CN205562823U - Rock burst prediction system - Google Patents

Rock burst prediction system Download PDF

Info

Publication number
CN205562823U
CN205562823U CN201620369685.1U CN201620369685U CN205562823U CN 205562823 U CN205562823 U CN 205562823U CN 201620369685 U CN201620369685 U CN 201620369685U CN 205562823 U CN205562823 U CN 205562823U
Authority
CN
China
Prior art keywords
microprocessor
rock burst
prediction
service terminal
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620369685.1U
Other languages
Chinese (zh)
Inventor
王鹰
申少华
魏有仪
李立民
武琨璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201620369685.1U priority Critical patent/CN205562823U/en
Application granted granted Critical
Publication of CN205562823U publication Critical patent/CN205562823U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a rock burst prediction system belongs to rock burst prediction technique field, provides the rock burst prediction system that prediction accuracy is higher. Including microprocessor, vibration signal acquisition element, stress signal acquisition element and service terminals, vibration signal acquisition element includes signal amplifier and a plurality of vibration sensor, and what a plurality of vibration sensor set up side by side is connected with signal amplifier, and signal amplifier and microprocessor are connected, stress signal acquisition element includes data acquisition unit and polylith foil gage, the polylith foil gage set up side by side with the data acquisition unit connection, the data acquisition unit is connected with microprocessor, microprocessor and service terminals are connected. Through setting up vibration signal acquisition element and stress signal acquisition element simultaneously, can gather the vibration condition and the stress condition of rock mass simultaneously, can improve the accuracy of prediction.

Description

A kind of Prediction for Rock Burst system
Technical field
This utility model relates to Prediction for Rock Burst technical field, particularly relates to a kind of Prediction for Rock Burst system.
Background technology
The Power geological disaster phenomenon that the elastic strain energy gathered in fragility country rock body when rock burst is High Ground Stress Areas Underground Engineering Excavation discharges suddenly and occurs.Low intensive rock burst shows as country rock and peels off, and has the sound, has blast, dangerous relatively small;The rock burst of high intensity show as country rock launch, avalanche, produce bigger dust and air-shock wave, rock mass and earth's surface the most also can be made to produce vibrations, be similar to micro-earthquakes.Rock burst geological disaster phenomenon directly threatens the safety of workmen, equipment, affects project progress, increases construction investment, it has also become one of global underground engineering difficult problem.From the point of view of world wide, rock burst all has generation in the engineering fields such as water power, traffic, mine and nuke rubbish underground disposal.And existing rock burst early warning system, the most only the vibration signal parameter of rock mass is monitored, its precision of prediction is limited, and existing rock burst early warning system, device somewhat expensive, the cycle that gets parms is longer, it is suitable with project progress actual demand collocation to be difficult to, therefore, a kind of fast simple, safe construction is produced and is particularly important by the device that precision of prediction height rock burst simultaneously occurs.
Utility model content
This utility model solves the technical problem that and is to provide a kind of precision of prediction higher Prediction for Rock Burst system.
This utility model solves its technical problem and be the technical scheme is that a kind of Prediction for Rock Burst system, including microprocessor, vibration signals collecting unit, stress signal collecting unit and service terminal;Described vibration signals collecting unit includes signal amplifier and multiple vibrating sensor, and what multiple vibrating sensors were set up in parallel is connected with signal amplifier, and signal amplifier is connected with microprocessor;Described stress signal collecting unit includes data acquisition unit and polylith foil gauge, and what polylith foil gauge was set up in parallel is connected with data acquisition unit, and data acquisition unit is connected with microprocessor;Microprocessor is connected with service terminal.
Further: described microprocessor is connected with service terminal wireless signal by wireless transmit/receive units.
Further: between wireless transmit/receive units and service terminal, be provided with data forwarding unit.
Further: also include that alarm, described alarm are connected with service terminal.
The beneficial effects of the utility model are: by arranging vibration signals collecting unit and stress signal collecting unit simultaneously, can Vibration Condition and stress situation to rock mass be acquired simultaneously, vibration signals collecting unit carries out signals collecting by arranging multiple vibrating sensor simultaneously, stress signal collecting unit carries out signals collecting by arranging multiple foil gauge, can effectively improve the accuracy of signals collecting, reduce detection error, and reduce the impact on detection data of the factors such as environment, and then finally can improve the precision of prediction.It addition, native system volume is little, cost is low, installs simple, and the monitoring network construction period is short, and repeatable utilization had the most both adapted to big cavity group, the Burst Prediction early warning of large-scale mine, is also applied for the deep-lying tunnel rock-burst monitoring early warning that monitoring investment is less.
Accompanying drawing explanation
Fig. 1 is this utility model schematic flow sheet;
Figure is labeled as: microprocessor 1, vibration signals collecting unit 2, stress signal collecting unit 3, service terminal 4, signal amplifier 5, vibrating sensor 6, data acquisition unit 7, foil gauge 8, wireless transmit/receive units 9, data forwarding unit 10, alarm 11.
Detailed description of the invention
With detailed description of the invention, this utility model is further illustrated below in conjunction with the accompanying drawings.
As shown in fig. 1, a kind of Prediction for Rock Burst system described in the utility model, including microprocessor 1, vibration signals collecting unit 2, stress signal collecting unit 3 and service terminal 4;Described vibration signals collecting unit 2 includes signal amplifier 5 and multiple vibrating sensor 6, and what multiple vibrating sensors 6 were set up in parallel is connected with signal amplifier 5, and signal amplifier 5 is connected with microprocessor 1;Described stress signal collecting unit 3 includes data acquisition unit 7 and polylith foil gauge 8, and what polylith foil gauge 8 was set up in parallel is connected with data acquisition unit 7, and data acquisition unit 7 is connected with microprocessor 1;Microprocessor 1 is connected with service terminal 4.
Wherein, vibration signals collecting unit 2 is the vibration signal parameter for gathering rock mass, should be arranged on equally distributed for multiple vibrating sensors 6 on tested rock mass in use, as the particular number of vibrating sensor 6 can be according to practical situation depending on;Vibrating sensor 6 can be used for being monitored the vibration signal characteristics parameter of rock mass, includes but not limited to: incident rate, amplitude, energy counting, incident duration, frequency distribution and the time difference;The data detected by vibrating sensor 6 are sent to microprocessor 1 after being amplified by signal amplifier 5 again and carry out data analysis.
Wherein, stress signal collecting unit 3 is for gathering the stress of rock mass, strain signal, should be arranged on equally distributed for polylith foil gauge 8 on tested rock mass in use, as the particular number of foil gauge 8 can be according to practical situation depending on;Foil gauge 8 can be used for the stress to rock mass, strain parameter is monitored;The data detected by foil gauge 8 carry out data analysis by being sent to microprocessor 1 after the preliminary treatment of data acquisition unit 7 again.
The data that vibration signals collecting unit 2 and stress signal collecting unit 3 collect can be processed, analyze work by microprocessor 1 accordingly, and corresponding data is sent to service terminal 4, in order to related personnel knows the data of collection in time.It addition, alarm 11 be may further be provided, alarm 11 is connected with service terminal 4, so when finding the data exception that vibration signals collecting unit 2 and/or stress signal collecting unit 3 collect, can be reported to the police by alarm.
Furthermore, it is contemplated that service terminal 4 generally arrange from microprocessor 1 farther out, for the ease of install, can by between service terminal 4 and microprocessor 1 data transmit use wireless transmission method, accordingly, wireless transmit/receive units 9 is set at microprocessor 1 end.It addition, data forwarding unit 10 also can be provided with between wireless transmit/receive units 9 and service terminal 4, to improve the distance that data are effectively transmitted, adapt to service terminal 4 from microprocessor 1 situation farther out.
The above; it is only preferred embodiment of the present utility model; not in order to limit this utility model; all in the case of not paying creative work; the any modification, equivalent substitution and improvement etc. done in spirit of the present utility model and principle, within should be included in protection domain of the present utility model.

Claims (4)

1. a Prediction for Rock Burst system, it is characterised in that: include microprocessor (1), vibration signals collecting unit (2), stress signal collecting unit (3) and service terminal (4);Described vibration signals collecting unit (2) includes signal amplifier (5) and multiple vibrating sensor (6), and what multiple vibrating sensors (6) were set up in parallel is connected with signal amplifier (5), and signal amplifier (5) is connected with microprocessor (1);Described stress signal collecting unit (3) includes data acquisition unit (7) and polylith foil gauge (8), and what polylith foil gauge (8) was set up in parallel is connected with data acquisition unit (7), and data acquisition unit (7) is connected with microprocessor (1);Microprocessor (1) is connected with service terminal (4).
2. Prediction for Rock Burst system as claimed in claim 1, it is characterised in that: described microprocessor (1) is connected with service terminal (4) wireless signal by wireless transmit/receive units (9).
3. Prediction for Rock Burst system as claimed in claim 2, it is characterised in that: between wireless transmit/receive units (9) and service terminal (4), it is provided with data forwarding unit (10).
4. the Prediction for Rock Burst system as described in claim 1,2 or 3, it is characterised in that: also include that alarm (11), described alarm (11) are connected with service terminal (4).
CN201620369685.1U 2016-04-28 2016-04-28 Rock burst prediction system Expired - Fee Related CN205562823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620369685.1U CN205562823U (en) 2016-04-28 2016-04-28 Rock burst prediction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620369685.1U CN205562823U (en) 2016-04-28 2016-04-28 Rock burst prediction system

Publications (1)

Publication Number Publication Date
CN205562823U true CN205562823U (en) 2016-09-07

Family

ID=56804050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620369685.1U Expired - Fee Related CN205562823U (en) 2016-04-28 2016-04-28 Rock burst prediction system

Country Status (1)

Country Link
CN (1) CN205562823U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107589026A (en) * 2017-09-05 2018-01-16 辽宁工程技术大学 A kind of bump analogue means and wireless data acquisition system
CN110318808A (en) * 2019-06-25 2019-10-11 武汉工程大学 A kind of Rockburst Prediction Method introducing gradient stress

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107589026A (en) * 2017-09-05 2018-01-16 辽宁工程技术大学 A kind of bump analogue means and wireless data acquisition system
CN107589026B (en) * 2017-09-05 2020-09-11 辽宁工程技术大学 Rock burst simulator
CN110318808A (en) * 2019-06-25 2019-10-11 武汉工程大学 A kind of Rockburst Prediction Method introducing gradient stress

Similar Documents

Publication Publication Date Title
CN203204791U (en) Multiparameter landslide and mud-rock flow monitoring early warning system
CN204462405U (en) A kind of rock burst omen early warning system based on acoustic emission
CN103852522B (en) The method of framing scaffold safety monitoring and early warning
CN103777232A (en) Deep rock mass rock blasting forecasting and early warning method based on blast vibration monitoring
CN202469500U (en) Natural gas transmission pipeline leakage monitoring and positioning device
CN108802825A (en) A kind of monitored by infrasonic wave coal rock dynamic disaster localization method and positioning system
CN103742131B (en) With the time difference real time extracting method boring sound wave underground signal Acquire and process system
CN102021919A (en) Foundation pit wireless monitoring and alarming device and monitoring method
CN103996269A (en) Wireless data collecting control system
CN104088668B (en) The monitoring method of SLF electromagnetic induction monitoring early warning coal rock dynamic disaster
CN205562823U (en) Rock burst prediction system
CN204212809U (en) A kind of novel intelligent safety for tunnel engineering monitoring system
CN102288984A (en) Earthquake sound sensing unit structure for imminent earthquake monitoring of earthquake
CN102563364A (en) Monitoring and positioning device for leakage of gas delivery pipe
CN204476480U (en) A kind of Mine Monitoring prior-warning device
CN202832658U (en) Tunnel engineering intelligent monitoring and alarming system
CN104912552A (en) Coal-rock mass ground stress distribution feature detection method and coal-rock mass ground stress distribution feature detection device
CN205015487U (en) Side slope rock mass monitoring system
CN202689012U (en) Side slope protecting monitoring system
CN207601015U (en) A kind of sound emission slope rock mass stability real time on-line monitoring system
CN101936014B (en) On-line real-time monitoring method for safety stability of foundation pit during stratum vibration
CN112362754A (en) Device and method for monitoring stability of filling body in real time by combining acoustic emission and infrasound
CN108801450B (en) Deep rock mass vibration monitoring system and method based on acceleration sensor steel pipe
CN203849835U (en) Wireless data acquisition control system
CN103410569A (en) Metal mine downhole microseismic monitoring system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20170428