bar.Wherein, the first section bar being connected on day groove 31 is by one block of subtype material 10 and one piece of son Section bar 11 is mutually lapped composition, on the upper edge of two pieces of dividing plates 1 and subtype material 10, subtype material 11 The clamping respectively of dividing plate installing port;The first section bar being connected on geosyncline 32 is made up of two blocks of subtype materials 2, The lower edge of two pieces of dividing plates 1 and the clamping respectively of the dividing plate installing port on subtype material 2.Further, front, Being additionally provided with light modulation louver 8 between rear two pieces of dividing plates 1, light modulation louver 8 is screwed onto on subtype material 10.
In said structure, dividing plate 1 can use existing conventional glass, wood veneer or steel panel Etc. material.It is also preferred that the left dividing plate can use fire proofing material, each parts junction also can arrange anti-further Fire Expandable strip.Additionally, also can sky groove 31 and end face, geosyncline 32 and ground, kerve 7 and side wall, Between shape of peripheral frame and dividing plate 1, connector 4 and vertical keel 5, software sealing strip is set, can play more Good stable, seal, sound insulation and flameproof effect.When dividing plate is spliced by multi-sheets, it is possible to Bonding adhesive tape between sheet material, playing sound insulation, decorates and protects the effect of dividing plate.In practice, permissible As required, on the basis of said structure, the finished product designing various concrete structure cuts off.
Owing to using above technical scheme, integral module assembled finished partition wall of the present utility model, Use customization section bar as supporting construction, configure finished product dividing plate, at the base ensureing partition wall structural strength On plinth, employing buckle, be spirally connected etc. removably connects into unified modules, assembles, and has dismounting side And do not interfere with the advantage of recycling of material, parts just,.Wherein, kerve and link slot, Using buckle-type to be connected between dividing plate with section bar, the site error more adjusting dividing plate remains space, from And greatly reduce the requirement to construction precision, and operate the simplest, construction period is shorter.Further, Dividing plate can use fire proofing material, each parts junction can arrange fire prevention Expandable strip and sealing strip, can play The most stably, sealing, sound insulation and flameproof effect.
The above, be only preferred embodiment of the present utility model, not makees this utility model Any pro forma restriction, those skilled in the art utilize the technology contents of the disclosure above to make a little letter Single amendment, equivalent variations or modification, all fall within protection domain of the present utility model.

Claims (10)

1. an integral module assembled finished partition wall, it is characterized in that, including for being fixed on the sky groove of end face and for being fixed on the geosyncline on ground, also include a plurality of vertical keel being located between described sky groove and geosyncline and the dividing plate being located between adjacent vertical keel;
First section bar with dividing plate installing port it is respectively mounted on described sky groove and geosyncline, and on sky groove, geosyncline the dividing plate installing port position of described first section bar relatively, opening in opposite directions, the lower edges correspondence of described dividing plate is arranged on described sky groove, geosyncline in the dividing plate installing port of the first section bar;
Second section bar with dividing plate installing port it is respectively mounted on described a plurality of vertical keel, the second section bar and dividing plate installing port are installed inwardly in the most outermost two vertical keel one side, other vertical keel bilaterals install the second section bar and dividing plate installing port outwardly, edge, the left and right correspondence of described dividing plate be arranged between adjacent two vertical keels position relatively, in opening dividing plate installing port in opposite directions;
An at least fixing groove being also associated with for being connected with metope on described outermost two vertical keels.
A kind of integral module assembled finished partition wall the most according to claim 1, it is characterised in that described fixing groove includes the kerve for being connected and the link slot with kerve clamping with metope, and described link slot removably connects with described vertical keel.
A kind of integral module assembled finished partition wall the most according to claim 1, it is characterised in that described second section bar is removably connected with vertical keel by connector.
A kind of integral module assembled finished partition wall the most according to claim 3, it is characterised in that described connector one end is connected on described vertical keel, and the other end is screwed onto on described second section bar.
A kind of integral module assembled finished partition wall the most according to claim 1, it is characterised in that described first section bar and described sky groove, geosyncline clamping.
A kind of integral module assembled finished partition wall the most according to claim 1, it is characterised in that four limits of described dividing plate are connected in the dividing plate installing port of correspondence respectively.
Integral module assembled finished partition wall the most according to claim 6, it is characterised in that be additionally provided with the sealing strip for sealing described dividing plate four limit in the dividing plate installing port of described correspondence.
8. according to a kind of integral module assembled finished partition wall described in any one of claim 1-7, it is characterised in that described dividing plate includes forward and backward two-layer dividing plate, accordingly, described first and second section bars is respectively equipped with former and later two dividing plate installing ports.
A kind of integral module assembled finished partition wall the most according to claim 8, it is characterised in that described first, second section bar respectively includes that two blocks of subtype materials being mutually lapped, former and later two dividing plate installing ports described are separately positioned on two blocks of subtype materials.
Integral module assembled finished partition wall the most according to claim 8, it is characterised in that be additionally provided with light modulation louver in the middle of described two-layer dividing plate, described light modulation louver is arranged on described first section bar.
CN201620013706.6U 2016-01-07 2016-01-07 Integral module ization fabricated product partition wall Expired - Fee Related CN205577169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620013706.6U CN205577169U (en) 2016-01-07 2016-01-07 Integral module ization fabricated product partition wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620013706.6U CN205577169U (en) 2016-01-07 2016-01-07 Integral module ization fabricated product partition wall

Publications (1)

Publication Number Publication Date
CN205577169U true CN205577169U (en) 2016-09-14

Family

ID=56882094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620013706.6U Expired - Fee Related CN205577169U (en) 2016-01-07 2016-01-07 Integral module ization fabricated product partition wall

Country Status (1)

Country Link
CN (1) CN205577169U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130704A (en) * 2017-06-27 2017-09-05 江苏建筑职业技术学院 A kind of passive ventilated energy-saving wall of module pin-connected panel
CN107227810A (en) * 2017-07-21 2017-10-03 东莞市宽铭家具制造有限公司 Multifunctional glass partition wall
CN107460977A (en) * 2017-07-28 2017-12-12 浙江亚厦装饰股份有限公司 A kind of building method of the bridge cut-off partition wall snapped connection and the bridge cut-off partition wall
CN108797850A (en) * 2018-07-13 2018-11-13 佛山市欧玛斯装饰工程有限公司 A kind of partition wall with high fire-protection rate
CN108978954A (en) * 2017-05-31 2018-12-11 北新集团建材股份有限公司 A kind of assembled wall body structure and its installation method
CN109057093A (en) * 2018-07-26 2018-12-21 浙江亚厦装饰股份有限公司 Partition wall side closing in component and method
CN110593458A (en) * 2019-08-26 2019-12-20 中国五冶集团有限公司 Assembly method of heat-preservation and heat-insulation wall
CN115233869A (en) * 2022-09-01 2022-10-25 长春铸诚实业股份有限公司 Modular wall split type top-bottom rail and construction process thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978954A (en) * 2017-05-31 2018-12-11 北新集团建材股份有限公司 A kind of assembled wall body structure and its installation method
CN107130704A (en) * 2017-06-27 2017-09-05 江苏建筑职业技术学院 A kind of passive ventilated energy-saving wall of module pin-connected panel
CN107130704B (en) * 2017-06-27 2022-05-03 江苏建筑职业技术学院 Module assembled passive ventilation energy-saving wall
CN107227810A (en) * 2017-07-21 2017-10-03 东莞市宽铭家具制造有限公司 Multifunctional glass partition wall
CN107460977A (en) * 2017-07-28 2017-12-12 浙江亚厦装饰股份有限公司 A kind of building method of the bridge cut-off partition wall snapped connection and the bridge cut-off partition wall
CN108797850A (en) * 2018-07-13 2018-11-13 佛山市欧玛斯装饰工程有限公司 A kind of partition wall with high fire-protection rate
CN109057093A (en) * 2018-07-26 2018-12-21 浙江亚厦装饰股份有限公司 Partition wall side closing in component and method
CN109057093B (en) * 2018-07-26 2023-09-19 浙江亚厦装饰股份有限公司 Partition side closing-in assembly and method
CN110593458A (en) * 2019-08-26 2019-12-20 中国五冶集团有限公司 Assembly method of heat-preservation and heat-insulation wall
CN115233869A (en) * 2022-09-01 2022-10-25 长春铸诚实业股份有限公司 Modular wall split type top-bottom rail and construction process thereof
CN115233869B (en) * 2022-09-01 2024-04-19 长春铸诚实业股份有限公司 Modularized wall split top-bottom rail and construction process thereof

Similar Documents

Publication Publication Date Title
CN205577169U (en) Integral module ization fabricated product partition wall
CN201826414U (en) Modular disassembly and assembly partition wall
CN211774823U (en) Assembled light partition wall
CN205348471U (en) Finished product partition wall
CN205875404U (en) Log cabin group that dismantles log cabin of storing and have it is built in easy installation
CN104032919A (en) Paper honeycomb compound wallboard and installation method thereof
CN201141162Y (en) Modularized partition plate
CN207700463U (en) A kind of connection structure of glass curtain wall vertical decorative panel
CN201730218U (en) Hidden frame double glass module type partition wall
CN203347172U (en) Plastic mesh support for plastic-wood sauna board
CN111042425A (en) Integrated decorative suspended ceiling
CN112144922A (en) Assembled bathroom convenient to installation
CN105534253A (en) Curtain box assembly and installing method thereof
JP5026140B2 (en) Window frame decorative material, window frame structure and building
CN205390864U (en) Basin cabinet board
CN210177824U (en) Movable board house roof waterproof construction
CN209924347U (en) Mounting structure of interior decoration board
CN217299611U (en) Interior decoration decorates wallboard
CN220164127U (en) Detachable decorative baffle
CN211396153U (en) Wooden tripe curtain decorative structure that parametric cutting was arranged
CN215948756U (en) Panel convenient to assemble
CN219158273U (en) Structure is assembled with composite sheet to leveling vertical hanging fossil fragments
CN215564089U (en) Fishbone type clamping piece for mounting assembly type wallboard
CN213773868U (en) Beautiful seam device of integration partition wall installation is decorated to assembled
CN220565592U (en) Assembled mounting system of background wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914

Termination date: 20190107